justice for rudolfo segovia

17
Justice for Rudy Segovia Rudy Segovia, one of the picketers, opposed to the mining operations of TVI Resources Development, was shot four times by a TVI company blue guard. Rudy died on the spot on March 6,2011 inside the mining blue guard. Rudy died on the spot on March 6,2011 inside the mining area. This photo does not show a bolo/sundang /machete. This photo shows a bolo/sundang /machete

Upload: no-to-mining-in-palawan

Post on 01-Sep-2014

1.099 views

Category:

Investor Relations


1 download

DESCRIPTION

Rudy Segovia, one of the picketers, opposed to the mining operations of TVI Resources Development, was shot four times by a TVI company blue guard. Rudy died on the spot on March 6, 2011 inside the mining area. According to the witness, prior to the killing incident, Segovia who was one of the picketers complained about the dusty road and requested TVI to sprinkle water on the road to control the dust while company-owned trucks and vehicles pass by. But nothing was done about the request, so they put wooden chair and blocked the road to stop the operation.

TRANSCRIPT

Page 1: Justice for Rudolfo Segovia

Justice for Rudy SegoviaRudy Segovia, one of the picketers, opposed to the mining operations of TVI Resources Development, was shot four times by a TVI company blue guard. Rudy died on the spot on March 6,2011 inside the miningblue guard. Rudy died on the spot on March 6,2011 inside the mining area.

This photo does not show a bolo/sundang /machete. This photo shows a bolo/sundang /machete

Page 2: Justice for Rudolfo Segovia

Around 12:30 in the afternoon, a group of blueguards drove back to the sceneof blueguards drove back to the scene of the road block. There was a heated verbal exchange, according to the media report put out by TVI Resources . However, eyewitness accounts testified that there “ there was no heated exchange”. one of the TVI guards addressed Rudy saying “Mopahawa kaaddressed Rudy saying Mopahawa ka ba?” meaning “Will you leave?” to which Rudy responded (mitubag si Rudy) “ Dili kay..” “No. because....” But before he could finish his sentence, he was gunned down. All he wanted was for the mining company to sprinkle the dusty road with water to cut downthe dusty road with water to cut down on the impact of the dust clouds on the people from passing company vehicles.

Page 3: Justice for Rudolfo Segovia

Life not GoldAccording to the witness, prior to the killing incident, Segovia who was one of the picketers complained about the dusty road and requested TVI to sprinkle water on the road to control the dust while company-owned trucks and vehicles pass by. But nothing was done about the request, so they put wooden chair and blockedBut nothing was done about the request, so they put wooden chair and blocked the road to stop the operation.

Page 4: Justice for Rudolfo Segovia

Strengthening the safety value chain June 3, 2009 TVIRD heavy equipment contractors post zero accident record Every morning, he diligently checks the road worthiness of his company’s dump trucks Athe road worthiness of his company s dump trucks. A mechanic for more than 12 years, Eric Tumasis starts the day’s work at the break of dawn to ensure that all the hauling trucks are safe for a 24/7 operation in a rugged and harsh terrain. Tumasis is the chief mechanic of MSKS Enterprises,Tumasis is the chief mechanic of MSKS Enterprises, one of the seven equipment contractors of TVI Resource Development Philippines, Inc. (TVIRD), a copper-gold mining firm operating in the ancestral land of the Subanon indigenous people in Canatuan, Siocon, Zamboanga del Norte. Despite the early

Above, Ariel Maghanoy (left), MSKS site manager,

onset of the rainy season, which has made the roads to and from the mine site slippery at times, all of TVIRD’s equipment contractors have maintained an unblemished vehicular accident record in the first quarter of 2009. This achievement can be attributed to good all weather roads that the company regularlybo e, e ag a oy ( e ), S S s e a age ,

confers with Eric Tumasis, MSKS chief mechanic (far right) and a driver to make sure that TVIRD’s safety plan for contractors is strictly implemented. Maghanoy says the contractors’ excellent safety record is due in large part to the close supervision of TVIRD’s Safety Department

to good all-weather roads that the company regularly looks after; the contractors’ well maintained trucks and heavy equipment; and a safety plan that both parties designed and are religiously implementing. http://www.tviphilippines.com/article.php?id=239

Department.

MSKS, a TVIRD contractor for three years, has 16 dump trucks that haul ore from the mine pit to the ore stockpile. It is also part of the team that is tasked to haul copper concentrates from the mine site to the Sta. Maria port, some 37 kilometers from Canatuan, where the product is loaded and shipped to China

Page 5: Justice for Rudolfo Segovia

Canatuan Siocon “What happen to our beautiful land!!!”

D t ti b TVIDestruction by TVI.

Page 6: Justice for Rudolfo Segovia

TVI tailings pond - poisoning the environment

Page 7: Justice for Rudolfo Segovia

Flooding and breach of tailings pond – affect of the open pit mining…

Page 8: Justice for Rudolfo Segovia

TVI’s expansion sites

Page 9: Justice for Rudolfo Segovia
Page 10: Justice for Rudolfo Segovia
Page 11: Justice for Rudolfo Segovia

http://blogs.tviphilippines.com/lifetype/index.php?op=Default&blogId=1&&page=30

To design this specialized dam, TVIRD contracted Smith‐Williams Consultants, a firm based in Denver, Colorado. Smith‐Williams visited the Canatuan site in 2006 to find a possible location of the dam and review the strength of the foundation soil in the area. The design phase then took around two to three months.Engineer Jeff Gibby, an employee of Smith‐Williams, has been in Canatuan since January 2007.

Page 12: Justice for Rudolfo Segovia

As the mine life of its Gold and Silver Project marks the end of its third year, TVI Resource Development Philippines, Inc. (TVIRD) is looking to begin the second phase of its operations in Canatuan, the Copper Zinc Project, also known as the Sulphide Project.The Company is in the process of building a tailings storage dam and impoundment which is a major component of the SulphideThe Company is in the process of building a tailings storage dam and impoundment, which is a major component of the Sulphide Project. The Sulphide ore will be extracted from the same open pit from which the Company is currently extracting gossan ore to get gold and silver. After extraction, however, the workflow is completely different. For this project, TVIRD will need to build a new mill plant to process the ore. The mill process residual product, known as tailings, will need to be sent to a new dam made specifically to hold the Sulphide tailings and to prevent the discharge of tailings into neighboring bodies of water. g p g g g g

While the design and construction of this new dam will be similar to the previously constructed Gossan Tailings Dam, the operational aspects will be different. In the Gossan Dam, the tailings are pumped into the impoundment as a slurry where they remain Water which is part of the slurry eventually evaporates and the tailings surface dries up over time In time the exposedremain. Water, which is part of the slurry, eventually evaporates and the tailings surface dries up over time. In time, the exposed tailings surface can be rehabilitated as grasslands, forest areas or turned into a cash crop plantation style agricultural area.The primary operational difference between the Gossan tailings and the Sulphide tailings disposal is that the Sulphide tailings should remain in a non oxidized state to avoid generation of acid mine drainage. Therefore, unlike the Gossan tailings, which can be left exposed and used for agricultural or forestry purposes, the Sulphide tailings must be protected from contact with air thereby preventing initiation of the oxidation process. This is done by maintaining a constant water cover over the tailings and y p g p y g goperating the impoundment as a continuous water impoundment.

To design this specialized dam, TVIRD contracted Smith‐Williams Consultants, a firm based in Denver, Colorado. Smith‐Williams visited the Canatuan site in 2006 to find a possible location of the dam and review the strength of the foundation soil in the area. Th d i h th t k d t t th thThe design phase then took around two to three months.Engineer Jeff Gibby, an employee of Smith‐Williams, has been in Canatuan since January 2007. He has been closely working with Jay Nelson, TVIRD Vice President for Environment and Civil Works, in overseeing the construction of the dam and in ensuring thatthe work being done is consistent with the design and that the quality is up to industry standards. Gibby has also made minoradjustments to the initial design plan as the construction progresses and new in the field information becomes available.

Page 13: Justice for Rudolfo Segovia

According to Gibby, the new dam is similar to those he has worked on before in other parts of the world, and the only differences g y, p , yare in the way the dam will make use of the contours of the site topography.

The dam, which will need a constant supply of fresh water, is located near the mouth of the Canatuan River. The river water impounded behind the dam will provide a minimum three‐meter deep water barrier between the Sulphide tailings and the air in the atmosphere.

The water will be maintained at this elevation by a high level spillway. Fresh water discharged from the spillway will continue down the Canatuan River and eventually join with other rivers before emptying into the Philippine Sea.Once completed, the initial construction phase of the dam will have placed nearlyone million cubic meters of earth, sand and rock fill. At this stage, the dam will be approximately 61 meters high and will have the capacity to store approximately 3.2 million tons of tailings When TVIRD chooses to expand its operations the dam will be extended to a height of 78 meters which will more thantailings. When TVIRD chooses to expand its operations, the dam will be extended to a height of 78 meters, which will more than double its tailings storage capacity. 

Gibby said that the only complications that he has faced during the construction phase have been the rainy weather and the rugged terrain. According to him, the dry‐season was not very dry, and the rainy‐season has been very rainy. Consequently, the work has slowed down and for two months the workers have been pumping the rainwater out from the construction areadown, and for two months the workers have been pumping the rainwater out from the construction area.

Most of the workers hired for the construction of the dam are from local and surrounding areas, providing additional benefits for TVIRD’s affected communities. While proper training can be time consuming, and involves a continual process, TVIRD believes that the skills learned will serve to enhance the long‐term and sustainable livelihood of many indigenous workers beyond the dam construction project. As the construction progresses to later phases, the workers will need to be trained for new activities. Training could range fromproject. As the construction progresses to later phases, the workers will need to be trained for new activities. Training could range from a couple of hours for the easier activities, to a week for the more complicated tasks.

Gibby has targeted September 2007 as the end date of construction. But if the weather continues to be a problem, work may not end until early 2008. (Andrew Dominguez)

Page 14: Justice for Rudolfo Segovia
Page 15: Justice for Rudolfo Segovia

http://www.tvipacific.com/Investors/Investor‐Overview/default.aspx

Page 16: Justice for Rudolfo Segovia
Page 17: Justice for Rudolfo Segovia