Western LRT StudyUPDATE
National Capital Commission
June 27, 2013
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
2/30
2
Overview
Background
What we heard
Rochester Field Alignment
Richmond Underground Dominion Station toCleary Station
Lincoln Fields to Baseline Station
Next steps
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
3/30
Federal Interests in the Study AreaTunneys Pasture Station LRT operational 2018
Bay view
Proposed Interprovincial Transit CrossingParkway
Central Experimental FarmDow
s Lake
Booth Street Complex
Lanark (CBC) Site
Pinecrest Creek
Capital Arrival along the Queensway
Airport Link
O-Train Confederation Station Lands
3
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
4/30
What we heard
Protect Capital Interest
Protect the Byron Corridor
Protect the Sir John A MacDonald Parkway Maintain access to the waterfront and
pathway system
Noise and Safety Concerns
4
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
5/30
Rochester Field
5
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
6/30
Rochester Field
modified
6
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
7/30
Cost
Rochester Field $1.7 B Underground full length
Rochester Field $1.3 B Trench in Rochester Field, under Richmond Road
Rochester Field $960M Not Acceptable At-grade in Byron Park
Richmond Underground $900M At-grade to Cleary, under Richmond Road
**costing does not include additional mitigation measures
7
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
8/30
Preferred Corridor
Richmond Underground
8
Lincoln Fields
New Orchard
Cleary
Dominion
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
9/30
Modifications
Skead St. to Cleary Station - Buried
Natural Ventilation Options
Dominion Station to Cleary Station
9
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
10/30
Dominion to Clearyaerial view
10
Cleary Station
Dominion Station
Rochester Field
Sir John A MacDonald Pkwy
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
11/30
Berm
11
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
12/30
Feasibility
Maintenance of the watermain
Control of groundwater
Access to the construction zone
12
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
13/30
Feasibility
Maintenance of the watermain
Drawings and inspection reports available
Typical support measures to be used
Staged daylighting
Evaluate short term closure
Typical construction activity
13
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
14/30
Feasibility
Control of groundwater
Various shoring systems available
Pumping to manage water and keep sitedry during construction
Fairly shallow excavation needed
Typical construction activity
14
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
15/30
Feasibility
Access to the construction zone
No access from Parkway
Via Cleary, Transitway & Rochester Field
Work areas needed for laydown areas
Areas to be fully restored after construction
Typical construction activity
15
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
16/30
Natural Ventilationoption
16
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
17/30
Natural Ventilationview from the pathway looking east
17
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
18/30
Improvementsbefore
18
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
19/30
Improvementsafter
19
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
20/30
20
Dominion StationToday
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
21/30
Dominion StationToday
21
Sir John A MacDonald Pkwy
Dominion Station
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
22/30
Dominion Stationaerial view
22
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
23/30
Rochester Field
Today
23
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
24/30
24
Rochester Fieldproposed
Richmond Road
Sir John A MacDonald Pkwy
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
25/30
Cleary Stationview from the Parkway
25
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
26/30
Cleary Stationview from the Continental
26
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
27/30
Lincoln Fields to BaselineStage 1
27
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
28/30
Lincoln Fields to BaselineStage 2
28
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
29/30
Iris Stationpreferred option
29
Shallow Trench
-
7/28/2019 June 27 Wlrtc Ncc Presentation Final
30/30
Next Steps
30
July 10 Transportation Committee
July 17 City Council
Functional Design and EA Documentation
Decision included in 2013 TMP