keele station preliminary design online consultation · open house #1 - - feb 9, 2012 online...
TRANSCRIPT
![Page 1: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/1.jpg)
2/8/2012
Keele Station Preliminary DesignOnline Consultation
Feb 9, 2012 - Feb 23, 2012
![Page 2: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/2.jpg)
2
Part 1•Introduction•Crosstown Update•Station Design 101 - Design PrinciplesPart 2•Keele Station Preliminary Design
*Our partners in City Planning can answer any questions about existing development applications at Keele for the future Land Use Study around Crosstown Stations
Online Consultation Overview2/8/2012 2
Keele Station Preliminary Design
![Page 3: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/3.jpg)
The Purpose of this Online Consultation
• Provide a brief Crosstown project update
• Present the Crosstown station design philosophy
• Explain the anatomy of a station and challenges
• Display the preliminary design of Keele Station
Most importantly:
*Get your input on the Preliminary Design early in this process.
• Architectural Station design will be prepared for Open House #2 in late Spring 2012. Significant public outreach will follow prior to construction.
2/8/2012 3
Keele Station Preliminary Design
![Page 4: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/4.jpg)
Open House #1 - - Feb 9, 2012
Online Consultation - - Feb 9 to Feb 23, 2012
Open House #2 - - Spring, 2012• Response to Open House #1 input
• Architectural Treatments
• Final Station Design Open House
Open House #3 - - Fall, 2012 (TBD)• Construction staging
• Ongoing Outreach on Construction
Tunnelling Construction Start - - Winter 2012 - 2013 (TBD)
Keele Station Construction Start - - 2014 (TBD)
Keele Station Design ProcessTimelines
2/8/2012 4
Keele Station Preliminary Design
![Page 5: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/5.jpg)
Format for Feedback
• Please submit your feedback online at www.thecrosstown.ca by February 23, 2012
• A consultation report to inform the designers will be posted online at: www.thecrosstown.ca
2/8/2012 5
Keele Station Preliminary Design
![Page 6: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/6.jpg)
Presentation Part 1:Crosstown Overview & Construction Update
2/8/2012 6
Keele Station Preliminary Design
![Page 7: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/7.jpg)
2/8/2012 7
The Crosstown* Final number and location of stations subject to review
Keele Station Preliminary Design
• 25 km east-west transit corridor between Black Creek Drive and Scarborough Centre
• 60% faster than current bus routes
• 15 minutes from Keele to Yonge
![Page 8: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/8.jpg)
8
2/8/2012 8
Congestion Today
Keele Station Preliminary Design
![Page 9: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/9.jpg)
2/8/2012 9
The Eglinton-Scarborough Crosstown Plan• $8.4 billion transit investment from the Province of Ontario through
Metrolinx
• 25 km east-west transit corridor between Black Creek Drive and Scarborough Centre
• 60% faster than bus service today (e.g. only 15 minutes from Keele to Yonge)
• 19 km underground tunnel (Black Creek Drive to Kennedy Station)*
• 6km seamless service will replace the SRT from Kennedy Station to Scarborough Centre
• Up to 26 stations
• *Exact alignment west of Keele Street and east of Laird Drive TBD
Keele Station Preliminary Design
![Page 10: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/10.jpg)
2/8/2012 10
Crosstown Construction Update• Crosstown tunnel preparation
work at Black Creek and Eglinton in Keelesdale Park
• Piling rigs are building concrete support walls for the future tunnel launch shaft
• The shaft will enable tunnelling eastward in summer 2012
• Soil testing for the tunnel and stations continues from Keele Street to Kennedy Station in Scarborough
Keele Station Preliminary Design
![Page 11: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/11.jpg)
Conceptual Design Typical Crosstown Station
Urban Design and Architectural Guidelines have been developed:• ensure positive change along the
corridor • guide individual station designs and
achieve consistency• guide configuration of surface
elements• integrate surface elements with
existing and future development
2/8/2012 11
Keele Station Preliminary Design
![Page 12: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/12.jpg)
Stations 101 What’s needed to make a Station Work?
2/8/2012 12
Keele Station Preliminary Design
• Main Entrance• Secondary Entrance• Passenger Transportation (elevators, escalators)• Mechanical and Electrical Systems • Ventilation Shafts and Ventilation Fan Rooms• Traction Power Substations
Guiding Principle: Consolidate Surface Elements to enhance design & minimize impacts
• Reduce construction impacts (traffic, staging area, noise, dust )• Preserve public space and development potential • Save $
![Page 13: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/13.jpg)
13
• Integrate with surrounding neighbourhood
• Safe and enjoyable user experience
• Full accessibility accessibility with all levels of mobility, elevators, escalators, low-floor access
• Preserve space for future re-development
• Enhance the local “sense of place”
• Long-term sustainability
• Reduce Construction Footprint & Impacts
• Reduce Costs
Design Philosophy
Compatible scale
2/8/2012 13
Accessibility for all users
Keele Station Preliminary Design
![Page 14: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/14.jpg)
14
Accessibility, Safety, and Security Features
• Access for persons with all levels of mobility
• Elevators
• Escalators
• Low-Floor Access
• Monitored CCTV Security Cameras
• Urban Braille
• High Quality Lighting
2/8/2012 14
Keele Station Preliminary Design
![Page 15: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/15.jpg)
2/8/2012 15
Keele Station Preliminary Design
Public Realm Elements
• Streetscape & integration of Public Realm Elements
• Innovative wayfinding and effective signage
• Bicycle Facilities
Elements to be determined and considered:
![Page 16: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/16.jpg)
Architectural Design Approach
• Excellence in architectural/urban design treatments
• Cost effective and maintainable structures
• Standard station box configurations• Creative use of materials, color,
textures, artwork, light• Brand identification with graphics
• Use standard elements whenever possible
2/8/2012 16
Eglinton West Station
Keele Station Preliminary Design
![Page 17: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/17.jpg)
Any architectural finish can contain
integrated artwork, including:
• walls
• floors
• ceilings
• glazing
Integrated Artwork2/8/2012 17
Keele Station Preliminary Design
![Page 18: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/18.jpg)
2/8/2012 18
Keele Station Preliminary Design
Surface ElementsGuiding Principles • Surface elements are most
visible to public
• Integrate into local community
• Minimize property implications
• High quality design
• Major focus on consolidating:
– Entrances
– Vent Shafts
– Substations
![Page 19: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/19.jpg)
2/8/2012 19
Keele Station Preliminary Design
Traction Power Substations What and Why?
• Required to provide power to the station system
• Every two kilometres, at stations
• Many different configurations
• Above ground, surface, below-ground
• Guidelines to integrate substations
Leslie Station
Toronto Hydro Substation in Scarborough
![Page 20: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/20.jpg)
2/8/2012 20
Keele Station Preliminary Design
Station Entrances• Public spaces which fit into the
community
• Main and secondary entrance
• Main entrance is fully accessible
• Use of height/massing to create unique structure
• Highly visible, transparent, sophisticated
• Promote transit-oriented development
• Maximize daylighting opportunities
• Well lit at night
• Connect with buses on the street
![Page 21: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/21.jpg)
Presentation Part 2: Keele Station Preliminary DesignDesign Team:
2/8/2012 21
Keele Station Preliminary Design
![Page 22: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/22.jpg)
Keele Station Local Context – Site Character
2/8/2012 22
Keele Station Preliminary Design
![Page 23: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/23.jpg)
Keele Station Density within 10 minute walk
2/8/2012 23
Keele Station Preliminary Design
![Page 24: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/24.jpg)
Keele Station Existing Land-Use
2/8/2012 24
Keele Station Preliminary Design
![Page 25: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/25.jpg)
Keele Station Potential Development
2/8/2012 25
Keele Station Preliminary Design
![Page 26: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/26.jpg)
Keele Station Business Improvement Area
2/8/2012 26
Keele Station Preliminary Design
Eglinton Hill BIA
The Eglinton Hill BIA is located on EglintonAvenue West between Kane Avenue and Bicknell Avenue. The BIA is composed of an eclectic mix of shops and services reflecting the diverse heritage of the city. Eglinton Hill BIA was created in 1997.
![Page 27: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/27.jpg)
Keele Station Existing Transportation Connections
2/8/2012 27
Keele Station Preliminary Design
![Page 28: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/28.jpg)
Keele Station Original Plan EA (2010)
2/8/2012 28
Keele Station Preliminary Design
![Page 29: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/29.jpg)
Keele Station New Consolidated Layout (2012)
2/8/2012 29
Keele Station Preliminary Design
![Page 30: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/30.jpg)
Keele Station New Consolidated Layout (2012)
2/8/2012 30
Keele Station Preliminary Design
![Page 31: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/31.jpg)
Keele Station New Consolidated Layout (2012)
2/8/2012 31
Keele Station Preliminary Design
Key advantages:Provides passengers with a clear point of entry into the station
• Entrance locations coincide with bus routes/stops
• Passenger travel from street level to concourse minimized
• Primary Entrance accessible to passengers from Eglinton Avenue and bus loop drop off area
• Primary York Memorial Collegiate façade not compromised, while still allowing students to access entrance without crossing Eglinton Avenue
• Station street level buildings respectful of surrounding context, while preserving for future development as envisioned by Avenues Study
• Efficient use of excavation footprint (station box length 132m), and avoiding major utility relocation
![Page 32: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/32.jpg)
Keele Station Site Plan
2/8/2012 32
Keele Station Preliminary Design
![Page 33: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/33.jpg)
Keele Station Concourse Perspective
2/8/2012 33
Keele Station Preliminary Design
![Page 34: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/34.jpg)
Keele Station Concourse View
2/8/2012 34
Keele Station Preliminary Design
![Page 35: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/35.jpg)
Keele Station Platform Perspective
2/8/2012 35
Keele Station Preliminary Design
![Page 36: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/36.jpg)
Keele Station Platform Perspective
2/8/2012 36
Keele Station Preliminary Design
![Page 37: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/37.jpg)
Keele Station Platform View
2/8/2012 37
Keele Station Preliminary Design
![Page 38: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/38.jpg)
Keele Station Passenger Circulation
2/8/2012 38
Keele Station Preliminary Design
![Page 39: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/39.jpg)
Keele Station Cross Section
2/8/2012 39
Keele Station Preliminary Design
![Page 40: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/40.jpg)
Keele Station Longitudinal Section
2/8/2012 40
Keele Station Preliminary Design
![Page 41: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/41.jpg)
Keele Station Existing NE Corner Trethewey & Eglinton
2/8/2012 41
Keele Station Preliminary Design
![Page 42: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/42.jpg)
Keele Station Future Main Entrance
2/8/2012 42
Keele Station Preliminary Design
Future NE Corner Trethewey/Eglinton
![Page 43: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/43.jpg)
Keele Station Existing NW Corner Trethewey & Eglinton
2/8/2012 43
Keele Station Preliminary Design
![Page 44: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/44.jpg)
Keele Station Future North West Secondary Entrance
2/8/2012 44
Keele Station Preliminary Design
Future NW Corner Trethewey/Eglinton
![Page 45: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/45.jpg)
Keele Station Existing SE Corner Trethewey/Eglinton
2/8/2012 45
Keele Station Preliminary Design
![Page 46: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/46.jpg)
Keele Station Future South East Secondary Entrance
2/8/2012 46
Keele Station Preliminary Design
Future SE Corner Trethewey/Eglinton
![Page 47: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/47.jpg)
Keele Station Existing Streetscape
2/8/2012 47
Keele Station Preliminary Design
North of main station entrance
![Page 48: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/48.jpg)
Keele Station Future Station Support Building
2/8/2012 48
Keele Station Preliminary Design
North of main station entrance
![Page 49: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/49.jpg)
Keele Station Existing Yarrow Road
2/8/2012 49
Keele Station Preliminary Design
![Page 50: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/50.jpg)
Keele Station Future Yarrow Road Vent Location
2/8/2012 50
Keele Station Preliminary Design
![Page 51: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/51.jpg)
Keele Station Toronto Green Standards
2/8/2012 51
Keele Station Preliminary Design
Key site-related components that will be analyzed and designed to meet Toronto Green Standards through the design process
• Cycling infrastructure
• Pedestrian infrastructure
• Urban heat island reduction: at-grade
• Urban heat island reduction: roof
• Water efficiency
• Urban forest: tree protection
• Urban forest: encourage tree growth
• Natural heritage: site
![Page 52: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/52.jpg)
Keele Station Community Outreach for Construction
2/8/2012 52
Keele Station Preliminary Design
• At this early design stage, construction staging is not yet developed
• Comprehensive Construction Management Plan & individual construction plans for each station will be developed with local consultation well before construction
• Please contact us any time with questions you may have about construction
![Page 53: Keele Station Preliminary Design Online Consultation · Open House #1 - - Feb 9, 2012 Online Consultation - - Feb 9 to Feb 23, 2012 Open House #2 - - Spring, 2012 • Response to](https://reader035.vdocuments.site/reader035/viewer/2022081402/5f08fdb27e708231d424b4ae/html5/thumbnails/53.jpg)
2/8/2012 53
Keele Station Preliminary Design
The Crosstown TeamPlease Get in Touch with Us!
Community Office Hours — 2012Monday, Wednesday, Friday: 9:00 a.m. – 5:00 p.m. Tuesday: 8:00 a.m. – 4:00 p.m.Thursday: 12:00 p.m. – 8:00 p.m.
Devin Horne, Franca Di Giovanni,Denise Jayawardene E-mail: [email protected] Online: www.thecrosstown.caTel: 416-338-6310Fax: 416-397-8193TTY: 416-481-2523Visit our West Community Office at1848 Eglinton Avenue West (at Dufferin)