julie conroy, aicp, senior environmental planner metropolitan area planning council
TRANSCRIPT
Funding Stormwater ManagementMilton Stormwater Drainage Fee/Utility Pilot
Julie Conroy, AICP, Senior Environmental PlannerMetropolitan Area Planning Council
1.Define: Water Quality Problems & Management Needs
2.Determine: Fee Structure3.Deliver: Outreach Program4.Develop: Management Program5.Draft: Bylaw/Ordinance/Regulations
Stormwater Funding / Utility Kit
Premise: stormwater drainage system is a public system/service!
Principles: equitable, stable, and adequate
Advantages: linked to actual costs, can be designed to meet local needs
Credit: City of Newton, MA
Premise & Principles
Needs: Management➢ Capital Improvements ➢ Staff:
✓ Stormwater Program Manager✓ Dedicated DPW staff for
Maintenance/IDDE➢ Infrastructure Maintenance/Repair➢ New Regulatory Compliance (NPDES
Phase II MS4)➢ Planning/GIS➢ Development Plan/Permitting Review ➢ Retrofitting for Improved
Treatment/Resource Protection
See Calculator
Define WQ Problems & Needs
Water Quality/ Quantity (TMDL)
Infrastructure Issues
Management Needs
Public Knowledge
Expenditure PlanNEW Stormwater Expenditures* Description Estimated Costs ($)**General Maintentance & Operations, (DPW) Routine cleaning, general maintenance and day to day
service operations $0.00
Stormwater Cleaning & Treatment, (Contractual) Costs of privately contracted facility to treat stormwater runoff. $0.00
NPDES Compliance Includes annual reporting and private consulting services. $0.00
MS4 Stormwater Permit Administration Review of permits annually by consultants paid for by the developer(s) $0.00
Illicit Discharge Detection and EliminationAssume 10% of outfalls have illicit discharge. Estimate cost to identify source at appx. $1200 per hit. Removal costs should be the owner's responsibility.
$0.00
Administrative Expenses Utility Fee Implementation Costs Capital expenses associated with establishing HR to
manage the new program. $0
Billing Costs Costs associated with preparing and distributing invoices. $0
Administrative Fees General office operations and overhead. $0
Utility Fee CreditsCosts for adminstering and deducting expenses for properties that meet set compliance standards to reduce runoff.
$0
Collection Fees, Delinquencies Costs for processing receivables with contingencies for late or non-payments. $0
Subtotal $825,500
Existing Expenditure $0
Funding to be Covered Under Fee $825,500
Determine Fee – Impervious Analysis
1. Use town data on driveways, parking lots, buildings, outbuildings, decks and pools. 2. Match impervious layers to the associated parcel using Arc GIS 10.1 3. Calculate the area (square feet) of impervious coverage per parcel4. Divide impervious (sq ft) by the total parcel area (sq ft) to derive the percentage of
impervious coverage per parcel5. After sorting the parcels by land use (multi-use, residential, commercial, etc)
calculations were made to derive the average impervious coverage by land use.
Based on a typical Single Family Residential home’s impervious area ( = 1 Equvalent Residential Unit [ERU]).
Fees for Commercial, Industrial and possible larger Residential parcels (Two-Family, Multi-Family, etc.) are calculated relative to ERU.
Impervious Areas
Rate Structure
Fee Options - FlatProperty Classification Number of Parcels in Town Annual Total
p/Property Monthly Fee p/Property
Residential (single fam) 8,051.00 $102.53 $8.18
Non-Residential 361 $7,823.20 $651.93
Total Billable Properties 8,412.00
Equal Allocation Across Property Types, p/yr.
$98.13
Equal Allocation Across Property Types, p/Mo.
$8.18
Total Revenue Raised $825,469.03
Net Operating Income under Flat Fee Structure ($)
$825,469.03
∆ Raised Revenue and Funding Gap $30.97
∆ Raised Revenue and NOI (CREDITS) $0.00
Fee Options - Graduated
Property Classification Number of Parcels in Town ERU Equivalent Annual Drainage Fee p/parcel Annual Total
Residential Single Family 8051 1.00 $102.53 $825,500.00
Multi Use 33 6.77 $694.15 $22,907.09
Non-Residential
Commercial 81 3.31 $339.33 $27,485.35
Industrial 4 6.19 $634.19 $2,536.77
Recreational 4 6.28 $643.40 $2,573.60
Exempt 229 9.21 $944.14 $216,207.07
Total Revenue Raised $1,097,209.89
Net Operating Income under a Graduated Fee Structure ($)
$1,097,209.89
∆ Raised Revenue and NOI $0.00
∆ Raised Revenue and Funding Gap $-271,740.00
Institutional (tax exempt)
34,500 sq ft imp.
$944.13/yr
Residential3,700 sq ft
imp.$102.53/yr
Commercial12,400 sq ft impervious$339.33/yr
1 ERU
6 ERU’s
9ERU’s
Applying ERU
1. Incentives for Certain Practices:
• Recharge/Reduction in Impervious Coverage
• Low Impact Development/Better Site Design
• Reduction of Post-development Peak Flow
• Quantifiable Stormwater Quality Benefit
• Educational Programming (in primary/secondary schools)
2. Opportunities for Reductions in Fee
Credits
Next Steps: Internal OutreachLocal Nonpoint Source
Issues
Purpose and Benefits of Long Term Funding Program
Describing Recommended Funding Program
Importance of Stormwater Advisory Committee
Developing Materials/Media for Internal Outreach
Next Steps: External Outreach
Pre-Education Phase (Setting Groundwork) What is Stormwater?
Program Development Phase
Education After Fee/Utility EstablishmentCRITICAL!
Questions?