june safety theme: other risks include injury, equipment and

3
WHAT ARE THE RISKS? The most serious consequence of a person being struck by a suspended load is death. Other risks include injury, equipment and / or load damage and production loss. For more information watch the Suspended Loads Video on the OTML Site Portal. JUNE SAFETY THEME: SUSPENDED LOADS A suspended load is something that is lifted and hangs above the ground. Working or walking immediately under or close to a suspended load is unsafe as the load can fall on you. NEVER suspend a load over a person or equipment, or allow a person or vehicle to go under a suspended load. Loads can slip or fall for many reasons, including: Wrong equipment used Faulty equipment or equipment failure Incorrect slinging or load restraint Load too heavy for equipment Overloaded attachment, e.g. bucket Equipment not level or stable during lifting, carrying or lowering Load strikes an obstacle, e.g. other equipment, building, powerline, etc. Even a controlled load, can be hazardous if personnel or equipment enter the lift / set down zone without the lifting equipment operator noticing. Cranes and other lifting equipment can have large blind spots that can hide personnel and even vehicles. Personnel approaching an area where lifting operations are being conducted MUST get approval from the crane / lifting unit operator via positive radio communication, before entering the work zone (which should be signed and barricaded). Be the CONTROL not the HAZARD 1. Be fit for work. 2. Be trained, competent and authorised before performing lifting operations. 3. Do a risk assessment before every job, something may have changed. 4. Inspect the site and equipment before starting operations. 5. Set up a drop zone / exclusion zone. 6. Have a spotter in place. 7. Only use equipment that is suitable for the task and conditions. 8. Refer to load charts and stay within equipment safe working load limits. 9. Have a lift plan and approved Authorisation to Work (ATW) in place if required. 10. Follow procedures. 11. Use a trained dogger / rigger to help secure the load. 12. Have a plan in place for bad weather,. Do not lift in storms. 13. Be prepared to respond to an emergency if things go wrong. 14. Refer to the Key Control Checklist (See over) to make sure all key controls are in place. If you must stop the lifting operation at any time, the load must be lowered to the ground. Do not leave the controls of the lifting equipment while the load is suspended in the air, unless in the case of a fire or other life threatening emergency.

Upload: others

Post on 21-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JUNE SAFETY THEME: Other risks include injury, equipment and

WHAT ARE THE RISKS? The most serious consequence of a person being struck by a suspended load is death.Other risks include injury, equipment and / or load damage and production loss.

For more information watch the Suspended Loads Video on the OTML Site Portal.

JUNE SAFETY THEME:

SUSPENDED LOADSA suspended load is something that is lifted and hangs above the ground. Working or walking immediately under or close to a suspended load is unsafe as the load can fall on you.

NEVER suspend a load over a person or equipment, or allow a person or vehicle to go under a suspended load.

Loads can slip or fall for many reasons, including:• Wrong equipment used • Faulty equipment or equipment failure• Incorrect slinging or load restraint• Load too heavy for equipment• Overloaded attachment, e.g. bucket• Equipment not level or stable during lifting,

carrying or lowering• Load strikes an obstacle, e.g. other

equipment, building, powerline, etc.

Even a controlled load, can be hazardous if personnel or equipment enter the lift / set down zone without the lifting equipment operator noticing. Cranes and other lifting equipment can have large blind spots that can hide personnel and even vehicles.

Personnel approaching an area where lifting operations are being conducted MUST get approval from the crane / lifting unit operator via positive radio communication, before entering the work zone (which should be signed and barricaded).

Be the CONTROL not the HAZARD

1. Be fit for work.2. Be trained, competent and

authorised before performing lifting operations.

3. Do a risk assessment before every job, something may have changed.

4. Inspect the site and equipment before starting operations.

5. Set up a drop zone / exclusion zone.6. Have a spotter in place.7. Only use equipment that is suitable

for the task and conditions.8. Refer to load charts and stay within

equipment safe working load limits.9. Have a lift plan and approved

Authorisation to Work (ATW) in place if required.

10. Follow procedures.11. Use a trained dogger / rigger to help

secure the load.12. Have a plan in place for bad weather,.

Do not lift in storms.13. Be prepared to respond to an

emergency if things go wrong.14. Refer to the Key Control Checklist

(See over) to make sure all key controls are in place.

If you must stop the lifting operation at any time, the load must be lowered to the ground. Do not leave the controls of the lifting equipment while the load is suspended in the air, unless in the case of a fire or other life threatening emergency.

Page 2: JUNE SAFETY THEME: Other risks include injury, equipment and

June

Safet

y The

me:

Susp

ende

d Loa

dsR

ISK

S

• A

ccid

ent,

inju

ry, f

atal

ity

• Eq

uip

men

t d

amag

e

• Pr

od

uct

ion

/ In

com

e lo

ss

KEY

CO

NTR

OL

CH

ECK

LIST

Am

Ifit

for

wor

k?

Am

Itr

aine

d,c

ompe

tent

and

aut

horis

edf

ort

he

task

?

Do

Iund

erst

and

that

con

ditio

nsc

anc

hang

ean

dIm

ust

doa

ris

kas

sess

men

tbe

fore

eac

hlif

t?

Hav

eIi

nspe

cted

the

wor

kar

ea,i

nclu

ding

the

pi

cku

pan

dse

tdo

wn

poin

ts,f

orh

azar

ds?

Isa

nex

clus

ion

zone

set

up

unde

ran

dar

ound

th

edr

opz

one?

Hav

eIi

nspe

cted

the

equ

ipm

ent

Iwill

be

usin

g?

Hav

eIe

nsur

edt

hat

equi

pmen

tis

fit

for

purp

ose?

Hav

eIc

heck

edt

hat

the

safe

wor

king

load

lim

itof

all

equi

pmen

tis

sui

tabl

efo

rth

eta

sk?

Isa

nA

utho

rity

toW

ork

oro

ther

wor

kcl

eara

nce

requ

ired?

Ifs

o,is

thi

sin

pla

ce?

Isa

lift

pla

nin

pla

cea

ndd

oal

lper

sons

invo

lved

in

the

lift

und

erst

and

wha

tto

do?

Am

Iaw

are

oft

hep

roce

dure

sIm

ust

follo

w?

Isa

spo

tter

or

sent

ryin

pla

ce,i

fne

eded

?

Ist

helo

adp

rope

rlys

ecur

ed,e

.g.b

ya

dogg

er

orr

igge

r?

Isa

pla

nin

pla

cein

cas

eof

bad

wea

ther

?

Am

Ipr

epar

edf

ora

nem

erge

ncy

shou

ldit

ha

ppen

?

OPE

RA

TOR

SU

SPEN

DED

LO

AD

S C

ON

TRO

L C

HEC

KLI

ST

BE

THE

CO

NTR

OL

NO

T TH

E H

AZA

RD

s

Page 3: JUNE SAFETY THEME: Other risks include injury, equipment and

SUSPENDED LOADS CONTROL CHECKLIST

OPERATOR / EMPLOYEE� AmIfitforwork(nodrugsoralcohol)?

� AmItrained,competentandauthorisedforthetaskIamabouttodo?

� DoIunderstandthatconditionscanchangeandImustdoariskassessmentbeforeeachlift?

� HaveIinspectedtheworkarea,includingthepickupandsetdownpoints,forhazards?

� Isanexclusionzonesetupunderandaroundthedropzone?

� HaveIinspectedalltheequipmentthatIwillbeusing?

� HaveIensuredthatequipmentisfitforpurpose?

� HaveIcheckedthatthesafeworkingloadlimitofallequipmentissuitableforthetask?

� IsanAuthoritytoWorkorotherworkclearancerequired?Ifso,isthisinplace?

� Isaliftplaninplaceanddoallpersonsinvolvedintheliftunderstandwhattodo?

� AmIawareoftheproceduresImustfollow?

� Isaspotterorsentryinplace,ifneeded?

� Istheloadproperlysecured,e.g.byadoggerorrigger?

� Isaplaninplaceincaseofbadweather?

� AmIpreparedforanemergencyshouldithappen?

SUPERVISORS / SUPERINTENDENT� Areallpersonsfit,competentandauthorisedfortheassignedtask?

� Hasariskassessmentbeencompletedfortheliftingtask?

� Ifrequired,hasanAuthoritytoWork(permit)beendevelopedandauthorised?

� Haveallrelevantpersonsread,understoodandsignedthepermit?

� Hasanexclusionzonebeenestablishedtopreventpersonnelfromenteringtheliftingzone?

� Havepre-operationalinspectionsbeenperformedonallequipment,includingliftinggear?

� Areallrelevantpersonsawareoftheplanforthetask,andtheirroleandresponsibilities?

� Haveproceduresbeenprovidedforthetask,andarepersonnelawareoftherequirements?

� Arespecialistpersonnel(spotter/sentry,dogger/rigger)beingusedtoassistliftingpersonnel?

� Isaplaninplaceincasethingsgowrongandareallpersonsawareofwhattodo?

MANAGERS / GENERAL MANAGERS� Aretrainingsystemsinplacetoensurecompetenciesareachievedandmaintained?

� Isariskmanagement/workpermitprocessinplaceforhighrisktasks?

� Areproceduresinplaceandbeingfollowed?

� Doesequipmentundergoregularinspectionsandmaintenanceaccordingtorequiredschedule?

� Isanemergencyresponseplandevelopedthatincludestheriskofbeingstruckbyasuspendedload?

� Areemergencyresponseresourcesavailableandingoodworkingorder?

� Couldtheapprovedpracticesforliftingoperationsbeimproved?