kate hughes + matthew kuzio - saving a toxic city through eco banking

Upload: asia-clean-energy-forum

Post on 07-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    1/12

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    2/12

    Poverty 60% of the city population lives in the Ger Districts (200,000 households).

    The average household income is 240,000 MNT ($148 USD). The bottom fifth quintile spend as much as 40% of their monthly winter

    income on heating fuels.

    Climate 9 Month Heating Season

    Average Winter Temperature: -20C

    Pollution On average, households located in the Ger Districts use 5 tons of coal and 1.5

    tons of wood per year. Most polluted city in the world by particulate matter during heating season

    Sources: - ADB Grant Assistance Report August 2008- Energy Efficient and Cleaner Heating in Poor, Peri-urban Areas of Ulaanbaatar,

    World Bank Consultant Summary Report on Activities, October 2008

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    3/12

    Where to Start? Addressing Market Barriers.

    Financing Products Marketing/ Distribution Long Term Program Sustainability

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    4/12

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    5/12

    Part 2: The Role of the Voluntary Markets

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    6/12

    Ger pollution before use of

    Financed Energy Efficient Product

    8 Tons 3 Tons

    Ger pollution after use of

    Financed Energy Efficient Product

    CO2 reduced

    by 5 Tons

    5 Tons XCarbon

    Creditsold by

    MEC=$$

    for bank

    Carbon Offset Basics Carbon Financing

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    7/12

    Carbon Monitoring

    1. Product is monitored at time of installation via smart phone (GPS iscollected and installation is confirmed as active)

    2. XacBank follows up every three months with the client through phone oran in-person visit

    Monitoring Methodology prepares program for CDM accreditation via PoA

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    8/12

    CarbonOffsets

    Generatedby User

    CarbonOffsets

    Generatedby User

    CarbonOffsets

    Generated

    by User

    CarbonOffsets

    Generated

    by User

    Day 0: Product Installed

    and Monitored

    Day 91: Product

    Monitored by Phone

    Day 183: ProductMonitored In-Person

    Day 274: Product

    Monitored by phone

    Carbon Payment Cycle

    of Yearly CarbonRevenue Earned

    of Carbon YearlyRevenue Earned

    of Carbon YearlyRevenue Earned

    of Yearly CarbonRevenue Earned

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    9/12

    CarbonOffsets

    Generatedby User

    CarbonOffsets

    Generatedby User

    CarbonOffsets

    Generated

    by User

    CarbonOffsets

    Generated

    by User

    $5.00

    $5.00$5.00

    $5.00

    Hypothetical 1: Product Operated Year Round

    Assumptions:Yearly Offset: 4 tonsPrice per ton: $5

    Yearly Revenue: 4 x $5 = $205 year Revenue: 5 x $20 = $100

    Day 0: Product Installed

    and Monitored

    Day 274: Product

    Monitored by phone

    Day 91: Product

    Monitored by Phone

    Day 183: ProductMonitored In-Person

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    10/12

    CarbonOffsets

    Generatedby User

    CarbonOffsets

    Generatedby User

    CarbonOffsets

    Generated

    by User

    Product Notin Use - no

    Offsets

    Generated

    $5.00

    $5.00

    $5.00

    Day 0: Product Installed

    and Monitored

    Day 274: Product

    Monitored by phone

    Day 91: Product

    Monitored by Phone

    Day 183: ProductMonitored In-Person

    Assumptions:Yearly Offset: 4 tonsPrice per ton: $5

    Yearly Revenue: 3 x $5 = $155 year Revenue: 5 x $15 = $75

    Hypothetical 2: Product Operated 9 months

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    11/12

    Voluntary Markets CDM Markets

    Registration Costs: $0 $200,000+

    Registration Period: 0 to 9 months 550+ Days

    Price per Ton: $5 to $7 Market (2011 Est. $15)

    Credit Pre-purchase: No/ Not Yet Yes

    Validation Period: 5 years 10 to 21 years

    Voluntary Markets v. CDM

  • 8/6/2019 Kate Hughes + Matthew Kuzio - Saving a Toxic City Through Eco Banking

    12/12

    XacBank will Use The Carbon

    Revenues To:Takeaways/Discussion Points:

    - Voluntary Markets are aviable avenue, but not a cureall for all small scale projects

    - Match standards for smallscale projects to the rigorouslevels of the compulsorymarkets

    - Further incorporate lessonsfrom the Voluntary markets

    within the larger carbonmarket debate