Joint Work Session April 4, 2017Iowa City Community School District
City of Iowa City, City Council
North
North
Goosetown/ Mann
ConservationDistrict
Mann 60.8
Horace Mann Elementary
Horace Mann Elementary
Mann Playground Structure
Park Playground Structure
Park Swing Structures
Elementary School Site Comparisons
2014 -2015 Enroll
2015 -2016 Enroll
2016 -2017 Enroll Avg. Enroll Site Acreage
Site Square Footage Building Sq. Ft.
Building Footprint
Sq.Ft.Foot print % of
Site Parking Stalls ADA
Mann 223 222 242 229 1.65 71,874 (9) 31,910 (7) 13,422 (9) 18.67% (9) 21 23 +2 (9)
Alexander 378 431 431 14.7 641,203 (2) 67,714 (1) 52,288 (1) 8.15% (3) 95 102 7 (1)
Hoover 311 272 261 281 5.7 248,292 (7) 42,314 (4) 32,094 (5) 12.93% (7) 39 41 +2 (6)
Lemme 407 395 377 393 9.0 392,040 (4) 36,878 (5) 36,878 (4) 9.41% (4) 68 72 +4 (3)
Lincoln 237 239 237 238 3.6 156,816 (8) 31,604 (8) 23,818 (7) 15.19% (8) 35 36 +1 (8)
Longfellow 329 338 335 334 8.1 352,836 (6) 35,356 (6) 13,941 (8) 3.95% (2) 59 61 +2 (5)
Lucas 405 442 441 429 8.3 361,548 (5) 46,250 (3) 46,250 (3) 12.79% (6) 74 77 +3 (2)
Shimek 210 212 215 212 20.4 888,624 (1) 28,213 (9) 28,213 (6) 3.17% (1) 67 69 +2 (4)
Twain 378 262 311 317 9.5 413,820 (3) 51,051 (2) 51,051 (2) 12.34% (5) 53 56 +3 (7)
Soft Fall Play Sq.Ft.
Hard Surface Play Sq.Ft.
Total Play Hard + Soft
Sq.Ft.Useable Green Space Sq.Ft.
Total Sq.Ft. Green+ Soft+
Hard Sq. Ft. / Student
Mann 5,920 (9) 15,930 (6) 21,850 (8) 4,728 (9) 26,578 (9) 116 (9)
Alexander 17,405 (2) 29,481 (2) 46,886 (2) 198,170 (1) 245,056 (1) 569 (4)
Hoover 7,709 (7) 21,186 (4) 28,895 (5) 75,240 (7) 104,135 (7) 370 (7)
Lemme 12,383 (5) 23,244 (3) 35,627 (3) 154,589 (5) 190,216 (5) 484 (5)
Lincoln 6,872 (8) 9,497 (8) 16,369 (9) 22,166 (8) 38,535 (8) 162 (8)
Longfellow 13,809 (4) 14,020 (7) 27,829 (6) 165,762 (3) 193,591 (4) 580 (3)
Lucas 10,616 (6) 20,623 (5) 31,239 (4) 172,368 (2) 203,607 (3) 474 (6)
Shimek 16,000 (3) 8,905 (9) 24,905 (7) 111,596 (6) 136,501 (6) 643 (2)
Twain 18,109 (1) 34,229 (1) 52,338 (1) 164,005 (4) 216,343 (2) 682 (1)
Mann, 1.65 Acres
20.4
14.7
9.5
9.0
8.3
8.1
5.7
3.6
1.65
0.0 5.0 10.0 15.0 20.0 25.0
SHIMEK
ALEXANDER
TWAIN
LEMME
LUCAS
LONGFELLOW
HOOVER
LINCOLN
MANN
Site Acreage
18.67%
15.19%
12.93%
12.79%
12.34%
9.41%
8.15%
3.95%
3.17%
0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 16.00% 18.00% 20.00%
MANN
LINCOLN
HOOVER
LUCAS
TWAIN
LEMME
ALEXANDER
LONGFELLOW
SHIMEK
Building Footprint % of Site
Mann, Footprint 18.67% of Site
Mann, 116 Sq. Ft. Play Space per Student
682
643
580
569
484
474
370
162
116
0 100 200 300 400 500 600 700 800
TWAIN
SHIMEK
LONGFELLOW
ALEXANDER
LEMME
LUCAS
HOOVER
LINCOLN
MANN
Sq. Ft. Play/Hard/Green Spaces / Student
Mann, 21 Parking Stalls
102
77
72
69
61
56
41
36
23
0 20 40 60 80 100 120
ALEXANDER
LUCAS
LEMME
SHIMEK
LONGFELLOW
TWAIN
HOOVER
LINCOLN
MANN
Parking Stalls
Site Improvement Options
618 - 620 Fairchild St.
630 Fairchild St.
623 Fairchild St.619 Fairchild St.
427 North Dodge Street
Desired Parcels Existing
Total Site1.65 Acres
ProsLocationHard Surface
ConsSmall SiteLack of ParkingBus Drop-offParent Drop-offSmall GreenSmall Soft Play
Existing Site Plan
Acreage 1.65
Soft Play 3,550 Sq. Ft.
Hard Surface Play15,555 Sq. Ft.
Green Space4,728 Sq. Ft
Parking Stalls21 + 2 ADA
Desired Parcels 630 Fairchild 618-620 Fairchild 619 Fairchild 623 Fairchild 427 N Dodge Fairchild Street
ProsHard Surface+Play Areas+Parent Drop-offBus Drop-offParkingPark Synergy
ConsCost/Process
Option “A”
Acreage 2.823
Soft Play 14,000 Sq. Ft.
Hard Surface Play17,280 Sq. Ft.
Parking Stalls60 + 2 ADA
Desired Parcels 630 Fairchild 618-620 Fairchild 619 Fairchild 623 Fairchild 427 N Dodge
ProsHard Surface+Play Areas+Parent Drop-offBus Drop-offParking
ConsTraffic FlowCost/Process
Option “B”
Acreage 2.256
Soft Play 15,650 Sq. Ft.
Hard Surface Play16,010 Sq. Ft.
Parking Stalls49 + 2 ADA
Desired Parcels 618-620 Fairchild 619 Fairchild 623 Fairchild 427 N Dodge
ProsHard Surface-Play Areas-Parent Drop-offBus Drop-offParking
ConsTraffic FlowUse of ParkCost/Process
Option “C”
Acreage 1.98
Soft Play 7,650 Sq. Ft.
Hard Surface Play14,530 Sq. Ft.
Parking Stalls49 + 2 ADA
Desired Parcels 630 Fairchild 618-620 Fairchild
ProsHard Surface-Play Areas-Parent Drop-offBus Drop-off
ConsLess ParkingTraffic FlowUse of ParkCost/Process
Option “D”
Acreage 1.933
Soft Play 7,950 Sq. Ft.
Hard Surface Play11,440 Sq. Ft.
Parking Stalls37 + 2 ADA
Desired Parcels 618-620 Fairchild
ProsParent Drop-offBus Drop-off
ConsLess ParkingLess Hard PlayLess Soft PlayTraffic FlowIncreased Use
of ParkCost/Process
Option “E”
Acreage 1.84
Soft Play 3,720 Sq. Ft.
Hard Surface Play5,785 Sq. Ft.
Parking Stalls37 + 2 ADA
Desired Parcels 630 Fairchild 618-620 Fairchild 619 Fairchild 623 Fairchild 427 N Dodge
ProsHard Play ++Soft Play ++Parent
Drop-offBus Drop-off Parking
ConsTraffic Flow
Option “F”
Acreage 2.256
Soft Play 19,230 Sq. Ft.
Hard Surface Play14,710 Sq. Ft.
Parking Stalls44 + 2 ADA
Desired Parcels 630 Fairchild 618-620 Fairchild
ProsHard Surface-Play Areas-Parent Drop-offBus Drop-off
ConsLess ParkingTraffic FlowCost/Process
Option “G”
Acreage 1.94
Soft Play 22,560 Sq. Ft.
Hard Surface Play11,085 Sq. Ft.
Parking Stalls16 + 2 ADA
Desired Parcels 618-620 Fairchild
ProsHard & Soft Play Areas AdjacentParent Drop-offBus Drop-offFront & Rear Entrance to Addition
ConsTraffic FlowCost/ProcessReduced Play Areas
Option “H-1”
Acreage 1.84
Soft Play 5,965 Sq. Ft.
Hard Surface Play6,410 Sq. Ft.
Parking Stalls42 + 3 ADA
Desired Parcels 618-620 Fairchild
ProsHard & Soft Play Areas AdjacentParent Drop-offBus Drop-offFront & Rear Entrance to Addition
ConsTraffic FlowCost/ProcessReduced Soft Play Area
Option “H-2”
Acreage 1.84
Soft Play 7,205 Sq. Ft.
Hard Surface Play12,235 Sq. Ft.
Parking Stalls37 + 3 ADA
Questions & Discussion