july 17 th, 2014 1 ryan rivers [email protected] (510) 809-8627 processing jeff clarkson...

38
July 17 th , 2014 1 Ryan Rivers [email protected] (510) 809-8627 Processing Jeff Clarkson [email protected] (510) 809-8628 Richelieu Hemphill [email protected] (510) 809-8615 Kim Chan [email protected] (510) 809-8631 Marilyn Kushner [email protected] (510) 809-8629

Upload: charleen-briggs

Post on 23-Dec-2015

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 1

Ryan [email protected]

(510) 809-8627

Processing

Jeff [email protected]

(510) 809-8628

Richelieu [email protected]

(510) 809-8615

Kim [email protected]

(510) 809-8631

Marilyn [email protected]

(510) 809-8629

Page 2: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 2

Research Community Commitment

Community

AssistanceCommunication Awareness

Page 3: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 3

Nanolab Engineers

Process and Equipment engineers are here to assist you

Each tool has assigned engineers

Process/Equipment Engineer 1 is in charge of that equipment

Process Engineer 1 approves special processes on equipment

Page 4: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 4

Plan Your Work !

Some tools are heavily reserved

Plan ahead one week – minimize idle time

Time = Money

Page 5: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 5

Working in the NanoLab

Nanolab Rule #1:

NEVER WORK ALONE

3rd to last person to leave must go notify the other two!

Page 6: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 6

Working in the NanoLab

Entrance Checklist:

Passed the Safety Quiz There are no announcements preventing lab access The HazMat alarm is not active Have blue shoe covers on No food or drink on person

Page 7: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 7

Gowning Procedure: Top Down

Shoe Covers Enter Gowning Bouffant Cap Bunny Suit

Shoe Covers Gloves Safety Glasses Complete

De-gowning occurs in reverse order

Page 8: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 8

Entering the Lab Area

Gowning Checklist:

No chemicals in storage box Safety Glasses on Name tag visible on coverall Changed damaged or stained coveralls/shoes/other gear Using proper size coverall and shoe cover Log on at the computer terminal before entering lab

Page 9: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 9

Equipment Qualification

Read the Manual

Take Equipment Test(520 SDH Front

Desk)

Get Training (Any Qualified

Member)

Complete Prerequisite

Requirements

Oral Qualification(Superuser)

When in doubt – ASK STAFF

Page 10: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 10

Complete Prerequisite Qualifications

• Many equipment sets have prerequisite qualifications and/or classes offered by staff

• Evaporation, SEM, E-beam Litho, and confocal microscopy classes are offered periodically

• Some toolsets have gateway tools (e.g. msink 6/8, tystar1-4, Leo SEM)

Page 11: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 11

Read the Manual

All major equipment has a lab manual on website

Process engineers update manual – send any suggestions to us!

Manual inconsistencies are reported on Mercury as process faults

Page 12: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 12

Training – All qualified can train!

Check reservations for the tool

Find a member using equipment

E-mail: <membername>@silicon.eecs.berkeley.edu

Request to observe run and get training

Each One Teach One – Train someone at least 1x per semester

Page 13: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 13

Take Equipment Test

Equipment tests available at 520 SDH (Front Desk)

Usually available online via Mercury

Specific tests are written only – copies at front desk

Page 14: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 14

Oral Qualification – Superuser Only

Check Mercury for superuser names/email

E-mail: <membername>@silicon.eecs.berkeley.edu

Request qualification. Make reservation with superuser

Sometimes process staff are the only superusers

Page 15: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 15

Quality Monitoring

• Quality Monitor tracks processes

• Data is posted monthly on MercuryWeb

Page 16: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 16

Quality Monitoring

• Quality monitor reports show valuable data trends• Reports also show standard process conditions for the monitor

Page 17: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 17

Material and Process Compatibility

• The Nanolab is a diverse processing environment

• Nanolab materials restrictions are as open as possible

• Many processes are very sensitive (e.g., Sinks/Furnaces)

• Duplicate process capability allows separation of materials

• Materials restrictions are given by tool and group

• Materials restricted by: • Substrate, Process, and Maintenance

Page 18: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 18

The Lab Manual

Page 19: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 19

Ch 1 - Material and Process Compatibility

• Chapter 1.7 – Furnace pre-clean & substrate restrictions

• Equipment manuals define material compatibility/cleaning

• Every piece of equipment has specific material restrictions

• Several equipment may have group contamination protocols

• Specific tools and processes require specific cleaning

Page 20: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 20

Ch 1 - Material and Process Compatibility

Page 21: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 21

Ch 2 - Sink Information /

Restrictions Sink Name (Maximum

Wafer Size)Processes Available

Marvell Lab

Location

Important Comments

msink1 (8")PR strip, tank develop, pre-furnace

metal clean 382 Note 2

msink2 (6")PR strip, tank develop

all metals allowed 382 Metal contaminated sink - Note 1

msink3 (8") Manual Resist Processing 382

msink4 (6") TMAH & KOH etch 382Staff Review required before wafers processed at

this sink returning to msink6, msink7, msink8.

msink5 (8")HF, BHF etch

special project etch(check labels at tanks)

382Metal contaminated sink, PR coated wafers allowed-

see Note 1

msink6 (8") Final Piranha - MOS clean sink 386No metals allowed- MOS clean sink

msink7 (6")Hot phosphoric, HF, silicon etch

386 No metals, PR coated wafers allowed

msink8 (8")Piranha clean,

BHF, aluminum etch386

No metals except aluminum in the aluminum etch tank, no PR coated wafers

msink16 (N/A) General clean - beaker process/part clean 582A Metal contaminated sink - Note 1

msink18 (N/A) General clean - beaker process/part clean 582A Metal contaminated sink - Note 1

Note 1 - Wafers processed at this sink are metal contaminated, ARE NOT ALLOWED to return to msink6, msink7, msink8.Note 2 - Gold, copper and or other highly diffusive metals ARE NOT ALLOWED at this sink.

Page 22: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 22

Ch 2 - Working at the Sinks• PPE must be worn when working at the sinks!

• Chemically resistant gloves• Face shield• Chemically resistant apron

Page 23: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 23

Ch 2 - Working at the Sinks

• Mixing chemistry can get HOT!

• Always use caution when adding chemicals and be aware of exothermic reactions

• Working at general purpose sinks (MSink16/18)

• You MUST be qualified• Describe your processes to each other• Process Tag all work at the station• Do not heat up a solvent directly on the heater chuck

Page 24: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 24

Ch 2 - General Wet Chemistry Cabinets

• Located in 582A, 381/383

• Standard chemicals available to members at no charge

• Special chemical storage needs pre-approval and label

• Use partial bottles first!

If empty – ask staff to restock

Page 25: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 25

Ch 2 - Changing Organic Bottles

Page 26: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 26

Ch 2 - Chemical Waste ManagementLog Sheet

Every pour requires an entry with a volume!

Page 27: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 27

Ch 3 - Mask Making at MNL

MNL provides in-house mask making• L-Edit Layout Software• GCA 3600 Pattern Generator• Refer to MNL Chapter 3 for complete details• Contact Process Engineer Jeff Clarkson for assistance

Page 28: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 28

Ch 4 - Photolithography Equipment

GCA 8500 5X i-Line StepperTypical Resolution: 0.8 umMinimum Resolution: 0.6 umPE1: Jeff ClarksonEE1: Greg Mullins

ASML 5500/300 4X DUV StepperTypical Resolution: 0.35 umMinimum Resolution: 0.25 umPE1: Jeff ClarksonEE1: Greg Mullins

Crestec CABL 9510 E-BeamTypical Resolution: 40 nmMinimum Resolution :10 nmPE1: Kim ChanEE1: Greg Mullins

Quintel Q4000 Mask AlignerTypical Resolution: 2.5 umMinimum Resolution: 1.0 umPE1: Kim ChanEE1: Greg Mullins

Karl Suss MA6 Mask AlignerTypical Resolution: 2.5 umMinimum Resolution: 1.0 umPE1: Kim ChanEE1: Greg Mullins

Canon 4X Projection MATypical Resolution: 1.5 umMinimum Resolution: 1.0 umPE1: Kim ChanEE1: Greg Mullins

Page 29: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 29

Ch 5 - Furnaces – AP and LPCVD

Tystar 1-4, Dry/Wet Ox,Anneal, Sinter, 4” & 6” wafers

Tystar 5-7, Dry/Wet Ox,Dopant Diffusion, Anneal, 4”, 6” & 8” wafers

Tystar 9-12, Nitride,poly-Si, a-Si, Low-Temp Oxide, 4” & 6” wafers

Tystar 13-16, Dopant Diffusion, SiC, poly-Si, a-Si, 4” & 6” wafers

Tystar 17-20, Nitride,Hi-Temp Oxide, Sinter, Si-Ge, 4” & 6” wafers

1. Furnaces are divided into MOS & non-MOS.2. Substrates must be cleaned before furnace use. Last pre-furnace step:

Msink6 for non-metal substrates, and,Msink1 for metal substrates going into metal approved furnaces.

3. III-V compounds are not allowed in any furnace.

Page 30: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 30

Ch 5 - Rapid Thermal Processors

RTP1 – III-V, PZT, metals; up to 6” wafersRTP2 – III-V; process up to 6” wafers

RTP3 – Si non-MOS, metals; up to 6” wafersRTP4 – Si MOS, silicidation; up to 6” wafers

RTP8 – Si MOS Gate Oxidation;Process up to 8” wafers

Rapid Thermal Processing has time scales on the order of seconds to reach up to 1100ºC. Applications include thermal oxidation, anneal, dopant activation and metal reflow.

Page 31: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 31

Ch 6 - Thin Film Deposition – PECVD/HFCVD

System Name Power Type Temp Materials

oxford2 RF Plasma 100-350C a-Si, SixNy, SiO2

pqecr ECR Plasma 25-300C Al, Cr, Cu, Fe*, ITO, Ni*, SiO2, Ti, W

sp3 Hot Filament 700C Diamond

Page 32: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 32

Ch 6 - Thin Film Deposition – ALD

System Name ALD type Temp Materials

cambridge RF Plasma/Thermal 100-500C Al2O3, TiO2, ZrO2, TiN, Ru, SiO2

picosun Thermal 160-300C Al2O3, TiO2

Page 33: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 33

Ch 6 - Thin Film Dep – PVD Sputter

All PVD tools require use of light blue “vacuum” gloves

System Name Type Porous Reactive Targets User Changed? Materials

mrc944 RF Magnetron

No No 4 N Al/2%Si, Al/Mn, Ni, NiV, W, Ti

edwards RF/DCMagnetron

Yes Yes 3 Y Al, Cr, Cu, Fe*, ITO, Ni*, SiO2, Ti, W

randex DC Diode Yes Yes 2 N

gartek DC Magnetron

No No 3 N Al, Nb

aln2 AC/DC Magnetron

No Yes 4 N Mo, AlN, Al

Topgun DC Magnetron

No Yes 4 N Al, Cu, Si, Ti

Page 34: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 34

Ch 6 - Thin Film Dep – PVD Evaporation

Evaporators require Evaporation Training Workshop Qualification

System Name Type Temp Porous Dielectrics Magnetics Sources Materials

cha E-beam High Yes No No 6 Ag, Al, Au, Cr, Cu, Nb, Pd, Pt, Sn, Ti

tescal Thermal High Yes No Yes 3 Ag, Al, Au, Cr, Nb, Pd, Pt, Ir, Ru

nrc Thermal Low-High Yes No (TBD) Yes 2 Ag, Al, Au, Co, Cr, Cu, Fe, In, Ni, Pd, Pt, Si, Sn, Ti, ITO, TCO

ultek E-beam High No No No 3 Al, Au, Cr, Cu, Pd, Pt, Ti

edwardseb3 E-beam Mid-High No Yes No 4 Ag, Al, Mn, Mg, Si, SiO2

dw E-beam Low-High No Yes No 4 Ag, Al, Mn, Zn

Page 35: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 35

Ch 7 – Etching Systems – Plasma

System Name Type Chemistry He cooling Materials Group

Lam6 RIE Fluorine Yes SiN, SiO2, BARC

Lam7 TCP/Bias Cl2/BCl3 Yes Al, Ti

Lam8 TCP/Bias HBr/Cl2 Yes Silicon, SiC, SiGe

Technics-c RIE SF6/He No SiN, SiO2, Si

Centura-3-5 ICP/Bias Various, Cl2 Yes III-V Nitrides

Centura-met ICP/Bias Cl2/BCl3 Yes Al, Ti, W

Centura-mxp RIE CF4/CHF3/CH3F Yes SiN, SiO2

Matrix-etch RIE CF4/SF6/O2 No Si, SiN, SiO2, Mo

Semi RIE CF4/O2 No Nb, SiO2

Ptherm RIE Various No Various

Sts2 DRIE SF6/O2, C4F8 Yes Si

Sts-oxide DRIE C4F8, H2 Yes SiO2

Page 36: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 36

Ch 7 – Etching Systems – Other

System Name Type Chemistry Materials Group

Primaxx Vapor Anhydrous HF SiO2

Xetch Vapor XeF2 Si

Ionmill Ion Mill Physical Ar Sputter Various

Page 37: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 37

Ch 8 -Testing and Inspection Equipment

MNL has a wide range of test and inspection equipment. See Chapter 8 in the MNL Manual for a complete list. Contact MNL Process Engineer Jeff Clarkson for assistance.

Page 38: July 17 th, 2014 1 Ryan Rivers rdrivers@eecs.berkeley.edu (510) 809-8627 Processing Jeff Clarkson jclarks@berkeley.edu (510) 809-8628 Richelieu Hemphill

July 17th, 2014 38

Thank You for your attention!