john arthur pixel project [email protected] april 7, 2005 status of the proposed pixel...

17
John Arthur PIXEL Project status [email protected] d.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation for X-ray Experiments at LCLS

Post on 21-Dec-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Status of the Proposed PIXEL ProjectJohn ArthurSSRL/SLAC

Photon Instrumentation

for

X-ray Experimentsat

LCLS

Page 2: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Boundary conditions that define the PIXEL projectLCLS construction scheduleDOE funding profileLCLS science thrusts endorsed by SAC

Organization of the PIXEL projectOrg chartPhased approach

Page 3: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

LCLS Construction Schedule

NEH beneficial occupancy June 2007

FEH beneficial occupancy September 2007

First electrons through undulator May 2008

Begin LCLS operations phase April 2009

Page 4: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

PIXEL possible funding profile

Asking for a total of $50-60M extending over FY06-FY12. About $18-22M would arrive in FY06-08. The funding profile is still being worked out with BES; nothing is certain yet.

Page 5: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

The LCLS Science Thrust Areas

Coherent scattering at the nanoscale (XPCS)

Atomic, Molecular, and Optical Science

Pump/probe diffraction dynamics

Pump/probe high-energy-density (HED) science

Nano-particle and single-molecule (non-periodic) imaging

Page 6: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

BES approach to the Thrust Areas

AMO science will be included in LCLS construction project

HED science deemed to be outside the mission of BES

Page 7: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Proposed PIXEL Scope

Build instruments that address the 3 remaining Thrust Areas

within BES mission

Include one additional instrument, for soft-x-ray coherent

imaging of magnetic domains (also endorsed by SAC)

Page 8: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

DOE BES project requirements

PIXEL will be a major item of equipment (MIE) procurement project

Not a line-item in the DOE budget

Can include construction funding and R&D funding

Must build distinct instruments, separate from what LCLS builds

Assume all new rules for BES project management apply

Page 9: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

PIXEL organization

Keith HodgsonSSRL Director

Jerry HastingsSSRL Asst. Dir for LCLS Science

John ArthurPIXEL Project Director

TBDPIXEL Project Chief Engineer

BudgetES&HPMCS

DatabasePurchasing

Administration

Engineering&

Development

4-5 Engineers2-3 Designers

Inst #1Instrument Scientist

Inst #2Instrument Scientist

Inst #3Instrument Scientist

Inst #4Instrument Scientist

LCLS Science Teams

Page 10: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Why a phased approach is needed

Each instrument costs $12M-$15M

Funding profile provides ~$22M maximum by end of FY08

So at most two instruments can be funded through FY08

Page 11: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

What will $12M-$15M buy?

Controls (including laser timing)+ComputersSlitsFlight pathValves/windows/pumpsKB focusing system (1 µm and sub-µm options)X-ray pulse split+delay with tableCrystal monochromator with tableDiffractometer with tableOptical table for laserLaser PPSLaser system (10 mJ Ti:sapphire plus OPA)Laser diagnosticsX-ray diagnostics2d detector

Typical PIXEL“instrument”

+

PEOPLE

Page 12: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

The phased approach

Build two instruments in Phase 1, plus a prototype 2d detector

Have Phase 1 instruments able to use first light (summer 2008)

Start to roll Phase 1 science resources onto LCLS ops in 2009

End Phase 1 in 2009-2010 time frame

Begin Phase 2 in 2009, hire additional scientists

Phase 2 includes two instruments plus additional detectors

Finish Phase 2 in 2012

Page 13: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Proposed Project Milestones

CD0 (Statement of mission need, beginning of project) mid 2005

CD1 (Completion of conceptual design) mid 2006

CD2a (Baseline costs of Phase 1) late 2006

CD3a (Begin construction of Phase 1 mid 2007

CD4a (Finish Phase 1) 2009-2010

CD2b (Baseline Phase 2) 2008-2010

CD3b (Construction Phase 2) 2009-2010

CD4b (Finish Phase 2) 2012

Page 14: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Phased Scheme Presented to LCLS

Science Team Leaders

Not yet approved by SAC, for

discussion only

Page 15: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Far Experimental Hall

Near Experimental Hall

Soft X-ray StationAMO Physics (funded by LCLS)

Hard X-ray Diffraction StationPump-probe dynamics (funded by PIXEL)XPCS (funded by PIXEL)

Hard X-ray Imaging StationCoherent imaging (funded by PIXEL)Extreme states of matter (funding?)

2008-9

Green applications do not have full capability, but can do preliminary experiments

Page 16: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

Far Experimental Hall

Near Experimental Hall

Soft X-ray StationAMO PhysicsMagnetic imaging

Hard X-ray Diffraction StationPump-probe dynamics

Hard X-ray Imaging StationCoherent imaging

by 2012

Hard X-ray StationExtreme states of matter(assumes funding found)

Hard X-ray Diffraction StationXPCS

Page 17: John Arthur PIXEL Project statusjarthur@slac.stanford.edu April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation

John Arthur

PIXEL Project status [email protected]

April 7, 2005

SummaryThe funding profile constraints on the PIXEL project,

along with the LCLS schedule, indicate that a phased

approach is needed

Two instruments in Phase1, two in Phase2, along with a

detector development program

Funding for this project is lean, especially in the first

years

Strong support from the Science Teams will be needed