kerio valley development authority 2014 – 2018
TRANSCRIPT
I
l,
KERIO VALLEY DEVELOPMENT AUTHORITY
2014 – 2018
“Integrated Planning for Sustainable resource utilization, Socio-cultural, Political and Economic Development in
Realization of Vision 2030”
“Integrated
II
KVDA’s OPERATION AREA
III
Foreword
The preparation of KVDA Strategic Plan (2014-2018) was guided by the Constitution of Kenya 2010, Vision 2030, Second Medium Term Plan (2013-2017), Regional Development Policy 2007, KVDA Act Cap 441 and Kerio Valley Integrated Regional Development Master Plan 2013-2033.
The plan was prepared through a consultative, collaborative and participatory process by stakeholders to
capture the needs of the communities within the region and takes cognizance of the National and County
Governments, dynamic environment, advancement of technology and the need for focused development.
The Strategic Plan is designed to mutually reinforce and ensure that Government policies are translated into actionable
programmes. In so doing, the Authority will position itself to meet the new challenges for a balanced integrated planning and
sustainable development in the region. The plan provides details on the priority projects the Authority will implement in the
region to meet its overall responsibility to the people. In order to reduce reliance on the exchequer and ensure sustainability of
the Authority, priority will be given to activities that generate revenue in addition to focusing on core mandate.
It is my conviction that the implementation of this Strategic Plan will impact the region positively.
SAM KONA
CHAIRMAN BOARD OF DIRECTORS
IV
Preface
Kerio Valley Development Authority (KVDA) is one of the six Regional Development Authorities (RDAs) in Kenya, established by an Act of Parliament CAP 441 with a mandate to, in part, initiate, plan and develop resources along the Kerio River basins. The Kerio Valley region covers the counties of West Pokot, Turkana, Baringo, Elgeyo Marakwet, Samburu and Nakuru Counties, with an estimated population of about 3 million people.
As part of carrying out its planning mandate, KVDA embarked on the preparation of the Strategic Plan (2014-
2018) that identifies development needs in the region and providing a roadmap for optimal utilization of
resources, with a view to improving livelihoods in the region. Through this Strategic Plan and subsequent ones
to come, KVDA will implement the Integrated Regional Development Master Plan (IRDMP) 2013-2033 for the next 20 years.
This five year Strategic Plan (2014-2018) aligns the development agenda to the IRDMP (2013-2033.) The Plan is geared towards
promotion of environmental sustainability, natural resource management, strengthening regional planning, resource mobilization
and capacity building to spur economic development through implementation of targeted programs and projects.
To deliver on the strategic objectives, the Authority will embark on re-engineering and restructuring of the existing institutional
framework. Greater emphasis will be on driving the organization towards achieving financial independence and promoting
programs that are complimentary to the region’s County Governments’ initiatives.
Our resolve is to conserve and manage the Kerio River Basin in a sustainable way and ensure that the Kerio ecosystem supports
sustainable economic development for the benefit of the people of Kenya.
DAVID KIMOSOP
MANAGING DIRECTOR
V
Acknowledgement
I would like to acknowledge first and foremost the strategic planning team that participated in retreats at Cheptebo and Eldoret
for their dedication and important contribution in steering the process of developing this Strategic Plan. The effort of all staff who
participated either directly or indirectly in this process deserves special commendation. We acknowledge the Institute of Directors
(Kenya) for their valuable contribution towards the finalization of this Strategic Plan. I also recognize the Board of Directors for
providing valuable contributions to the document, policy guidance and their unrelenting support in giving suggestions to improve
the document.
The Management would also like to appreciate the assistance and guidance from the Ministry of Environment, Water and Natural
Resources and especially the Cabinet Secretary Hon. Prof. Judy W. Wakhungu, OGW, the Principal Secretary State Department of
Water Mr. James Teko Lopoyetum and other senior staff of the Ministry who provided valuable support during preparation of this
Strategic Plan. It is my sincere hope that this Strategic Plan, which identifies our core priority areas of action, will spur economic
growth, promote equitable development and create employment in the vast region of Kerio Valley.
DAVID KIMOSOP MANAGING DIRECTOR
VI
Executive Summary
This Strategic Plan (2014-2018) is anchored on Vision 2030, the country’s development blueprint and the second Medium Term
Plan. It defines the Authority’s Vision, Mission, Objectives, Strategies and expected outputs to be achieved during the first period
of implementation of the Kerio Valley Integrated Regional Development Master Plan (2013-2033).
For the next five years, the Authority’s core functions will focus on those projects that create multiplier effect on outcomes to
achieve faster growth and address the development challenges particularly in food security, employment, poverty reduction and
environmental conservation. KVDA will re-engineer itself to meet these challenges for a balanced, integrated and sustainable
development in the region.
The strategy has identified three key strategic objectives to accelerate development in the region. These are: promote
sustainable environment and natural resource management, spur economic development and strengthen regional planning,
resource mobilization and institutional capacity.
The realization of these three strategic objectives will lead to creation of 20,000 direct and over 60,000 indirect jobs thereby
reducing unemployment and poverty levels in the region.
The amount required for implementation of this plan is estimated at Kshs.162 billion. The funding sources will include GOK
grants, development partners, Public Private Partnerships and internal revenue generation. The milestones to be achieved by this
strategy include;
Generation of about 125MW of H.E.P to the national grid from Arror (60MW), Embobut (45MW), Kimwarer (20MW)
multi-purpose projects thereby creating employment opportunities. Other potential energy sources to be explored include
Geothermal power in the region, wind energy, solar energy, biogas, petroleum and oil.
Conservation of the environment by raising and planting ten million assorted tree seedlings.
VII
Improved food security through irrigated agriculture of 55,180 ha out of the potential 300,028 ha within Kerio, Turkwel
and Baringo basins.
Raising and planting 5 million mango seedlings to empower communities.
Capacity building and technology transfer to communities.
The mandate and functions are executed through three (3) Directorates namely- Technical Services, Business and Strategy and
Corporate Services. During the plan period, the Authority will establish modern monitoring and evaluation techniques to improve
on operational efficiency.
VIII
Table of Contents
KVDA’s Operation Area ........................................................................................... II
Foreword ............................................................................................................... III
Preface ................................................................................................................... IV
Acknowledgement ................................................................................................... V
Executive Summary ............................................................................................... VI
Acronyms And Abbreviations ................................................................................... X
Chapter One: Introduction .................................................................................... 12
1.1 Background ...................................................................................................... 12
1.2 Location And Size ............................................................................................ 12
1.4 Poverty Levels And Insecurity In The Region ................................................. 14
1.5 KVDA’s Development Focus ............................................................................. 15
1.6 KVDA Strategic Plan (2014-2018) ................................................................... 16
1.7 Vision ............................................................................................................... 17
1.7.1 Mission Statement ........................................................................................ 17
1.8 Core Values ...................................................................................................... 17
Chapter Two: Situational Analysis ......................................................................... 18
2.1 Achievements Of The 2008-2012 Plan ............................................................ 18
2.2 Lessons Learnt ........................................................... Error! Bookmark not defined.
2.3 Swot Analysis Of KVDA .................................................................................... 20
Chapter Three: Strategic Objectives ..................................................................... 22
3.1.To Promote Sustainable Environment Protection And Natural Resource Management 22
IX
3.2. To Spur Economic Development ..................................................................... 22
3.3 To Strengthen Regional Planning, Resource Mobilization And Capacity Building 23
Chapter Four: Implementation Matrix/Plan ......................................................... 24
Chapter Five: Budget ............................................................................................. 31
5.1 Indicative Budget ............................................................................................ 31
5.4 Risk Management ............................................................................................ 43
Chapter Six ............................................................................................................ 44
6.0: Monitoring, Evaluation And Reporting (M, E&R) ........................................... 44
6.1Monitoring And Evaluation Framework ............................................................ 44
6.2 ME&R Indicators .............................................................................................. 44
6.3Monitoring, Evaluation And Reporting Model .................................................. 44
Annexes: ................................................................................................................ 45
X
Acronyms and Abbreviations
CBOs Community Based Organizations
CCTV Closed Circuit Television
CGs County Governments
GSM Global System for Mobile
H.E.P Hydro Electric Power
ICT Information Communication Technology
IGAS Income Generating Activities
IRDMP Integrated Regional Development Master Plan
ISO International Organization for Standardization
KFS Kenya Forest Service
Kshs Kenya Shillings
KVDA Kerio Valley Development Authority
KWTA Kenya Water Tower Agency
KWS Kenya Wildlife Service
LAPSSET Lamu Port Southern Sudan Ethiopia Transport
LBDA Lake Basin Development Authority
M&E Monitoring and Evaluation
MEWNR Ministry of Environment Water and Natural Resources
MOU Memorandum of Understanding
MW MegaWatts
NGOs Non-Governmental Organizations
XI
NIB National Irrigation Board
NYS National Youth Service
PPPs Public Private Partnerships
RDAs Regional Development Authorities
RWSB Rift Valley Water Services Board
SOPs Standard Operating Procedures
SWOT Strengths, Weaknesses, Opportunities and Threats
12 | P a g e
12
CHAPTER ONE: INTRODUCTION
1.1 Background
Kerio Valley Development Authority (KVDA) is a corporate legal entity established in 1979 as a Regional Development Authority
(RDA) under Cap 441 of the Laws of Kenya. The Authority is mandated to undertake River basin conservation and management
through integrated river basin based development programmes with the key objective of propelling development to improve the
region’s per capita income.
1.2 Location and Size
KVDA’s area of jurisdiction is located in the North Western part of Kenya and lies between Latitudes 00 10 South and 100 30
North; and longitudes 340 and 370 East. The area which includes the Counties’ of Baringo, Elgeyo-Marakwet, West Pokot,
Turkana, Samburu and Nakuru is approximately 107,759.18 square Kilometers, representing 19% of the land mass of Kenya
with over 80% being arid and semi-arid. The total projected human population in KVDA’s area of jurisdiction is 2,952,556 people
with rural and urban population of 2,583,486 and 369,070 respectively. The average region’s poverty index is 73.57 according to
2009 house and population census report.
The operational area is bounded by the drainage basins of Turkwel and Kerio rivers which drain into Lake Turkana. Other
drainage basins within the area include:-
i) Lakes Baringo and Bogoria drainage basin
ii) Suguta - Lake Lokipi drainage basin
iii) Tarach - Lotikipi drainage basin
13
Table 1: KVDA Geographical Coverage and Population Projections
County Population Projection Land area in sq. Kms
Growth Rate (%) 2009 2012 (Projected) 2017 (Projected)
Turkana 3.3 855,399 942, 908.83 1,109,101.55 71,597.8
West Pokot 3.1 555,561 608,846.41 709,252.83 8418.2
Samburu* 2.8 164,853 179,092 205,608.83 10,972.68
Baringo 2.6 512,690 553,728.6 629,555.08 11,050.21
Elgeyo Marakwet 3.0 369,998 404,306.8 468,702.4 3,049.7
Nakuru* 3.4 494,055 539,867.23 589,927.49 2,670.49
Total 2,952,556 3,228,749.87 3,712,148.18 107,759.08
Source: National census 2009 (used projection growth rate of 3% p.a)
NB: *The population figures for Samburu and Nakuru counties are only applicable to the area covered by KVDA
Table 2: County Development Index (CDI)
County Development Index (CDI) is computed using indices of poverty, infrastructure, health and Education as indicated in the table below. Poverty index Infrastructure Health Education County Development Index (CDI)
National Average 0.8098 0.4143 0.5881 0.3935 0.5204
County
Turkana 0.3250 0.4540 0.1853 0.1380 0.2697
Baringo 0.7840 0.3310 0.4110 0.3950 0.4438
Elgeyo-Marakwet 0.8340 0.3740 0.6247 0.4410 0.5365
West Pokot 0.7820 0.3263 0.3457 0.2655 0.3812
Samburu 0.5760 0.4483 0.3953 0.1770 0.3779
Source: CRA working paper 2012/01 (2009)
From the CDI ranking above, Turkana, Samburu, West Pokot, and Baringo have a CDI of 0.27, 0.38, 0.38 and 0.44 respectively and are classified as most marginalized with high levels of poverty, poor infrastructure, low literacy levels and inadequate health facilities. Elgeyo Marakwet County has a CDI of 0.54 and is thus classified as moderately marginalized.
14
1.3 Water Resources in Kerio Valley Region
The amount of renewable surface water in Kenya is estimated at 19.5 million m3 or 650 m3 per capita compared with the global
recommendation of 1,000 m3 per capita which means the country is chronically water scarce. Kerio Valley region is experiencing
challenges of water scarcity where communities travel for upto 20 km in search of water for domestic and livestock use. Surface
water resources in the region include both permanent and seasonal rivers, lakes, dams, ponds and water-pans that are mainly
used for hydropower generation, irrigation, domestic and livestock purposes. Groundwater is also an important resource that
supplements surface water in socio-economic development. The new radar technology developed by the French discovered an
aquifer with an estimated volume of 200 billion m3 at Lotikipi plains. The aquifer alone holds 900% more than Kenya’s current
water reserves (UNESCO, 2013) according to the findings. The development of the aquifer and other water resources will
improve the water availability in the region.
1.4 Poverty levels and insecurity in the region
The current national poverty rate is 45.2% while that of the region is indicated below;
Table 3. Poverty incidence in KVDA region
County Poverty rate (%)
Turkana 87.5
Baringo 52.2
Elgeyo Marakwet 52.7
West Pokot 66.3
Samburu 71.4
Source: Social-economic Atlas of Kenya (2014)
15
The 2005/2006 Kenya Integrated Household Budget survey indicates that some of the poorest constituencies in Kenya are found
in Kerio Valley region. For example Turkana Central Constituency (population census 2009) is ranked 210 out of 210
constituencies in the country. It is followed by Turkana South, Sigor, Kapenguria constituencies which are ranked 209, 186 and
184 out of 210 constituencies respectively.
Insecurity issues are also experienced in the region majorly manifesting itself in the form of cattle rustling, cross-border conflicts,
resource and cultural conflicts, affecting the development of the region.
1.5 KVDA’s Development Focus
KVDA was formed to promote sustainable River basin conservation and management through integrated development. It
undertakes programmes that promote environmental conservation, water development, food security, employment creation and
community empowerment. Specific activities include co-ordination and management of water bodies (ecosystem) including
abstraction and usage of water in the region, development and management of multipurpose dams, HEP generation, formulation
of basin-wide Integrated Regional Development Master Plans and other relevant plans, establish and manage up to-date river
basin natural resource data and information system necessary for planning and development of the region, provision of advisory
services to the National Government and other institutions on the resource based development and investment opportunities,
develop a broad consultative and collaborative framework with the private sector, development partners and other appropriate
agencies in developing the region through:-
(i) basin based resource studies,
(ii) knowledge and information sharing, and
(iii) technology transfer and capacity building,
In addition, the Authority is mandated to initiate, plan, promote, implement and manage sustainable integrated resource based
investments; undertake programmes and projects that promote resolution of basin based resource use conflicts; undertake
resource mobilization and investment activities in line with the National Government Investment Policy; and implement relevant
16
National Government Strategic programmes and perform other related functions and activities as may be necessary to promote
and sustain socio-economic development
It’s main objective is to deliver business solutions in River basin regional development for wealth creation and improve the living
standards of the people.
KVDA has vast and rich knowledge on the potential resources in the various counties within its region and thus acts as a
knowledge hub on resource potentials. It undertakes programmes to promote environmental conservation, water development,
food security, employment creation and community empowerment. For effective implementation of the planned projects the
Authority will work closely with both National and County Governments and development partners.
1.6 KVDA Strategic Plan (2014-2018)
This plan defines the Authority’s vision and mission statements and developed strategic direction to make it a better vehicle to
spur development in the region. The plan draws lessons learnt together with challenges encountered during implementation of
the previous Strategic Plan (2008-2012). It is the first short term plan towards the achievement and implementation of the Kerio
Valley Integrated Regional Development Master Plan (2013-2033).
17
1.7 Vision
To be a leading regional partner in integrated and sustainable economic development.
1.7.1 Mission Statement
To deliver sustainable business solutions in River Basin Development through prudent management of resources for economic
prosperity of the people.
1.8 Core Values
i) Integrity: As an Authority, we will be sincere and uncompromising in serving the public.
ii) Respectful: We will serve all people with courtesy and fairness.
iii) Accountability: We will conduct business in a transparent and accountable manner.
iv) Teamwork: We will cooperate and work together for the common good of the people.
v) Creativity and Innovation: We will nurture and adopt new technologies in our operations.
vi) Customer focus: We will endeavor to understand our customer needs and consistently strive to satisfy them.
18
CHAPTER TWO: SITUATIONAL ANALYSIS
2.1 Achievements of the Strategic Plan (2008-2012)
The implementation of the last Strategic Plan (2008-2012) achieved milestones:-
Development of the Integrated Regional Development Master Plan (IRDMP) which has mapped resources for optimal
utilization and provided a useful guide for development in the region.
Completion of six feasibility studies on the various areas to determine the viability of implementing the projects. These
include Arror Multipurpose project, Mango processing plant, Honey processing plant, lower Turkwel irrigation, greenhouse
technology and meat processing.
Introduction of green house technology and promotion of aquaculture as an alternative source to food security.
Supported farm forestry through raising and sale of 10 million assorted tree seedlings to institutions, individual farmers
and Non-Governmental Organizations (NGOs) for planting within Cherangany and other catchments.
Increase in land under irrigation by 500 ha. in existing irrigation projects at Tot, Arror and Ptokou/Sangat to improve food
security in the region.
Production of 6,000 beehives for community empowerment by improving the quality of honey produced in the region.
Construction of 10 (ten) small dams and 90 (ninety) water pans spread within the Kerio valley region.
Establishment of three additional community empowerment projects i.e. fish farming in Weiwei, green houses in Kerio
Roses and Lodwar.
Establishment of Livestock Improvement Programme in Chemeron, Baringo County.
Review of terms and conditions of service, recruitment of management staff has improved operational efficiency and
motivation of staff.
However, some projects were not completed and are at various stages of implementation. The same will be progressed during
the current plan period.
Wei wei Phase III Irrigation Scheme which targets to put 325 hectares of land under irrigation to support food security.
Development of Nairobi business centre and KVDA plaza southern wing involving development of commercial properties
to enhance revenue streams.
Development of Arror Multipurpose for production of 60MW of hydro power and irrigation of over 2,500 ha. of land
19
2.2 Lessons Learnt
These are the lessons learnt from the last Strategic Plan and strategies adopted by management to address the constraints encountered
Lessons Learnt Strategy to Address Issues
a) Delay in release of funds affect project implementation - To form an internal desk to follow release of funds by the Government
- Initiate new revenue sources
b) Motivation of employees inhibits productivity Improve the terms and conditions of service
c) Limited public awareness of the Authority activities - Develop and implement an effective communication strategy
- Strengthen linkages with development partners, Government Ministries
- Rebranding of the Authority
d) Ownership of assets affects operations/development - Registration of Authority’s assets
- Engage relevant Government agencies
- Land acquisition, leasing, crop sharing and farm contracting arrangements.
- Processing of titles for land donated by communities.
e)Weak stakeholders linkages affects pooling of resources - Establish greater linkages with all stakeholders and development partners
- Strengthen Regional offices for better coordination
- Holding of stakeholders fora.
g) Weak monitoring and evaluation mechanisms. - Strengthen the Monitoring and Evaluation structure by developing M&E framework.
- Adopt an effective reporting and feedback mechanism to inform and disseminate
performance progress to both internal and external customers
h)Lack of political good will affects project implementation Engage local leaders in project planning and implementation.
20
2.3 SWOT ANALYSIS OF KVDA
A summary of the institutional SWOT analysis is given below:
Strengths Sustainability Strategy
Existence of enabling Act (cap 441 laws of Kenya) Review the Act in line with the constitution
Existence of an Integrated Regional Master Plan (2013-2033) for focused
development and optimal resource utilization
Publicity and advocacy of IRDMP and forging partnerships in its Implementation
Ownership of capital assets e.g. KVDA Plaza, Turkwel dam, heavy
machinery, residential houses and plots
Securing ownership/maintaining existing assets and developing new ones to
increase revenue
Established business units that can be expanded Develop business plans to make them stand alone business units
Existence of an approved staff establishment which provides for optimum
staffing
Regular reviews of terms and conditions of service to be in tandem with market
trends
Availability of research papers, feasibility reports, concept papers and
project proposals for funding implementation or resource mobilization
Digitization of the documents, Publication, review and mobilizing funds for
implementation
Existence of performance management tools for example balance score
card, performance contracting and SOPS (standard operating procedures )
Regular evaluation and review of the documents to ensure they remain
effective
Cordial relationship with the stakeholders Nurture and foster the relationships through MOUs and stakeholder
engagements
Committed workforce Regular review of motivational strategies and reward systems
Weaknesses Mitigation Strategy
Limited public awareness of the Authority activities Intensification of publicity and advocacy for Authority programmes and
activities
Inadequate government funding leading to pending bills Strengthening existing IGAs and partnering with development agencies
Inadequate technical personnel. Training existing staff and Recruitment of required personnel on need basis
Under-utilization of KVDA assets Identify potential use of assets, develop proposal and implement
Inappropriate land tenure system Liaise with county governments and ministry of lands for land demarcation for
issuance of title deeds in the region.
21
Opportunities Exploitation Strategy
Potential for establishment of agro-business industries (abattoirs,
tanneries, maize shelling, cooling plants).
Undertake feasibility studies and spearhead value chain processes (industries,
production, infrastructure, market) in agro business
Untapped mineral deposits that can be commercially exploited (oil in
Turkana & Marble in Koitilial in Elgeyo Marakwet).
Spearhead mining and production of minerals whose deposits have been
determined to be viable
Availability of labour force. Nurture diversity and tap the relevant talent for maximum production while
giving preference to youth, women and people with special needs
Untapped tourism potentials. Spearhead the region as a tourist destination of choice in conjunction with
National and county Governments and private sector
Existence of Eldoret International Airport. Utilize the facility for channeling the products and tourist to/from international
destinations
Planned infrastructural development; LAPSSET project, fibre optic and
standard gauge railway among others.
Develop key facilities such as tourist resorts to benefit from the LAPPSET, go
downs and cold rooms along the standard gauge railway
Potential linkages with partners e.g. Research institutions, Universities,
NGO’s and CBOs and county Governments.
Regular engagement with relevant institutions through MOUs to improve
products and services
Existence of national blue print the Kenya Vision 2030. Anchor our programmes and activities to the national blue print.
Devolved government. Engage county governments in the implementation and management of
resources and programmes
Threats Intervention Strategy
Rampant environmental degradation arising from destruction of water
catchment areas
Develop and implement an action plan with stakeholders for environmental
conservation and protection of the region
Global warming Spearhead environmental conservation initiatives with stakeholders
Prevalence of livestock diseases Engage partners to establish disease free zones and provide veterinary
services and regular advocacy on diseases
Low literacy levels Engage partners to establish learning institutions at all levels
Insecurity in the region resulting from banditry, cattle rustling and
proliferation of small arms
Spearhead peace building initiatives with other stakeholders in the region
22
CHAPTER THREE: STRATEGIC OBJECTIVES
The following shall be the strategic objectives that the Authority shall endeavour to fulfill in the next five years.
3.1. To Promote Sustainable Environment protection and Natural Resource Management
KVDA region is richly endowed with natural resources such as land, water, wildlife, minerals, and forests that have not been fully
utilized. Water infrastructure is not well developed hence leading to water deficiency in the region. Moreover, the region
experiences disasters such drought, landslides, deforestation, flooding and soil erosion which have adversely affected the
environment.
During the plan period, KVDA will spearhead conservation efforts of the catchment areas, develop water resources and storage
for irrigation, domestic and livestock use. In addition, the Authority will develop other natural resources such as energy, minerals,
tourism and wildlife.
3.2 To Spur Economic Development
The region is 80% arid and semi-arid with pastoralism being the main economic activity. It has enormous resources including
land, water, forestry resources, livestock and fisheries, energy, tourism and wildlife, minerals, human resources and is
strategically positioned to both local and regional markets. However, these resources remain largely untapped due to high
poverty levels (73.57%), insecurity, illiteracy, poor infrastructure and marketing channels.
KVDA will promote economic development together with stakeholders by exploiting the available resources to benefit the
communities. The Authority will promote value addition and value chain development in agricultural products, livestock and
fisheries, minerals, tourism; promote industrialization, promote development of SMEs. In doing these, the Authority will also
create revenue streams and promote businesses that will enhance its asset base and create wealth for sustainability. In addition,
the Authority will partner with stakeholders to undertake infrastructural development in energy, access roads, water and ICT.
The Authority shall strive to ensure that its programs lead to equitable development within the region.
23
3.3 To Strengthen Regional Planning, Resource Mobilization and Capacity Building
In the past, regional planning lacked clear focus due to insufficient data and inadequate coordination among stakeholders. The
Integrated Regional development master plan (2013-2033) has mapped resources in the region and will be used to strengthen
regional planning. In addition the Authority will undertake research and provide consultancy services for effective project
implementation. In the past, the Authority heavily relied on the exchequer for its financial requirements. During the plan period it
will forge partnerships by engaging with GOK, PPPs, and development partners to mobilize resources for sustainable project
implementation.
The Authority previously lacked diversity in several areas and in the next five years it is committed to progressively address the
imbalances in gender, ethnicity, youth and people with special needs.
The organization structure that has been in place did not effectively support the Authority’s development agenda. During the plan
period, the Authority will implement the new organizational structure and human resource policies. Previously, staff appraisals
were ad hoc with little impact. This is expected to change with the introduction of balance score card to improve organizational
performance.
24
CHAPTER FOUR: IMPLEMENTATION MATRIX/PLAN
This chapter outlines the Strategic objectives, key result areas, operational objectives, activities, performance indicators and
performance targets to guide implementation of the strategy. –
Strategic objective 1: To promote sustainable Environment and Natural Resource Management.
Operational Objective Key Result Areas
Activities Performance Indicators
Performance Targets during the Period
2014/15 2015/16 2016/17 2017/18 2018/19
To Conserve Catchment areas in the region ( Kerio , Suam /Turkwel, Lotikipi plain, Lake Turkana, lake Baringo/Bogoria and Suguta river basins )
Rehabilitation, Conservation and Protection of the catchments
Raising of assorted seedlings
5 million assorted fruit seedlings including temperate fruits raised
0.5m
1m
1.2m
1.5m
1.8m
6 million tree seedlings raised
1.2m 1.2m 1.2m 1.2m 1.2m
Planting and management of seedlings in partnership with other stakeholders
11 million Seedlings Planted
0.5m
1m
1.2m
1.5m
1.8m
-Raise giant bamboo seedlings
100,000 bamboo seedlings raised
20,000
20,000
20,000
20,000
20,000
Construction of electric fence around Cherangany watershed
50 km electric fence erected
-
5
10
15
20
Protection of riparian areas along river banks
10 km riparian areas along river banks protected
2
2
2
2
2
Promote farm forestry (woodlots establishment )
500 no. contact farmers engaged
100
100
100
100
100
Publicity and awareness campaigns Publicity
5 no. stakeholder meetings held
1
1
1
1
1
5 No. of advocacy initiatives on environment
1
1
1
1
1
25
Support mitigation measures on landslide prone areas, restoration and resettlement of victims with other stakeholders
400 No. of household resettled to suitable settlement
-
100
100
100
100
- Promote community alternative sources of livelihood
500 Beehives 100
100
100
100
100
-Promote Climate change adaptation and mitigation
Sensitize 500 no. farmers on carbon credit trading
100
100
100
100
100
To develop Water harvesting and storage facilities and increase per capita water storage
Improved water availability for irrigation, water supply and H.E.P generation
Construction of water pans/small dams
400 No. of water pans 80 80 80 80 80
50 small dams constructed
- 10 10 15 15
Drilling of boreholes 5 no. boreholes drilled
1 1 1 1 1
Construction of 9 no. multipurpose dams
3 no. dams (Arror, Kimwarer and Embobut) completed and 6 others
- 3 2 2 2
To develop water and irrigation infrastructure
Efficient water supply infrastructure for irrigation
Development of Irrigation infrastructure to support 55,180ha of land out of 300,028 ha.
19No. irrigation schemes developed
7No. (20,329ha)
3No (8,713ha)
3No. (8,713ha)
3No. (8,713ha)
3No. (8,713ha)
To map and exploit Mineral resources for economic utilization (marble and limestone)
Increase supply of building materials
Survey and delineate the potential sites
5No. of sites mapped and 5 no. survey reports
1 1 1 1 1
Construct and equip marble processing plants
3No. marble extraction and processing plant
- 1 - 1 1
26
Strategic objective 2: To Spur Economic Development
Operational Objective
To promote crop and livestock production and also undertake value addition in the following areas:
Key Result Areas
Activities Performance Indicators
Performance Targets during the Period 2014/15
2015/16
2016/17
2017/18
2018/19
Facilitate
infrastructure and
technology transfer in
horticulture
production
Increase in income
levels
Production of
horticultural crops
4,500 fruits
produced
500 800 1,000 1,100 1,000
production of
vegetable crops
through green houses
600 tons of
vegetable crops
harvested
50 70 100 180 200
Processing of assorted fruits
1.5 million litres of juice
- - 0.3 m 0.5m 0.7m
Cereals and
pulses
production
-Improved food
security
Crop production Produce 6,000
tons of seed and
commercial cereals
400 600 1,200 1,800 2,000
Milling of cereals 2,000 tons of
cereals processed
- - 600 600 800
Seed crop
development
-Improve food
security and income
processing and
packaging of seed maize
4,000 tons seed
maize processed
400 600 1,000 1,000 1,000
processing and
packaging of pasture seed
10 tons of pasture
seed produced
1 1.5 2.0 2.5 3.0
Livestock
development
Improved livestock
breeds
Multiplication of
improved livestock breeds -cattle,goats
1,000 no breeding
stock reared
100 150 200 250 300
Establish artificial insemination
centres
5 no. insemination centres
established
1 1 1 1 1
Establish an abattoir and
tannery centre and
milk processing
1 no. abattoir established
- - 1 - -
1 no. tannery centre established
- - - 1 -
27
plant 1 no. milk
processing plant
- - 1 - -
Apiculture development
Production 20,000 modern beehives
25 35 40 45 145
Processing, Packaging and of
honey (350 tons)
50 60 70 80 90
Aquaculture
development
Introduce 1 million
fingerlings in fish
ponds and dams
0.2 m 0.2 m 0.2 m 0.2 m 0.2 m
Development of commercial
buildings
Improved revenue stream
Completion of KVDA plaza
southern wing
KVDA plaza southern wing
complete
1 - - - -
Construction of commercial
business centre in Nairobi
1 no. commercial business centre
developed
- 1 - - -
Promote
Tourism product
development
Increase tourism
accommodation/bed capacity
Develop new tourist
accommodation facilities
3 No. of tourist
facilities developed
- 1 1 - 1
Spearhead development of
tourist circuit in the
region
Promote the region as preferred tourist
destination jointly
with counties
5 no. of tourism forums
1 1 1 1 1
Develop H.E.P Energy
sources
Increased power supply to the
national grid
Construction of 3 no. power plants to
generate 125MW
Arror-60 MW - 1 - - -
Embobut-45MW - - 1 - -
Kimwarer-20MW - - 1 - -
Undertake mineral
resource exploitation
(marble and
limestone)
Increase supply of building materials
Construct and equip marble
/limestone processing plant
with strategic
partner (s)
1 no. extraction and processing
plant
- - 1 - -
Mango
seedling production
Support food
security
Raise 5 million
mango seedlings
1.5 1.5 1.5 0.5
28
Strategic objective 3: To Strengthen Regional Planning, Resource Mobilization and Institutional Capacity
Operational Objective
To Engage in Business Process Re-engineering (Institutional Development)
Key Result Areas
Activities Performance indicators
Performance Targets During the Period
2014/15 2015/16 2016/17 2017/18 2018/19
Empower staff and improve
work
environment for increased
productivity
Improve skills base
Capacity building
400 No. Staff trained on various courses
100 100 100 50 50
25 no. Stakeholder fora held
5 5 5 5 5
Improve
business processes
ISO
certification
Certification and
continuous improvement
- 1 -
Improves
work efficiency
ICT
programmes
5 No. Enterprise
Resource programmes installed
1 2 2 - -
Improves efficiency and
organizational
focus
Review organizational
structure to
align to the vision
1 no. structure implemented
1 - - - -
Enhances
employee retention
Review of
work processes
and culture
1 no. E-human resource
programme implemented
1 - - - -
Improve job
satisfaction
Improve the
work
environment
Procure 30NO.
workstations
10 20 - - -
Improve
employee
motivation
Implement
the score
card
Improve aggregate
performance index
weight from 3 to 2.
2.7 2.6 2.5 2.3 2.0
Improve
organizational integrity and
productivity
Review of
Governance and ethics
Introduce CCTV in the
organization
1 - - - -
Undertake Research,
Improved quality
Feasibility studies and
5 no. feasibility studies and surveys completed
1 1 1 1 1
29
development
& consultancy services
information,
technologies, products and
services
surveys
Innovations
and publications
5 no. innovations
developed and published
1 1 1 1 1
Geographical information
systems
Improved quality of
information
Digitization of the master
plan
1 no. IRDMP digitized - 1 - - -
Undertake detailed
studies on
mapped resources
2 no. resource maps completed
- 1 - 1 -
Establish data resource
centre
1 no. resource centre established
- 1 - - -
Undertake consultancy
services
20 no consultancies undertaken
2 3 4 5 6
Undertake Resource
mobilization and
partnership
initiatives
Improved access to
project funding
Prepare funding
Proposals
25 no. quality funding proposals
5 5 5 5 5
Identify and collaborate
with funding partners
10 no collaborations /partnerships
2 2 2 2 2
Organize and
participate Investment
conference
5no. conferences 1 1 1 1 1
Promote peaceful co-
existence among
communities
in collaboration
with counties
Enhance community
integration
-Spearhead peace and
conflict resolution
forums
-1 no. Regional leaders forum
-1 no. County specific forum
-1 no. National forum
1 1 1 - -
Establish conservancies
along the
borders
4 no. conservancy 1 1 1 1 -
30
Establish
inter community
development
projects
2 no. development
projects completed
- 1 1 - -
-Inter and
intra communal
relations
through sports
/cultural events in
partnership
with other stakeholders
5 no. events 1 1 1 1 1
31
CHAPTER FIVE: BUDGET
5.1 Indicative Budget
Below is the budget of activities to be undertaken during the period;
Strategic objective 1:To promote sustainable Environment and Natural Resource Management
Operational
Objective
Key
Result Areas
Activities Performance
indicators
Projected Budgetary Requirement in Kshs (million) Sourc
e of funds
Respo
nsibility
2014/
15
2015/
16
2016/
17
2017/
18
2018/
19
Total
To Conserve
Catchment
areas in the region (Kerio
river, Suam /Turkwel,
Lotikipi plain,
Lake Turkana, lake
Baringo/Bogoria and Suguta
river)
Conservati
on and
Protection of the
catchments
Raising of
assorted
seedlings
5 million
assorted fruit
seedlings Raised including
temperate fruit
40
40
40
40
40
200
GOK
KVDA
6 million tree seedlings raised
9
9
9
9
9
45
GOK
Planting and management of
seedlings in partnership with
other stakeholders
11 million Seedlings
Planted
3 7.5 7.5 6 6 30 GOK KVDA, KFS ,
CGs, ,KWTA,
CBOs
-Raise giant
bamboo seedlings
100,000 bamboo
seedlings raised
1 1.1 1.2 1.3 1.4 6 GOK KVDA
Construction of
electric fence around
Cherangany
watershed
500 km electric
fence erected
0 150 300 450 600 1500 GOK/
donors
KVDA/
KFS, CGs,
KWS,C
BOs
Protection of
riparian areas along river banks
10 km riparian
areas along river banks protected
0.5 0.55 0.6 0.65 0.7 3 GOK KVDA/
KFS, CGs,
32
e.g Chebaria and
Cheptongei areas
CBOs,
KWTA
Promote farm
forestry
(woodlots establishment )
500 No. contact
farmers engaged
0.7 0.75 0.8 0.85 0.9 4 GOK KVDA/
KFS,
CGs, ,CBOs
Publicity and awareness
campaigns
Publicity
5 No. stakeholder
meetings held
1 1 1 1 1 5 GOK KVDA/ KFS,
CGs,
,CBOs
5 No. of
advocacy
initiatives on environment
1 2 3 4 5 15 GOK KVDA/
KFS,
CGs, CBOs
Support mitigation
measures on
landslide prone areas, restoration
and resettlement of victims with
other
stakeholders
400 No. of household
resettled to
suitable settlement
0 40 42 45 48 175 GOK/ donor
s
KVDA/ KFS,
CGs,
NGOs
- Promote
community alternative
sources of
livelihoods
500 Beehives 0.5 0.6 0.7 0.8 0.9 3.5 GOK KVDA/
KFS, CGs,
CBOs
-Promote Climate
change
adaptation and mitigation
Sensitize 500
no. farmers on
carbon credit trading
0.9 0.91 0.92 0.93 0.94 4.6 GOK KVDA/
KFS,
CGs, NGOs
To develop Water
harvesting and
storage
Improved water
availability
for
Construction of water pans/small
dams
400 No. of water pans
400 410 420 430 440 2,100 GOK/ donor
s
KVDA/NYS,
RVWSB
, CGs,
33
facilities to
store 8M3 of water
irrigation
and, water supply
50 small dams
constructed
- 500 500 750 750 2500 GOK/
donors
KVDA
Drilling of
boreholes
5 No. boreholes
drilled
2.5 2.6 2.7 2.8 2.9 13.5 GOK KVDA,
RVWSB,CGs
Construction of
dams
9No. dams
constructed
200 200 200 250 - 850 GOK KVDA
To develop
water and
irrigation infrastructure
Efficient
water
supply and
infrastructure for
irrigation
Development of
Irrigation
infrastructure to support 55,180
ha of land.
19no. irrigation
schemes
developed
311 20,422 20,422 20,422 20,423 82,000 GOK/
donor
s/ PPPs
KVDA/
NIB,
CGs
To map and exploit Mineral
resources for economic
utilization
(marble and limestone)
Increase supply of
building material
Survey and delineate the
potential sites
5 No. of sites mapped and 5
no. survey reports
1 1 1 1 1 5 GOK/ Donor
KVDA
Cause
construction of marble
processing plant
1 no. marble
processing plant
0.2 0.3 0.7 1 1.2 3.4 GOK/
Donor
KVDA
Sub-Total 972.3 21,789 21,953 22,416 22,332 89,463
34
Strategic objective 2. To spur Economic development
Operational
Objective
Key Result
Areas
Activities Performan
ce indicators
Projected Budgetary Requirement in Kshs
(millions)
Source
of Funds
Responsib
ility
To promote crop and livestock production and value
addition in the following areas:
2014/
15
2015/
16
2016/
17
2017/
18
2018/
19
Total
Horticulture
production
-Increase in
income levels
- Production
of horticultural
crops
4,500 tons of
fruits produced
6.5 7 3 5 6 27.5 GOK KVDA/CBOs
/ Farmers
-production of vegetable
crops
through green
houses
600 tons of vegetable
crops
harvested
0.6 1 1.5 2 2.5 7.6 GOK KVDA
Processing of assorted
fruits
1.5 million litres of juice
0 0 77 30 35 142 GOK/ Donor
KVDA
Cereals and
pulses
production
-Improved
food
security
Crop
production
Produce
6,000 tons of
seed & commercial
cereals
3 7 12 14 16 52 GOK KVDA/KALR
O, farmer
-Milling of cereals
2,000 tons of cereals
processed
0 0 10 20 21 51 GOK/ Donor
KVDA
Seed crop
development
-Improve
food security
and income
-processing
& packaging
of seed maize
4,000 tons
seed maize
processed
7 9.8 12 12.5 13 54.3 GOK/
Donor
KVDA
processing
& packaging of pasture
seed
10 tons of
pasture seed produced
0.5 0.8 1 1.5 1.8 5.6 GOK KVDA/CBOs
, farmers
Livestock
development
Improved
livestock
Multiplication
of improved
1,000 No
breeding
4 6 7 8.5 9 34.5 GOK KVDA,
Farmers
35
breeds livestock
breeds (cattle,
goats)
stock reared
Establish artificial
insemination centres
5 No. insemination
centres established
0.8 1 1 1.2 1.3 5.3 GOK KVDA
Establish an
abattoir and tannery
centre and
milk processing
plant
1 No.
abattoir established
0 0 20 10 2 32 GOK/don
or
KVDA
1 No.
tannery centre
established
0 0 0 10 13 23 GOK/don
or
KVDA
1 No. milk processing
plant
0 0 30 5 10 45 GOK/donor
KVDA
Apiculture development
Production of modern
beehives (20,000 No.)
20 7 9 11 13 60 GOK KVDA
Processing
and Packaging
and of honey (350 tons)
20 12 13 14 15 74 GOK KVDA
Aquaculture
development
Introduce 1
million fingerlings in
fish ponds and dams
1.5 4 4.5 5 5.5 20.5 GOK KVDA,
KALRO
Development
of commercial
buildings
Improved
revenue stream
Completion
of KVDA plaza
southern
wing
KVDA plaza
southern wing
complete
0 460 50 50 50 610 GOK/
Loan
KVDA
36
Construction
of commercial
business
centre in Nairobi
1 No.
commercial business
centre
developed
5 2000 3600 600 600 6,805 GOK/
Donor/PPP
KVDA
Promote Tourism
product
development
Increase tourism
accommodati
on/bed capacity
Develop new tourist
accommodat
ion facilities
3 No. of tourist
facilities
developed
0 10 50 2 80 142 GOK/ Donor
KVDA
Spearhead
development of tourist
circuit in the region
Promote the
region as preferred
tourist destination
jointly with counties
5 no. of
tourism forums
0.5 0.6 0.7 0.8 0.9 3.5 GOK KVDA,
Private Sector
Develop
H.E.P Energy sources
Increased
power supply to the
national grid
Construction
of 3 no. power plants
to generate
125 MW
Arror-60 MW 0 1,000 8,000 10,000 7,300 26,300 GOK/don
or/PPP
KVDA, CGs
Embobut-
45MW
0 0 5,000 17,000 500 22,500
Kimwarer-
20MW
0 0 5,000 9,500 500 15,000
Undertake mineral
resource exploitation
(marble and
limestone)
Increase supply of
building materials
Cause construction
and equip marble/limes
tone
processing plant with
strategic partner (s)
1 no. processing
plant
5 150 275 20 20 470 GOK/donor
KVDA,CGs
Sub- total 74.4 3,676 22,177 37,323 9,215 72,465
37
Strategic Objective 3: To strengthen Regional planning, Resource Mobilization and Institutional Capacity
Operational Objective
Key Result Areas
Activities Performance indicators
Projected Budgetary Requirement in Kshs (millions)
Source of funds
Responsibility
2014/15 2015/16 2016/1
7
2017/18 2018/1
9
Total
Engage in business
process re-
engineering (institutional
development)
Improve skills
inventory
Capacity building
400 No. Staff trained
on various
courses
1 1.2 1.4 1.6 1.8 7 GOK KVDA
25 no.
Stakeholder
fora held
1 1.1 1.2 1.3 1.4 6 GOK KVDA, CGs
Improve
business processe
s
ISO
certification
Certification
& continuous
improvemen
t
2 1.5 0.1 .02 .03 3.65 GOK KVDA
Improve
work
efficiency
ICT
programmes
5 No.
Enterprise
Resource programmes
installed
1 4 4.5 5 5.5 20 GOK KVDA
Improve
efficiency
and organizat
ional focus
Review
organizationa
l structure to align to the
vision
1 no.
structure
implemented
1.2 0 0 0 0 1.2 GOK KVDA
Enhance
employee
retention
Review of
work processes
and culture
1 no. E-
human resource
programme implemente
d
4.0 0.2 0.5 0.5 0.5 5.7 GOK KVDA
Improve Improve the Migration 0.1 0.15 0.2 0.25 0.3 1 GOK KVDA
38
job
satisfaction
work
environment
from old to
new work station by
implementin
g 30No. stations
Improve employe
e
motivation
Implement the score
card
Improve aggregate
performance
index weight 3 to 2.
2.1 2.6 2.5 2.3 2.0 11.5 GOK KVDA
Improve
organizational
integrity and
productivity
Review of
Governance and ethics
Introduce
CCTV technology
in the organization
5.5 0.1 0.15 0.2 0.25 6.2 GOK KVDA
Undertake
Research, development
and
consultancy services
Improve
d quality
informati
on, technolo
gies, products
and services
Undertake
Feasibility studies and
surveys
5 no.
feasibility studies and
surveys
completed
1.5 5.6 6.7 7.8 1.9 23.5 GOK KVDA
Innovations
and publications
5 no.
innovations developed
and
published
0.5 0.5 0.6 0.7 0.8 3.1 GOK KVDA
Geographical
information
systems
Improve
d quality
of informati
on
Digitization
of the master
plan
1 no. IRDMP
digitized
0 10 1 0.5 0.5 12 GOK KVDA
Undertake
detailed
studies on mapped
resources
2 no.
resource
maps completed
0 5 0 5.7 0 10.7 GOK KVDA
Establish
data resource
centre
1 no.
resource
centre
0 5 0.1 0.2 0.3 5.6 GOK KVDA
39
established
Undertake consultancy
services
20 no consultancie
s undertaken
0.5 2 1.5 2 2.5 8.5 GOK KVDA
Undertake
Resource mobilization
and
partnership initiatives
Improve
d access to
project
funding
Prepare
funding Proposals
25 no.
quality funding
proposals
1 1 1 1.5 2 6.5 GOK KVDA
Identify and collaborate
with funding partners
10 no collaboration
s /partnership
0.2 0.25 0.3 0.35 0.4 1.5 GOK KVDA
Organize and
participate Investment
conference
5no.
conferences
1 1.5 0 5 0 7.5 GOK/
Donors
KVDA/CGs
Promote peaceful co-
existence among
communities
in collaboration
with counties
Enhance communi
ty integrati
on
-Spearhead peace and
conflict resolution
forums
-1 no. Regional
leaders forum
-1 no.
County specific
forum -1 no.
National
forum
0 0.5 0 1 1.5 3 GOK KVDA, CGs, CBOs
Establish
conservancies along the
borders
4No.
conservancies
20 20 30 30 35 135 GOK/
Donors
KVDA,
CBOS, CGs, KWS
Establish inter
community
development projects
2 no. developmen
t projects
completed
0 50 60 0.3 0.5 110.8 GOK/ Donors
KVDA, CGs, CBOs
40
-Inter and
intra communal
relations
through sports
/cultural events in
partnership with other
stakeholders
5 no. events 1 1.1 1.2 1.3 1.5 6.1 GOK KVDA, CGs,
CBOs
Sub-total 43.6 113.3 113 67.5 58.7 396.1
GRAND –TOTAL 1,090 25,579 44,243 59,806 31,606 162,324
41
5.2 Financing Plan The total budget for this Strategic Plan is KShs 162 billion which will be sourced mainly from GoK’s budgetary allocations,
Development partners, public private partnerships, external grants, internally generated funds, sponsorship, donations and
donors. County Governments are also expected to take up some of the flagship projects
5.3 Resource Mobilization Strategies
For successful implementation of this strategy adequate sources of funds are required. The following strategies will be used to
raise funds for effective project implementation;
a) Government Grants
The Government is the leading financier of the Authority’s budget. The Strategic Plan, has identified some of the Vision 2030
flagship projects which will attract high level funding from both Government and Development partners.
b) Income Generation Activities (IGAs)
The Strategic Plan identified investments in energy, tourism, beekeeping, and real estate investments to increase revenue base.
An upward improvement of IGAs will enable KVDA to finance its operations and contribute to the exchequer in the long run.
c) Development Partners
KVDA will develop attractive and bankable proposals that meet development partner’s requirements and/or expectations. Further,
it will enhance collaborations and linkages to access financial and other resources.
d) Public Private Partnerships (PPPs)
The Authority will explore PPPs arrangement to attract a wide a wide range of both local and International investors. PPPs
include arrangements such as Build, Own, Operate (BOO), Build Own, Operate and Transfer (BOOT), and Build Own Transfer
(BOT), Build, Transfer, Operate (BTO), Design, Build, Finance ,`Operate (DBFO), Rehabilitate, Operate and Transfer (ROT), and
Concessions.
42
e) Asset financing
The Authority will use it assets as collateral to access loans to finance specific projects.
f) Special Economic Zones (SEZs)
The Authority will identify strategic locations in its area of jurisdiction and liaise with EPZA for gazettement and marketing to
attract both local and foreign investors.
g) Special Projects Funds
KVDA will negotiate for Special projects funds to mitigate against adverse effects of social economic shocks as a result of natural
calamities such as droughts and floods among others.
h) Environmental Conservation Resources
The Authority will generate revenues from greening technologies such as carbon credit and climate change global adaptation
funds aimed at environment conservation.
j) Fees and donations
KVDA will levy fees on water usage to improve its incomes. The will also seek donations from willing partners to support specific
programmes.
Other Sustainability Strategies
In addition to the above mentioned strategy, the authority will strengthen its capacity by progressing the following:-
(i) Review of Legal and policy frameworks.
(ii) Reorganize Human resources management.
(iii) Prudent Asset and financial management.
(iv) Adapt new Technology and innovation.
(v) Develop linkages and networks.
43
5.4 Risk Management
In implementing the strategy the Authority will mitigate risks as shown in the table below.
Risk area Description Likelihood (H,M,L)
Impact of risk (H,M,L)
Mitigation
Organizational High staff turnover M H Staff motivation
Low staff morale H M Merit recruitment and promotion
Low skills and poor succession management
H H Capacity building
Financial Corruption M M Strengthen disciplinary mechanism
Accounting for funds L H Frequent audit
Budget cuts and low funding H H Monitoring budget implementation
Inflation of project costs M H Capacity building on Project planning and implementation
Technological Inferior technology M M Acquisition of new technology
Low adoption level M M Skills development
Operational Budget reallocation H L Adherence to fiscal discipline and budget principles
Bureaucracy/process flaws H M Implement service charter and ISO Certification, SOPs
Policy/ Structural changes
Policy reversals L H Strengthen adherence to policy implementation
Reorganization of Government H L Review of the KVDA Act in line with the Constitution
Conservative institutional culture
H M Motivational seminars on change management
Social,cultural and political
Political interference M M Community empowerment and sensitization
Cultural and Resource based conflicts
M H Stakeholders participation
Disaster Drought Floods Famine
H H Early warning systems Sensitization on disaster preparedness
44
Chapter Six: MONITORING, EVALUATION AND REPORTING (M,E&R)
6.1 Monitoring and Evaluation Framework
Monitoring, Evaluation and Reporting will be undertaken at project, Management and Board levels. There will be weekly, monthly
and quarterly reports from the ME&R Committee/s to correct variances as they occur. The Authority will establish a monitoring
and evaluation office to improve the reporting and feedback.
6.2 ME&R Indicators
Indicators will be based on activities, targets, outputs and outcomes of development projects/programmes outlined in the
implementation matrix of the Strategic Plan
6.3 Monitoring, Evaluation and Reporting Model
ME&R process will be carried
out at all stages of project
development as illustrated in
the model below.
45
LIST OF ANNEXES:
Annex 1: Schedule of Irrigation Projects
Site(Scheme) Developed /ongoing
(existing) (Ha)
Planned (Ha.) Additional Potential
Irrigable Areas (Ha)
Arror 160 2500 8,190
Tot/Kolowa/Embobut 118 1500 5000
Ptokou/Sangat 320 - -
Marich /Sikarorot 100 1000 -
Weiwei River Basin 600 - 300
Cherangany Irrigation - 300 1000
Kawalathe Irrigation - 400 500
Loyapat 75 100 -
Turkwel downstream - 26,900 3,100
Kimwarer Irrigation - 300 200
Lomut Irrigation - 300 550
Todonyang Irrigation - 20,000 5000
Kipkukutia/Endao - 600 -
Oke Kipsaa - 1080 -
Lorrogi - 200 250
Nemerit - - 2000
Embomon - - 1500
Embo olot - - 1000
Emsoo - - 400
Emyaat/Kiplus - - 150
Chesegon - - 500
46
Mogil - - 1000
Chesongoch - - 1000
Nauwia(Tunyo) - - 1000
Torok - - 1000
Tunyo - - 1000
Kakuma Irrigation - - 700
Kalemngorok Irrigation - - 300
Tuum Irrigation - - 250
Waseges - - 470
Chebuskek - - 480
Chebaran/Kimose - - 650
Yeptos/Kimeren - - 350
Sirwe/Sabor/Kimao - - 220
Sook/Enopugh Mtelo - - 100
Ngelecha/Sinoni - - 460
Yatya/Sibilo - - 300
Chemariat/Kimoriot - - 375
Sirwon/Katuya/Amaya - - 210
Kalewa/Kamar/Lokiri - - 470
Lotikipi plains aquifer - - 203,500
Sub Total 1,373 55,180 243,475
GRAND TOTAL 300,028
47
Annex 2: Region’s Facts Sheet
Characteristic Description
Location Located in the North West region of Kenya between latitudes 00 10 South and 100 30 North; and
longitude 340 and 370 East. Its operational area includes the Counties of Baringo, Elgeyo-Marakwet,
West Pokot, Turkana, Samburu and Nakuru.
Area 107,759.18 sq km representing 18.3% of Kenya’s landmass. 80% of the area is arid and semi-arid. The
area is bounded by the drainage basins of Turkwel and Kerio rivers which drain into lake Turkana. Other
drainage basins include: - Lake Baringo, Lake Bogoria, Suguta – Lake Lotikipi and Tarach – Lotikipi.
Economic Activities Major economic activity in the region is agro-pastoralism. Other key economic activities include, mining,
irrigated agriculture especially in Kerio and Perkerra valley, fishing in inland lakes of Turkana, Baringo,
and Turkwel reservoir, retail trade in the main trading centres
Population 2,952,556 (rural 2,583,486 and urban 369,070)
Poverty Index 73.57%
Topography Altitude ranges between 300m – 3,500m above the sea level
Climate Approximately 80% arid and semi arid with temperatures ranging from 100 to 400C. Mean annual rainfall ranges from 1000 mm for the highlands and between 200 mm to 800 mm for the dry low lands. long rain season between April – July and short rains between September – November.
Soils Deep, fertile alluvial soils which range from clay to loam
Infrastructure The region is served by Eldoret International Airport located 314 km west of Nairobi City. The road
network is accessible and is linked to Nairobi and Mombasa by the great North road. The region has a
total of 13,223 km of road with only 1,265km being tarmac.
Telecommunication Telecommunication services are available in the region especially with advances in GSM technology. The use of ICT has increased.
Energy Hydro electric power is available and there is potential for further development. Other potential sources
of energy include wood-fuel, geothermal, solar and wind energy.
Financial Services Private financial institutions in the region are numerous and fairly well distributed within the major towns.
Health Services The region has several well equipped medical facilities.
Source: IRDMP 2013-2033
48
Annex 3: Strategic Plan Priority Areas
The Strategic Plan has identified key priority projects which will is expected to propel the Authority into the profitability and
enhance its assets base and create necessary revenue for sustainability. The following projects will be prioritized and given
necessary support towards that end.
Areas
i. Agricultural projects
ii. Commercial Buildings
iii. Mango Processing plant
iv. Heavy machinery and hire services
v. Catchment Conservation Programme
vi. Tourism Development
vii. Hydropower Development
viii. Marble Quarrying and Processing
The table below gives a summary of the estimates of revenues and expenditures during implementation.
Annex 4: Project Revenue Estimates and Expenditure
Project Activity Estimated Revenue and Project cost (Kshs Millions) in five years
2014/15 2015/16 2016/17 2017/18 2018/19 Total
Honey processing
and beehive
production
Beehive production (30,000),
Honey purchase and processing
(500 tons)
Expected
Revenue 35.7 41.05 46.4 51.75 57.1 232
Estimated Cost 19 19.4 22.1 24.8 27.6 112.9
Crop production
Production of 1,200 tons of
seed cereals, tomatoes and
pulses
Revenue 17 21 24 28 30 120
Cost
8.3 10 11 13 14
56
Mango Processing
plant
Purchase and installation of
mango processing plant (1 No.)
Revenue 0 0 36 60 84 180
Cost 24.3 1.5 2 2.5 3 33
49
Commercial
Buildings
Construction of KVDA Southern
Wing
Revenue 0 50 60 60 60 2300
Cost 100 300 0 0 0 400
Nairobi commercial building Revenue 0 0 0 0 2000 2,000
Cost 0 2000 2000 1000 0 5,000
Purchase of
machinery and hire
services
Purchase of Dozzer (2 no.) and
2 shovels
Revenue 0 8 18 22 24 72
Cost 2 35 35 30 30 132
Catchment
Conservation
Programme
Tree seedling production (6m
no.)
Revenue 12 14 16 18 20 80
Cost 6 7 8 9 10 40
Mango seedlings
production
Mango seedling production (5m
no.)
Revenue 40 48 56 64 72 280
Cost 5 6 7 8 9 35
Tourism
Development
Development of tourist facilities
(3 No.)-Lodwar, Arror &
Turkwel
Revenue 0 1.5 2 10 15 28
Cost 4 40 0 0 0 44
Hydropower
development
Arror H.E.P (60MW Revenue 0 0 0 0 500 500
Cost 2 2 10,004 10,006 6308 26322
Marble quarrying
and processing
Construct and equip
marble/limestone processing
plant with strategic partner (s)
Revenue 0 0 0 0 100 100
Cost 2 2 204 150 5 363
Total expected revenue in five years translates to Kshs 709.5 million. Funds to be mobilized through PPPs, Loans etc. amount to
Ksh, 31.6 bn.( Arror H.E.P. 25.822bn, Nairobi commercial building 5bn and KVDA Plaza southern wing 0.4bn, marble factory
0.375bn)
50
Annex 4: KVDA Organization Structure
BOARD OF DIRECTORS
MANAGING DIRECTOR/CHIEF EXECUTIVE OFFICER
(KV 1)
HEAD OF DEPT - LEGAL & CORPORATE SECRETARIAT
(KV3)
DIRECTOR, TECHNICAL SERVICES
(KV2)
DIRECTOR, BUSINESS DEVELOPMENT
& STRATEGY (KV2)
DIRECTOR, SUPPORT
SERVICES (KV2)
HEAD OF DEPT, AUDIT & RISK
DEPARTMENT (KV3)
51
Annex 5: KVDA STRATEGY MAP 2014- 2018
Vision: To be a leading River Basin partner in integrated and sustainable economic development
Mission: To deliver sustainable business solutions in Regional development through prudent management of resources for
economic prosperity of the people.
Core Values: Integrity, Respectful, Accountability, Teamwork, Creativity, Innovation and Customer focus.
Promote sustainable Strengthen Regional planning, Strategic Objectives Environment and Natural Spur Economic Development Resource Mobilization and
Resources Capacity Building Beneficiaries: Ensure generation, Create an enabling Raise the profile of KVDA What must we achieve dissemination & utilization environment for SME’ growth for our Stakeholders? of evidence based benefits growth amongst all stakeholders Internal Processes Promote Strategic Business re-engineering Develop standard Operating What must we excel at? Research and Development procedures Learning and Growth Monitoring, evaluation Enhance communication Organization and Institutional Where must KVDA reporting and learning and marketing development invest? Resource: How to Develop internal resources Diversify funding base Engage development partners adequately resource
52
PICTORIALS OF KVDA ACTIVITIES
Tree Planting at Cherangany Watershed by KVDA
53
54
55
56
57
Managing Director Kerio Valley Development Authority
KVDA Plaza P.O. Box 2660 30100
Eldoret, Kenya Tel: 053 20 63361/2
Email: [email protected]
Website: www.kvda.go.ke