k3 unit chair installation - maxfac.no · 1. chairbox 2. unit box 3. table box 4. light arm box 5....
TRANSCRIPT
![Page 1: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/1.jpg)
K3 Unit Chair Installation
Osstem ImplantTechnical Support Division
![Page 2: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/2.jpg)
K3 Unit Chair Installation(Mechanical)
Osstem Implant
![Page 3: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/3.jpg)
3
* Contents
Ⅰ K3 installation Checklist
Ⅱ
Ⅲ K3 UNIT CHAIR Installation
Select installation location
Ⅳ Pipeline installation
Ⅴ Air / Water Line Diagram
![Page 4: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/4.jpg)
4
K3 Installation Checklist
Ⅰ
![Page 5: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/5.jpg)
5
Ⅰ K3 Installation Checklist
Packing Box Components
1. CHAIR BOX 2. UNIT BOX 3. TABLE BOX
4. LIGHT ARM BOX 5. LIGHT HEAD BOX 6. SEAT BOX
7. DOCTOR STOOL BOX
![Page 6: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/6.jpg)
6
Ⅰ K3 Installation Checklist
Checklist before Installation
• Check the product transportation route.
• The product must be transported in a packed state.
If packing materials need to be removed before transportation, soft materials must be used to prevent damage to the product.
• Before installation, confirm that all components are included in the packing box.
# Packing Component
1 Chair BOX CHAIR ASS’Y, ARM REST “L”, “R”, HEADREST BOX
2 UNIT BOX UNIT ASS’Y, FOOT ASS’Y, ASSIST TABLE ASS’Y (Distilled water tank ASS’Y)
3 TABLE BOX DOCTOR TABLE ASS’Y, Hanaro Console Box, MONITOR ARM BOX, ASSIST BOX(SCALER, ELECTRIC MOTOR)
4 LIGHT ARM BOX DENTAL LIGHT ASS’Y, LIGHT POLE
5 LIGHT HEAD BOX LIGHT HEAD ASS’Y
5 SEAT BOX SEAT ASS’Y, BACKREST ASS’Y
7 STOOL BOX STOOL ASS’Y, MOTOR COVER, BASE FRONT COVER, BASE BACK COVER
§ Check components in the box
![Page 7: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/7.jpg)
7
Select installation locationⅡ
![Page 8: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/8.jpg)
8
Ⅱ Select installation location
Requirements for Installation Location
• Must be level
• A floor to ceiling distance must be secured 2.5m at least
• Distance from piping to the spittoon must be within 2m
• Sufficient space must be secured for repair and maintenance
• Support structure must be able to withstand the weight of equipment
§ K3 Unit Chair Size
![Page 9: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/9.jpg)
9
K3 UNIT CHAIR InstallationⅢ
![Page 10: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/10.jpg)
10
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #1
1. Install the base plate
Check the direction to place the main plate (A) on the installation location agreed upon with the user, as shown in <Figure 01>, and place the chair on the floor.
2. Check the application position for each bolt use
Referring to <Figure 02>, identify the use-specific location of bolts to be applied to Base Plate (A).
M8mm head wrench bolts for fixing chair - 5EA
M10mm headless wrench bolts for levelness - 6EA
M8mm head wrench bolts for fixing unit - 5EA
< Figure 02 >
『CHAIR Installation』
Piping position
Narrow gaps
Small R size
Large gaps
Large R size
< Figure 01 >Wall
![Page 11: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/11.jpg)
11
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #2
3. Install the chair assembly
As shown in <Figure 03>, place the chair assembly (B) on the main plate (A), align the bolt hole positions and fasten the fixing bolts and level
adjustment bolts, referring to <Figure 02>.
4. Install Armrest
As shown in <Figure 04>, unfasten the armrest fixing bolts on the chair assembly (B) and assemble the armrest (C).
< Figure 03 >
< Figure 04 >
Use 5mm and 6mm T-wrench
Use 5mm T-wrench
『CHAIR Installation』
![Page 12: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/12.jpg)
12
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #3
5. Install backrest bracket
As shown in <Figure 05>, assemble the backrest bracket (D) to the backrest support ①.
6. Install backrest seat
As shown in <Figure 06>, assemble the backrest seat (E) to the backrest bracket (D).
Use a Phillips screwdriver
Use a Phillips screwdriver
1
< Figure 05 >
< Figure 06 >
『CHAIR Installation』
![Page 13: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/13.jpg)
13
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #4
7. Install backrest coverReferring to <Figure 07>, align the heads of 4 bolts for the backrest cover (F) with the holes (b) of the backrest seat (E), and push the bolts down to insert them into the holes.
8. Install headrestAs shown in <Figure 08>, put the headrest assembly into the groove on the sliding rail of the backrest bracket (D) mounted in Step 5.
※ Difference in steps between backrest cover and the backrest seat can be adjusted by fastening the bolt.
< Figure 07 >
< Figure 08 >
『CHAIR Installation』
![Page 14: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/14.jpg)
14
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #5
9. Install seat
As shown in <Figure 09>, push the seat assembly (H) in the backrest direction to set the position to mount the seat assembly.
10 Fasten the bolts fixing the seat
As shown in <Figure 10>, fix the seat assembly (H) to the chair assembly (B) using bolts.
Use a Phillips screwdriver
< Figure 09 >
< Figure 10 >
『CHAIR Installation』
![Page 15: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/15.jpg)
15
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #6
11. Remove the main power cable
As shown <Figure 11>, remove the main power cable located in the chair assembly.
12. Assemble power switch
As shown in <Figure 12>, plug the main power switch into the base back cover (I) and mount it on the base plate.
< Figure 11 >
< Figure 12 >
『CHAIR Installation』
![Page 16: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/16.jpg)
16
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #7
13. Assemble main power cable
As shown in <Figure 13>, connect the connector.
14. Assemble power switch
As shown in <Figure 14>, place the base front cover (J) on the base plate and fasten with bolts on both sides.
< Figure 13 >
< Figure 14 >
Use a Phillips screwdriver
『CHAIR Installation』
![Page 17: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/17.jpg)
17
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation procedures #8
15. Install motor cover
As shown in <Figure 15>, mount a hook (C) located on the front side of the motor cover (K) aligning with the groove on the base front cover (J).
16. Fasten motor cover
As shown in <Figure 16>, fasten with a bolt on each side of the motor cover (K).
< Figure 15 >
< Figure 16 >
Use a Phillips screwdriver
『CHAIR Installation』
![Page 18: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/18.jpg)
18
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation precautions #1
1. Align the backrest cover with the center of the headrest
2. Perform an armrest operating test to check whether there is any interference with the seat
Regular gapsIrregular gaps
『CHAIR Installation』
Push ButtonPush Button
Good Example Bad Example
![Page 19: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/19.jpg)
19
Ⅲ K3 UNIT CHAIR Installation
CHAIR INSTALLATION
§ Installation precautions #2
3. Chair levelness adjustment
After installing the unit chair, check the levelness using a level gauge, and balance the unit chair using the levelness adjustment bolt shown in <Figure 01>.
4. Chair speed adjustment
Use 5mm T-wrench
『CHAIR Installation』
Chair speed adjustment valve Chair speed adjustment valve
Chair Up
Chair Down Back Down
Back Up
Chair levelness adjustment bolt
![Page 20: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/20.jpg)
20
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation procedures #1
1. Remove Unit Base Cover_R
Unfasten 2 bolts as shown in <Figure 01> and remove the Unit Base Cover_R (A).
2. Remove Back Lower Cover
As shown in <Figure 02>, grab the Back Lower Cover (B) and pull in the direction of the arrow to remove it from the cover.
< Figure 02 >
< Figure 01 >
Use a Phillips screwdriver
『UNIT Installation』
![Page 21: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/21.jpg)
21
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation procedures #2
3 Fasten levelness adjustment bolt
As shown in <Figure 03>, temporarily fasten the levelness adjustment bolt for the unit to the Main Plate (C).
4. Install Unit AssemblyAs shown in <Figure 04>, place the Unit Assembly (A) on the Main Plate (C), align the bolt holes ofthe Chair Assembly (D) and the Unit Assembly (A), insert a bolt and temporarily fasten the bolt.
< Figure 04 >
< Figure 03 >
Use 8mm T-wrench
Use 5mm T-wrench
『UNIT Installation』
![Page 22: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/22.jpg)
22
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation procedures #3
5. Remove bolt cap
As shown in <Figure 05>, remove the rubber cap mounted on Unit Base Cover_L.
6. Remove fixing bolt
As shown in <Figure 06>, fasten the bolt fixing the Main Plate (C) and the Unit Assembly (A), and put the rubber cap into the original position.
< Figure 06 >
< Figure 05 >
Use 6mm T-wrench
『UNIT Installation』
![Page 23: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/23.jpg)
23
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation procedures #4
7. Fix Unit Assembly
As shown in <Figure 07>, fasten the bolt fixing the Main Plate (C) and the Unit Assembly (A) and tightly fasten the bolt that was temporarily
fastened in Step 4.
8. Assemble Assist Table Assembly
As shown in <Figure 08>, put the Assist Table Assembly (F) into the Unit Assembly (E).
< Figure 08 >
< Figure 07 >
Use 6mm T-wrench
『UNIT Installation』
![Page 24: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/24.jpg)
24
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation procedures #5
9. Fix Assist Table Assembly
As shown in <Figure 09>, fasten Unit Assembly (E) and Assist Table Assembly (F) using bolts.
10. Assemble Foot Control Assembly
As shown in <Figure 10>, insert wiring for Foot Control Assembly (H) into Unit Base Plate (G) and fasten the clamp with bolts to fix the Metal Hose.
Use a Phillips screwdriver
Use a Phillips screwdriver
< Figure 10 >
< Figure 09 >
『UNIT Installation』
![Page 25: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/25.jpg)
25
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation procedures #6
11. Assemble Back Low Cover
As shown in <Figure 11>, align the Back Lower Cover (B) with the Assembly Ball and push it in
the arrow direction to put the cover in.
※ Assemble the Back Lower Cover (B) after completing wiring for the Main PCB.
< Figure 11 >
『UNIT Installation』
![Page 26: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/26.jpg)
26
Ⅲ K3 UNIT CHAIR Installation
UNIT INSTALLATION
§ Installation precautions
1. How to move Unit Assembly
When moving Unit Assembly, you must
grab the safety point (position #2 and 3).
『UNIT Installation』
SafetySection
Safety point
Dangerous point when lift up to move
![Page 27: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/27.jpg)
27
Ⅲ K3 UNIT CHAIR Installation
DOCTOR TABLE INSTALLATION
§ Installation procedures #1
1. Install Large Arm Assembly
As shown in <Figure 01>, level off the Large Arm Assembly (A) and put it in Unit Assembly ① in the vertical direction.
2. Fix Large Arm Assembly
As shown in <Figure 02>, align the positions ofthe bolt holes for Unit Assembly ① and Large Arm Assembly (A), and fasten the bolts.
< Figure 02 >
< Figure 01 >
Use a Phillips screwdriver
1
『TABLE Installation』
![Page 28: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/28.jpg)
28
Ⅲ K3 UNIT CHAIR Installation
DOCTOR TABLE INSTALLATION
§ Installation procedures #2
3. Insert Wire in Doctor Table Assembly
As shown in <Figure 03>, hold the Doctor Table Assembly (B) and pass the wire through the inside
of Large Arm (C) to insert it inside the unit.
4. Fix Balance Arm AssemblyAs shown in <Figure 04>, insert Balance Arm (D) in Large Arm (C) and fasten with bolts.
< Figure 04 >
< Figure 03 >
Use 4mm T-wrench
『TABLE Installation』
![Page 29: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/29.jpg)
29
Ⅲ K3 UNIT CHAIR Installation
DOCTOR TABLE INSTALLATION
§ Installation procedures #3
5. Assemble Sub Table
As shown in <Figure 05>, fasten Sub Table (E) to Sub Table Bar (F) with bolts.
6. Install Sub Table Assembly
As shown <Figure 06>. fasten Sub Table Bar (F) to Lower Table Block (G) with bolts.
< Figure 06 >
< Figure 05 >
Use a Phillips screwdriver
Use a Phillips screwdriver
『TABLE Installation』
![Page 30: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/30.jpg)
30
Ⅲ K3 UNIT CHAIR Installation
DOCTOR TABLE INSTALLATION
§ Installation procedures #4
7. Install Chart Holder
As shown in <Figure 07>, align and insert the Chart Holder (I) in the holes on Upper Table Block (H).
8. Remove Mouse Pad Bolts
As shown in <Figure 08> remove the bolts fastened on the side of Doctor Table.
< Figure 08 >
Use a Phillips screwdriver
H
I< Figure 07 >
『TABLE Installation』
![Page 31: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/31.jpg)
31
Ⅲ K3 UNIT CHAIR Installation
DOCTOR TABLE INSTALLATION
§ Installation procedures #5
9. Assemble Mouse Pad
As shown in <Figure 09>,insert the Mouse Pad (J) into the side of Doctor Table and fasten with bolts.
10. Mount Protective Pad
As shown in <Figure 10>, mount the Protective Pad (K) on the Mouse Pad (J).
Use a Phillips screwdriver
K
< Figure 10 >
< Figure 09 >
J
『TABLE Installation』
![Page 32: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/32.jpg)
32
Ⅲ K3 UNIT CHAIR Installation
§ Installation procedures #6
11. Mount Stainless Tray
As shown in <Figure 11>, mount Stainless Tray (L) on the Sub Table (E).
DOCTOR TABLE INSTALLATION
L< Figure 11 >
『TABLE Installation』
![Page 33: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/33.jpg)
33
Ⅲ K3 UNIT CHAIR Installation
§ Installation precautions #1
1. Level off Doctor Table
As shown in the figure, remove the Table Cover. Adjust the wrench bolts shown in Figure "A" and "B“ and level off the Doctor Table.
2. Adjust Balance Arm Tension
As shown in the figure, remove the Slide Bar Cover Cap.
Using a 5mm T-wrench in the "C" area on the figure, adjust the Balance Arm tension.
DOCTOR TABLE INSTALLATION
『TABLE Installation』
![Page 34: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/34.jpg)
34
Ⅲ K3 UNIT CHAIR Installation
§ Installation precautions #2
3. Balance Arm Tension Fixing Device
Turn the Balance Arm Knob shown in Figure "D" counter-clockwise to lock it, and the load will be applied to the tension adjustment device, which leads to an increase in the fixing force of the Balance Arm.
4. Adjust Air Pressure for Doctor Table Master Block
Turn the air pressure adjustment valve of the master block clockwise (lock) and the air pressure decreases. Turning the valve counter-clockwise (release) increases the air pressure.※ Set pressure: 3Kgf/㎠
Notice) Do not apply too much torque when closing the valve, as it may cause the diaphragm be
torn, causing a gas leakage. Do not fasten further when the valve is closed to the stopper.
[ Valve ]
Stopper
DOCTOR TABLE INSTALLATION
『TABLE Installation』
![Page 35: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/35.jpg)
35
Ⅲ K3 UNIT CHAIR Installation
§ Installation precautions #3
5. How to Adjust Water Volume for the Balance Arm
Water volume adjustment valve is placed on the bottom right of the Doctor Table. Turn each valve clockwise to decrease the water volume; turn it counter-clockwise to increase the water volume.
DOCTOR TABLE INSTALLATION
『TABLE Installation』
![Page 36: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/36.jpg)
36
Ⅲ K3 UNIT CHAIR Installation
MONITOR ARM INSTALLATION
§ Installation procedures #1
1. Install Light Pole
As shown in <Figure 01>, level off the Large Arm (A) and insert the Light Pole (B) in the vertical direction.
2. Fasten Large Arm Assembly Bolts
As shown in <Figure 02>, fasten 2 headless bolts in Large Arm (A) to fix the Light Pole (B) and place the Large Arm Cover ①.
Use 4mm T-wrench
1
< Figure 02 >
< Figure 01 >
『MONITOR ARM Installation』
![Page 37: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/37.jpg)
37
Ⅲ K3 UNIT CHAIR Installation
MONITOR ARM INSTALLATION
§ Installation procedures #2
3. Install Monitor Arm Support
As shown in <Figure 03>, align Support_Left (C) and Support_Right (D) on Light Pole (B) and fasten with bolts.
4. Remove Pole Arm Body Cover
As shown in <Figure 04>, remove the Pole Arm Body Cover (E).
< Figure 04 >
< Figure 03 >
Use 5mm T-wrench
5 to 10mm
※ Installation height
『MONITOR ARM Installation』
![Page 38: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/38.jpg)
38
Ⅲ K3 UNIT CHAIR Installation
MONITOR ARM INSTALLATION
§ Installation procedures #3
5. Install Monitor Arm Assembly
As shown in <Figure 05>, align and put the Monitor Arm Assembly (F) in the bolt holes on Support_Left (C) and Support_Right (D).
6. Fasten Monitor Arm Assembly
As shown in <Figure 06>, fasten Support_Left (C) and Support_Right (D) on the Monitor Arm
Assembly (F) using bolts.
Use 5mm T-wrench
< Figure 06 >
< Figure 05 >
Use 4mm T-wrench
『MONITOR ARM Installation』
![Page 39: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/39.jpg)
39
Ⅲ K3 UNIT CHAIR Installation
MONITOR ARM INSTALLATION
§ Installation procedures #4
7. Insert Monitor Arm Wire
As shown in <Figure 07>, pass the wire of Monitor Arm Assembly (F) through the Light Pole (B) to insert it into the unit.
8. Assemble Pole Arm Body Cover
As shown in <Figure 08>, assemble the Pole Arm Body Cover (E).
< Figure 08 >
< Figure 07 >
『MONITOR ARM Installation』
![Page 40: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/40.jpg)
40
Ⅲ K3 UNIT CHAIR Installation
§ Installation precautions
1. Installation direction of monitor arm
When installing the monitor arm, install it at an angle of 30˚ (or 5 o'clock) when looking straight at the front surface of the Spittoon.
2. Check the fixing force of monitor fixing bracket joint
Before installing the monitor, you must check each joint of the monitor fixing bracket by moving and turning it in arrow direction, and fasten the adjustment bolt if the fixing force is insufficient.
< Monitor up/down motion adjustment bolt >
< Monitor rotating motion adjustment bolt >
MONITOR ARM INSTALLATION
< Figure 01 >
『MONITOR ARM Installation』
30˚
Monitor ArmSpittoon
![Page 41: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/41.jpg)
41
Ⅲ K3 UNIT CHAIR Installation
DENTAL LIGHT INSTALLATION
§ Installation procedures
1. Insert Wire in Light Arm Assembly
As shown in <Figure 10>, pass the wire of Light Arm Assembly through the Light Pole ① to insert it in the unit.
2. Assemble Light Arm Assembly
As shown in <Figure 02>, level off the Light Arm Assembly (A) and put it in the Light Pole ① in the vertical direction.
< Figure 02 >
< Figure 01 >
1
『DENTAL LIGHT Installation』
![Page 42: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/42.jpg)
42
Ⅲ K3 UNIT CHAIR Installation
HANARO CONSOLE INSTALLATION
§ Installation procedures #1
1. Assemble Main Body
As shown in <Figure 01>, put the Support Insert (B) in the Main Body (A).
2. Assemble Pole Support
As shown in <Figure 02>, put the Support Insert (B) in the Pole Support (C).
< Figure 02 >
< Figure 01 >
『 HANARO CONSOLE Installation』
![Page 43: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/43.jpg)
43
Ⅲ K3 UNIT CHAIR Installation
HANARO CONSOLE INSTALLATION
§ Installation procedures #2
3. Install Main Body
As shown in <Figure 03>, fasten Main Body (A) and Pole Support (C) to Light Pole ① using bolts.
4. Assemble Main Body Right
As shown in <Figure 04>, align and insert Main Body Right (D) to the holes on Main Body (A), and insert and fasten bolts in Pole Support (C).
1
< Figure 04 >
< Figure 03 >
Use a Phillips screwdriver
Use a Phillips screwdriver
『 HANARO CONSOLE Installation』
![Page 44: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/44.jpg)
44
Ⅲ K3 UNIT CHAIR Installation
HANARO CONSOLE INSTALLATION
§ Installation procedures #3
5. Assemble Side Table
As shown in <Figure 05>, put the Side Table (E) in the side groove on the Main Body (A) in the direction indicated by the arrow.
6. Assemble Main Top Body
As shown in <Figure 06>, put the Main Top Body (F) over the Main Body (A).
< Figure 06 >
< Figure 05 >
『 HANARO CONSOLE Installation』
![Page 45: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/45.jpg)
45
Ⅲ K3 UNIT CHAIR Installation
HANARO CONSOLE INSTALLATION
§ Installation procedures #4
7. Assemble Main Top Body Right
As shown in <Figure 07>, put Main Top Body Right (G) over the Main Body (A).
8. Assemble Cup Dispenser
As shown in <Figure 08>, put the Cup Dispenser Body (H) and the Cup Dispenser Cap (I) in the Main Body (A), in that order.
< Figure 08 >
< Figure 07 >
『 HANARO CONSOLE Installation』
![Page 46: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/46.jpg)
46
Ⅲ K3 UNIT CHAIR Installation
§ Installation precautions
1. Support Insert mounting position
2. How to assemble the Cup Ejector
Before Cup Ejector-related disassembly, make sure you fully understand the procedure for assembling the parts.
※ Assembly procedures Spring(A) à Cup Ejector Button(B) à Cup Ejector Wing(C)
HANARO CONSOLE INSTALLATION
Note installation direction
Note spring fastening
AB
C
C
『 HANARO CONSOLE Installation』
Good GoodMounting support part
(main body side)Mounting support part
(pole side)
![Page 47: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/47.jpg)
47
Pipeline installationⅣ
![Page 48: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/48.jpg)
48
Ⅳ Install pipelines
How to Install Pipe
A: Connect the spittoon drain line to the floor pipe.
B: Connect the suction drain line to the CVS.
(For air suction system, connect the line to the floor pipe)
C: Connect to the water input line.
D: Connect the air input to the compressor.
§ Piping
![Page 49: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/49.jpg)
49
Ⅴ Air/Water Line Diagram
![Page 50: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/50.jpg)
50
Ⅴ Air / Water Line Diagram
Basic System
![Page 51: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/51.jpg)
51
Ⅴ Air / Water Line Diagram
Air Suction System
![Page 52: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/52.jpg)
52
Ⅴ Air / Water Line Diagram
Water Sanitation System
![Page 53: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/53.jpg)
Thank you
![Page 54: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/54.jpg)
K3 Unit Chair Installation(Electrical)
Osstem Implant
![Page 55: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/55.jpg)
55
* Contents
Ⅰ Electrical equipment installation
Ⅱ Wiring test
![Page 56: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/56.jpg)
56
Ⅰ Electrical equipment installation
![Page 57: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/57.jpg)
57
BASE
TABLEUNIT
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Parts and Components of K3 Unit Chair
• Base Part, Unit Part (Light Part, Assist Part), Table Part
![Page 58: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/58.jpg)
58
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
BASE
§ K3 Base Part
Position of Power PCB
『POWER PCB』
![Page 59: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/59.jpg)
59
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
④ Hydraulic motor ① MAIN PCB
③ POWER SWITCH ② Suction device
⑤ Hydraulic solenoid valve
『POWER PCB』
§ Power PCB – Harness Connector Configuration (5 connections)
![Page 60: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/60.jpg)
60
Power PCB
MAIN PCB
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『POWER PCB』
§ Power PCB – Main PCB Power Supply Harness Connection
• Delivers chair operation signals from Main PCB to Channel and from Assist PCB to Power PCB
![Page 61: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/61.jpg)
61
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
MAIN Suction devicePower PCB
『POWER PCB』
§ Power PCB – Suction Start Signal Configuration
• Delivers start signal for the suction device in the dental clinic
![Page 62: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/62.jpg)
62
Main Switch(AC220V)
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
Power PCB
『POWER PCB』
§ Configuration between Power PCB – Power Supply(AC220V)
• Applies AC 220V to the dental clinic through the Main Switch when the Oil Motor and Oil Solenoid Valve are turned ON
![Page 63: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/63.jpg)
63
OIL SOL. VALVE
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『POWER PCB』
• Converts the signal received from the Main PCB from weak current to strong current, and delivers the operating signal for Oil Solenoid Valve that corresponds to the
Chair/Backrest Up/Down Selection value
§ Configuration between Power PCB – Oil Sol. Valve
ü Notice: Take care to avoid electric shock from the AC220V line
Power PCB
![Page 64: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/64.jpg)
64
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『POWER PCB』
• If the value delivered from the signal received from the Main PCB and converted from weak current to
strong current is a command to raise the chair/backrest, the signal is delivered to operate the oil motor
to push the hydraulic pressure to raise the chair/backrest
ü Notice: Take care to avoid electric shock from the AC220V line
Configuration between Power PCB – Oil Motor
Power PCB
![Page 65: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/65.jpg)
65
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ K3 Unit Part
UNIT
Position of Unit PCB
『MAIN PCB』
![Page 66: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/66.jpg)
66
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『MAIN PCB』
§ Components of K3 Unit Connection
M①
M① SENSOR
M② Level VR M②
M③M③ DATA
M④M④ Emergency
M⑤M⑤ Light DATAM⑥
M⑥ Brest VR
M⑦ Chair VR
M⑦
M⑧
M⑨
M⑧ Main Power M⑩ Table Power
M⑩
M⑩ Warmer
M⑪
M⑪ Foot Controller
M⑫ Power PCBM⑫
M⑬ Assist_2M⑬
M⑭
M⑮
M⑭ Water SolM⑮ Assist_1
BASE
Assemble ASSIST Table
Assemble TABLE
Semi-assembly release
![Page 67: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/67.jpg)
67
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Final assembly photo of K3 Unit Connection
Rear sideFront side
『MAIN PCB』
![Page 68: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/68.jpg)
68
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ K3 Unit Connection Wiring
A :
B :
C :
D :
A :
B :
C :
D :
A
B
C
D
M① M② M③
M④
M⑤
M⑦
M⑩
M⑪
M⑥
M⑧ M⑨
M⑫
M⑬
M⑭
M⑮
L①
L②
M④, M⑤, M⑥, M⑦, M⑧,M⑨
M①, M②, M③
M⑩, M⑪, L①, L②
M⑫, M⑬, M⑭, M⑮
Power coverMain/Light PCB Cover
『MAIN PCB』
![Page 69: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/69.jpg)
69
SWITCH Color
Up Limit Black, Green
Down Limit Black, Blue
Position Sensor Red,White,Black
U
DP
U
D P
P
D
U
Harness common
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Sensor position and limit switch harness color
『MAIN PCB』
![Page 70: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/70.jpg)
70
Foot Harness
M⑪
F②
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Connect to Foot Harness à Main PCB
『FOOT PCB』
![Page 71: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/71.jpg)
71
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Connect to Foot Harness à Main PCB
『FOOT PCB』
F②
M⑪
M⑪ Foot ControllerF② FOOT V/R
FROM FOOT CONTROLLER
Main PCB
![Page 72: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/72.jpg)
72
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『FOOT PCB』
§ Connect to Foot Harness à Main PCB
• Delivers chair operation control signals via manual position button, rinsing and return buttons
Foot Pedal Foot PCB
Main PCB
ü Precautions: For Elec. Low HP, the foot pedal features a 3-pin harness (wire), which is intended to deliver RPM (speed) control signals for the Elec. Low HP, and this harness must be connected to the Motor PCB located at the table.
![Page 73: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/73.jpg)
73
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Light PCB - LIGHT HARNESS Connection
『LIGHT PCB』
L①
L②
L① LED Light
L② Light Power
![Page 74: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/74.jpg)
74
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Parts and components of K3 Assist PCB Table
Suction Large
Syringe SuctionSmall
Assist Membrane
Assist PCB
『ASSIST PCB』
![Page 75: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/75.jpg)
75
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Main PCB - Assist PCB Connection
Assist PCB
Main PCB Power PCB
SuctionSuction
『ASSIST PCB』
![Page 76: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/76.jpg)
76
TABLE
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ K3 Table Part
『TABLE PCB』
![Page 77: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/77.jpg)
77
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Parts and components of K3 Table Electrical equipment Connection
『TABLE PCB』
T① T① LCD Data
T② DATA
T②T③
T③ Bien-air Data
T④
T⑤ T⑤ Speaker
T⑥ SolenoidT⑥T⑦ H/P Slot LED T⑦
T⑧T⑧ H/P Micro S/W
T⑬
T⑬ Table Power
T⑩ Scaler PowerT⑩
T⑨ Scaler StartT⑨
T⑪ Bien-air Power
T⑪
T⑫ Fiber OpticT⑫
![Page 78: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/78.jpg)
78
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『TABLE PCB』
LCD PCB
§ Table – LCD PCB Connection
• Check whether the copper plate is properly shielded in the event of an abnormal phenomenon, such as the LCD window turning off or whitening while in use
![Page 79: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/79.jpg)
79
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『TABLE PCB』
§ Table – Dr. Table Membrane Connection
• Take out the lock section in the connector and remove the film connection section
![Page 80: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/80.jpg)
80
54321
321
54
6
3
12
24Vac ±10%
32Vdc ±10%
(+)
(-)
TO MICROMOTOR(MCX)
Signa
l G
ND
RX
INTX
OU
T
RS-232C(UART0)
Pedal On/Off,Pedal AD
K3 Main Board
K3 Foot Controller
CONV24
MCX
K3 Table Board
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
§ Table – Bien-air Signal Connection Diagram
『TABLE PCB』
![Page 81: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/81.jpg)
81
Ⅰ Electrical equipment installation
v K3 PCB Harness Connection
『TABLE PCB』
Table
SCALER
AC24V
Startsignal
• If the power supply line and the start signal line are switched with each other, it will cause a critical error in the Scaler PCB.
§ Table – SCALER Connection
![Page 82: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/82.jpg)
82
Suction circuit configuration
① Activated when either of them is lifted - parallel circuit
v K3 Suction Connection
§ Suction Micro S/W
Ⅰ Electrical equipment installation 『Suction Connection』
Assist PCB
DC24V
![Page 83: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/83.jpg)
83
Motor
Chair UP
Chair DN
B.Rest UP
B.Rest DN
B. AC24V
L. AC12V
AC24V
300V
A
10A FuseL1
L2
C1
C2
Noise FilterMain Switch(AC220V)
Power PCB
TRANS
AC220V
Grounding
v K3 Power Connection
§ AC220V Power LINE
Ⅰ Electrical equipment installation 『Power Connection』
![Page 84: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/84.jpg)
84
B. AC24V
L. AC12V
AC24V
300V
A
TRANS
MainPCB
TablePCB
Scaler
Bien AirLow HP
Light PCB ExcelitasLED
1 2 1
1
1 2 3 : Fuse
DC24V
v K3 Power Connection
§ K3 Power Supply Diagram
Ⅰ Electrical equipment installation 『Power Connection』
![Page 85: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/85.jpg)
85
Building grounding
1
Light
Unit
LCD
2
3
4
5
667
8
A total of 8 grounds
v K3 Power Connection
§ K3 Electrical equipment Grounding Configuration
Ⅰ Electrical equipment installation 『Power Connection』
![Page 86: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/86.jpg)
86
AC 220V input AC 220V output
OUTPUTBlack
Red
INTPUTBlue
Brown
Blue
Brown
Black
Red
Blue
Brown
Black
Red
OUTPUTINPUT
v K3 Power Connection
§ K3 Main Switch Replacement
Ⅰ Electrical equipment installation 『Power Connection』
![Page 87: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/87.jpg)
87
Ⅱ Wiring test
![Page 88: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/88.jpg)
88
Basic operation Diagnosis
Light bulb turns on when the operation is completed after pressing Light, M1, M2, M3,
and RP keys
1. Light Signal PCB2. Check the light brightness change3. Check the Membrane UI
Check the brightness adjustment level
Ⅱ Wiring Test
v Light ON/OFF
『LIGHT Test』
§ Light On/Off Key Input Operation
![Page 89: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/89.jpg)
89
- Supplies PCB operating power (DC 12V)
- Delivers ON/OFF signal
- Adjusts the halogen light’s brightness
Ⅱ Wiring test
v Light ON/OFF
§ Functions of signal harness delivered to the light PCB
『LIGHT Test』
![Page 90: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/90.jpg)
90
Ⅱ Wiring Test
v Light ON/OFF
Light PCB How to check Light PCB
① Check AC_IN, AC12V voltage - tester
② Perform 7A current test on the fuse
③ Perform visual check on D2 LED (D2 LED is turned
on/off when the Dr. Table membrane light button is
pressed)
④ Check the light output power voltage (LAMP): AC12V
should be read when turning the light button ON
①
②
④
③
『LIGHT Test』
§ Light PCB Check and diagnosis
![Page 91: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/91.jpg)
91
Ⅱ Wiring Test
v Suction operation
Suction
N
P
switch
AC110V
Machine room
SuctionSwitch
Power PCBCVS Relay
Treatment office
Signal
『SUCTION Test』
§ Suction Operating Diagram
![Page 92: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/92.jpg)
92
Ⅱ Wiring Test
v Suction operation
§ Suction signal check
『SUCTION Test』
Assist PCB
Main PCB Power PCB
How to check the suction operation LED indicator
- When turning On/Off: Displayed 1
1
SuctionSuction
![Page 93: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/93.jpg)
93
Ⅱ Wiring Test
v Chair operation signal check
§ How to check the Power PCB operation LED indicator
TCDCUBUBD
AC 220V Input
Hydraulic motor2
1
3
『Chair operation test 』
Control function
Basic operation Checking operation Checklist
Hydraulic motor
Operates when chair goes up
or backrest goes up
Measure the AC 220V voltage when the motor operates
Check the motor LED illumination
Hydraulic Solenoid Valve
Chair moves up/downBack moves up/ down
Check the operating voltage of each solenoid valveEx) When the chair goes down, check the 220V voltage at T & CD test point
Each operating solenoid valveCheck the signal LED illumination
Suction(C.V.S) On/OffPerform short check on the output sectionto check whether CVS signal is properly controlled
(Suction On : short / Off : open)
Check the CVS LED illumination
1
2
3
![Page 94: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/94.jpg)
94
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ AC24V main PCB power check
『MAIN PCB』
Main PCB Checklist
① Connection of connector from the Trans
② If LED is not turned on, check the fuse for AC24V (B)
③ Check the base end- Check the fuse in the noise filter
- Check the trans
Trans
DC 12V LED (water supply related)
DC 24V LEDWater Solenoid power supply
Normal
![Page 95: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/95.jpg)
95
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ AC24V main PCB power check
『MAIN PCB』
Main PCB Checklist
① Connection of connector from the Trans
② If LED is not turned on, check the fuse for AC24V (B)
③ Check the base end- Check the fuse in the noise filter
- Check the trans
Trans
DC 5V LEDPower supply to PCB
Normal
![Page 96: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/96.jpg)
96
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Main PCB CPU activation check
『MAIN PCB』
Main PCB Checklist
① Connection of connector from the Trans
② If LED is not turned on, check the fuse for AC24V (B)
③ Check the base end- Check the fuse in the noise filter
- Check the trans
Trans
Check Table Power è ON/OFF LED
Normal
![Page 97: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/97.jpg)
97
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ DC5V Table PCB power check
『TABLE PCB』
Table PCB Checklist
① Check the LED (table PCB power) operation
② Check the fuse for main PCB on the right sideSpec. : 1.6A
Fuse for Table PCB
DC 5V LEDPower supply to table PCB
IF DC 5V LED is OFF
![Page 98: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/98.jpg)
98
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ DC24V Table PCB power check
『TABLE PCB』
Table PCB Checklist
① Check the LED (HP Air/Water power) operation
② Check the fuse for main PCB on the right sideSpec. : 1.6A
HP Air/Watercontrol power fuse
DC 24V LEDTable HP Air/Water
Power supply
IF DC 5V LED is OFF
![Page 99: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/99.jpg)
99
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Table PCB CPU activation check
『TABLE PCB』
Table PCB Checklist
① Connection of connector from the Trans
② If LED is not turned on, check the table membrane and the communication line
③ Check the main PCB fuse- Check the fuse in the noise filter- Check the trans
Main
Dr. Table MembraneMirror : On/Off
Normal
![Page 100: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/100.jpg)
100
4-by-1 connection solenoid valve
<How to measure>ⓐ Connect the tester to DC voltage.ⓑ Connect the lead wires of the tester to 2 terminals of the solenoid valveⓒ DC24V is output when removing the HP → Normal
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ HP Air/Water control solenoid valve power check
『SOL.VALVE』
![Page 101: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/101.jpg)
101
HP Optic voltage LED : Max 3.2VHalogen : Max 2.9V
Precaution: Please note that the LED lamp has polarity (+,-)
H.P Optic
Lamp
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ HandPiece(HP) Optic brightness adjustment check
Table PCB
『OPTIC Test』
![Page 102: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/102.jpg)
102
HP-specific Micro SW LED check
M4 M3 M3 M1
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ HandPiece (HP) detachment recognition Micro SW check
『MICRO-SWITCH』
Table PCB
![Page 103: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/103.jpg)
103
Check through HP-specific internal/external LED
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ HandPiece (HP) detachment recognition Slot LED check
L1
L2
L3
L4
『MICRO-SWITCH』
Table PCB
![Page 104: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/104.jpg)
104
Rinsing PositionReturn PositionPedalChair DownChair UpBackrest DownBackrest Up
※ LED illumination check
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Operation check between Main PCB and Foot PCB
『FOOT Test』
ü Ex1) When the pedal is pressed, the 3rd LED from the top illuminates
ü Ex2) When rinsing is pressed the 1st LED from the top illuminates
![Page 105: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/105.jpg)
105
Manual water supply, drainage
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Operation check between Main PCB and Sensor PCB
『Water Supply Test』
ü Water operation check
• Water continuously flows to the cup/spittoon
- Check water penetration status at the manual assist
membrane button
- Remove the manual connector button
• Cup detection LED light in the main PCB is turned on
- When no cup is placed - ON
- When a cup is placed – OFF
- If there is no change between when you place
a cup on the cup holder and when you remove
the cup, the sensor on the PCB may not work
properly due to interference, or the sensor PCB
may need to be checked.
![Page 106: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/106.jpg)
106
Level signal
RearWater supply
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Water level check between Main PCB and Sensor PCB
『Water Supply Test』
ü Water level check
• Checking- If the FULL LED is always turned on, check whether the cup level signal connector is flooded
• Troubleshooting- Normal: If the water reaches a set level, FULL LED is temporarily turned on and then turned off again
![Page 107: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/107.jpg)
107
Basic instructions Checklist
Cup recognitionè 1 secè Water supplyè 10 secsè Water drain
1. Water supply is suspended when the cup is removed while water is supplied
2. Drainage is suspended when the cup is recognized during drainage3. Check variable water supply resistance level4. Check variable water supply resistance drainage time5. Check manual water supply and drainage
Drainage
Water supply
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Cup sensor operation
『Water Supply Test』
![Page 108: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/108.jpg)
108
Side
Water supply instructions
① Place the cup at the cup holder position.② Water comes out 1 second after.③ Water is automatically filled into the cup at
the set position.(min : 1 second, max : 10 seconds)
④ Water comes out from the spittoon 10 seconds after.(min : 1 second, max : 10 seconds)
Checklist
① Water supply should be suspended when the cup is removed while water is supplied
② Drainage should be suspended when the cup is recognized during drainage
③ Water supply volume value should be changed when the water volume is set to variable water supply resistance
④ Water drainage volume value should be changed when the water volume is set to variable water drainage resistance
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Water Supply/Spittoon
『Water Supply Test』
![Page 109: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/109.jpg)
109
Water supply volume adjustment voltage (4 to 12V)
Ref voltage(2V)+-
Cup
Level voltage
CPUL/H
Volume
Potential
Ref Voltage
HL
Water level recognition
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ Water supply volume adjustment
『Water Supply Test』
![Page 110: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/110.jpg)
110
Light emitting sensor
Light receiving sensor
Sensor signal
level signal
Front
Rear
Side
Manual water supply and drainage
Ⅱ Wiring Test
v Operating status between PCBs (chair operation)
§ K3 water supply cup recognition function
『Water Supply Test』
![Page 111: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/111.jpg)
111
Ⅱ Wiring Test
v Key operation test
§ Doctor Table Membrane Connection Test
ü Connection procedures
- Lift the connector, and detach or attach the film connection section
- Perform a check on the operation of each key button
- If any of the membrane keys are pressed
èAll keys do not work è Membrane failure
- Check the error window
『KEY operation test』
![Page 112: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/112.jpg)
112
§ Doctor Table Membrane Defect Test
ü Perform check on the operation of each of 23 keys
- Key is not pressed
- Key is pressed, and does not return to the original position due to a lack of key tension
- None of the keys work if any of the Dr. Membrane keys are pressed
ü How to check
- How to perform a check on resistance when any abnormality other than those specified above occurs
: Multi-meter (tester)
- Place the resistance gauge and check whether infinite resistance value
(0MΩ - normal) is read on the power button and the key matrix sections
ü Resistance value is read to be MΩ (defective), membrane needs to be replaced
Ⅱ Wiring Test
v Key operation test
Infinite value (normal)
xx MΩ (defective)
『KEY operation test』
![Page 113: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/113.jpg)
Thank you
![Page 114: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/114.jpg)
K3 Unit Chair Installation(Settings)
Osstem Implant
![Page 115: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/115.jpg)
115
* Contents
Ⅳ Limit and option settings
Ⅴ Check foot pedal operation
Ⅵ Adjust chair/backrest speed
Ⅶ Adjust water volume for cup/spittoon
Ⅷ Adjust water volume for handpiece
Ⅸ Check water sanitation operation
Ⅹ Pneumatic control
Ⅰ Check air at the inlet
Ⅱ
Ⅲ Check water/air injection at handpiece
Check water injection at the inlet
![Page 116: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/116.jpg)
116
Ⅰ Check air at the inlet
![Page 117: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/117.jpg)
117
Ⅰ Check air at the inlet
Air Regulator Pressure Check #1
§ Check air pressure
Air Regulator: 5 Bar
『 Air Regulator 』
• Check whether the air pressure of the air regulator is 5 bar.
![Page 118: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/118.jpg)
118
Ⅰ Check air at the inlet
Air Regulator Pressure Check #2
§ Check air spray
3-way syringe
Air spray button
Water spray button
3-way syringe tip
『 Air Regulator 』
• Press the air spray button on the 3-way syringe to confirm that air comes out properly.
![Page 119: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/119.jpg)
119
Ⅱ Check water injection at the inlet
![Page 120: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/120.jpg)
120
Ⅱ Check water injection at the inlet
Inlet Water Injection Valve Check #1
§ Check water injection valve
OPENCLOSE
Air injection line Water injection line
『 Check water injection 』
• Open the water injection valve
![Page 121: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/121.jpg)
121
Ⅱ Check water injection at the inlet
Inlet Water Injection Valve Check #2
§ Check water injection of the 3-way syringe
『 Check water injection 』
• Press the water spray button on the 3-way syringe to check whether water comes out properly.
3-way syringe
Air spray button
Water spray button
3-way syringe tip
![Page 122: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/122.jpg)
122
Ⅲ Check water/air injection at handpiece
![Page 123: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/123.jpg)
123
Ⅲ Check water/air injection at handpiece
Water/Air Injection Check
§ Detach the handpiece from the Dr.Table and turn water injection of the handpiece ON.
『 Handpiece 』
![Page 124: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/124.jpg)
124
Ⅲ Check water/air injection at handpiece
Water/Air Injection Check
§ Presss the foot pedal to check the operation and water injection of the handpiece.
handpiece
『 Handpiece 』
![Page 125: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/125.jpg)
125
Ⅳ Limit and option settings
![Page 126: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/126.jpg)
126
Ⅳ Limit and option settings
How to Set Limits
• Setting limits enables the chair to recognize the position of limit resistance
• You must perform this function after installing the chair
1. Press the LED LIGHT key and the RPM1 key simultaneously on the membrane of Dr.Table.
Press simultaneously
Enter the options mode menu
2. Press the M1 key on the membrane of Dr.Table to select a limit set.
- Immediately after entering, setting limits for the chair and backrest begins.
Select Limit Set
Types of limit setting errorsv BD limit:FAIL - Backrest lowering limit errorv CD limit:FAIL - Chair lowering limit errorv BD limit:FAIL - Backrest lowering limit errorv CU limit:FAIL - Chair raising limit errorv AD Data:B FAIL - Backrest position variable resistance errorv AD Data:C FAIL - Chair position variable resistance error
![Page 127: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/127.jpg)
127
Option Settings
§ How to enter the options menu
Ⅳ Limit and option settings
1. Press the LED LIGHT key and the RPM1 key simultaneously on the membrane of Dr.Table.
Press simultaneously
Enter the options mode menu
2. Enter option 1 menu: Press the M2 key on the membrane of Dr.Table and select Option 1.
3. Enter option 2 menu: Press the M3 key on the membrane of Dr.Table and select Option 2.
Select Option 1
Select Option 2
『 Option settings 』
![Page 128: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/128.jpg)
128
§ How to exit options menu
Ⅳ Limit and option settings
1. After completing option mode settings, follow the steps described below to return to the treatment mode screen.
Press simultaneously
Exit the option mode menuOption mode screen Treatment mode screen opens
『 Option settings 』
Option Settings
![Page 129: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/129.jpg)
129
§ How to set option data
Ⅳ Limit and option settings
1. Move to Select Option
Option mode screen
+ key - Key
or
Select option Move to Select Option
- Key
Move to Select Option
MODE keySelect
『 Option settings 』
Option Settings
![Page 130: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/130.jpg)
130
Name LCD screen Description Settings
Optic Hold
When you pick up the handpiece without pressing the
pedal
• Optic of the handpiece turns on (ON)
• Optic of the handpiece turns off (OFF)
OFF: disabled(default)
ON: enabled
ScalerOperation
When you press the pedal while you pick up the scaler• Configured so that the scaler is enabled when you press the pedal once, and is disabled when you press the pedal once again (ONCE)• When you press and hold the pedal, the scaler operates (KEEP)
ONCE: Press once(default)
KEEP: Press and hold
Elec.Mot.Rotate
LOW: when the handpiece is an electric motor type
• Maintains the final rotating direction of the electric
motor
• Restart in the normal direction (RECOVER)
RECOVER:Resets the rotating
direction(default)
KEEP:Maintains the rotating
direction
Ⅳ Limit and option settings
§ Option function descriptions #1
『 Option settings 』
Option Settings
![Page 131: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/131.jpg)
131
Name LCD screen Description Settings
Chair Wait Mode
At the time of chair operation (move), it stops the chair operation for 1 second to prevent the patient's hand from being caught by the handle
OFF: disabled
(default)
ON: enabled
Select FootCtrl
For changing the pedal type
• To use a joystick type pedal (JOYSTICK)
• To use a new lever type pedal (LEVER)
- JOYSTICK (FOOT in the older model) is the
default type
JOYSTICK:
Joystick-type pedal
LEVER:
Lever-type pedal
Foot Position Key
When you use a position change key on the
pedal
• Double-tap the pedal position change key to
operate (TWICE)
• Single-tap the pedal position change key to
operate (ONCE)
TWICE:
Double tap applied
(default)
ONCE:
Single tap applied
Ⅳ Limit and option settings
§ Option function descriptions #2
『 Option settings 』
Option Settings
![Page 132: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/132.jpg)
132
Name LCD screen Description Settings
BRestEmergency
Select whether to use the backrest safety device
- OFF (disabled) is the default setting
OFF: disabled
(default)
ON: enabled
WaterError Check
When you install new firmware on the old PCB (version before 2015/6/22) • Do not use the forced water supply error judgment for the assistant table (old PCB disabled)• Use the forced water supply error judgment for the assistant table (new PCB enabled)
ON:
New PCB used
(default)
OFF
Old PCB used
Ⅳ Limit and option settings
§ Option function descriptions #3
『 Option settings 』
Option Settings
![Page 133: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/133.jpg)
133
Name LCD screen Description Settings
Instrument 2
Configures settings for the instrument to be installed on the 2nd holder of Dr.Table• Elec-High : High electric motor speed
• Air-High : High Handpiece2
• Air-Low : Low air speed for HP
• Elec-Low : Low electric motor speed
Elec-High
(default)
Air-High
Air-Low
Elec-Low
Instrument 3
Configures settings for the instrument to be installed on the 3rd holder of Dr.Table• Elec-Low : Low electric motor speed
• Elec-High : High electric motor speed
• Air-Low : Low air speed for HP
Elec-Low
(default)
Elec-High
Air-Low
Ⅳ Limit and option settings
§ Option function descriptions #4
『 Option settings 』
Option Settings
![Page 134: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/134.jpg)
134
Name LCD screen Description Settings
WaterSupply
In the water supply settings for water supply to cup or spittoon• When water is automatically supplied by the cup sensor (AUTO)• When supplying water using the water injection key on the assistant table (MANUAL)- AUTO(automatic water supply) is the default setting
AUTO:
Automatic water
supply enabled
MANUAL:
Manual water supply
enabled
W-Line CleanUse
Select whether to use the water sanitation system
- OFF (disabled) is the default setting
OFF:
Disabled
ON:
Enabled
TimerMelody
Function added for overseas sales, which generates a beep sound instead of melody for the timer alarm sound• Melody is used for timer alarm sound (SOUND)• Beep sound is used for timer alarm sound (BEEP)- SOUND (melody) is the default setting
SOUND:
Melody used
BEEP:
Beep sound used
Ⅳ Limit and option settings
§ Option function descriptions #5
『 Option settings 』
Option Settings
![Page 135: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/135.jpg)
135
Ⅴ Check foot pedal operation
![Page 136: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/136.jpg)
136
Ⅴ Check foot pedal operation
Foot Pedal Operation Check #1
§ Try moving the position of the foot control using the foot control pedal.
§ Try moving the chair and backrest up/down using the foot control joystick.
Raise the chair Lower the chair
Raise the backrest Lower the backrest
『 FOOT 』
![Page 137: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/137.jpg)
137
Ⅴ Check foot pedal operation
Foot Pedal Operation Check #2
§ Try moving the chair to the rinsing position using the foot control button.
§ Try moving the chair to the return position using the foot control button.
Rinsing positionReturn position
Rinsing Position Return Position
『 FOOT 』
![Page 138: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/138.jpg)
138
Ⅵ Adjust chair/backrest speed
![Page 139: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/139.jpg)
139
Ⅵ Adjust chair/backrest speed
• Adjust the solenoid valve speed adjustment knob.
• Turn clockwise to slow down.
• Turn counter-clockwise to speed up.
Solenoid ValveRaise the backrest
Raise the chair
Lower the chair
Lower the backrest
How to Adjust Chair/Backrest Ascending Speed
![Page 140: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/140.jpg)
140
Ⅶ Adjust water volume for cup/spittoon
![Page 141: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/141.jpg)
141
Ⅶ Adjust water volume for cup/spittoon
• Adjust the water volume using the adjustment knob.
Cup water volume adjustment knob
Spittoon water volume adjustment knob(Spittoon)
Warmer On/Off
[User control section]
ü Turning the adjustment knob clockwise increases the volume of water supplied to the
spittoon
ü Turning the adjustment knob counter-clockwise decreases the volume of water supplied
to spittoon
Spittoon Water Volume Adjustment
![Page 142: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/142.jpg)
142
Ⅶ Adjust water volume for cup/spittoon
• Adjust the water volume using the adjustment knob on the main PCB to meet the needs of the water supply environment
Auto Cup Water Volume Adjustment #1
Salt waterSalt waterDistilled waterDistilled water
Tap waterTap water
『 Water outlet 』
![Page 143: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/143.jpg)
143
Ⅶ Adjust water volume for cup/spittoon
• Adjust the water volume using the adjustment knob.
Auto Cup Water Volume Adjustment #2
『 Water outlet 』
Cup water volume adjustment knob
Spittoon water volume adjustment knob
Warmer On/Off
[User control section]
ü Turning the adjustment knob clockwise increases the volume of water supplied to the cup
ü Turning the adjustment knob counter-clockwise decreases the volume of water supplied to the cup
![Page 144: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/144.jpg)
144
Ⅶ Adjust water volume for cup/spittoon
• Adjust the water volume using the adjustment pin.
Dr.T
able
Dr.T
able
Wat
er o
utlet
spitto
on
3-w
ay s
yrin
ge
3-w
ay s
yrin
ge
Wat
er IN
Air IN
Water volume adjustment valve on the spittoon
3-way syringeWater volume adjustment valve
3-way syringeAir volume adjustment valve
Adjustable
ü Turning the adjustment pin clockwise decreases the water volume.ü Turning the adjustment pin counter-clockwise increases the water volume.
How to Adjust Water Volume for 3-Way syringe (Assist Table)
『 3-Way syringe 』
![Page 145: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/145.jpg)
145
Ⅶ Adjust water volume for cup/spittoon
Precautions When Adjusting Air / Water Pressure for 3-way Syringe (Assist Table)
Unit distribution blockUnit distribution block
Pipeline is openPipeline is open Pipeline is closedPipeline is closed
vPrecautions- The steps of the distribution block and the pin must be balanced. Please note that if you turn the distribution block pin counter-
clockwise, the pin will come off the block and water and air will leak.
Balance between pin and block steps
MAX MIN
『 3-Way syringe 』
![Page 146: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/146.jpg)
146
Ⅷ Adjust water volume for handpiece
![Page 147: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/147.jpg)
147
Ⅷ Adjust water volume for handpiece
Water Volume Adjustment for Devices
Position of water volume adjustment knob
§ How to adjust the water volume for Dr.Table devices
• Water volume adjustment knob: Turning the knob clockwise increases the water
volume, and turning it counter-clockwise decreases the water volume
![Page 148: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/148.jpg)
148
Ⅸ Check water sanitation operation
![Page 149: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/149.jpg)
149
Ⅸ Check water sanitation operation
Preset
§ Options menu settings
『 Water sanitation 』
• In the options menu, set the 'W-Line-Clean Use' item to ON.
![Page 150: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/150.jpg)
150
Ⅸ Check water sanitation operation
Water Sanitation
1
5
2
- Key
WETF/V
3 4
6
Takes about 7 minutes
7
§ Before leaving the office (chemical cleaning)
『 Water sanitation 』
![Page 151: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/151.jpg)
151
Ⅸ Check water sanitation operation
Water Sanitation
21
WETF/V
3
+ key
4
Takes about 10 minutes
5 6
MODE key
7
§ After arriving at the office (water washing)
『 Water sanitation 』
![Page 152: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/152.jpg)
152
Ⅹ Pneumatic control
![Page 153: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/153.jpg)
153
Ⅹ Pneumatic control
Handpiece Pneumatic Pressure Control
§ How to adjust pneumatic pressure
• Air pressure of 3.5 bar is recommended for the handpiece.
• Configure the air regulator settings and then the master block settings.
• Configure settings considering the drop in pressure that occurs while the air passes through the pipe.
Air Regulator: 5 Bar
Handpiece
Pressure gauge Master Block: 4 Bar
![Page 154: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/154.jpg)
154
Ⅹ Pneumatic control
Handpiece Pneumatic Pressure Control
§ How to adjust the air regulator
• Using the adjustment knob, set the pressure to 5 bar.
Pressure gauge
Filter
① Pull the pressure adjustment knobupwards to unlockit.
② Turn the pressure adjusting knob clockwise or counter-clockwise to adjust the pressure.
③ Push the pressure adjustment knobdownwards to lockit again.
![Page 155: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/155.jpg)
155
Ⅹ Pneumatic control
Handpiece Pneumatic Pressure Control
§ How to adjust master block
• Turning clockwise decreases the pressure.
• Turning counter-clockwise increases the pressure.
• Perform adjustment while checking the pressure gauge.
• Set the pressure to 4 bar.
ScalerHigh Speed Handpiece 1
High Speed Handpiece 2 Low Speed Handpiece
Pressure gauge
![Page 156: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/156.jpg)
156
Ⅹ Pneumatic control
3-Way syringe Pneumatic Pressure Control
§How to adjust 3-way syringe (assist table) air pressure
• Adjust the air pressure using the adjustment pin.
Dr.T
able
Dr.T
able
Wat
er o
utlet
spitto
on
3-w
ay s
yrin
ge
3-w
ay s
yrin
ge
Wat
er IN
Air IN
Water volume adjustment valve on the spittoon
3-way syringeWater volume adjustment valve
3-way syringeAir volume adjustment valve
Adjustable
ü Turning the adjustment pin clockwise decreases the air pressure.ü Turning the adjustment pin counter-clockwise increases the air pressure.
![Page 157: K3 Unit Chair Installation - maxfac.no · 1. CHAIRBOX 2. UNIT BOX 3. TABLE BOX 4. LIGHT ARM BOX 5. LIGHTHEADBOX 6. SEAT BOX 7. DOCTORSTOOL BOX. 6 ⅠK3 Installation Checklist Checklist](https://reader035.vdocuments.site/reader035/viewer/2022071413/610a713f4841103bbb3c454d/html5/thumbnails/157.jpg)
Thank you