Key Performance Metrics and End-to-End Testing

Tim Jenness

Page 2: Key Performance Metrics and End-to-End Testing Tim Jenness

2

Key Performance Metrics

• LSST Science Requirements (LPM-17) and LSST System Requirements (LSE-29) specify the performance of LSST.

• Key Performance Metrics (KPM) are important metrics used to monitor pipeline development.

• They are monitored annually.

Page 3: Key Performance Metrics and End-to-End Testing Tim Jenness

3

Page 4: Key Performance Metrics and End-to-End Testing Tim Jenness

4

End-to-End Testing

• Raw data on disk to visualization of catalogs and images in a web browser.

• Does not have to be fully automated. Manual intervention is okay.

• What are we missing?• Do we have enough of a system to calculate

S15 KPMs? Which can’t we attempt?

Page 5: Key Performance Metrics and End-to-End Testing Tim Jenness

5

End-to-End Testing

• Alert Production end-to-end requires OCS and other infrastructure.– diffim performance only.

• Focus on Data Release Production– Use HSC data– Use NCSA systems– Scale to LSST for performance metrics.

• Five sessions at this meeting.