KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY PROJECT BIO-DIVERSITY PARK AT MADIWALA LAKE BID DOCUMENTS [National Competitive Bidding(NCB)] Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake Volume 1 GeneralRequirements JANUARY2016 CHIEF EXECUTIVE OFFICER; KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN, CHURCH STREET, BANGALORE 560 009, KARNATAKA,INDIA

Upload: hoangdat

Post on 01-Feb-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BID DOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4MLD Sewage Treatment Plant at

Madiwala Lake

Volume 1

GeneralRequirements

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 2: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 1 of 55 Bid Document

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BID DOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4 MLD Sewage Treatment Plant at

Madiwala Lake

TURNKEY CONTRACT

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 3: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 2 of 55 Bid Document

Summary of Contents

Volume 1: GeneralRequirements

Invitation for Bids

Section 1 : Instruction to Bidders

Section 2 : General Conditions

Section 3 : Appendix to Tender

Section 8 : Sample Forms

Volume 2: Employer’sRequirements

Section 4 : Technical Specifications (Part 1to Part 17)

Section 5A : Form of Technical Proposal

Section 6 : Technical Schedules

6A : Qualification Criteria Bidder

6B : Qualification Criteria Technology/Process

6C : Qualification Criteria Civil Contractor

Volume 3: PriceProposal

Section 5B : Form of Price Proposal

Section 7 : Payment Schedule for Interim Valuations

Volume 4:Drawings

Drawings 4A : Madiwala Kere Layout

4B : Existing Plant Layout

4C : Existing UASB drawings

4D : Treatment Process & Flow Chart

4E : Tentative P & ID

Page 4: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 3 of 55 Bid Document

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BID DOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4 MLD Sewage Treatment Plant at

Madiwala Lake

INVITATION FOR BIDS(IFB)

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 5: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 4 of 55 Bid Document

INVITATION FOR BIDS

IFB No. No:KLCDA/Mdl.Lake-STP/Tender/Notification/

2015-16/1031

Date: 04.01.2016

Name of Contract: UPGRADATION OF THE 4 MLD STP AT MADIWALA LAKE

Project Name: BIO-DIVERSITY PARK AT MADIWALA LAKE

STP in Contract: 4 MLD STP MADIWALA LAKE

1. Madiwala lake is located in Begur Hobli, Bangalore South Taluk having an total

extent of 275A–13G. The lake at present is the custody of Forest

Department.A primary sewage treatment plant having a capacity of 4MLD had

been installed in the lake land which is being maintained by the BWSSB. The

treated water from the STP enters into the oxidation ponds and in turn it

enters into main water body of the lake. Based on the recommendation of

Karnataka Knowledge Commission, the Government of Karnataka has

approved the project “BIO DIVERSITY PARK AT MADIWALA LAKE”and given

administration approval vide its Order No.FEE 80 ENV 2015,dated 07.10.2015

for development of Bio-diversity Park at Madiwala lake for the year 2015-16.

It was decided that the agency in the state for administering the project was

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY (KLCDA),

who should implement and maintain the project as per the advice of Prof Babu,

New Delhi. The total estimated budget for implementation of the Bio-diversity

Park at Madiwala lake works out to Rs.24.72 crores. In the said project,

provision has been made for upgradation of present 4MLD STP at Madiwala

lake with an project cost of Rs.12.0 Crores.

2. The KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY

(KLCDA),is the Executing Agency, for upgrading the present 4MLD

capacity STP under construction of Biodiversity Park at Madiwala lake.

Page 6: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 5 of 55 Bid Document

KLCDA requires that bidders and contractors, under contracts funded

with Government Approved sanction, observe the highest standard of

ethics during the procurement and execution of such contracts. In

pursuance of this policy,

(a) reject a proposal for award if it determined that the bidder

recommended for award has engaged in corrupt or fraudulent

practices in competing for the contract in question; and

(b) recognize a contractor as ineligible, for a period determined by

KLCDA, to be awarded a contract funded with Government

Approved Sanction if it at any time determines that the

contractor has engaged in corrupt or fraudulent practices in

competing for, or in executing, another contract funded with

Government Approved Sanctions

3. The KLCDA has decided to invite the tender for the Upgradation work at

Madiwala Lake STP of 4 MLD capacity by following the Govt. Order No FD 9 PCL

2004 (I), Bangalore, dated: 06.08.2005 complying with the KTPP Act and its

subsequent amendments. The tenders has to operate and maintain the

Upgraded Sewage treatment plant for the period of 7 (seven) years. As for the

finance concern for the Operation and Maintenance expenses of the upgraded

Sewage Treatment Plant, for the period of 7(seven) years, KLCDA will take

appropriate measures.

4. KLCDA through the CHIEF EXECUTIVE OFFICER, ("the Employer") invites

tenders from eligible tenderers, for the work detailed in the Table below &

the tenderers may submit tenders for the work in Two Cover tender

procedure as per Rule 28 of the KTPP Act, shall be followed through e-

Procurement portal. The tenderers are required to submit the Earnest

Money Deposit and the details of their capability to undertake the tender

(as detailed in ITB Clause 3 & 5) through e-Procurement portal, which will

be opened first and the price tender which will be opened only if the

Tenderer is found to be qualified in technical bid to execute the tendered

work.

Page 7: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 6 of 55 Bid Document

The bids through e-portal and separately in sealed envelops from all

Eligible Bidders as defined in Clause 3 Section I of Instructions to Bidders,

of Bid Document who also meet the 'Qualification Criteria' as set out under

Section 6: Technical Schedules, Volume II of Bid Documents, for Design,

Supply, Construction, Installation, Testing, Commissioning, and Operation

and Maintenance for a period of seven (7) years of the Upgraded 4 MLD

Sewage Treatment Plant. This includes all Civil, Mechanical, Electrical,

Instrumentation, and any and all allied Works necessary for fully functional

and operational installations and facilities capable of meeting all

performance and other requirements specified in these bid documents. The

bidding and evaluation process is based on 'Initial Filter' and the bid which

meets the Qualification Criteria set down in Section 6:Technical Schedules

of Volume 2 of Bid Document will only be taken up for further evaluation.

Tender documents may be downloaded from Government of Karnataka

e-Procurement website https://eproc.karnataka.gov.in/eportal/index.seam

login under “contractors”. Tenders must be accompanied by Earnest

Money Deposit to be paid online through e-Procurement portal as per

Table below.

TABLE :-

SL

No Name of the work

Approx

Cost put

to

Tender

(Rs in

lakhs)

EMD

(Rs

in

Lakh

s)

Tender

Processing

Fee

Time for

completion

1 Upgradation of4MLD

Sewage Treatment Plant

in Madiwala Lake in

Begur Hobli, Bangalore

South Taluk

1200.00 12.00 Refer

e-procurement

Portal

12 Months

Page 8: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 7 of 55 Bid Document

Table

FOLLOWING SHALL BE THE CALENDAR OF EVENTS FOR TENDERING :

Availability of Tender documents ::: 11/01/2016 at 16.00 – Hours Pre-bid Meeting ::: 10/02/2016 at 16.00 – Hours Last date & time for receipt of Tender ::: 11/03/2016 at 16.00 - Hours Date & time for opening of Technical Bid

::: 15/03/2016 at- 11.00 - Hours

Opening of Financial Bid ::: Will be intimated to the Qualified Tenderers

5. Bidders should download the complete set of bid documents from the

website https://www.karnataka.gov.in/ldakarnatakaafter obtaining a

user ID and passwordafter 16.00 Hours on 11th of January 2016.The

fee shall be payable through e-portal.

Bidders may obtain further information and inspect the Bid Documents

at the office of the Employer, at the following address:

Office of the Chief Executive Officer,

Karnataka Lake Conservation and Development Authority,

No.49, Parisara Bhavan, 2nd Floor,

Church Street, Bangalore-560001

Karnataka. INDIA

Tel: 080-25590098 Fax: 080-25550698

e-mail:[email protected]

6. A two-envelope National Competitive Bidding (NCB) procedure (Technical

and Price Proposals) will be adopted. Bidders are required to

simultaneously submit their Technical Proposal and also Price Proposal

in electronic form by uploading to the electronic tender box on the

website https://www.karnataka.gov.in/ldakarnataka. Additionally,in two

separate sealed envelopes two copies of the Technical proposal is

required to be submitted in paper form at the Office of the Chief

Executive Officer, KLCDA at the above mentioned address on or before

the Date and Time mentioned in the instruction to the bidder elsewhere.

Initially only the Technical Proposals submitted will be opened.

Page 9: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 8 of 55 Bid Document

Technical Proposals that do not meet all requirements of the bid

documents and technical specifications will be rejected. If

necessary, the Employer will seek clarification of the Technical Proposals

to get additional information to fully understand the proposals or to

determine whether or not the requirements of the Bid Documents are

met, but no change in the price or substance of the bid shall be

sought, offered, or permitted. At the end of the evaluation of Technical

Proposals and after receiving the approval of TECHNICAL COMMITTEE

(KLCDA), the Employer will invite bidders who have submitted,

substantially responsive (as defined in Instruction to Bidders)

Technical Proposals and who have been determined as being qualified

to attend the bid opening of the Price Proposals. All other bids will be

rejected and the Price Proposals for these bids will not be opened.

7. Bids delivered after the due date and time stated above will be declared

"Late" and such late bids shall berejected.

8. The Employer will not be responsible for any costs or expenses incurred

by the bidders in connection with preparation or delivery of bids.

9. The Employer reserves the right to accept any bid, or reject any or all

bids, without assigning any reason therefore and without thereby

incurring any liability to the bidder or bidders.

10. The Price Proposals shall be submitted in electronic form by

uploading to the web site as given in Para 4 above prior to the

deadline of submission of Bids. The system will automatically

generate a time stamp that will acknowledge the submission of the

Price Proposal by each Bidder. Price Proposals will be opened in the

presence of representatives of technically qualified bidders who

choose to attend at a time and at an address to be determined and

announced by the Employer after TECHNICAL COMMITTEE (KLCDA)

approval of the evaluation of the Technical Proposals based on the

Qualification Criteria in Section 6 Technical Schedules in Volume 2 of

the Bid Document. The time, date and location of bid opening of the

Page 10: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY VolumeI- GeneralRequirements

Upgradationof4MLDSewageTreatmentPlantatMadiwalaLake

Section 1: Instruction to Bidders Page 9 of 55 Bid Document

Price Proposals will be intimated in writing by post or by fax by the

Employer.

11. A Pre-bid meeting will be held on 10th February2016, at 16.00 hrs in

the office of the undersigned subsequent to the joint site visit in the

morning at 11.00 hours, to give prospective bidders the opportunity

to ask questions and get clarifications on the bid documents. The

Bidder is expected to plan to visit(s) to the Madiwala Lake STP site

before the Pre-bid meeting and apprise himself of the ground

realities and status of each of the existing equipment. The bidders

are requested to submit their queries, if any, in writing, to reach

Employer no later than Three (3) working day before this meeting.

Bidders should refer to Section1, Instruction to Bidders, for specific

procedures to be followed in submitting queries, and other details

about responses to queries and the pre-bid meeting.

CHIEF EXECUTIVE OFFICER KARNATAKLAKE CONSERVATION AND DEVELOPMENT AUTHORITY

Page 11: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 10 of 55 Bid Document

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BID DOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4 MLD Sewage Treatment Plant at

Madiwala Lake

INSTRUCTIONS TO BIDDERS (ITB)

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 12: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 11 of 55 Bid Document

SECTION 1 – INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

a. GENERAL ............................................................................................. 1

1. Scope of Bid ........................................................................... 1 2. Source of Funds ...................................................................... 1 3. Eligible Bidders ....................................................................... 2

4. Eligible Equipment and Services ................................................ 2 5. Qualification of the Bidder ........................................................ 2

6. One Bid per Bidder .................................................................. 3 7. Cost of Bidding ........................................................................ 3 8. Site Visit ................................................................................... 3

b. BIDDOCUMENTS ................................................................................... 4

9. Content of Bid Documents .......................................................... 4

10. Clarification of Bid Documents ................................................... 5 11. Amendment of Bid Documents .................................................... 5

c. PREPARATION OF BIDS .......................................................................... 5

12. Language of Bid ........................................................................ 5

13. Documents Comprising the Bid ................................................... 6

14. Bid Prices ................................................................................. 7 15. Currencies of Bid and Payment ……………………………………………………… 8

16. Bid Validity……………………………………………………………………………………….. 9 17. Bid Security …………………………………………………………………………………….. 9

18. Alternative Proposals by Bidders ……………………………………………………. 10 19. Pre-Bid Meeting ………………………………………………………………………………… 10 20. Format and Signing of Bid ……………………………………………………………… 11

d. SUBMISSIONOF BIDS ........................................................................ ..11

21. Sealing and MarkingofBids……………….…………………………………………… 11

22. Deadline for Submission of Bids ……………………………………………………. 12

23. Late Bids …………………………………………………………………………………………. 13

24. Modification and Withdrawal of Bids………………………………………………. 13

e. OPENING AND EVALUATION OF TECHNICAL PROPOSALS .......................... 13

25. Opening of Technical Proposals .................................................. 13 26. Process to be Confidential ......................................................... 14

27. Preliminary Examination of Technical Proposals and

Determination of Responsiveness ............................................... 14 28. Evaluation and Comparison of Technical Proposals ................... 14

29. Clarification of Technical Proposal ………………………………………………… 15 30. Invitation to Attend Opening of Price Proposals………………….……..… 15

f. OPENING AND EVALUATION OFPRICEPROPOSALS …………………………………… 16

31. Opening of Price Proposals ........................................................ 16

Page 13: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 12 of 55 Bid Document

32. Process to be Confidential ......................................................... 16 33. Preliminary Examination of Price Proposals and

Determination of Responsiveness …………………………………………….16 34. Clarification of Price Proposals ................................................... 16 35. Correction of Errors .................................................................. 17

36. Conversion to Single Currency ................................................... 17

37. Evaluation and Comparison of Price Proposals ............................. 17 38. Domestic Preference ................................................................. 19

g. AWARD OF CONTRACT .......................................................................... 19

39. Award .......................................................................................... 19

40. Employer's Right to Accept any Bid and to Reject Any or All Bids ... 19 41. Notification of Award .................................................................... 19 42. Signing of Agreement ............................................................... 20 43. Performance Security ........................................................................................... 20

Page 14: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 13 of 55 Bid Document

SECTION 1

INSTRUCTIONTOBIDDERS

a. GENERAL

1.Scope of Bid 1.1 The Karnataka Lake Conservation and Development Authority

(KLCDA),through the CHIEF EXECUTIVE OFFICER(KLCDA),

Bangalore (hereinafter referred to as the Employer), wishes to

receive bids for Design, Supply, Construction, Installation,

Testing, Commissioning, and subsequently Operation and

Maintenance for a period of seven (7) years of the Works as

defined in the Invitation for Bids.

1.2 The successful bidder will be required by contract to complete the

Design, Construction, Installation, Testing, and Commissioning of

the Works within Twelve (12) months from the Commencement

Date and shall thereafter provide O&M services for seven (7)years.

2. Source of Funds 2.1 The KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY (KLCDA), is the Executing

Agency, for upgrading the present 4MLD capacity STP under

construction of Bio-diversity Park at Madiwala lake project. As

for the remaining portion mainly the Operation and Maintenance

expenses of the upgraded Sewage Treatment Plant,

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY will take appropriate measures

for finance.

Based on the recommendation of Karnataka Knowledge

Commission, the Government of Karnataka has approved the

project and given administration approval vide its Order No.FEE

80 ENV 2015, dated 07.10.2015 for development of Bio-

diversity Park at Madiwala lake for the year 2015-16. It was

decided that the agency in the state for administering the project

was KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY (KLCDA), who should

implement and maintain the project as per the advice of Prof

Babu, New Delhi. The total estimated budget for implementation

of the Bio-diversity Park at Madiwala lake works out to Rs.24.72

crores. In the said project, provision has been made for

upgradation of present 4MLD STP at Madiwala lake with an

project estimatedcost of Rs.12.0 Crores.

2.2 Technical Committee KLCDA (TC KLCDA) requires that

bidders and contractors, as well as KLCDA, under contract

is funded with Government Approved Sanctions observe the

highest standard of ethics during the procurement and execution

of such contracts. In pursuance of this policy, KLCDAwill;

a. reject a proposal for award if it determines that the bidder

recommended for award has engaged in corrupt or

fraudulent practices in competing for the contract in

question and

Page 15: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 14 of 55 Bid Document

b. recognize a contractor as ineligible, for a period

determined by TC KLCDA, to be awarded a contract

funded with Government Approved Sanctions if it at any

times determines that the contractor has engaged in corrupt

or fraudulent practices in competing for, or in executing,

another contract funded with Government Approved

Sanctions.

3. EligibleBidders 3.1 This Invitation to Bid is open to Eligible Bidders only. Eligible

bidders are those that meet both of the following requirements:

The Bidder shall be from the eligible source country INDIA,

and

The Bidder (applies to all members in case of a joint venture)

shall not be one of the following:

(i) A firm or an organization which has been engaged by the

Employer to provide consulting services for the preparation related

to procurement for or implementation of this project

(ii) An associate or affiliate (inclusive of parent firm) of a firm or an

organization that falls under sub-clause (b)(i)above

(iii)A firm or an organization who lends, or temporarily seconds its

personnel to firms or organizations which are engaged in

consulting services for the preparation related to procurement for

or implementation of the project, if the personnel would

be involved in any capacity on the same project.

3.2 Each bidder (all members in case of a joint venture) shall provide

a

statement that it complies with Clause 3.1 in all respects and provide

such further evidence of their eligibility as the Employer may

reasonably require.

4.Eligible Equipment 4.1 Eligible source Country is INDIA only.

and Services

Page 16: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 15 of 55 Bid Document

5. Qualification oftheBidder 5.1 To be qualified for award of Contract, bidders shall be required

to satisfy all of thefollowing:

(a) meet the eligibility criteria described in Clause 3above;

(b) submit an original written power of attorney authorizing

the signatory of the bid to commit the bidder to bid for this

contract;

(c) submit all requisite information with documentary

evidence as required and set out in Schedule I:

Qualification Criteria, Section 6: Technical Schedules,

Volume 2 of Bid Documents, clearly demonstrating that

the bidder meets all the Qualification Criteria specified.

The bidding and evaluation process is based on ‘Initial Filter’

and the bid which meets the Qualification Criteria set down in

Section 6: Technical Schedules will only be taken up for further

evaluation.

5.2 Bids submitted by a joint venture of two or more firms as

partners shall comply with the followingrequirements:

(a) the bid, and in case of the successful bid, the Form of

Agreement, shall be signed so as to be legally binding on

all partners;

(b) one of the partners shall be authorized to be in charge and

this authorization shall be evidenced by submitting a

power of attorney signed by legally authorized signatories

of all the partners;

(c) the partner-in-charge shall be authorized to incur

liabilities, receive payments, and receive instructions for

and on behalf of any or all partners of the joint venture for

the entire execution of the contract;

(d) all partners of the joint venture shall be jointly and

severally liable for the execution of the Contract in

accordance with the Contract terms, and a statement to

this effect shall be included in the authorization mentioned

under (b) above as well as in the Bid Form and the Form

of Agreement (in case of a successful bid);

(e) a copy of the agreement entered into by the joint venture

partners shall be submitted with the Technical Proposal;

(f) the bid shall include all the information listed in Sub-

clause 5.1above.

6. One Bidper Company 6.1 Each individual company may participate in only one bid by

itself or as a partner in a joint venture. Further, no company may be a subcontractor on one bid while participating in another bid individually or as a partner of a joint venture in the same

Page 17: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 16 of 55 Bid Document

bidding process. However, a company may participate in more

than one bid if its role in all the bids is that of a subcontractor.

Any company violating these restrictions as well as all bids

associated with such company will be automatically

disqualified.

7. Cost ofBidding 7.1 The bidder shall bear all costs associated with the preparation

and submission of its bid and the Employer will in no case be

responsible or liable for those costs, regardless of the conduct or

outcome of the tendering process.

8. Site Visit 8.1 The bidder is advised to visit and examine the Site(s) of the

Works and surroundings and obtain for itself on its own

responsibility and at its own expense, all the information that

may be necessary for preparing the bid and entering into this

contract. The bidder agrees that missing or incomplete

information in the Bid Documents shall not be entertained as a

basis for any type of claim by thebidder.

8.2 The bidder and any of its personnel or agents will be granted

permission by the Employer to enter upon its premises and lands

for the purpose of such inspection, but only upon the express

condition that the bidder, its personnel, and agents, will release

and indemnify the Employer and its personnel and agents from

and against all liability in respect thereof and will be responsible

for death or personal injury, loss of or damage to property, and

any other loss, damage, costs or expenses incurred as a result of

the inspection.

8.3 The Employer may conduct a Site Visit concurrently with the

Pre-Bid Meeting referred to in Clause19.

B. BID DOCUMENTS

9. Content of Bid Documents 9.1 The bid documents consist of the components listed below, and

should be used in conjunction with any Addenda issued in

accordance with Clause 11:

Volume 1 : General Requirements Invitation for Bids

Section 1: Instructions to Bidders Section 2: Part I – General Conditions Section 3: Appendix to Tender Section 8: Sample Forms

Volume 2 : Employer’s Requirements

Section 4: Technical Specification

Section

Section 6

5A: Form of Technical Proposal

Technical Schedules

Page 18: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 17 of 55 Bid Document

Volume 3: Price Proposal

Section 5B: Form of Price Proposal

Section 7 Schedule of Prices & Schedule of Payments

Volume 4: Drawings

Drawings

9.2 The bidder is expected to examine carefully the contents of the

bid documents. Failure to comply with the requirements of bid

submission will be at the bidder’s own risk. Pursuant to Clause

28, bids which are not substantially responsive to the

requirements of the Bid Documents will be rejected.

10. Clarification of Bid Documents

9.3 Bidders are informed that the site investigation (topographical survey, geotechnical investigations, high flood level, etc. but not be limited to this) information which may be provided is general informational purposes only and the Employer does not warrant either its accuracy or adequacy. Bidders agree that they may choose to use this information in preparing their bids at their own risk and no claims of any kind will be allowed based on this information. Bidders are responsible for obtaining on their own any and all site information they deem necessary in order to prepare theirbids.

10.1 A prospective bidder requiring any clarification of the bid

documents may notify the Employer in writing by post or by fax

(hereinafter, the term “fax” is deemed to include electronic

transmission such as facsimile, cable, e-mail and telex) at the

Employer’s address indicated in the Invitation for Bids. The

Employer will respond to any request for clarification which it

receives not later than Three (3) working days prior to the day of

Pre Bid Meeting. Bidder shall use Bidder Query Form as given

in Section 8, Volume 1 of the Bid Document for sending their

queries. Copies of the Employer’s response will be forwarded to

all purchasers of the Bid Documents, including a description of

the inquiry, but without identifying its source.

11. Amendment of Bid

Documents

11.1 At any time prior to the deadline for submission of bids, the

Employer may, for any reason, whether on its own initiative or

in response to a clarification requested by a prospective bidder,

modify the Bid Documents by issuing addenda.

11.2 Any addendum thus issued shall be part of the Bid Documents

pursuant to Sub-Clause 9.1, and shall be communicated in writing or by fax to all purchasers of the Bid Documents. Prospective bidders shall acknowledge receipt of each addendum by fax to the Employer within one working day of receipt. Submission of a bid shall be deemed acknowledgement by bidder of all addenda issued, regardless of whether or not bidder explicitly acknowledges each addendum.

Page 19: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 18 of 55 Bid Document

11.2 To afford prospective bidders reasonable time in which to take

an addendum into account in preparing their bids, the Employer

may extend the deadline for submission of bids, in accordance

with Clause22.

C. PREPARATION OF BIDS

12. Language of Bid 12.1 The bid and all correspondence and documents related to the bid

exchanged between the bidder and the Employer shall be written

in the English language.

12.2 In case of any of the submitted documents, like Power of

Attorney, Letter of Acceptance, Work Order, Work Completion

Certificate and /or Experience Certificate etc; are in a language

other than English, then notarized English translation of the

documents shall also be submitted along with the original

documents. The English translation shall include an affidavit of

the translator regarding the literal conformity of the transcript

with the original text. Such document shall be authenticated by

the Embassy / Consulate of that country inIndia.

12.3 For all purposes of bid the translation as mentioned in the

preceding sub paragraph above shall govern.

13. Documents in the Bid 13.1 The bid submitted by the bidder shall comprise two ways – one

through e-portal ( Technical & Price bids separately) and second

in two envelopes submitted simultaneously, both containing only

the Technical Proposal ( two copies).

13.2 The Technical Proposal shall comprise: Volume 1: General

Requirements, Volume 2: Employer’s Requirements, covering

the fully completed Technical Specifications Section 6

Technical Schedules, and Volume 4: Drawings. Without limiting

the generality of the foregoing, the hard copy of Technical

Proposal shall include but not be limited to following:

(i) Proof of Bid Security in a separate envelope;

(ii) Original of the Power of Attorney for authorized signatory

for this bid;

(iii) Fully completed Schedules in Volume 2 Section 6;

including the required qualification information.

(iv) Bid Form for Technical Proposal, signed by the authorized

signatory;

(v) Appendix to Tender, signed by the authorized signatory;

(vi) In the case of Joint Ventures, a copy of the agreement

entered into by the joint venture partners.

(vii) Statements from the bidder (and each member of a joint

venture) in accordance with clause3.2;

Page 20: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 19 of 55 Bid Document

(viii) The portions of the Original Bid Documents issued by the

Employer related to the Technical Proposal, duly stamped

and initialed by the authorized signatory.

(ix) Any other information/data required to be submitted in the

Technical Proposal by the bidders in accordance with

these Instructions to Bidders.

13.3 The Price Proposal shall comprise the fully completed Volume -

3: Price Proposal. Without limiting the generality of the

foregoing, the Price Proposal shall include but not be limited to

the following:

(i) Bid Form for Price Proposal signed by the authorized

signatory;

(ii) Schedule of Prices and Schedule of Payments;

(iii) Portions of the original Bid Documents issued by the

Employer related to the Price Proposal, duly stamped and

initialed by the authorized signatory.

(iv) Any other information /data required to be submitted in

the Price Proposal by bidders in accordance with these

Instructions to Bidders.

13.4 The Bid Form, Appendix to Tender, and unit rates and price shall

be filled-in without exception, subject to extensions thereof in

the same format.

14. Bid Prices 14.1 Unless stated otherwise in the Bid Documents, the Contract

shall be for the entirety of the Works on a ‘single point

responsibility’ basis such that the total bid price covers all the

Contractor’s obligations mentioned in or that may be reasonably

inferred from the Bid Documents, including but not limited to

design, submittals, resubmittals as necessary, procurement,

delivery, construction, installation, testing, commissioning,

subcontract administration and execution if any, and operation

and maintenance of the Works for the period specified in Sub-

Clause 1.2, all in accordance with the conditions of the contract.

14.2 The bidder shall give break down of prices in the manner and

detail called for in the Schedules of Prices. The Bidder shall fill

in unit rates and prices for all items of the Works described in

the Schedule of Prices. Items against which no rate or price is

entered by the bidder will still be required to be provided by the

Contractor as part of the complete Works but will be deemed

covered by Contractor elsewhere under other rates and prices

and will not be paid for by the Employer when executed.

14.3 The bidders expressly represent and warrant that they are

familiar with the Tax laws of India. In the various Schedule of

Prices, Bidders shall give required details and breakdown of

their prices including all duties, taxes and other levies and

charges payable by the Contractor under the Contract, as of the

Page 21: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 20 of 55 Bid Document

date 28 days prior to the deadline for submission of bids. Details

of price breakdown to be provided include but are not limited to

the following:

(a) Civil Works, Installation, and Other Services shall be

quoted separately (Schedule B of Prices ) and shall include

rates or prices for all labour, Contractor's equipment,

temporary works, materials, consumables, and all matters

and things of whatsoever nature necessary for the proper

execution of the Civil Works, Installation, and Other

Services;

(b) Plant and Equipment supplied from within the Employer's

country (Schedule C of Prices ) shall be quoted and shall

be inclusive of all costs as well as duties and taxes paid or

payable on components and raw materials incorporated or

to be incorporated in the item. As well as the cost of

transportation from the point of supply up to the Site

inclusive insurance, erection, commissioning and

operation and maintenance.

(c) Operation and Maintenance of the Works (Schedule E of

Prices)shall be quoted on a monthly basis and shall

include all costs of electricity, labour, chemicals, spare

parts, consumables, fuel, and all other matters and things

of whatsoever nature, including but not limited to local

transportation, taxes, insurance and any other services

which are required for operating and maintaining the

Works in accordance with the Employer’s Requirements,

(d) The bidder in his estimation shall include a

PROVISIONAL SUM (estimation indicated in Schedule D

of Price) for the Electrical connection to be provided by

BESCOM for the additional power requirement for the

proposed Upgraded 4MLD STP at Madiwala Lake. The

Provisional sum payable to self-execution by the Bidder/

Contractor shall be 5% more than the approved BESCOM

estimate for the proposed work involved in providing the

electrical inputs to the MCC room

15. Currencies of Bid and

Payment

The unit rates and the prices shall be quoted by the bidder in

INDIAN RUPEES only.

Page 22: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 21 of 55 Bid Document

16. Bid Validity 16.1 Bids shall remain valid for a period of 90 days after the date of

bid opening of Technical proposal specified in Clause25.

16.2 In exceptional circumstances, prior to expiry of the original bid

validity period, the Employer may request that the bidders

extend the period of validity for a specified additional period.

The request and the responses thereto shall be made in writing

by mail or by fax. A bidder may refuse the request without

forfeiting its bid security. A bidder agreeing to the request will

not be required or permitted to modify its bid, but will be

required to extend the validity of its bid security for the period

of the extension, and in compliance with Clause 17 in all

respects.

17. Bid Security 17.1 The bidder shall furnish, as part of its bid, a Bid Security in the

amount of INR 12,00,000.00 (Indian Rupees twelve lacs only),

as per e-portal.

17.2 Any bid not accompanied by an acceptable bid security shall be

rejected by the Employer as non-responsive

17.3 The bid securities of unsuccessful bidders will be returned as

promptly as possible, but not later than 28 days after the expiry

of the period of bid validity.

17.4

The bid security of the successful bidder will be returned when

the bidder has signed the Contract Agreement and furnished the

required performance security.

17.5 The bid security may beforfeited:

(a) if the bidder withdraws its bid during the period of bid

validity;or

(b) if the bidder does not accept the correction of its bid price,

pursuant to Sub-Clause 35;or

(c) in the case of a successful bidder, if it fails within the

specified time limitto:

(i) sign the Agreement,or

(ii) furnish the required performance security,or

(d) if the bidder is determined, at any time prior to the award

of contract, to have engaged in corrupt or fraudulent

practices in competing for theContract;

18. Alternative Proposals by

Bidders 18.1 Bidders shall submit offers which comply with the Bid

Documents, including the basic technical design as indicated in

the Drawings and Specifications. The attention of bidders is

drawn to the provisions of Clause 28 regarding rejection of bids

which are not substantially responsive to the requirements of

the Bid Documents.

Page 23: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 22 of 55 Bid Document

19. Pre-Bid Meeting 19.1 The bidder or its designated representative is invited to attend a

pre-bid meeting, which will take place at:

Office of the CHIEF EXECUTIVE OFFICER, KARNATAKALAKE CONSERVATION AND DEVELOPMENT AUTHORITY , No.49, Parisara Bhavan,

2nd

Floor, Church , Bangalore -

560001. Karnataka,INDIA

Tel: 91-(080) 25590098 Fax: 91-(080)25550698

e-mail:[email protected]

on the date and at the time given in the Invitation for Bids..

19.2 The purpose of the meeting will be to clarify issues and to

answer questions on any matter that may be raised at that stage.

19.3 Bidders may submit any queries in writing by post or by fax

(hereinafter, the term “fax” is deemed to include electronic

transmission such as facsimile, cable, e-mail and telex) to reach

the Employer not later than 3 (Three) working days before the

meeting. All queries shall be submitted using the Bidder Query

Form provided in Section 8 of this Volume 1. Bidders shall

submit the queries by e-mail in editable Microsoft Word format

preferably and also submit the same file in Adobe PDF format.

In addition, bidders shall submit a hard copy of the same file by

post orfax.

19.4 Minutes of the pre-bid meeting, including the text of the

questions raised and the responses given, will also be

transmitted without delay to all purchasers of the Bid

Documents. Any modification of the Bid Documents listed in

Sub-Clause 9.1 which may become necessary as a result of the

pre-bid meeting shall be made by the Employer exclusively

through the issue of an Addendum pursuant to Clause 11 and not

through the minutes of the pre-bid meeting.

19.5 Bidders are advised to attend the pre-bid meeting. However,

non-attendance at the pre-bid meeting will not be a cause for

Page 24: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 23 of 55 Bid Document

disqualification of a bidder. Bidders who do not attend the pre-

bid meeting assume the responsibility to comply with

modifications to the Bid Documents mentioned in sub-Clause

19.4 above and which are communicated through an Addendum

pursuant to Clause 11.

20. Format and Signing of

Bid 20.1 The bid shall contain no alterations, deletions, or additions,

except those to comply with instructions issued by the

Employer, or as necessary to correct errors made by the bidder,

in which case such corrections shall be numbered and initialed

by the person or persons signing the bid.

D. SUBMISSION OF BIDS

21. Sealing and Marking of

Bids 21.1 The bidder shall submit the Technical Proposal and also Price

Proposal independently in electronic form by uploading to

the electronic tender box on the website

https://www.karnataka.gov.in/ldakarnataka.

21.2 Additionally the bidder shall also seal the original Technical

Proposal and the copy of the Technical Proposal in separate

sealed envelopes, clearly marking each one as “ORIGINAL –

TECHNICAL PROPOSAL” and “COPY – TECHNICAL PROPOSAL”

as appropriate. These envelopes shall be placed in another

sealed envelope, clearly marked with “ORIGINAL AND COPY OF

TECHNICAL PROPOSAL”. The original Bid Security shall be

placed in a separate sealed envelope within the envelope for the

Original Technical Proposal and a copy of the Bid Security

shall be placed in a separate sealed envelope within the

envelope containing the Copy of the Technical Proposal.

21.3 The fully completed price proposal in electronic form shall be

submitted by uploading to the website. All price proposals will

remain stored in a Time Stamped, electronically sealed tender

box. Electronic submission of price proposals will require a

Digital Certificate, which all bidders must obtain per

Information Technology Act 2000 of India.

21.4 When a bidder submits the price proposal, the system will

automatically generate a Time Stamp that will acknowledge the

submission by the bidder.

21.5 All pages of the documents shall be stamped and signed by the

authorized signatory of the bidder, in accordance with Clause

20. The documents shall be enclosed with original or copy of

the Technical Proposal as described in Clause 13.

Page 25: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 24 of 55 Bid Document

21.6 The outer envelope of Technical Proposal shall:

(a) be addressed to the Employer at the following address:

Office of the CHIEF EXECUTIVE OFFICER, KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY , No.49, Parisara Bhavan,

2nd

Floor, Church Street ,

Bangalore -560001.

Karnataka,INDIA

Tel: 91-(080) 25590098 Fax: 91-(080)25550698

e-mail:[email protected]

(b) bear the following identification:

Bid for: KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY PROJECT BIO-

DIVERSITY PARK AT MADIWALA LAKE

Bid Reference Number: KLCDA/Mdl.Lake-

STP/ Tender/Notification/2015-16/1031

Contract No.: ………. INDENT NO. 3

Name of Contract: ………. BIO-DIVERSITY PARK

AT MADIWALA LAKE

STP in Contract: UPGRADATION OF THE 4 MLD STP

AT MADIWALA LAKE

DO NOT OPEN BEFORE: 15.03.2016; 11.00 HOURS

21.7 In addition to the identification required in Sub-Clause 21.1, the

outer envelope shall indicate the name and address of the

bidder to enable the bid to be returned unopened in case it is

declared “late” pursuant to Clause23.

21.8 If the outer envelope is not sealed and marked as above, the

Employer will assume no responsibility for the misplacement or

premature opening of thebid.

22. Deadline for Submission

of Bids 22.1 The bids must be received by the Employer at the address

specified above not later than the time and date mentioned in the

Invitation for Bids.

22.2 The Employer may, at its discretion, extend the deadline for

submission of bids by issuing an addendum in accordance with

Clause 11, in which case all rights and obligations of the

Employer and the bidders previously subject to the original

deadline will thereafter be subject to the deadline as extended.

23. Late Bids 23.1 Any bid received by the Employer after the deadline for

submission of bids prescribed in Clause 22 will be rejected and

will be returned unopened to the bidder.

Page 26: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 25 of 55 Bid Document

24. Modification and

Withdrawal of Bids 24.1 The bidder may modify or withdraw its bid after bid

submission, provided that written notice of the

modification or withdrawal is received by the

Employer prior to the deadline for submission of

bids.

24.2 Modification of bids will not be permitted after the

deadline for submission of bids.

24.3 Withdrawal of a bid during the interval between the

deadline for submission of bids and the expiration of

the period of bid validity specified in the Form of Bid

may result in the forfeiture of the bid security pursuant

to Clause 17.

Page 27: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 26 of 55 Bid Document

E. OPENING AND EVALUATION OF TECHNICAL PROPOSAL

25. Opening of

Technical Proposals

25.1 The Employer will open the Technical Proposals, including

modifications made pursuant to Clause 24, in the presence of

bidders' representatives who choose to attend, at 11.00 hrs on

the date of opening of bids, as provided in Sub-Clause 22.1, at

the address given in Sub-Clause 21.5 The bidders'

representatives who are present shall sign a register evidencing

their attendance.

25.2 The Price Proposal will remain unopened and will be held in

the custody of the Employer until the time of bid opening of

the Price Proposals. The time, date and location of the bid

opening of the Price Proposals will be intimated in writing by

post or by fax by the Employer.

25.3 Envelopes marked "WITHDRAWAL" or “MODIFICATION”

shall be opened and first Bids for which an acceptable notice of

withdrawal has been submitted pursuant to Clause 24 shall not

be opened.

25.4 The bidders’ names, bid modifications and withdrawals, and the

presence or absence of the requisite bid security and such other

details as the Employer may consider appropriate, will be

announced and recorded by the Employer at the opening.

25.5 The Employer shall prepare minutes of the bid opening,

including the information disclosed to those present in

accordance with Sub-Clause 25.4.

26. Process to be

Confidential

26.1 Information relating to the examination, clarification,

evaluation and comparison of bids and recommendations for

the award of a contract shall not be disclosed to bidders or any

other persons not officially concerned with such process until

the successful bidder is announced. Any effort by a bidder to

influence the Employer’s processing of bids or award decisions

may result in rejection of the bidder’s bid.

27. Preliminary

Examination of

Technical Proposals and

Determination of

Responsiveness

27.1 Prior to the detailed evaluation of bids, the Employer will

Determine whether each bid (i) meets the eligibility criteria of TC

KLCDA; (ii) has been properly signed; (iii) is accompanied by

the required securities; (iv) Qualification criteria to the

requirement of the bidding document; (v) provides any

clarification and /or substantiation that the Employer may

require pursuant to Clause 29.

Page 28: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 27 of 55 Bid Document

27.2 Qualification criteria

(i) qualification information submitted in Schedule I of

the Technical Schedules (Volume 2: Section 6) in

relation to the minimum qualification criteria given

in the Bid Documents.

(ii) an affirmative determination will be a prerequisite

for the Employer to continue with the detailed

evaluation of the technical proposal; a negative

determination will result in rejection of the Bidder's

bid.

28. Evaluation and

Comparison of

Technical

Proposals

28.1 The Employer will carry out a detailed evaluation of the bids

which have satisfactorily met the requirement of clause 27

above in order to determine whether the bidders are qualified

and whether the technical aspects are substantially

responsive to the requirements set forth in the Bid

Documents. In order to reach such a determination, the

Employer will examine the information supplied by the

bidders in relation to the requirements specified in the Bid

Documents. Bid with minimal foot print and power

consumption values shall be preferred.

28.2 Technical Aspect

(i) overall completeness and compliance with the

Employer's Requirements including those described

in Sub-Clauses 5.1 (b), 5.2 and 13.2, as well as such

other information as the Employer deems relevant to

determining the technical merits of the plant and

equipment offered.

(ii) Submission of a realistic Construction Program

which complies with the time schedule called for in

the Appendix to Bid Document.

(iii) adequacy, merit, and compliance of information

provided in the Technical Schedules (Schedules III –

XI); including but not limited to the Proposed Plant

Details, Instrumentation and Control Equipment,

Electrical Works, Operating Details, Subcontractors,

Quality Assurance and Quality Control Plan,

Environmental Management Plan, Safety Plan, and

Functional Guarantee(s);

(iv) any deviations proposed to the Technical

Specifications (Schedule XII).

28.3 A substantially responsive bid is one which conforms to all the

terms, conditions, and specifications of the Bid Documents,

without material deviation or reservation. A material deviation

or reservation is one (i) which affects in any substantial way the

Page 29: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 28 of 55 Bid Document

s

c

o

p

e

,

s

scope, quality, or performance of the Works; (ii) which

limits in any substantial way, inconsistent with the Bid

Documents, the Employer’s rights or the bidder’s

obligations under the Contract; or (iii) whose rectification

would affect unfairly the competitive position of the other

bidders presenting substantially responsive bids

.

If a bid is not substantially responsive, it will be rejected by the

Employer, and may not subsequently be made responsive by

correction or withdrawal of the non-conforming deviation or

reservation.

28.4 The Employer wishes to clarify that regardless of the contents of

a bid, the successful Bidder shall be required to conform in all

respects to the requirements of the Contract, and all proposals

shall be subject to the approval of the Engineer. Acceptance of

the Bidder’s proposal for the purposes of bid evaluation and

award of tender shall not be construed as approval by the

Employer. All details will subsequently be subject to the

approval of the Engineer during execution of the Contract. No

claim for additional payments shall be entertained, other than in

accordance with the Contract.

29. Clarification of

Technical

Proposals

29.1 The Employer may request any Bidder to provide further

information on any matters, technical or otherwise, where the

Employer requires clarification to be made to the Technical

Proposal. The request for clarification and the response shall be

in writing by post or by fax, but no change in the price or

substance of the bid shall be sought, offered, or permitted. The

request shall be answered promptly within the time stipulated in

the request. Failure to respond promptly may result in the

Technical Proposal being deemed not to be substantially

responsive.

30. Invitation to Attend

Opening of Price

Proposals

30.1 At the end of the evaluation of Technical Proposals by the

Employer, the Employer will invite bidders who have submitted

substantially responsive Technical Proposals and who have

been determined as being qualified for award to attend the bid

opening of the Price Proposals. Bidders shall be given

reasonable notice of the date and time of opening of the Price

Proposals.

30.2 Subsequently, the Employer will notify Bidders that have been

rejected on the grounds of Qualification Criteria and or

Technically substantially non-responsive to the requirements of

Bid Documents in writing and their Price Proposals will remain

unopened and be returned to the bidders.

Page 30: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 29 of 55 Bid Document

31. Opening of

Price Proposals

F. OPENING AND EVALUATION OF PRICE PROPOSALS

31.1 The Employer will open the Price Proposals of all

bidders who have submitted substantially responsive Technical Proposals at advised time, date, and location that will be intimated to the

bidders. The bidders’ representatives who are present shall sign a register evidencing their

attendance.

31.2 The bidders’ names, the bid prices, the total amount of each bid, any discounts, and such other

details as the Employer may consider appropriate, will be announced and recorded by the Employer

at the opening. Any bid price or discount which is not announced and recorded at the opening of

Price Proposals will not be taken into account in bid evaluation. The bidders’ representatives who are present will be required to sign the record.

31.3 The Employer shall prepare minutes of the bid

opening, including the information disclosed to those present in accordance with Sub-Clause 31.2. After the contract is determined, the names of all bidders,

their bid prices, the name and address of the successful bidder may be made public by TC KLCDA.

32. Process to

be

Confident-

ial

32.1 Information relating to the examination,

clarification, evaluation, and comparison of Price Proposals and recommendations for the award of a contract shall not be disclosed to bidders or any

other persons not officially concerned with such process until the successful bidder is announced.

Any effort by a bidder to influence the Employer’s processing of bids or award decisions may result in rejection of the bidder’s bid.

Page 31: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 30 of 55 Bid Document

33. Preliminary

Examination of

Price Proposals and

Determination of Responsiveness

33.1 Prior to the detailed examination of the Price

Proposals, the Employer will determine whether each opened bid (i) has been properly signed; and

(ii) is substantially responsive to the requirements of the Bid Documents.

33.2 A substantially responsive bid is one which conforms to all terms, conditions, and

requirements of the Bid Documents without material deviation or reservation. A material

deviation or reservation is one (i) which affects in any substantial way the scope, quality, or performance of the Works; (ii) which limits in any

substantial way, inconsistent with the Bid Documents, the Employer’s rights or the bidder’s

obligations under the Contract; or (iii) whose rectification would affect unfairly the competitive position of the other bidders presenting

substantially responsive bids.

33.3 If a Price Proposal is not substantially responsive it will be rejected by the Employer, and may not subsequently be made responsive by correction or

withdrawal of the nonconforming deviation or reservation.

34. Clarification of

Price Proposals

34.1 To assist in the examination, evaluation, and

comparison of Price Proposals, the Employer may, at its discretion, ask any bidder for clarification of its bid, including breakdowns of unit rates. The

request for clarification and the response shall be in writing by mail or by fax, but no change in the

price or substance of the bid shall be sought, offered, or permitted except as required to confirm the correction of any arithmetic errors discovered

by the Employer in the evaluation of the bids in accordance with Clause 35.

Page 32: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 31 of 55 Bid Document

35

5.

Correction of Errors 35.1 Price Proposals determined to be substantially

responsive will be checked by the Employer for any arithmetic errors. Arithmetic errors

will be rectified on the following basis. If there is a discrepancy between the unit rate and the

total cost per item that is obtained by multiplying the unit rate and quantity, the unit rate shall prevail and the total cost per item will

be corrected unless in the opinion of the Employer there is an obvious misplacement of

the decimal point in the unit rate, in which case the total price as quoted will govern and the unit rate will be corrected. If there is a discrepancy

between the total bid amount and the sum of total costs per item, the sum of the total costs

per item shall prevail and the total bid amount will be corrected. If the bidder has offered a discount expressed as a percentage of the

quoted price, such discount will be applied to the corrected bid price

.

35.2 The amount stated in the Form of Bid for Price Proposal will be adjusted by the Employer in

accordance with the above procedure for the correction of errors and shall be considered as binding upon bidder. If the bidder does not accept

the corrected amount of bid, his bid will be rejected, and the bid security may be forfeited in

accordance with sub-Clause 17.6(b).

36.

37. Evaluation and

Comparison of Price Proposals

NOT USED

37.1 The Employer will evaluate and compare only the bids determined to be substantially responsive in

accordance with Clause 33.

37.2 For plant and equipment, the comparison shall be

of the landed price of plant and equipment offered, (such price to include all costs as well as duties and taxes paid or payable on components

and raw material incorporated or to be incorporated in the plant and equipment), plus the

cost of local transportation, design, civil works, installation, operations and maintenance of the facilities,and all other services required under the

contract.The Employer's comparison will also include the costs resulting from application of the

evaluation procedures described in Sub- Clause

37.4

Page 33: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 32 of 55 Bid Document

37.3 The Employer's evaluation of a bid will not take into account:

(i) any Provisional Sum items in the Schedule of

Prices where the Employer has pre-determined its value;or

However, in addition to the bid prices indicated in the Schedule of Prices, the evaluation will take

into account the following costs and factors which will be added to each Bidder's bid price in the evaluation using pricing information available to

the Employer in the manner and to the extent indicated in Sub- Clause 37.4

37.4 Pursuant to Sub-Clause 37.3, the following

evaluation methods will befollowed: (a) Time Schedule: The plant and equipment

covered by this bidding are required to be

shipped and installed and the facilities completed within the period specified in the Appendix to Tender. Bidders submitting bids

which deviate from the time schedule specified will be rejected.

(b) Operating costs: Since operating costs form a major part of the life cycle cost of the Works, these costs will be evaluated in accordance

with the methodology described in Sub-Clause 37.5 and 37.6.

Page 34: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 33 of 55 Bid Document

37.5 For the purposes of calculating the operating costs under Sub- clause 37.4 (b) above, plant operation

costs which may vary from bidder to bidder will be considered based upon the manpower cost,

chemical consumption cost and electricity usage charges of the plants and equipment which bidder proposes to supply and install as a part of the

Works, as per the data furnished in Section 6, Technical Schedule XI – Functional Guarantees of

the Plant, Volume 2: Employer’s Requirements of Bid Documents. The following procedure will be adopted for the purpose of arriving at the total

operating cost:

(i) for calculation of the estimated total cost of

electricity consumed by the Works, an electricity unit cost of Rs.5.50 per kWh will be used, which roughly equals the current rate

paid by similar works

(ii) a discount rate of eight percent (8%) per

annum which shall be used to discount to present value all future annual costs calculated for the specified periods.

37.6 The estimated cost of the operating cost loading

will be calculated in accordance with the methodology set out in Technical Schedule VI of Section 6. Bidders are encouraged to offer Plant

and equipment with high efficiencies and lower operating costs at the specified operating

conditions.

37.7 Land required for construction should also be

mentioned and will be counted for evaluation of bid.

37.8 The Employer reserves the right to accept or

reject any variations or deviations. The variations, deviations, and other factors offered in excess of the requirements of the Bid Documents or which

otherwise result in the accrual of unsolicited benefits to the Employer shall not be taken into

account in bid evaluation.

37.9 If the bid of the successful bidder is seriously

unbalanced in relation to or substantially above or below the Engineer’s cost estimate, the Employer

may require the bidder to produce detailed price analyses for any or all items of the Schedule of

Page 35: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 34 of 55 Bid Document

Prices, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price

analyses, the Employer may require that the amount of the performance security set forth in

Clause 43 be increased at the expense of the successful bidder to a level sufficient to protect the

Employer against financial loss in the event of default of the successful bidder under the Contract.

G AWARD OF CONTRACT

38. Award 39.1 Subject to Clause 40, the Employer will award the

Contract to the bidder whose bid is determined to be substantially responsive to the Bid Documents and offers the Lowest Evaluated Bid Price, provided

that such bidder has been determined to be (i) eligible in accordance with the provisions of Sub-

Clause 3.1 and 4.1; (ii) qualified in accordance with the provisions of Clause 5; and has submitted a substantially responsive Technical Proposal in

accordance with Clauses 27, 28 and29.

39. Employer’s Right to Accept any Bid

and to Reject any or all Bids

39.1 Notwithstanding Clause 39, the Employer reserves the right to accept or reject any bid, and to annul the bidding process and reject all bids, at any time

prior to award of Contract, without thereby incurring any liability to the affected bidder or

bidders or any obligation to inform the affected bidder or bidders of the grounds for the Employer’s action.

Page 36: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 35 of 55 Bid Document

40. Notification of Award 40.1 Prior to expiry of the period of bid validity prescribed

by the Employer, the Employer will notify the

successful bidder by fax and confirm by registered

letter that its bid has been accepted. This letter

(hereinafter and in the Conditions of Contract called

the “Letter of Acceptance”) shall name the sum

which the Employer will pay the Contractor

(hereinafter and in the Conditions of Contract called

“the Contract Price”) in consideration for the

Contractor’s full and complete performance of its

obligations under the Contracts

40.2

The notification of award will constitute the

formation of the Contract.

40.3 Upon the furnishing by the successful bidder of the required performance security, the Employer will

promptly notify the other bidders that their bids have been unsuccessful.

42. Signing of Agreement

42.1

At the same time that the Employer notifies the

successful bidder that its bid has been accepted, the Employer will send the bidder the Form of

Agreement provided in the Bid Documents, incorporating all agreements between the parties.

42.2 Within 14 days of receipt of the Form of

Agreement, the successful bidder shall sign the Form and return it to the Employer.

43. Performance Security 43.1 Within 28 days of receipt of the notification of award from the Employer, the successful bidder

shall furnish to the Employer a performance security in an amount specified in the Appendix to

Tender in accordance with the Conditions of Contract. The form of the Performance Security may be as described in Section 8 of Volume 1 of the

Bid Documents or some other form acceptable to the Employer may be used.

43.2 Failure of the successful bidder to comply with the

requirements of Clauses 42 or 43 shall constitute sufficient grounds for annulment of the award and forfeiture of the bidsecurity.

Page 37: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 36 of 55 Bid Document

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BID DOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4 MLD Sewage Treatment Plant at

Madiwala Lake

Volume 1

SECTION 2 : GENERAL CONDITIONS

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 38: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 37 of 55 Bid Document

Section 2: General Conditions

These Conditions of Contract shall be governed by the KTPP ACT

Copies of the KTPP Act Conditions of Contract can be obtained from:

e-Portal of Karnataka Government

Page 39: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 38 of 55 Bid Document

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BIDDOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4 MLD Sewage Treatment Plant at

Madiwala Lake

Volume 1

SECTION 3 : APPENDIX TO TENDER

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 40: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 39 of 55 Bid Document

APPENDIX

[NOTE: With the exception of the items for which the Employer’s requirements have been inserted, the

following information must be completed before the Tender issubmitted].

Item Data

Employer’s Name and

Contact Information

Office of the CHIEF EXECUTIVE OFFICER,

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY ,

No.49, ParisaraBhavan,2nd Floor,

ChurchStreet , Bangalore -560001.

Karnataka, INDIA

Tel: 91-(080) 25590098 Fax: 91-(080) 25550698

e-mail: [email protected]

Contractor’s

Address Name and [To be insertedbelow]

Engineer’s

Address Name and [To be notified later]

Time for Completion of

Works TWELVE (12) months (365Days) including mansoon

Operation and

Maintenance Period Seven (7) years, or 2555days.

Defects Notification

Period Defects Notification Period shall be 365days

Cost plus Profit Where the Contract allows for Cost Plus Profit, Five Percent (5%)

profit to be added to the Cost.

Section Section does not apply for this contract. The Works shall be fully

completed within the Time for Completion ofWorks.

Electronic

systems

transmission Facsimile transmission will be an acceptable form of electronic

transmission system.

As an alternate, E-mail will also be an acceptable form of electronic

transmission system, provided a signed hard copy of the entire contents

of the E-mail, including any attachments, is also received within

seven (7) days of the transmission of the E-mail.

Governing Law Law of the Republic of India

Ruling Language English

Language of

Communication

English

Page 41: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 40 of 55 Bid Document

Item Data

Date of Access to Site 14 days after Commencement Date

Amount of Performance Security Ten (10) percent of the Accepted Works Contract Price.

The amount of performance security will be in INR

Return of Performance Security There exist two performance securities, one for "Works

contract" & other for "O&M Contract". Half of the

performance security of "Works contract "shall be released

after issue of “Taking Over Certificate”. The remaining half

of the Performance Security will be released to the

Contractor within 14 days of the issue of the "Works

Contract Completion Certificate" for the Works executed as

per Contract. The bidder shall submit performance security

of "O & M Contract" (Fifteen percent (15%) of "O & M

Contract price") prior to release of the remaining half

portion of Performance Security of "Works contract"

Deadline for Contractor to Notify

Engineer of Errors in the Employer’s

Requirements

Within 21 days from the Commencement Date.

Normal working hours 08:30 hrs to 17:30 hrs on all days of the week excluding

general holidays.

Delay Damages for Works 0.1% of the STP Works Contract Price per day for STP that is

delayed, in the same currency / currencies the Contract Price is

payable in.

Maximum amount of Delay

Damages forWorks

10% of the Works Contract Price.

Damages for Failure to Pass the

Tests on Completion.

See formulationsbelow

Effluent Quality: Failure to

achievethe specified effluent

quality requirement at the outlet of

the Discharge reservoir

Damages as Percent of the Works Contract Price for each

additional “quantum” (as defined below) of the effluent

quality parameter, or part thereof, beyond the specified

maximum concentration, present in the actual effluent

produced during the Tests on Completion:

Page 42: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 41 of 55 Bid Document

Item Data

Parameter Specified

maximum

concentration

BOD 20 mg/l

TSS 50 mg/l

NH4-N 1mg/l

NO3-N 10mg/l

TP 1mg/l

Fecal Coliform 22 MPN/100ml

Percent of(STP)Works For each additional or

Contract Price part of parameter

1% 2 mg/l,BOD

1% 1 mg/l,TSS

1% 0.2 mg/l,NH4-N

1% 1 mg/l,NO3-N

1% 0.2 mg/l,TP

1% 2 MPN/100mL,

Fecal Coliform

For a given STP, Damages shall not exceed 2% of that

STP’s Works Contract Price. Further, all remedies other

than damages, including but not limited to construction of

additional facilities, additional equipment and repair

and/or replacement of the installed equipment shall

continue to be fully available to the Employer, and the

Employer may choose to invoke any or all of them at any

time in accordance with the terms of the Contract.

Effluent Quality: Failure to achievethe

specified effluent quality requirement at

the outlet of the Discharge Reservoir

during the Operation and Maintenance

(O & M )period

Parameter Specified

maximum

concentration

BOD 20mg/l

TSS 50 mg/l

NH4-N 1mg/l

NO3-N 10mg/l

TP 1mg/l

FecalColiform 22 MPN/100ml

Performance Damages as Percent of the O & M

Monthly payment, as Percent of the STP O & M

Monthly payment for STP that fails to pass the Tests

during O & M period for each additional “quantum” (as

defined below) of the effluent quality parameter, or part

thereof, beyond the specified maximum concentration,

present in the actual effluent produced during the Tests

on Completion:

Percent of (STP) O&M For

eachadditionalorMonthlypayment part ofparameter

2% 2mg/l,BOD

2% 1 mg/l,TSS

2% 0.2 mg/l,NH4-N

2% 1 mg/l,NO3-N

2% 0.2 mg/l,TP

2% 2MPN/100mL,

FecalColiform

For a given STP, Performance Damages shall not exceed

5% of that STP’s STP O & M Contract

Page 43: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 43 of 55 Bid Document

Item Data

Price. Further, all remedies other than performance

damages, including but not limited to construction of

additional facilities, additional equipment and repair

and/or replacement of the installed equipment shall

continue to be fully available to the Employer, and the

Employer may choose to invoke any or all of them at

any time in accordance with the terms of the Contract.

Power Consumption:

Excess Damages payable by Contractor to Employer on

a monthly basis shall be equal to the actual cost of

the excess energy used for Operation and

Maintenance of the Works for the STP under the

Contract, based on the guaranteed consumption

provided by the Contractor under the relevant

Technical Schedules in Section 6 and the current

rates charged to the Employer for electricity

consumed. Such payable will be assessed for each

month during the O&M Period in which the actual

power consumption exceeds the guaranteed power

consumption calculated in the Technical Schedule

XI.

consumption of electrical energy for Operation and Maintenance of the

constructed Works for each STPand under the Contract.

Percentage for adjustment of

Provisional Sums

5% (five percent) of the actual price paid to cover all

costs, charges and profit with respect to the Costs of

works, supplies and services provided under the

Provisional sums.

Total advance payment 10% of the Works Contract Price, excluding any

Provisional Sums, payable against Bank Guarantee(s) in

the proportions of currencies in which the Works Contract

Price is payable.

Number and timings of installments Two(2).

Currencies and proportion Local Currency: Indian Rupee (Rs)

Start repayment of advance

payment

By deduction from the Interim Payments in accordance with the conditions set out in Section 3, Particular Conditions of Contract. Deductions of each installment of the advance will start from the Interim Payment for the 2

nd

(second) month following the month in which the advance was paid.

Page 44: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 44 of 55 Bid Document

Repayment amortization of advance

payment

Each installment of the advance payments shall be repaid in

10 (ten) equal monthly installments, each in the amount

of 10% of the amount of the mobilization advance until

such time as the advance payments shall have been fully

repaid.

Item Data

Percentage of retention 5% (five percent) of the amount of all Interim Payment

Certificates for the Works Contract portion of the Contract,

excluding any Provisional Sums.

Limit of Retention Money 5% (five percent) of the Works Contract Price, excluding

any Provisional Sums.

Plant and Materials for Payment

when delivered to site (a) Valves, sluice gates, pipes, pumpsblowers

(b) Centrifuge &Accessories,

(c) Micro filters andAccessories,

(d) DGsets,

(e) Cables, Central HMI and SCADASystem,

(f) miscellaneous equipment : Chemical Dosing

system, , flow meters and level indicatorsetc.,

Minimum Amount of Interim

Payment Certificate

1.5 % of the Accepted Works Contract Price.

Period of Submission of evidence:

(a) Evidence of insurance

(b) Relevant policies

60 days

90 days

Minimum amount of Insurance

third party insurance

Rs 2,00,000/- per occurrence with 10 number of

occurrences.

Limit of the Compensation for delays

or interruptions caused by the

Contractor

10 % of STP, O & M Contract Price

Limit of the Compensation for delays

or interruptions caused by the

Employer

10 % of STP, O & M Contract Price

Page 45: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 45 of 55 Bid Document

KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY

PROJECT

BIO-DIVERSITY PARK AT MADIWALA LAKE

BIDDOCUMENTS [National Competitive Bidding(NCB)]

Upgradation of 4 MLD Sewage Treatment Plant at

Madiwala Lake

Volume 1

SECTION 8 : SAMPLE FORMS

JANUARY2016

CHIEF EXECUTIVE OFFICER;

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY 2NDFLOOR, PARISARA BHAVAN,

CHURCH STREET, BANGALORE – 560 009,

KARNATAKA,INDIA

Page 46: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 46 of 55 Bid Document

SECTION 8: SAMPLEFORMS

Notes on Sample Forms

All Bidders shall complete and provide the Bid Security in accordance with the

requirements of the bidding documents.

Bidders should not complete the Forms of Agreement at this time. Only the

successful Bidder will be required to complete the Forms. The Forms of Agreement,

when finalized at time of contract award, will incorporate any corrections or

modifications to the accepted bid resulting from arithmetic corrections,

acceptabledeviations (time for completion, technical deviations, commercial

deviations, etc.), spare parts or quantity variations in accordance with the

requirements of the bidding documents.

The Form of Performance Security and Form of Advance Payment Security should

not be completed by the bidders at the time of bid preparation. Only the successful

Bidder will be required to provide these securities in accordance with the forms

indicated herein or in another form acceptable to the Employer.

Page 47: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY Volume I - General Requirements

Upgradation of 4MLD Sewage Treatment Plant at Madiwala Lake

Section 1: Instruction to Bidders Page 47 of 55 Bid Document

TABLE OF

CONTENTS

Description Pageno.

Bidder Query Form 3

Form of Statement form

compliance of 3.1 of ITB

5

Form of Bid Security 6

Form of Contract Agreement 7

Form of Performance Security 8

Form of Performance Security Operation and Maintenance

Period 9

Form of Advance Payment Security 10

Page 48: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at MadiwalaLake

Volume1–GeneralRequirements

Section 8: SampleForms Page 3 of10 Biddocument

BidderName:

Bidder Query Form

Query

No.

ClauseNo.

PageNo.

Bidder’sQueries

Response fromLDA

General

Technical

Process

Mechanical

Civil

Page 49: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at MadiwalaLake

Volume1–GeneralRequirements

Section 8: SampleForms Page 4 of10 Biddocument

Query

No.

ClauseNo.

PageNo.

Bidder’sQueries

Response fromLDA

Electrical

Instrumentation/Control/Automation

Financial /Commercial

Operation andMaintenance

Page 50: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at Madiwala Lake

Volume1–GeneralRequirements

Section 8: SampleForms Page 5 of10 Biddocument

FORM OF STATEMENT FOR COMPLIANCE OF PARA 3.1 OF ITB

(To be submitted by Bidder or each partner of a Joint venture)

Name of the Contract:Up-gradation of Sewage Treatment Plant at Madiwala Lake

The CHIEF EXECUTIVE OFFICER

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY ,

No.49, Parisara Bhavan, 2nd Floor, Church Street ,

Bangalore -560001. Karnataka, INDIA

Gentleman,

We (Name of the Bidder or Partner of Joint venture in case of JV) herby confirm our compliance to

Para3.1as eligible bidder to bid for this contract and as follows:

We confirm that we are from the eligible source country. We are not engaged by the Employer to

provide consulting services for the preparation related to procurement for or implementation of this

project. Any associates / affiliates of our organization are not engaged by the Employer to provide

consulting services for preparation related to procurement for implementation of this project. Our

organization shall not lend or temporarily seconds our personnel to provide consulting services for

preparationrelatedtoprocurementforimplementationoftheproject.

We further under take to provide such further evidence of our eligibility as you may reasonably require.

We are Gentlemen

Yours faithfully

Signature in the capacity of duly authorized to sign

bids for and on behalf of

Address:

Date: ,

Page 51: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at Madiwala Lake

Volume1–GeneralRequirements

Section 8: SampleForms Page 6 of10 Biddocument

FORM OF BID SECURITY

(BANK GUARANTEE)

WHEREAS, [Name of Bidder] (hereinafter called “the Bidder”)has

submitted his bid dated , 2016, [Date] for the Up-gradation of 4MLD

Sewage Treatment Plant at MADIWALA LAKE comprising of Design, Supply of Equipment,

Construction, Installation Testing and Commissioning of Sewage Treatment Plant comprising of all

Civil, Mechanical, Electrical and Instrumentation and SCADA works and Operation and Maintenance

of Sewage Treatment Plant for Seven (7)Years, under Contract No( )(herein after called “the Bid”).

KNOW ALL PEOPLE by these presents that We [Name of

Bank]of [Name of Country] having our registered office at

(herein after called “the Bank”) are bound unto the CHIEF

EXECUTIVE OFFICER, KARNATAKA LAKE CONSERVATION AND DEVELOPMENT

AUTHORITY No.49, Parisara Bhavan, 2nd Floor, Church Street, Bangalore 560001, Karnataka

(India),

(herein after called "the Employer") in the sum of 1 for which payment

well and truly to be made to the said Employer the Bank binds himself, its successors and assigns by

these presents.

SEALED with the Common Seal of the said Bank this day of 2016.

THE CONDITIONS of this obligation are:

(1) if the Bidder withdraws his Bid during the period of Bid validity specified in the Form

of Bid; or

(2) if the Bidder does not accept the correction of arithmetical errors of his bid price in

accordance with the Instructions to Bidders in his Bid; or

(3) if the Bidder, having been notified of the acceptance of his Bid by the Employer

during the period of Bid validity:

(a) fails or refuses to execute the Form of Contract Agreement in accordance with

the Instructions to Bidders, if required; or

(b) fails or refuses to furnish the Performance Security, in accordance with the

Instructions toBidders;

(4) if the Bidder is determined, at any time prior to the award of contract, to have

engaged in corrupt or fraudulent in competing the contract;or

we undertake to pay to the Employer up to the above amount upon receipt of its first written demand,

without the Employer having to substantiate his demand, provided that in its demand the Employer

will note that the amount claimed by him is due to him owing to the occurrence of one or all of the

above conditions, specifying the occurred condition or conditions.

This Guarantee will remain in force up to and including the date occurring 148 days after the deadline

for submission of bids as such deadline is stated in the Instructions to Bidders or as it may be extended

by the Employer, notice of which extension(s) to the Bank is hereby waived. Any demand in respect

of this Guarantee should reach the Bank not later than the above date.

DATE

WITNESS

[Signature,Name,andAddress]

SIGNATUREOFTHEBANK

SEAL

1 The bidder should insert the amount of the guarantee in words and figures denominated in Indian Rupees This

figure should be the same as shown in Clause 17.1 of the Instructions to Bidders.

Page 52: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at Madiwala Lake

Volume1–GeneralRequirements

Section 8: SampleForms Page 7 of10 Biddocument

FORM OF CONTRACT AGREEMENT

This Agreement made this day of , 2016, KARNATAKA LAKE CONSERVATION

AND DEVELOPMENT AUTHORITY, represented by the CHIEF EXECUTIVE OFFICER, KARNATAKA LAKE

CONSERVATION AND DEVELOPMENT AUTHORITY,No.49, Parisara Bhavan, 2nd Floor, Church Street,

Bangalore 560 001, Karnataka (India), (hereinafter called "the Employer") of the one part and of

(herein after called" the Contractor") of the

other part.

Whereas the Employer desires that the Works known as the Up-gradation of 4MLD Sewage Treatment Plant

at MADIWALA LAKE under the KARNATAKA LAKE CONSERVATION AND DEVELOPMENT

AUTHORITY PROJECT MADIWALA LAKE BIO-DIVERSITY PARK under Contract should be designed and

executed by the Contractor, and has accepted a Bid by the Contractor for the design, execution and completion

of such Works and the remedying of any defects there in.

TheEmployerandtheContractoragreeasfollows:

1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to

them in the Conditions of Contract hereinafter referred to.

2. The following documents shall be deemed to form and be read and construed as part of this

Agreement:

(a) The Contract Agreement ( including addenda, clarifications when signed by all parties

concerned)

(b) the Letter of Acceptance

(c) Volume1,Section2–PartI:General Conditions

(d) Volume2-Employer's Requirements

(e) The accepted Price Proposal and Appendix to Tender

(f) Volume 4 -Drawings

(g) Completed Technical Schedules

(h) Bidder’s Technical Proposal other than Completed Technical Schedules

(i) Standard Basic Specifications

(j) Any other documents issued by the Employer before signing the Contract Agreement and

forming the part of the Contract

3. In consideration the payments to be made by the Employer to the Contractor as hereinafter mentioned,

the Contractor hereby covenants with the Employer to design, execute and complete the Works and

remedy any defects therein and operate and maintain the constructed facility, inconformity in all

respects with the provisions of the Contract.

4. The Employer hereby covenants to pay the Contractor, in consideration of the design, execution and

completion of the Works and the remedying of defects therein and operate and maintain, the

Constructed facility, the Contract Price INR ……………. (In Words

) or such other sum as may become payable under the provisions of the

Contract at the times and in the manner prescribed by the Contract.

In Witness where of the parties here to have caused this Agreement to be executed the day and year first before

written in accordance with their respective laws.

Authorized signature of Contractor Authorized signature of Employer

SEAL (ifany) SEAL (ifany)

in thepresenceof: in the presenceof:

Name Name

Signature Signature

Address Address

Page 53: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at Madiwala Lake

Volume1–GeneralRequirements

Section 8: SampleForms Page 8 of10 Biddocument

FORM OF PERFORMANCE SECURITY FOR WORKS CONTRACT PERIOD

(BANK GUARANTEE) To: KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY

Represented by

CHIEF EXECUTIVE OFFICER

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY ,

No.49, Parisara Bhavan, 2nd Floor, Church Street ,

Bangalore -560001. Karnataka, INDIA

WHEREAS [name and address of Contractor] (herein after called

"the Contractor") has undertaken, in pursuance of Contract) ,dated 2016 to

execute the Up-gradation of 4MLD Sewage Treatment Plant at MADIWALA LAKE under the

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY PROJECT

MADIWALA LAKE BIO DIVERSITY PARK (herein after called "the Contract");

AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish

you with a Bank Guarantee by a recognized bank for the sum specified( ie two Bank Guarantees, each

of 5% accepted works contract price) therein as security for compliance with his obligation in

accordance with the Contract;

ANDWHEREAS we have agreed to give the Contractor such a Bank Guarantee;

NOWTHEREFORE we hereby affirm that we are the Guarantor and responsible to you, on behalf of

the Contractor, up to a total of [amount of Guarantee]1

[in words], such sum being payable in the Indian

Rupees in the amount specified in the Appendix to Tender , and we undertake to pay you, upon your

first written demand and without cavil or argument, any sum or sums within the limits of

[amount of Guarantee] as a foresaid without you

needing to prove or show grounds or reasons for your demand for the sum specified therein.

We hereby waive the necessity of your demanding the said debt from the Contractor before presenting

us with thedemand.

We further agree that no change or addition to or other modification of the terms of the Contract or of

the Works to be performed there under or of any of the Contract documents which may be made

between you and the Contract or shall in any way release us from any liability under this guarantee,

and we here by waive any right to receiving notice of any such change, addition or modification.

This guarantee shall be valid until the date of issue of the Works Contract Completion Certificate.

Yours truly,

Signature and seal of the Guarantor:

Name of Bank /Financial Institution:

Address:

Date:

1 An amount to be inserted by the Guarantor, representing 10% of the Accepted Works Contract Price and denominated in Indian Rupees as specified in the Contract.

Page 54: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at Madiwala Lake

Volume1–GeneralRequirements

Section 8: SampleForms Page 9 of10 Biddocument

FORM OF PERFORMANCE SECURITY FOR OPERATION AND

MAINTENANCE PERIOD

(BANK GUARANTEE)

To: CHIEF EXECUTIVE OFFICER

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY ,

No.49, Parisara Bhavan, 2nd Floor, Church Street ,

Bangalore -560001. Karnataka, INDIA

WHEREAS [name and address of Contractor] (herein after called "the

Contractor") has undertaken, in pursuance of Contract No.( ),dated 2016 to

execute the Up-gradation of 4MLD Sewage Treatment Plant at MADIWALA LAKE under the

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY PROJECT

MADIWALA LAKE BIO DIVERSITY PARK (herein after called "the Contract");

AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish

you with a Bank Guarantee by a recognized bank for the sum specified therein as security for

compliance with his obligation in accordance with the Contract;

AND WHERE AS we have agreed to give the Contractor such a Bank Guarantee;

NOW THEREFORE we here by affirm that we are the Guarantor and responsible to you, on behalf

of the Contractor, up to a total of [amount of Guarantee]1

[in words], such sum being payable in the Indian

Rupees in the amount specified in the Appendix to Tender , and we undertake to pay you, upon your

first written demand and without cavil or argument, any sum or sums within the limits of

[amount of Guarantee] as aforesaid without you

needing to prove or to show grounds or reasons for your demand for the sum specified therein.

We hereby waive the necessity of your demanding the said debt from the Contractor before presenting

us with thedemand.

We further agree that no change or addition to or other modification of the terms of the Contract or of

the Works to be performed there under or of any of the Contract documents which may be made

between you and the Contractor shall in any way release us from any liability under this guarantee,

and we hereby waive any right to receiving notice of any such change, addition or modification.

This guarantee shall be valid until the date of issue of the Final Contract Completion Certificate

Yours truly,

Signature and seal of the Guarantor:

NameofBank/FinancialInstitution:

Address:

Date:

1 An amount to be inserted by the Guarantor, representing 15% of the Accepted “O &M Contract Price” and

denominated in Indian Rupees as specified in the Contract.

Page 55: KARNATAKA LAKE CONSERVATION AND … I... · e-Procurement website  login under “contractors”. Tenders must be accompanied by Earnest Money

KARNATAKA LAKE CONSERVATION & DEVELOPMENT AUTHORITY

Upgradation of Sewage Treatment Plant at Madiwala Lake

Volume1–GeneralRequirements

Section 8: SampleForms Page 10 of10 Biddocument

FORM OF ADVANCE PAYMENT

SECURITY (BANK GUARANTEE)

To: KARNATAKA LAKE CONSERVATION

AND DEVELOPMENT AUTHORITY

Represented by

CHIEF EXECUTIVE OFFICER

KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY ,

No.49, Parisara Bhavan, 2nd Floor, Church Street ,

Bangalore -560001. Karnataka, INDIA

Ref: KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY PROJECT

MADIWALA LAKE BIO DIVERSITY PARK – Upgradation of 4 MLD Sewage Treatment Plant

at MADIWALA LAKE Contract No.( ),dated ,2016

Gentlemen:

In accordance with the provisions of the Conditions of Contract, Sub-Clause 14.2 ("Advance

Payment")1

of the above mentioned Contract, [name and address of

Contractor] (hereinafter called "the Contractor") shall deposit with the Office of The CHIEF

EXECUTIVE OFFICER, KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY, No.49, Parisara Bhavan, 2nd Floor, Church Street, Bangalore -560001. Karnataka, INDIA, a bank guarantee to guarantee his proper and faithful performance under the said Clause of the Contract in an

amount of [amount of Guarantee]2

[in words].

We, the [Bank or financial institution], as instructed by the Contractor,

agree unconditionally and irrevocably to guarantee as primary obligatory and not as Surety merely, the

payment to CHIEF EXECUTIVE OFFICER ,KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY, on its first demand without whatsoever right of objection on our part

and without its first claim to the Contractor, in the amount not exceeding

[amount of Guarantee] [in words].

We further agree that no change or addition to or other modification of the terms of the Contract or of

the Works to be performed thereunder or of any of the Contract documents which may be made

between KARNATAKA LAKE CONSERVATION AND DEVELOPMENT AUTHORITY,

represented by the CHIEF EXECUTIVE OFFICER,KARNATAKA LAKE CONSERVATION AND

DEVELOPMENT AUTHORITY, and the Contractor shall in any way release us from any liability

under this guarantee, and we hereby waive notice of any such change, addition or modification.

This guarantee shall remain valid and in full effect from the date of the advance payment under the

Contract until the CHIEF EXECUTIVE OFFICER, KARNATAKA LAKE CONSERVATION

AND DEVELOPMENT AUTHORITY receives full repayment of the same amount from the

Contractor.

Yours truly,

Signature and seal of the Guarantor:

Name of Ban k/Financial Institution:

Address:

Date:

1 Replace the phrase “Sub-Clause 14.2, Advance Payment” with the phrase “Sub-Clause 14.4, Interim Valuation”