REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
153
Electrical Arrangements to the Service Buildings at Various Location in Chennai
July - 2011 Supply and Erection Electrical Products and Wiring
152
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Jan - 2011 Supply and Erection of Electrical, Instrumentation and Control System
151
Electrification of DAE – UGC – CSR Building
Jan - 2011 Design Manufacturing, Supply, Installation, Testing, and Commissioning of Electrical systems.
150
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Heat Tracing
149
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Fire Alarm Panel
148
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Electric Control System and DCS System
![Page 2: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/2.jpg)
REFERENCE LIST
SL NO CUSTOMER PROJECT DELIVERY REMARKS
147
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of E-House and Instrumentation
146
Electrical and Automation Panel
Nov - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels
145
Building Management Systems
Nov - 2010 Supply and Installation of BMS
144
Automation System for Air Conditioning Equipments
Nov - 2010 Design, Manufacture, Supply, Installation, Testing , Commissioning and Training of Automation System.
143
Electrical System for RECLAIMER
Nov - 2010
Design, Engineering, Supply, Erection and Commissioning of Electrical System.
![Page 3: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/3.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
142
Control System Upgradation for EAF – III Project
Nov - 2010 Design, Supply, Erection, Testing, Commissioning of PLC based Control System
141
Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Vedanta Aluminum Limited, Orissa )
Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
140
Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Bellary Thermal Power Station, Karnataka Power Corporation )
Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
139
Electrical and Control systems for Stacker & Reclaimer ( Bellary Thermal Power Station, Karnataka Power Corporation )
Oct 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
138
6th Oxidizer Line at Cristal Pigment Plant
Sep - 2010 Detail Design Engineering, PDMS Modeling of Mechanical and Piping.
137
Control System for Nitrogen Package
Sep - 2010 Design, Engineering and Commissioning of PLC and Power Distributed Panels
![Page 4: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/4.jpg)
REFERENCE LIST
SL NO CUSTOMER PROJECT DELIVERY REMARKS
136
Electrical Works at LOBS Project Site
Aug 2010 Supply, Installation, Testing & Commissioning of LT Switchgears ( Excluding Supply ), Cabling, Lighting etc at LOBS Project Site
135
PLC Based Control System for Fuel Recovery System
Jul - 2010 Design, Engineering and Commissioning for PLC, MCC and VFD Systems
134
ROC Plant
Jun - 2010
Design and Detail Engineering of Electrical, Instrumentation and control system
133
Electrical and Automation Panel
Apr - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels.
132
OGIP IK WELLHEAD PLATFORM
Apr - 2010 Site survey, design and detail engineering for modification of Existing E-House with deck extension
131
OGIP SD WELLHEAD PLATFORM
Mar - 2010 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
![Page 5: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/5.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
130
GOHDS REVAMP PROJECT AT MRPL
Mar - 2010
Supply and Installation of Electrical & Instrumentation work
129
B193 – Detailed Engineering
Feb - 2010 Pre-Bid Engineering support
128
D1 Development Project
Feb - 2010 Pre-Bid Engineering support
127
Tank Level and Temperature Measurement System
Jan - 2010 Design, Engineering, Commissioning and Supply of Instrumentation and PLC Panel
126
B193 Process Platform
Jan - 2010 Pre-Bid Engineering support
125
PLC System
Jan - 2010
Supply, Installation, Commissioning and Testing of PLC system
124
Electrification of Modified Hall
Jan - 2010
Electrical Works
123
Drive Panels for Printing Machines - 47 Nos.
Dec - 2009
Manufacturing and Supply
![Page 6: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/6.jpg)
REFERENCE LIST
SL NO CUSTOMER PROJECT DELIVERY REMARKS
122
Compression Test Bed Facility at SIEMENS, Vadodara
Dec - 2009
SITC of Electrical and Instrumentation Package
121
HRDC Building
Dec - 2009
Electrical Works
120
, KKNPP
Starter Panel
Nov - 2009
Manufacture, and Supply of Stater Panel
119
,KKNPP
Copper Bus Bar
Nov- 2009
Supply,Fabrication & Installation of Copper Bus Bar
118
Electrical System for Wagon Tippler
Nov - 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical Systems.
117
, DAE , KALPAKKAM
Power Control Center
Nov - 2009
Manufacture,Supply,Erection, Commissioning and Testing of Control panel
116
Electrical and Control systems for Stacker & Reclaimer (Paradeep project of ESSAR STEEL)
Nov - 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
115
6WPP Well Head Platform
Oct - 2009 Pre-Bid Engineering support
![Page 7: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/7.jpg)
REFERENCE LIST
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
114
Orient Cement Plant
Oct - 2009
Manufacture and supply of MCC Panel
113
Orient Cement Plant
Oct - 2009
Manufacture and supply of Control desk
112
Automatic Cotton Feeding System
Oct - 2009
Design, Engineering and Supply of PLC System
111 INS KATTABOMMAN
Modification of compressor control system
Sep - 2009
Manufacture and supply of compressor control system
110 EXCEL TEXTRONICS
VFD Panel
Aug - 2009
Manufacture and Supply of VFD Panel.
109
Drive Panel
Aug - 2009
Manufacture and Supply of Drive Panel.
108
B-193 Well head
Aug - 2009
Pre-Bid Engineering support
107
Automation for 10 MW Bio Mass Power plant
Jun - 2009
Design , Engineering, Supply, Erection and Commissioning of DCS system
![Page 8: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/8.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
106
Fertilizer &Chemical Plant
May -2009
Design and Detail Engineering & supply of PLC control system
105
OGIP IB WELLHEAD PLATFORM
Apr - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
104
OGIP SR WELLHEAD PLATFORM
Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
103
OGIP NH WELLHEAD PLATFORM
Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
102
Electrical and Control systems for Paddle Feeder. (Santaldih Thermal Power plant)
Apr- 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
101
Automation for Amine Sweetening Plant
Apr - 2009
Design , Engineering and Commissioning of PLC system
100
OGIP RS2 WELLHEAD PLATFORM
Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
![Page 9: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/9.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
99
OGIP SE WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
98
OGIP N4 WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
97
OGIP NJ WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
96
OGIP NV WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
95
OGIP SP WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
94
OGIP NM WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
93
OGIP SB WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
![Page 10: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/10.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
92
OGIP IF WELLHEAD PLATFORM
Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
91
Electrical Distribution system with DG sets
Mar- 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical distribution systems and DG sets.
90
Unit - 400
Mar- 2009
Design and Detail Engineering of Electrical, Instrumentation and control system
89
OGIP RS11 WELLHEAD PLATFORM
Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
88
OGIP NO WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
87
OGIP NW WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
86
OGIP SS WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
![Page 11: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/11.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
85
OGIP SJ WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
84
OGIP SN WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
83
OGIP IG WELLHEAD PLATFORM
Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
82
OGIP IA WELLHEAD PLATFORM
Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
81 JEYA VISHNU TEX PROCESSORS PVT LTD
PLC based water level control panel
Feb - 2009
Manufacture and Supply of PLC Control Panel.
80
Automation for Sinter Plant
Feb - 2009
Design , Engineering , Erection and Commissioning of PLC system
79
OGIP SY WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
![Page 12: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/12.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
78
OGIP SM WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
77
OGIP N8 WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
76
OGIP N9 WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
75
Drive Panels for Printing Machines – 21 Nos.
Jan - 2009
Manufacturing and Supply
74
Drive Panels for process Pumps
Jan - 2009
Design ,Engineering , Installation, Erection and Commissioning
73
MHN Process Platform
Dec- 2008
Pre-Bid Engineering support
72
6th Chlorinator
Dec - 2008
Design and Detail Engineering of Electrical, Instrumentation and control system
![Page 13: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/13.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
71
Automatic cotton feeding system
May - 2008
Design, Engineering , Installation, Erection and Commissioning
70
Digital Counting system for Castings
May-2008
Design, Engineering , Installation, Erection and Commissioning
69
Automation of Cup Cake Machine
Mar-2008
Design, Engineering , Installation, Erection and Commissioning
68 GLOBAL CONVEYOR
Automation of Material Handling System
Feb-2008
Design, Engineering , Installation, Erection and Commissioning
67
Automatic cotton feeding system
Feb-2008
Design, Engineering , Installation, Erection and Commissioning of PLC System
66
Design and Detail Engineering of ONGC - OGIP Power to ESP
Jan-2008/ Mar-09
Design and Detail Engineering for Offshore Grid interconnectivity Project comprising of Electrical Instrumentation, Structural modification Telecommunication, Catholic Production, JTube Design, SCADA System etc.,
65
Control Panel for Ready-mix Concrete preparation plant
Nov-2007
Design, Engineering , Installation, Erection and Commissioning of PLC System
64
Automatic cotton feeding system
Aug-2007
Design, Engineering , Installation, Erection and Commissioning of PLC System
![Page 14: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/14.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
63
Automatic cotton feeding system
July-2007
Design ,Engineering , Installation, Erection and Commissioning of PLC System
62
G.KUPPUSWAMYNAIDU MEMORIALHOSPITAL
Automation control panel for chillers p/c and plant room equipments
July-2007
Design ,Engineering , Installation, Erection and Commissioning of PLC System
61
2.5MW Captive Power Plant
July-2007
Design , Engineering , Erection and Commissioning of DCS
60
10MW Bio-Mass Power Plant
July-2007
Design , Engineering , Erection and Commissioning of DCS
59
3 MW Captive Power Plant
May-2007
Design , Engineering , Erection and Commissioning of DCS
58
SAXI – TEG regeneration package
June-2007
Design and Engineering of Gas Dehydration and TEG Regeneration System (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)
57
PURE GROUP -Modec TEG Package
June-2007
13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator
56
FRADE FPSO – TEG regeneration package
June-2007
Design and Engineering of Gas Dehydration and TEG Regeneration System
![Page 15: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/15.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
55
SBM / CHEVRON -FRADE FPSO Desander and Sand Jetting water feed pump package
June-2007
Design & Enginnering of sand removal system
54
PETROBRAS-GENERIC FPSO GAS
Aug-2007
Detailed engineering of Flare and Drain Module,Water Injection Module and Gas dehydration/Fuel gas module.
53
SRKP Field Development – TSIOC/Modec
Aug-2007
FPSO Topsides Basic design and Engineering - production and treatment of 25,000 BOPD
52
SHELL BC-10 FPSO-TEG Package
June-2007
Design and Engineering of Gas Dehydration and TEG Regeneration System(45 MMscfd,11USgpm (99.78% wt TEG conc.)
51
RAS GAS OFFSHORE EXPANSION PROJECT PH-2
Apr-2007
Design engineering of condensate and water strainers (Basket strainers)
50
ARMADA PEKASHA FPSO
Feb-2007
Existing system review and design
49
PETROBRAS- FPSO OPPORTUNITY OIL
Jan-2007
Gas comp capacity of 3,500k m3/day and De-sulphated water inj capacity of 22k m3/day.
![Page 16: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/16.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
48
SBM Saxi Bataque TEG Package
Dec-2006
Design and Engage of Gas Dehydration and TEG Regen Sys (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)
47
SBM/Chevron- FRADE FPSO – Gas Dehydration and TEG Regeneration package
Dec-2006
Design and Engineering of Gas Dehydration and TEG Regen Sys (116.6 MMscfd, 18 USgpm (99.5% wt TEG conc.)
46
PETROBRAS- FPSO OPPORTUNITY OIL
Sep-2006
FPSO Topsides design Engg & (Bidsupport)prodandtreatment of 16k m3/day, Gas comp capacity of 3,500k m3/day & De-sulphated water inj capacity of 22km3/day
45
KIZOMBA- C FPSO MONDO
Sep-2006
Design and Engineering of Gas Dehydration and TEG Regeneration System
44
Premier Oil MERU Project
July-2006
Design, Review and Optimization of Marine Energy Resource Unit (MERU)
43
POLVO-FPSO – COTP 500BPD
May-2006
Design, Review and Optimization of Crude Oil Topping Plant (COTP)
42 Global Techno Systems Engineering
EPCC for MOGA and Transit Line
Mar-2006
Produced water treatment system
41
MODEC INTERNATIONAL LLC / PETROBRAS PRA-1 FSO Project- Fuel Gas Skid Package
Feb -2006
13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator
![Page 17: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/17.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
40
SHELL(SSB)- F13 Glycol Dehydration package
Mar-2006
720 MMSCFD gas flow/ 132 USgpm (98.8% wt Glycol concentration)
39
Ujung Pangkah Development Project Gas Dehydration and TEG Regeneration Package
July-2006
148.8 MMSCFD gas flow/ 30USgpm (98.98% wt Glycol concentration)
38 TESMA/Singapore
PETROCHINA-TBA/TBC- Field Development
April-2006
FPSO Topside Process and Utilities
37 JORD International
PTTEP Arthit Field Development Central Facilities
Nov-2005
HP Production Separator Sand Jet Design case
36
COOEC
HZ21-1 Development Project
Aug-2005
Commissioning services
35
Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil
July-2005
Separators Design Assistance
34
SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia
Dec-2005
FEED for gas Processing Facility
33
FPSO Kikeh-Murphy Sabah Oil.Ltd. - Chemical Injection Package
Nov-2005
Chemical Injection System
![Page 18: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/18.jpg)
REFERENCE LIST
SL NO CUSTOMER PROJECT DELIVERY REMARKS
32
FPSO Kikeh-Murphy Sabah Oil.Ltd.- Nitrogen Generator Package and Nitrogen Intensifier
Nov-2005
Membrane Technology, N2 purity 95%, 100 Nm3/hr
31
FPSO Kikeh-Murphy Sabah Oil.Ltd.- Gas Dehydration And TEG Regeneration Package
Nov-2005
141 MMscfd / 19 USgpm( 99.8% Wt Glycol Concentration)
30 CACT OG, China.
Feasibility Study for Marginal Field Development
Dec-2005
Feasibility Study
29
Panyu 4-2/5-1 Well head Platform Modifications.
Sep-2005
Pre-Commissioning and Commissioning Procedure & IOM
28
OKUME TLP – Modec International
May-2005
Methanol Injection System
27
OKUME TLP – Modec International
May-2005
Methanol Injection System
26
OKUME TLP – Modec International
May-2005
Chemical Injection System
25
OKUME TLP – Modec International
May-2005
Chemical Injection System
![Page 19: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/19.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
24
SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia
May-2005
Sea Water Treatment And Deaeration- Conceptual Design
23
Rong Doi Field Development/Vietnam For Korean National Oil Corporation
June-2005
201 MMscfd / 18 USgpm( 99.0% Wt Glycol Concentration)
22
Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil
May-2005
121 MMscfd / 7.5 USgpm( 99.5% Wt Glycol Concentration)
21
PC Myanmar (Hong Kong) Ltd
FEED
Mar-2005
Pipeline Heaters
20
Back Processing Facility Block 51
Nov-2004
On Shore Processing Facility, Tank Form, Utilities Etc.
19
D1 WWIP
Sep-2004
Fine Filters Package
18
Sumatec Corporation Sdn.Bhd
Rehmat Gas Processing Facilities/Bid Support
June-2003
2 x 62 MMscfd / 10 gpm
17
/NanHaiwest
FPSO (Hai Yang She You 111) Debottlenecking Project
June-2004
FPSO Capacity Upgrade Studies
![Page 20: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/20.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
16
PCSB –Fuel Gas Package- Bid Support
May-2004
Fuel Gas Package
15
BR-E CO2 Topsides Talisman Malaysia Limited
Dec-2004
Condensate Stabilization And Flash Gas Recovery
14
Basis and Detailed Engineering of BAOBAB FPSO Gas Processing Module
May-2004
Gas Dehydration, Gas Hydrocarbon Dew point Control, Gas Metering
13
Basis and Detailed Engineering of BAOBAB FPSO Separation Packages – 4 Skids
May-2004
RVP, BS&W, OIL IN WATER
12
Gas Dehydration And TEG Regeneration Facility -Venezuela
July-2003
2 x 17 MMscfd / 3.4 gpm
11 CPOC/Thailand
CO2 Removal Facility/Bid Support
June-2003
468 MMscfd, CO2 Mole frac.0.4335
10
Training for IBA / EXXON Mobil - Gas Dehydration And TEG Regeneration System/Bid Support
April/May 2003
Training – Operators and Engineers
9 Prai Power Sdn.Bhd.
TENAGA NAZAR - Trouble Shooting/ (350MW Combine cycle gas turbine project Prani, Pulau Pinang .Malaysia)
Feb-2003
Trouble shooting of Diesel Handling System
![Page 21: KEAS ReferenceList Jan · PDF fileIK WELLHEAD PLATFORM Apr - 2010 Site survey, ... Desander and Sand ... KEAS ReferenceList Jan 29th](https://reader031.vdocuments.site/reader031/viewer/2022022004/5aaaa4f47f8b9a77188e712d/html5/thumbnails/21.jpg)
REFERENCE LIST SL NO CUSTOMER PROJECT DELIVERY REMARKS
8
Salman Oil & Gas Field, Gas Dehydration And TEG Regeneration System
July-2003
2 x 300 MMscfd / 55 GPM
7
KINARUT Development - ERB West Tie - in
May-2003
150 MMscfd / 6 GPM
6
MISC - FPSO Project- Gas Dehydration System
May-2003
60 MMscfd / 14 GPM
5
BOABAB Field Development-FPSO Topsides / CNR International (Côte d' Ivoire) S.A.R.L.- Bid Support
Nov-2003
90,000 BPD with 78% Water Cut/ 64 MMscfd/ 9 GPM
4
Espadarte FPSO Brazil - Trouble Shooting of Gas Dehydration Facility
Dec-2003
100 MMscfd
3 General Electric/
Turbine Encloser Structural General Arrangement
Dec-2003
Engineering Support
2
OKUME & OVENG Field's - FPSO Topsides Triton Eqaterial Quinea Inc./Bid Support
Oct-2003
230,000 BPD with 60% Water cut. Gas Flow Rate 70 MMscfd
1 Santa Fe Energy Resources Of China,Ltd. / China Offshore Oil Nanhai West Corporation
Process Design Engineering of PANYU FPSO Topsides
May-2002
220,000 BPD with 0-90% Water Cut, Highly Waxy, High Dew point