jsa ut thickness pv
DESCRIPTION
about Jobs SAfetTRANSCRIPT
JOB SAFETY ANALYSISJOB SAFETY ANALYSIS
JOB DESCRIPTION : ULTRASONIC TEST FOR CORROSION MONITORING PRESSURE VESSEL DATE OF ISSUE : March. 17. 2011 SIGNATURE OF SUPERVISOR
AREA/TAG NO/EQUIPMENT DESCRIPTION : PERTAMINA EP - CEPU REVIEWED BY :
REFERENCES : PERTAMINA EP - HSE LAST REVIEWED DATE :
SAFETY EQUIPMENT (PPE) REQUIRED TO DO THIS JOB : Hand gloves, safety shoes, safety hats, masker, safety harness, ear plugs.
Sequence of Basic Job StepsSequence of Basic Job Steps Machine/Equipment /ToolMachine/Equipment /Tool Involved in each stepInvolved in each step
Potential Accidents orPotential Accidents or HazardsHazards
Recommendations to Eliminate or ReduceRecommendations to Eliminate or ReducePotential HazardsPotential Hazards
1. Prepare work permit, materials, tools and 1. Prepare work permit, materials, tools and equipments to be used for the job.equipments to be used for the job.
Wire brushWire brush Hand glovesHand gloves MaskerMasker Ear PlugsEar Plugs Safety harnessSafety harness
Wire brush Wire brush failure causing failure causing hand injury.hand injury.
Slip or fallSlip or fall
Safety Meeting before starting the job.Safety Meeting before starting the job. The PPE must be used when do the job.The PPE must be used when do the job. Wash after handling, and before eating, Wash after handling, and before eating,
drinking or smoking.drinking or smoking. Unusual fire and explosion hazards.Unusual fire and explosion hazards. Don’t expose to extreme heat. Don’t expose to extreme heat.
2. Minimum surface pressure vessel preparation 2. Minimum surface pressure vessel preparation Wire brushWire brush Hand gloveHand glove MaskerMasker Ear PlugsEar Plugs Safety harnessSafety harness
Wire brush Wire brush failure causing failure causing hand injury.hand injury.
Slip or fallSlip or fall
Be careful when used wire brush and Be careful when used wire brush and equipment.equipment.
The PPE c/w safety harness & work vest shall The PPE c/w safety harness & work vest shall be used when do the job.be used when do the job.
Make sure the pipe was clean as minimum Make sure the pipe was clean as minimum preparation. Wash after handling, and before preparation. Wash after handling, and before eating, drinking or smoking.eating, drinking or smoking.
Unusual fire and explosion hazards.Unusual fire and explosion hazards. Don’t expose to extreme heat.Don’t expose to extreme heat. Make sure safety harness in safe Make sure safety harness in safe
installation/positioninstallation/position3. Phase I for conduct thickness measurement 3. Phase I for conduct thickness measurement Wire brushWire brush
Hand gloveHand glove MaskerMasker Ear PlugsEar Plugs Safety harness Safety harness Thickness meterThickness meter
(UT equip.)(UT equip.)
Wire brush Wire brush failure causing failure causing hand injury.hand injury.
Slip or fallSlip or fall
The PPE must be used when do the job.The PPE must be used when do the job. Be careful when conduct the job.Be careful when conduct the job. Make sure the materials save in the correct Make sure the materials save in the correct
place.place. Wash after handling, and before eating, Wash after handling, and before eating,
drinking or smoking.drinking or smoking. Unusual fire and explosion hazards.Unusual fire and explosion hazards. Don’t expose to extreme heat.Don’t expose to extreme heat. Put in Garbage in the correct place. Put in Garbage in the correct place.
4. Phase II for install marks area of inspection4. Phase II for install marks area of inspection Wire brushWire brush Hand gloveHand glove MaskerMasker Ear PlugsEar Plugs Safety harnessSafety harness
Wire brush Wire brush failure causing failure causing hand injury.hand injury.
Slip or fallSlip or fall
The PPE must be used when do the job.The PPE must be used when do the job. Be careful when do the job.Be careful when do the job. Make sure the materials save in the correct Make sure the materials save in the correct
place.place. Wash after handling, and before eating, Wash after handling, and before eating,
drinking or smoking.drinking or smoking. Unusual fire and explosion hazards.Unusual fire and explosion hazards. Don’t expose to extreme heat.Don’t expose to extreme heat. Put in garbage in the correct placePut in garbage in the correct place
5. Phase III for storage equipments5. Phase III for storage equipments Thickness meterThickness meter (UT equip.)(UT equip.)
Make sure all equipments stored in the correct Make sure all equipments stored in the correct place.place.
Wash after handling, and before eating, Wash after handling, and before eating, drinking or smoking.drinking or smoking.
Put in garbage in the correct place.Put in garbage in the correct place.
PT. RADIANT UTAMA INTERINSCO Tbk.
This sheet is to record that Personnel noted below have been made aware of the nature of the task to be carried out; any potential hazards associated with the completion of this task and any additional work activities which could impact on safe completion of this task. It can be used as an aid by work leader.
Are you satisfied that: You have seen, briefed and understood all Work Permits, Work Procedure, and Job Safety Analysis? You understand your responsibilities for both the work activity and safe working practices? You have the correct tools and equipment for the job? You know how to access and exit the work site safely, the nearest emergency telephone or fire alarm point is? You are aware what action to take in an emergency? You have all the necessary and specified personnel protective equipment? You have received MSDS advice on any materials or substances you may come in contact with? You have considered the work environment? You understand how you will control waste? You have considered conflicting activities? You are PTW trained and competent to carry out the task?