What Do We Do?
Facilitate Water and
Wastewater Planning
Fund Infrastructure Projects
Using Loans and Grants
![Page 3: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/3.jpg)
Statewide Planning
• KIA coordinates drinking water and wastewater planning in cooperation with the ADDs
• Role of planning will become more critical
• Sound planning requires a wide range of information and participation
![Page 4: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/4.jpg)
Project Rankings
Two Ranking Processes
• SRF Rankings– Clean Water Act– Safe Drinking Water Act
• Area Water Management Council Rankings
![Page 5: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/5.jpg)
Prioritization of Projects by AWMC
• AWMC rankings are based on local needs
• Consideration will be given to projects…..
– involving regionalization of systems (physical or management)
– with the highest impact in numbers of households served
– with the lowest average cost per customer– where the Median Household Income is less than
the state average
![Page 6: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/6.jpg)
Grants
• No new in the current biennium
• Close out existing grants
• Grant funds can only be used for the purpose in the budget line item
• Reauthorization
![Page 7: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/7.jpg)
KIA Has 4 Loan Programs
• Federally Funded– Clean Water State Revolving Fund (Fund A)– Drinking Water State Revolving Fund (Fund F)
• State Funded– Infrastructure Revolving Loan/Grant (Fund B)– Governmental Agencies Program (Fund C)
![Page 8: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/8.jpg)
State Funded Loan Programs (B and C)
• State Funded programs for governmental entities for the construction of infrastructure projects, primarily water and sewer, broadband and possible financing for brownfields remediation
• Minimal Requirements– WRIS number (WX or SX)– Uniform System of Accounts and Cost Based Rates– E-Clearinghouse– Adequate Revenue to Repay the Loan– Replacement Reserve Requirement– Principal and Interest Repaid Monthly– Submit Audited Financial Statements
![Page 9: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/9.jpg)
Funds B & C Terms
• Below Market Interest Rates– Fund B Rates are 3%, 2% and 1%– Fund C Rates range from 3% to Market Rate
• Flexible Maturities– Fund B Repayment Terms from 5 to 30 years– Fund C Repayment Terms from 20 to 30 years
• Funds Availability– Limited availability of funds to loan– Fund C may be bond funded
![Page 10: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/10.jpg)
State Revolving Funds (SRF)
• Created and Funded by the Federal Government– Clean Water Act (Fund A)– Safe Drinking Water Act (Fund F)
• Administered jointly by– Kentucky Infrastructure Authority (KIA)
• KIA receives grant from EPA• KIA provides 20% State Match• Financial and Administrative Responsibility
– Division of Water (DOW)• Environmental Responsibility• Technical Responsibility
![Page 11: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/11.jpg)
Eligible Borrowers
• Governmental Agency– City– County– Special District
• No Federal Agencies
• Project MUST BE on the SRF Priority List. (Different from Area Water Management Council Priority List)
![Page 12: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/12.jpg)
REQUIREMENTS FOR 2012• Green Projects – 20% of the federal funds received will go to “Green”
projects
• Principal Forgiveness - All systems that qualify for 1% interest rate loans will receive principal forgiveness– Tiered principal forgiveness will be offered to CWSRF borrowers
• 30% for borrowers’ whose Median Household Income <=$20,599• 10% for borrowers’ whose Median Household Income between
$20,599 & $32,959• No project can receive more than $1,200,000 in forgiveness
– 35% principal forgiveness will be offered to DWSRF borrowers
• Davis-Bacon Act – Federal wage rates could apply– Currently applies to SRF loans – Expires September 30, 2011– Could be reinstated when Congress passes new federal budget
![Page 13: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/13.jpg)
FUND A
CLEAN WATER STATE REVOLVING FUND
2012 Funds Availability ~ $132,475,385
![Page 14: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/14.jpg)
ELIGIBLE PROJECTS - CWSRF
• Wastewater Collection, Conveyance, & Treatment Facilities
• Storm Water Collection, Conveyance, & Treatment Facilities
• Implementation of Nonpoint Source Pollution Control Management Programs;
• Purchase of Wastewater System
Loans for planning and design are available to expedite a project, which may be rolled into a construction loan.
![Page 15: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/15.jpg)
INELIGIBLE PROJECTS - CWSRF
• Laboratory Fees and Other Monitoring Expenses
• Operation and Maintenance Expenses
![Page 16: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/16.jpg)
FUND F
DRINKING WATER STATE REVOLVING FUND
2012 Funds Availability ~ $38,373,772
![Page 17: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/17.jpg)
ELIGIBLE PROJECTS - DWSRF
• Replace Inadequate/Aging Infrastructure• Upgrade Treatment Facilities• Install or Upgrade Storage• Rehab Wells or Develop Source Water• Consolidation/Purchase of Water Systems• Extension of Service to Existing Homes to
Address Quantity and Quality Issues• Security Measures
Loans for planning and design are available to expedite a project, which may be rolled into a construction loan.
![Page 18: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/18.jpg)
INELIGIBLE PROJECTS - DWSRF
• Compliance Monitoring
• Operation and Maintenance
• Reservoirs (raw water)
• Dams or Dam Rehabilitation
• Water Rights
• Growth
• Fire Protection
![Page 19: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/19.jpg)
CURRENT SRF RATES
Interest Rate set annually by the KIA Board.• Standard Rate is 3.0% (MHI at or above $41,197)
• Non-Standard Rate (a) is 2.0% (MHI between $32,958 & $41,197)
• Non-Standard Rate (b) is 1.0% (MHI at or below $32,958)
• Criteria for Non-standard Rates based on:– MHI of Jurisdiction– MHI of service area– Regionalization– Orders or Judgments– Public Health or Safety Issues– Environmental Concerns– Financial Considerations
![Page 20: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/20.jpg)
REPAYMENTS TERMS Repayment Period
CWSRF – 20 YearsDWSRF – 20 Years (may be 30 years if
hardship community)
Financing Expenses
CWSRF – 0.2% Servicing FeeDWSRF – 0.25% Servicing Fee
Debt Service Reserve: None
Replacement Reserve: 2.5% of project amount funded over 10 years
![Page 21: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/21.jpg)
SRF Basic Process
1. Environmental Review
• Includes E-Clearinghouse
2. Plans Review
3. Financial Administration
• Eligible projects will be “invited”
to apply
![Page 22: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/22.jpg)
SRF Process FlowchartKIA Board Approval & Binding Commitment
InvitationApplication
Environmental Review(includes E-Clearinghouse)
Plans and Specs Review
Bid Opening
Pre-Construction Conference
Start Construction/ Construction Contract
Enter into Assistance Agreement
Initial Pay Request
Construction Complete
Closeout
KIA Board Approval & Binding Commitment
![Page 23: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/23.jpg)
WHERE TO START?
• Project Profile• Call for Projects
IMPORTANT DATES:
October 1, 2011 - DW & CW Call by KIA & DOW
December 31, 2011 - Call for Projects Closed
March 31, 2012 - DOW Project Ranking Complete
June 1, 2012 - Draft IUP and Priority List
July 1, 2012 - Beginning of Funding Cycle
![Page 24: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/24.jpg)
PROCESS IMPROVEMENTS…
• DOW will use the information from the Project Profile to Rank the SRF Projects.
• You DO NOT have to complete an SRF Project Questionnaire Form.
• You DO have to get your project endorsed by the Water Management Council
• You DO have to let DOW know which WX or SX numbers you wish to have considered for SRF funding.
![Page 25: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/25.jpg)
AGENCY CONTACTSDOW
Shafiq AmawiWater Infrastructure Branch
Branch Manager
Buddy GriffinProgram Administration Section
Supervisor
Amanda YearyDWSRF Coordinator
Anshu SinghCWSRF Coordinator
Phone 502-564-3410
KIA
John CovingtonExecutive Director
Kasi WhiteFinancial Analyst
Sandy Williams Financial Analyst
Phone 502-573-0260
![Page 27: KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August 17 - 19, 2011](https://reader036.vdocuments.site/reader036/viewer/2022070401/56649f175503460f94c2ea53/html5/thumbnails/27.jpg)
For more information contact:
Kentucky Infrastructure Authority1024 Capital Center Drive, Suite 340
Frankfort, KY 40601(502) 573-0260