KAUAI ISLAND UTILITY COOPERATIVEENERGY STORAGE – YESTERDAY, TODAY, AND TOMORROW
![Page 2: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/2.jpg)
WHO WE ARE
• Sole electric utility for the island of Kauai
• Not for Profit Rural Electric Co-op
• Over 37,000 meters
• Over 44% of power generated by renewables in 2017
• Goal of 50% renewable by 2023, 70% by 2030
![Page 3: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/3.jpg)
KIUC INTERCONNECTION PROCESS
• KIUC publishes RFO for land
• KIUC publishes RFP for EPC Company
• KIUC Selects site and EPC
1. Based on our grid needs, price, ability, etc.
2. Negotiates directly with land owners; EPCs
• KIUC develops infrastructure (if needed)
• Co-op has access to low interest $
• Fast execution
• Process results in lower cost Purchase Power Agreement (PPA)
![Page 4: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/4.jpg)
YESTERDAY – STORAGE FOR STABILITY
• Three 1.5 MW / 1.0 MWh BESS – Extreme-Advanced Lead Acid
• 6.0 MW / 4.5 MWh BESS – Saft-Lithium Ion
• Sited near PV
• Minimal interconnection issues
![Page 5: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/5.jpg)
TODAY – STORAGE FOR LOAD SHIFTING & CONTROL
• Tesla PV + BESS – May 2017
• AES Lawai PV + BESS – December 2018
• AES PMRF PV + BESS – November 2019
![Page 6: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/6.jpg)
![Page 7: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/7.jpg)
![Page 8: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/8.jpg)
TOMORROW – STORAGE IS THE GRID
• Westside pumped storage + PV – 2022-2023 in service
• Over 80% of electricity generated from renewables
• Over 35% of daily electricity will be sourced by storage
• Storage “Units” will control the grid
![Page 9: Kauai Island Utility CooperativeWHO WE ARE •Sole electric utility for the island of Kauai •Not for Profit Rural Electric Co-op •Over 37,000 meters •Over 44% of power generated](https://reader035.vdocuments.site/reader035/viewer/2022081516/5f48b7737d129b07481c073a/html5/thumbnails/9.jpg)
SUMMARY
• KIUC Storage Interconnections have resulted or will result in:
1. Low cost PPAs
2. Fast implementation
3. Improved substation infrastructure
4. Improved customer satisfaction (Navy)
5. Over 80% of island electricity generated by renewables
Questions / Comments [email protected]