kea’s renewable vision
DESCRIPTION
KEA’s Renewable Vision. Kodiak Electric Association, Inc. Darron Scott, President/CEO. KEA’s Vision. Kodiak Electric Association, Inc. Locally-Owned Electric Cooperative Provides Electricity to approximately 5,800 Meters Isolated Electric Grid Peak Load – 26 MW Minimum Load – 11 MW - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/1.jpg)
Kodiak Electric Association, Inc.Darron Scott, President/CEO
![Page 2: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/2.jpg)
![Page 3: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/3.jpg)
Kodiak Electric Association, Inc.Locally-Owned Electric CooperativeProvides Electricity to approximately 5,800
MetersIsolated Electric Grid
Peak Load – 26 MWMinimum Load – 11 MW
Diverse Power Generation PortfolioTerror Lake Hydroelectric Plant: Two 11.5 MW UnitsPillar Mountain Wind Project: Three 1.5 MW UnitsFour Diesel Generating Stations
Generator size ranges from 140 kW to 6.5 MW Total diesel generating capacity of 33 MW
![Page 4: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/4.jpg)
KEA’s System Prior to 2009
20% Diesel
80% Hydro
![Page 5: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/5.jpg)
•Three 1.5 MW General Electric (GE) Wind Turbines
•Operating since July 2009
Photo courtesy of Dake Schmidt
Pillar Mountain Wind Project
![Page 6: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/6.jpg)
Pillar Mountain and Terror Lake Hydroelectric Facility
• Terror Lake Works like a battery• Lowers fuel costs• Stabilizes power costs• Lowers Emissions
![Page 7: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/7.jpg)
Load Variability
![Page 8: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/8.jpg)
•Approximately 98% availability
•28,472,822 kWh generated since July 2009
•2,005,128 gallons of diesel saved
•22,559 tons of CO2 saved
![Page 9: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/9.jpg)
Net Savings to CommunityAt $3.30 per gallon for diesel,
approximately $4.5 million net savings.
![Page 10: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/10.jpg)
KEA’s Current Power Sources• 80% Hydro• 11% Diesel • 9% Wind
![Page 11: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/11.jpg)
Generation Comparison
20% Diesel
80% Hydro
80% Hydro
9% Wind
11% Diesel
Old System
New System
![Page 12: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/12.jpg)
Road Work and Building the Foundation
![Page 13: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/13.jpg)
Underground and Overhead Power Lines
![Page 14: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/14.jpg)
Transportation
![Page 15: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/15.jpg)
Assembly
![Page 16: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/16.jpg)
First Completed Wind Turbine
![Page 17: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/17.jpg)
Next Steps to Vision• Terror Lake Third Hydroelectric Turbine• Additional Three Wind Turbines• Energy Storage System
![Page 18: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/18.jpg)
Terror Lake Third Hydroelectric Turbine
![Page 19: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/19.jpg)
![Page 20: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/20.jpg)
Energy Storage System• Xtreme Power Battery System
![Page 21: KEA’s Renewable Vision](https://reader036.vdocuments.site/reader036/viewer/2022081519/568144a8550346895db1703a/html5/thumbnails/21.jpg)
82% Hydro
16% Wind
2% Diesel