joe brown park d-cdbg west side enhancements · joe brown park d-cdbg west side enhancements joe w....

11
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PROJECT DESCRIPTION AND SITE PLAN - 1 JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard in New Orleans East. The D-CDBG West Side Enhancements Project focuses on the park west of the lagoon. Since the 1950’s, Joe Brown Park has served as a primary natural and recreational amenity to the New Orleans East Community. Reconceived as a contemporary park with a distinctive identity, the 2013 design seeks to actively participate in the revitalization of the New Orleans East community post-Hurricane Katrina. Proposed Park Enhancements on Read Boulevard include: (Funding is secured for this work) New Passive Green Forecourt and New Monument Signage at the Primary Entrance on Read Boulevard: -Park gates set back from the property edge on Read Boulevard to allow for a more open, inviting entrance and to create the forecourt area for use by East New Orleans Regional Library patrons and future hospital patrons without entering the Park -Sidewalk connections to the Library and to Read Boulevard -New tree landscaping along the entry drives to reinforce the Park component at the Entrance -Removal of the cyclone fencing between the Library and the Park to promote usage between Library and Park -Benches -New monument signage to identify the entrance Within Joe Brown Park, Enhancements include: (Funding is secured for this work) -Improvements at Baseball Field #1: Reorient, regrade, and hyrdroseed; new scoreboard, equipment and accessories -New 2960 SF Picnic Shelter with site furniture, accessories, and signage -New Asphalt Walking Path throughout West side, connecting existing “Inner Loop” Walking Path, East New Orleans Regional Library, Read Boulevard, and new Picnic Shelter; New Nature Path on peninsula; New Pedestrian Bridge over lagoon connecting to East side -New Tennis Forecourt at existing Tennis Courts, including landscaping, lighting, and site furniture -New Signage and Wayfinding throughout the Park -New Site Furniture throughout the Park (Funding is NOT secured for this work) -Future Asphalt Walking Path from Baseball Field #1 to Spartan Field -Landscaping Master Plan for West Side of the Park Td Td Td Qp Qp Qp Td Td Td Td Td Td Td Td Td Td Td Td Qn Qv Qv Qv Qv Qa Qn Ls Ls Qn Ls Qn Qa Ul Ul Qn Ua Ua Ab Qv Qn Fp Td Fp Fp Qn Fp Fp Td Fp Td Td Ls Ls Ls Qm Qm Td Td Td Td Td Td Td Td Qn Qn Qn Qn Qn Qv Qv Qv Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Qa Qa Qn Qa Ab Qa Ls Cv Cv Cv Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Bn Bn Po REFORESTATION AREA 1 REFORESTATION AREA 2 Ab Pb Pb Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Td Td Td Td Td Td Td Po Po Td Ls Po Po Po Po Po Po Po Po Po Po Po Ar Ar Qv Qv Ar Po Po Po Po Po Qv Td Td Qv Qv Td Td Po Po Po Po Po Po Po Po Po Po Po Po Mc Mc Mc Mc Mc Mc Mc Td Td Td Ar Ar Ar Td Td Td Td Td Td Fp Fp Td Td Td Td Td Td Ar Qv Ar Ar Ar Ar Td Td Td Qp Qm Td Td Td Td Qp Qp Qp Qp Qp Qp Qp Td Td Td Td Td Qm Qm Qm Fp Ar Ar Ar Td Td Fp Mc Mc Mc Mc Mc Mc Mc Sn Fp Mc Mc Sn Sn Na Na Td Td Td Td Td Td Td Ar Ar Qm Qm Td Td Qp Qp Qp Qp Td Td Td Td Ar Fp Fp Qn Qn Qn Ls Qa Ua Ua Fp Ar Qn Qn Qv Qv Qv Qv Qn Qn Qn Ar Ar Ar Ar Qv Qv Qv Sb Sb Sb Qv Po Ar Qv Qv Qv Qv Qv Qv Qv Qv Qv Qv Td Qp Ar Ls Qa Qn Qn Qn Ul Ul Qn Td Td Td Td Td Td Ar Td Ar Ls Qp Qp Qp Qp Td Td Po Ar Ar Fp Ar Po Ua Fp Po Po Ls Qp Ua Td Td Td Td Td Td Td Td Td Td Qv Qv Qv Td Td Td Td Td Td Fp Ls Ar Fp Fp Fp Ls Ls Qp Ua Ua Ua Ar Td Td Td Td Fp Fp Fp Fp Fp Ar Ar Qp Ls Qm Qm Ls Qm Td Td Td Ar Ar Ar Ua Td Td Td Td Td Na Td Td Td Sn Na Qm Qa Qm Qn Fp Td Sn Sn Sn Sn Sn Fp Td Sn Sn Sb Na Fp Td Td Td Sb Qv Qv Qv Qv Ar Ar Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Td Td Td Qp Qp Qp Td Td Td Td Td Td Td Td Td Td Td Td Qn Qv Qv Qv Qv Qa Qn Ls Ls Qn Ls Qn Qa Ul Ul Qn Ua Ua Ab Qv Qn Fp Td Fp Fp Qn Fp Fp Td Fp Td Td Ls Ls Ls Qm Qm Td Td Td Td Td Td Td Td Qn Qn Qn Qn Qn Qv Qv Qv Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Qa Qa Qn Qa Ab Qa Ls Cv Cv Cv Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Bn Bn Po REFORESTATION AREA 1 REFORESTATION AREA 2 Ab Pb Pb Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Td Td Td Td Td Td Td Po Po Td Ls Po Po Po Po Po Po Po Po Po Po Po Ar Ar Qv Qv Ar Po Po Po Po Po Qv Td Td Qv Qv Td Td Po Po Po Po Po Po Po Po Po Po Po Po Mc Mc Mc Mc Mc Mc Mc Td Td Td Ar Ar Ar Td Td Td Td Td Td Fp Fp Td Td Td Td Td Td Ar Qv Ar Ar Ar Ar Td Td Td Qp Qm Td Td Td Td Qp Qp Qp Qp Qp Qp Qp Td Td Td Td Td Qm Qm Qm Fp Ar Ar Ar Td Td Fp Mc Mc Mc Mc Mc Mc Mc Sn Fp Mc Mc Sn Sn Na Na Td Td Td Td Td Td Td Ar Ar Qm Qm Td Td Qp Qp Qp Qp Td Td Td Td Ar Fp Fp Qn Qn Qn Ls Qa Ua Ua Fp Ar Qn Qn Qv Qv Qv Qv Qn Qn Qn Ar Ar Ar Ar Qv Qv Qv Sb Sb Sb Qv Po Ar Qv Qv Qv Qv Qv Qv Qv Qv Qv Qv Td Qp Ar Ls Qa Qn Qn Qn Ul Ul Qn Td Td Td Td Td Td Ar Td Ar Ls Qp Qp Qp Qp Td Td Po Ar Ar Fp Ar Po Ua Fp Po Po Ls Qp Ua Td Td Td Td Td Td Td Td Td Td Qv Qv Qv Td Td Td Td Td Td Fp Ls Ar Fp Fp Fp Ls Ls Qp Ua Ua Ua Ar Td Td Td Td Fp Fp Fp Fp Fp Ar Ar Qp Ls Qm Qm Ls Qm Td Td Td Ar Ar Ar Ua Td Td Td Td Td Na Td Td Td Sn Na Qm Qa Qm Qn Fp Td Sn Sn Sn Sn Sn Fp Td Sn Sn Sb Na Fp Td Td Td Sb Qv Qv Qv Qv Ar Ar Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Td Td Td Qp Qp Qp Td Td Td Td Td Td Td Td Td Td Td Td Qn Qv Qv Qv Qv Qa Qn Ls Ls Qn Ls Qn Qa Ul Ul Qn Ua Ua Ab Qv Qn Fp Td Fp Fp Qn Fp Fp Td Fp Td Td Ls Ls Ls Qm Qm Td Td Td Td Td Td Td Td Qn Qn Qn Qn Qn Qv Qv Qv Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po Qa Qa Qn Qa Ab Qa Ls Cv Cv Cv Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Td Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Ar Bn Bn Po REFORESTATION AREA 1 REFORESTATION AREA 2 Ab Pb Pb Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Mv Td Td Td Td Td Td Td Po Po Td Ls Po Po Po Po Po Po Po Po Po Po Po Ar Ar Qv Qv Ar Po Po Po Po Po Qv Td Td Qv Qv Td Td Po Po Po Po Po Po Po Po Po Po Po Po Mc Mc Mc Mc Mc Mc Mc Td Td Td Ar Ar Ar Td Td Td Td Td Td Fp Fp Td Td Td Td Td Td Ar Qv Ar Ar Ar Ar Td Td Td Qp Qm Td Td Td Td Qp Qp Qp Qp Qp Qp Qp Td Td Td Td Td Qm Qm Qm Fp Ar Ar Ar Td Td Fp Mc Mc Mc Mc Mc Mc Mc Sn Fp Mc Mc Sn Sn Na Na Td Td Td Td Td Td Td Ar Ar Qm Qm Td Td Qp Qp Qp Qp Td Td Td Td Ar Fp Fp Qn Qn Qn Ls Qa Ua Ua Fp Ar Qn Qn Qv Qv Qv Qv Qn Qn Qn Ar Ar Ar Ar Qv Qv Qv Sb Sb Sb Qv Po Ar Qv Qv Qv Qv Qv Qv Qv Qv Qv Qv Td Qp Ar Ls Qa Qn Qn Qn Ul Ul Qn Td Td Td Td Td Td Ar Td Ar Ls Qp Qp Qp Qp Td Td Po Ar Ar Fp Ar Po Ua Fp Po Po Ls Qp Ua Td Td Td Td Td Td Td Td Td Td Qv Qv Qv Td Td Td Td Td Td Fp Ls Ar Fp Fp Fp Ls Ls Qp Ua Ua Ua Ar Td Td Td Td Fp Fp Fp Fp Fp Ar Ar Qp Ls Qm Qm Ls Qm Td Td Td Ar Ar Ar Ua Td Td Td Td Td Na Td Td Td Sn Na Qm Qa Qm Qn Fp Td Sn Sn Sn Sn Sn Fp Td Sn Sn Sb Na Fp Td Td Td Sb Qv Qv Qv Qv Ar Ar Po Po Po Po Po Po Po Po Po Po Po Po Po Po Po READ BOULEVARD AUDUBON LOUISIANA NATURE CENTER DWYER ROAD NOFD ENGINE 36 NOPD 7TH DISTRICT L A KE FO R EST BO ULE VA R D JOE W. BROWN MEMORIAL PARK 5601 READ BOULEVARD NEW ORLEANS, LA 70127

Upload: others

Post on 29-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PROJECT DESCRIPTION AND SITE PLAN - 1

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS

Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard in New Orleans East. The D-CDBG West Side Enhancements Project focuses on the park west of the lagoon. Since the 1950’s, Joe Brown Park has served as a primary natural and recreational amenity to the New Orleans East Community. Reconceived as a contemporary park with a distinctive identity, the 2013 design seeks to actively participate in the revitalization of the New Orleans East community post-Hurricane Katrina.

Proposed Park Enhancements on Read Boulevard include:(Funding is secured for this work)New Passive Green Forecourt and New Monument Signage at the Primary Entrance on Read Boulevard:-Park gates set back from the property edge on Read Boulevard to allow for a more open, inviting entrance and to create the forecourt area for use by East New Orleans Regional Library patrons and future hospital patrons without entering the Park-Sidewalk connections to the Library and to Read Boulevard -New tree landscaping along the entry drives to reinforce the Park component at the Entrance -Removal of the cyclone fencing between the Library and the Park to promote usage between Library and Park-Benches-New monument signage to identify the entrance

Within Joe Brown Park, Enhancements include:(Funding is secured for this work)-Improvements at Baseball Field #1: Reorient, regrade, and hyrdroseed; new scoreboard, equipment and accessories -New 2960 SF Picnic Shelter with site furniture, accessories, and signage -New Asphalt Walking Path throughout West side, connecting existing “Inner Loop” Walking Path, East New Orleans Regional Library, Read Boulevard, and new Picnic Shelter; New Nature Path on peninsula; New Pedestrian Bridge over lagoon connecting to East side -New Tennis Forecourt at existing Tennis Courts, including landscaping, lighting, and site furniture -New Signage and Wayfinding throughout the Park-New Site Furniture throughout the Park

(Funding is NOT secured for this work)-Future Asphalt Walking Path from Baseball Field #1 to Spartan Field -Landscaping Master Plan for West Side of the Park

SS

Td

Td

Td

Qp

Qp Qp

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Qn

Qv

Qv

Qv

Qv

Qa

Qn

Ls

Ls

Qn

LsQn

Qa

Ul

Ul

Qn

Ua

UaAb

QvQn

Fp

Td

Fp

Fp

Qn

Fp

Fp

Td

Fp

Td

Td

Ls

Ls

Ls

Qm

Qm

Td

Td

Td

Td

Td

Td

Td

Td

QnQn

Qn

Qn

Qn

Qv

Qv

Qv

Ar

Ar Ar

Ar

Ar

Ar

Ar

ArAr

ArArArArArAr

ArAr

Ar

Ar

Ar

Po

PoPoPoPoPo

PoPo

PoPo

PoPo

PoPo

PoPo

PoPo

PoPo

Po

Po

PoPo

PoPo

PoPo

PoPo

PoPo

Qa

Qa

Qn

Qa

Ab

Qa

Ls

Cv

Cv

Cv

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

TdTd

TdTd

TdTd

TdTd

TdTd

TdTd

Td

Ar

ArAr

ArArArArAr

Ar

Ar

Ar

ArAr

Ar

Bn

Bn

Po

REFORESTATION AREA 1

REFORESTATION AREA 2

Ab

Pb

Pb

Mv

Mv

Mv

Mv

Mv

MvMv

MvMv

Mv

Mv

Mv

Mv

MvMv

MvMv

Mv

Td

TdTd

Td Td

Td

Td

Po

Po

TdLs

Po Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Ar

Ar

Qv

Qv

Ar

Po

Po

Po

Po

Po

Qv

TdTd

Qv

Qv

Td Td

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Mc

Mc

Mc

Mc

Mc

Mc

Mc

Td

Td

TdAr

Ar

Ar

Td

Td

Td

Td

Td

Td

Fp

Fp Td

Td

TdTd

Td Td

Ar

Qv

Ar

Ar

Ar

Ar

Td

Td

Td

Qp

Qm

Td

Td

Td

Td

Qp

Qp

Qp

Qp

Qp

Qp

Qp

TdTd

Td

Td

Td

Qm

Qm

Qm

Fp

Ar

Ar

Ar

Td

Td

Fp

Mc

Mc

McMc

McMc

Mc Sn

Fp

Mc

McSn

Sn

NaNa

TdTd

Td

TdTdTd

Td

Ar

Ar

Qm

Qm TdTd

Qp

Qp

Qp

Qp

TdTd

Td

Td

Ar

Fp

Fp

Qn

Qn

Qn

Ls

Qa

Ua

Ua

Fp

Ar Qn

Qn

Qv

Qv

Qv

Qv

Qn

Qn

Qn

Ar

Ar

Ar

Ar

Qv Qv

Qv

Sb

Sb

Sb

Qv

Po

ArQv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Td

Qp

Ar

LsQa

Qn

Qn Qn

Ul

Ul

Qn

TdTd

Td

Td

Td

Td

Ar

Td

Ar

Ls

Qp

Qp

Qp

Qp

TdTd

Po

Ar

Ar

Fp

Ar

Po

Ua

Fp

Po

Po

LsQp

Ua

Td

Td

Td

TdTd

Td

TdTd

Td

Td

QvQv

QvTd

TdTdTd

Td Td

Fp

Ls

Ar FpFp

Fp

Ls

Ls

Qp

UaUa

Ua

ArTd

Td

Td

Td

FpFp

Fp

FpFp

Ar

Ar

Qp

Ls

Qm

Qm

Ls

Qm

Td

Td Td

Ar

ArArUa

Td

Td

TdTd

Td

Na

Td

TdTd

Sn

Na

Qm

Qa

Qm

Qn

Fp

TdSn

SnSn

SnSn

Fp

Td

Sn

Sn

Sb

Na

Fp

Td

Td

Td

Sb

Qv Qv

Qv

Qv

Ar

Ar

Po

Po

Po

Po

Po

PoPoPo

PoPoPo

PoPo

PoPo

SS

Td

Td

Td

Qp

Qp Qp

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Qn

Qv

Qv

Qv

Qv

Qa

Qn

Ls

Ls

Qn

LsQn

Qa

Ul

Ul

Qn

Ua

UaAb

QvQn

Fp

Td

Fp

Fp

Qn

Fp

Fp

Td

Fp

Td

Td

Ls

Ls

Ls

Qm

Qm

Td

Td

Td

Td

Td

Td

Td

Td

QnQn

Qn

Qn

Qn

Qv

Qv

Qv

Ar

Ar Ar

Ar

Ar

Ar

Ar

ArAr

ArArArArArAr

ArAr

Ar

Ar

Ar

Po

PoPoPoPoPo

PoPo

PoPo

PoPo

PoPo

PoPo

PoPo

PoPo

Po

Po

PoPo

PoPo

PoPo

PoPo

PoPo

Qa

Qa

Qn

Qa

Ab

Qa

Ls

Cv

Cv

Cv

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

TdTd

TdTd

TdTd

TdTd

TdTd

TdTd

Td

Ar

ArAr

ArArArArAr

Ar

Ar

Ar

ArAr

Ar

Bn

Bn

Po

REFORESTATION AREA 1

REFORESTATION AREA 2

Ab

Pb

Pb

Mv

Mv

Mv

Mv

Mv

MvMv

MvMv

Mv

Mv

Mv

Mv

MvMv

MvMv

Mv

Td

TdTd

Td Td

Td

Td

Po

Po

TdLs

Po Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Ar

Ar

Qv

Qv

Ar

Po

Po

Po

Po

Po

Qv

TdTd

Qv

Qv

Td Td

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Mc

Mc

Mc

Mc

Mc

Mc

Mc

Td

Td

TdAr

Ar

Ar

Td

Td

Td

Td

Td

Td

Fp

Fp Td

Td

TdTd

Td Td

Ar

Qv

Ar

Ar

Ar

Ar

Td

Td

Td

Qp

Qm

Td

Td

Td

Td

Qp

Qp

Qp

Qp

Qp

Qp

Qp

TdTd

Td

Td

Td

Qm

Qm

Qm

Fp

Ar

Ar

Ar

Td

Td

Fp

Mc

Mc

McMc

McMc

Mc Sn

Fp

Mc

McSn

Sn

NaNa

TdTd

Td

TdTdTd

Td

Ar

Ar

Qm

Qm TdTd

Qp

Qp

Qp

Qp

TdTd

Td

Td

Ar

Fp

Fp

Qn

Qn

Qn

Ls

Qa

Ua

Ua

Fp

Ar Qn

Qn

Qv

Qv

Qv

Qv

Qn

Qn

Qn

Ar

Ar

Ar

Ar

Qv Qv

Qv

Sb

Sb

Sb

Qv

Po

ArQv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Td

Qp

Ar

LsQa

Qn

Qn Qn

Ul

Ul

Qn

TdTd

Td

Td

Td

Td

Ar

Td

Ar

Ls

Qp

Qp

Qp

Qp

TdTd

Po

Ar

Ar

Fp

Ar

Po

Ua

Fp

Po

Po

LsQp

Ua

Td

Td

Td

TdTd

Td

TdTd

Td

Td

QvQv

QvTd

TdTdTd

Td Td

Fp

Ls

Ar FpFp

Fp

Ls

Ls

Qp

UaUa

Ua

ArTd

Td

Td

Td

FpFp

Fp

FpFp

Ar

Ar

Qp

Ls

Qm

Qm

Ls

Qm

Td

Td Td

Ar

ArArUa

Td

Td

TdTd

Td

Na

Td

TdTd

Sn

Na

Qm

Qa

Qm

Qn

Fp

TdSn

SnSn

SnSn

Fp

Td

Sn

Sn

Sb

Na

Fp

Td

Td

Td

Sb

Qv Qv

Qv

Qv

Ar

Ar

Po

Po

Po

Po

Po

PoPoPo

PoPoPo

PoPo

PoPo

SS

Td

Td

Td

Qp

Qp Qp

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Qn

Qv

Qv

Qv

Qv

Qa

Qn

Ls

Ls

Qn

LsQn

Qa

Ul

Ul

Qn

Ua

UaAb

QvQn

Fp

Td

Fp

Fp

Qn

Fp

Fp

Td

Fp

Td

Td

Ls

Ls

Ls

Qm

Qm

Td

Td

Td

Td

Td

Td

Td

Td

QnQn

Qn

Qn

Qn

Qv

Qv

Qv

Ar

Ar Ar

Ar

Ar

Ar

Ar

ArAr

ArArArArArAr

ArAr

Ar

Ar

Ar

Po

PoPoPoPoPo

PoPo

PoPo

PoPo

PoPo

PoPo

PoPo

PoPo

Po

Po

PoPo

PoPo

PoPo

PoPo

PoPo

Qa

Qa

Qn

Qa

Ab

Qa

Ls

Cv

Cv

Cv

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

Td

TdTd

TdTd

TdTd

TdTd

TdTd

TdTd

Td

Ar

ArAr

ArArArArAr

Ar

Ar

Ar

ArAr

Ar

Bn

Bn

Po

REFORESTATION AREA 1

REFORESTATION AREA 2

Ab

Pb

Pb

Mv

Mv

Mv

Mv

Mv

MvMv

MvMv

Mv

Mv

Mv

Mv

MvMv

MvMv

Mv

Td

TdTd

Td Td

Td

Td

Po

Po

TdLs

Po Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Ar

Ar

Qv

Qv

Ar

Po

Po

Po

Po

Po

Qv

TdTd

Qv

Qv

Td Td

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Po

Mc

Mc

Mc

Mc

Mc

Mc

Mc

Td

Td

TdAr

Ar

Ar

Td

Td

Td

Td

Td

Td

Fp

Fp Td

Td

TdTd

Td Td

Ar

Qv

Ar

Ar

Ar

Ar

Td

Td

Td

Qp

Qm

Td

Td

Td

Td

Qp

Qp

Qp

Qp

Qp

Qp

Qp

TdTd

Td

Td

Td

Qm

Qm

Qm

Fp

Ar

Ar

Ar

Td

Td

Fp

Mc

Mc

McMc

McMc

Mc Sn

Fp

Mc

McSn

Sn

NaNa

TdTd

Td

TdTdTd

Td

Ar

Ar

Qm

Qm TdTd

Qp

Qp

Qp

Qp

TdTd

Td

Td

Ar

Fp

Fp

Qn

Qn

Qn

Ls

Qa

Ua

Ua

Fp

Ar Qn

Qn

Qv

Qv

Qv

Qv

Qn

Qn

Qn

Ar

Ar

Ar

Ar

Qv Qv

Qv

Sb

Sb

Sb

Qv

Po

ArQv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Qv

Td

Qp

Ar

LsQa

Qn

Qn Qn

Ul

Ul

Qn

TdTd

Td

Td

Td

Td

Ar

Td

Ar

Ls

Qp

Qp

Qp

Qp

TdTd

Po

Ar

Ar

Fp

Ar

Po

Ua

Fp

Po

Po

LsQp

Ua

Td

Td

Td

TdTd

Td

TdTd

Td

Td

QvQv

QvTd

TdTdTd

Td Td

Fp

Ls

Ar FpFp

Fp

Ls

Ls

Qp

UaUa

Ua

ArTd

Td

Td

Td

FpFp

Fp

FpFp

Ar

Ar

Qp

Ls

Qm

Qm

Ls

Qm

Td

Td Td

Ar

ArArUa

Td

Td

TdTd

Td

Na

Td

TdTd

Sn

Na

Qm

Qa

Qm

Qn

Fp

TdSn

SnSn

SnSn

Fp

Td

Sn

Sn

Sb

Na

Fp

Td

Td

Td

Sb

Qv Qv

Qv

Qv

Ar

Ar

Po

Po

Po

Po

Po

PoPoPo

PoPoPo

PoPo

PoPo

SS

READ BOULEVARD

AUDUBON LOUISIANA NATURE CENTER

DWYER ROADNOFD ENGINE 36

NOPD 7TH DISTRICT

LAKE FOREST BOULEVARD

JOE W. BROWN MEMORIAL PARK5601 READ BOULEVARDNEW ORLEANS, LA 70127

Page 2: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 RENDERING - SITE PLAN - 2

BASEBALL FIELD

NEW PICNIC SHELTER

REFORESTATION

PRIMARY ENTRANCE

READ BOULEVARD

BLEACHERS

PEDESTRAIN BRIDGE

ASPHALT PATH

AUDUBON LOUISIANA NATURE CENTER

DWYER ROADNOFD ENGINE 36

NOPD 7TH DISTRICT

JOE BROWN PARK WEST SIDE ENHANCEMENTS SITE PLAN

TENNIS FORECOURT

NATURE PATH

LAKE FOREST BOULEVARD

Page 3: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PHOTOGRAPHS OF EXISTING SITE - 3

ENTRANCE ON READ BLVD. ENTRANCE ON READ BLVD.

SITE OF NEW PICNIC SHELTER ON LAGOONEXISTING PICNIC SHELTER

Page 4: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 RENDERING - NEW PARK ENTRY, READ BLVD. - 4

Page 5: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 ENTRANCE SIGN - ELEVATIONS & SECTIONS - 5

13'-0"

PRE-CAST CONCRETEPANEL, TYP.,CONNECTION BY GC

FABRICATED METAL LETTERSIGNAGE, 1'-0" TALL, SIGNAGETYPE 6

FABRICATED METAL LETTERSIGNAGE, 3'-0" TALL, SIGNAGETYPE 6

33'-1

1/2"

8'-6"

8'-0"

8'-0"

8'-0"

TRANSLUCENTRESINOUS PANEL, TYP.,REMOVABLE FORMAINTENANCE

TRANSLUCENTRESINOUS PANEL, TYP.,REMOVABLE FORMAINTENANCE

4'-0"

12'-0"

PRE-CAST CONCRETEPANEL, TYP.,CONNECTION BY GC

TRANSLUCENTRESINOUS PANEL,TYP., REMOVABLEFOR MAINTENANCE

TRANSLUCENTRESINOUS PANEL, TYP.,

REMOVABLE FORMAINTENANCE

PRE-CAST CONCRETEPANEL, TYP.,CONNECTION BY GC

1.5" UNISTRUT

PT-1

PT-1

1'-7"

1/A205

2/A20

5

32'-2

1/2"

4'-0"

TRANSLUCENTRESINOUSPANEL

PRE-CAST CONCRETEPANEL, TYP., CONNECTIONBY GC

1.5" UNISTRUT@ 2'-0" O.C.VERTICAL

PT-1

32'-2

1/2"

13'-0"

TRANSLUCENT RESINOUSPANEL, TYP., REMOVABLE FORMAINTENANCE

1.5" UNISTRUT@ 2'-0" O.C.VERTICAL

1'-7"

PT-1

4'-0"

TRANSLUCENT RESINOUSPANEL, TYP., REMOVABLE FORMAINTENANCE

CUT ALUMINUMSIGNAGE, 6" TALL,SIGNAGE TYPE 1

PRE-CASTCONCRETEPANEL, TYP.,CONNECTIONBY GC

32'-2

1/2"

8'-7 1

/2"8'-

0"8'-

0"7'-

5 1/2"

12'-0"

7'-6"

7'-6"

3"

6"

8"

CONNECTION TOSTRUCTURE BY GC,GALVANIZED STEEL,

SLOPED TOPREVENT WATER

POOLING

CONNECTION TOSTRUCTURE BY GC,GALVANIZED STEEL,

SLOPED TOPREVENT WATER

POOLING

COLUMN

87.46°

3'-0"

GC TO RELOCATE EXISTING SOIL ATENTRANCE TO CREATE HILL

BP

PR

OJE

CT

NO

.: LA

08.0

162.

20

RE

AD

BO

ULE

VA

RD

AN

D L

AK

E F

OR

ES

T B

OU

LEV

AR

D

|

NE

W O

RLE

AN

S, L

A 7

0127

JOE

W. B

RO

WN

ME

MO

RIA

L P

AR

KE

NH

AN

CE

ME

NTS

- WE

ST

(D-C

DB

G)

Scale: 3/8"=1'-0"

NORTH & SOUTH ELEVATION1A2.05 - Scale: 3/8"=1'-0"

WEST ELEVATION2A2.05 - Scale: 3/8"=1'-0"

SECTION A3A2.05 - Scale: 3/8"=1'-0"

SECTION B4A2.05 -

Scale: 3/8"=1'-0"

PLAN7A2.05 -Scale: 3/8"=1'-0"

PRE-CAST CONCRETE PANEL5A2.05 - Scale: 1/4"=1'-0"

HILL @ ENTRANCE6A2.05 -

Page 6: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 RENDERING - NEW PICNIC SHELTER - 6

Page 7: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PICNIC SHELTER PLAN - 7

1 2 3 4 5 6

AB

14'-0" 14'-0" 14'-0" 14'-0" 14'-0"

32'-0

"4'-

0"4'-

0"

8"12

'-0"

3/204C

1/204C

4/204

C

2/204

C

20'-0" 8'-0" 42'-8"

STEEL COLUMN,PTD, TYP.

LINE OF ROOFABOVE

TA-13TA-10,TYP.TA-06

TA-05

TA-01,TYP.TA-09,TYP.

TA-08, TYPTA-02TA-02

TA-12 (ADA) TA-04

TA-02TA-02

TA-12 (ADA)TA-04

TA-13

TA-05TA-06

TA-01TA-09

1/A8001/A800

5'-0" 3'-2"

2'-0"

6'-0"

4'-8"

5'-1"

4'-8" 5'-0"3'-2"5'-8"

5'-8"

6'-0"

2'-0"

8'-8" 14'-0"

SF-03 SF-03 SF-03 SF-03 SF-03

SF-03SF-03SF-03SF-03SF-03

6/204

C

5/204

C

3'-0"

EQ EQ

3'-6 1

/2"3'-

0"

EQ EQ

FE-1 FE-1

SIM

CMU WALL TOCEILING

CMU WALL TOCEILING

FLOOD VENT

FLOOD VENT FLOOD VENT FLOOD VENT

FLOOD VENT

FLOOD VENT

SLASH PADSYSTEM VAULT

1 2 3 4 5 6

AB

14'-0" 14'-0" 14'-0" 14'-0" 14'-0"

32'-0

"4'-

0"

2'-0"

74'-0"

40'-0

"

3/204C

1/204C

4/204

C

2/204

C

STANDING SEAM METAL ROOF

Scale: 1/4"=1'-0"

PLAN- PICNIC SHELTER 21A2.02 -

BP

PR

OJE

CT

NO

.: LA

08.0

162.

20

RE

AD

BO

ULE

VA

RD

AN

D L

AK

E F

OR

ES

T B

OU

LEV

AR

D

|

NE

W O

RLE

AN

S, L

A 7

0127

JOE

W. B

RO

WN

ME

MO

RIA

L P

AR

KE

NH

AN

CE

ME

NTS

- WE

ST

(D-C

DB

G)

Scale: 1/4"=1'-0"

ROOF PLAN- PICNIC SHELTER 22A2.04A -

NOTES:1. ALL CONCRETE FLOOR SLABS TO BE SLOPED TO FLOOR DRAINS, SLOPE TO BE MIN 1

8" PER 1'-0".2. ALL INTERIOR PARTITIONS ARE 7-5/8" CMU TO A HEIGHT OF 8'-8" UNLESS OTHERWISE NOTED.SEE DRAWING 09/A6.01 FOR PARTITION DETAILS.3. SEE SHEET A0.02 AND DRAWING 2/A8.00 FOR TOILET ACCESSORY MOUNTING HEIGHTS.

Page 8: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PICNIC SHELTER ELEVATIONS - 8

AB

STANDING SEAM METAL SOFFIT FASCIA

STEEL COLUMN, PT-7 TYP.

POLYCARBONATEPANEL TRANSOM

HM DOOR AND FRAME, PT-7

CMU, PT-1

SF-03, TYP

FLOOD VENT

6 5 4 3 2 1

STANDING SEAM METAL SOFFIT

STEEL COLUMN, PT-7 TYP.

POLYCARBONATEPANEL TRANSOM

CMU, PT-1 4" EDGE OFSIGNAGE

6'-0"

BOT

TOM

OF S

IGNA

GE

4" EDGE OFSIGNAGE

6'-0"

BOT

TOM

OF S

IGNA

GE

FIXED LOUVER19" X 16"

1 2 3 4 5 6

STANDING SEAM METAL ROOF

STEEL COLUMN, PT-7 TYP.

POLYCARBONATEPANEL TRANSOM

CMU, PT-1SF-03, TYP

6'-0"

1'-6"FLOOD VENT FLOOD VENT FLOOD VENT

BA

STANDING SEAM METAL SOFFIT FASCIA

STEEL COLUMN, PT-X TYP.

POLYCARBONATEPANEL TRANSOM

CMU, PT-1

SF-03, TYP

FLOOD VENT

HM DOOR AND FRAME, PT-7

CMU PT-1

HM DOOR AND FRAME, PT-7

CMU, PT-1

POLYCARBONATEPANEL TRANSOM

POLYCARBONATEPANEL TRANSOM

Scale: 1/4"=1'-0"

EAST ELEVATION- PICNIC SHELTER 22A2.04C A2.04A

BP

PR

OJE

CT

NO

.: LA

08.0

162.

20

RE

AD

BO

ULE

VA

RD

AN

D L

AK

E F

OR

ES

T B

OU

LEV

AR

D

|

NE

W O

RLE

AN

S, L

A 7

0127

JOE

W. B

RO

WN

ME

MO

RIA

L P

AR

KE

NH

AN

CE

ME

NTS

- WE

ST

(D-C

DB

G)

Scale: 1/4"=1'-0"

NORTH ELEVATION- PICNIC SHELTER 21A2.04C A2.04A

Scale: 1/4"=1'-0"

WEST ELEVATION- PICNIC SHELTER 24A2.04C A2.04AScale: 1/4"=1'-0"

SOUTH ELEVATION- PICNIC SHELTER 23A2.04C A2.04A

Scale: 1/4"=1'-0"

EAST ELEVATION6A2.04C A2.04AScale: 1/4"=1'-0"

WEST ELEVATION5A2.04C A2.04A

Page 9: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 WAYFINDING - 9

23456789101112FDL141516171819

1C JOE W. BROWN MEMORIAL PARK

LIBRARY

ENTRANCE / EXIT

JBP BASEBALL FIELD

PICNIC SHELTER 1

PLAYGROUND WEST

PICNIC SHELTER 2

SPLASH PAD

GAZEBO

TENNIS COURTS

PICNIC SHELTER 3

SPARTAN FIELD

HURRICANE KATRINA, AUGUST 2005

VICTORY PLAZA

VICTORY TRACK

VICTORY FIELD

RECREATION CENTER

POOL

PLAYGROUND EAST

1B1A

AUDUBON NATURE CENTER

EAST NEW ORLEANS REGIONALBRANCH LIBRARY

VARI

ES4"

TYP

POWDER COATEDSTEEL MESH, 2" OPENINGS

2" POWDER COATEDSTEEL TUBES

SCHE

DULE

LINE

11'-8

"

2'-2"

BENT STAINLESS STEELPLATE, 16 GAUGE,

1" WIDTH

SLOPE CONCRETE BASEFROM CENTER TO EDGE

BENT STAINLESS STEELPLATE, 16 GAUGE,2 12 " WIDTH

CUT STAINLESS STEELLETTERS, SURFACEMOUNTED,SIGNAGE TYPE 5

POWDER COATED STEELPANEL, MECHANICALLYFASTENED,SIGNAGE TYPE 4

GRADE

FLOOD DATUMV.I.F.

PHOTOPOLYMERBONDED TO ACRYLIC

SIGNAGE, TYP,SIGNAGE TYPE 2

POWDER COATEDSTEEL MESH LID,

2" OPENINGS

6" SQUARE FORMED LEAVE-OUT FOR TUBES AND GROUT

BOLT

1'-4"

5'-0"

1'-0"

1'-0"

#5 @ 24" OC TYP

(5) #5 CONT. LAP, 36Db.#4 w/ STD HW @ 12" OC TYPCONSTRUCTION JOINT

KIOSK FOUNDATION

4"

3'-0"

2" POWDER COATEDSTEEL TUBE BRACING

2" POWDER COATEDSTEEL TUBE BRACING

EMBEDDED STEEL TUBES -PRIMED ONLY

1'-0"

2'-2"

3'-0"

2" POWDER COATEDSTEEL TUBES

BENT STAINLESSSTEEL PLATE

2'-2"

3'-0"

POWDER COATEDSTEEL MESH

2" OPENINGS

6" SQUARE FORMED LEAVE-OUT FOR TUBES AND GROUT

SLOPE CONCRETE BASEFROM CENTER TO EDGE

2" POWDER COATED STEELTUBE BRACING, TOP AND

BOTTOM OF FRAME

2" POWDER COATEDSTEEL TUBES

PHOTOPOLYMERBONDED TO ACRYLIC

SIGNAGE, TYP,SIGNAGE TYPE 2

BENT STAINLESSSTEEL PLATE

SLOPE CONCRETE BASEFROM CENTER TO EDGE

VARI

ES4"

TYP

12"-0

"

BENT STAINLESSSTEEL PLATE

CUT STAINLESS STEELLETTERS, SURFACEMOUNTED;SIGNAGE TYPE 5

POWDER COATEDSTAINLESS STEEL PANEL,MECHANICALLY FASTENED,SIGNAGE TYPE 4

POWDER COATEDSTEEL MESH

2" OPENINGS

CORE BASE FOR TUBES AND GROUT

GRADE

FLOOD DATUMV.I.F.

POWDER COATEDSTEEL MESH LID,

2" OPENINGS

VARI

ES

GRADE

FLOOD DATUMV.I.F.

STAINLESS STEEL MESH,HORIZONTAL BAR

FASTENERCLIP

ACRYLIC BASEADHESIVEACRYLIC PLAQUE

STAINLESS STEEL MESH,VERTICAL BAR

2"2"

2"

HURRICANE KATRINA, AUGUST 29th 2005

COUNTER SUNKMECHANICAL FASTENER,POWDER COATED TOMATCH PANEL

BP

PR

OJE

CT

NO

.: LA

08.0

162.

20

RE

AD

BO

ULE

VA

RD

AN

D L

AK

E F

OR

ES

T B

OU

LEV

AR

D

|

NE

W O

RLE

AN

S, L

A 7

0127

JOE

W. B

RO

WN

ME

MO

RIA

L P

AR

KE

NH

AN

CE

ME

NTS

- WE

ST

(D-C

DB

G)

Scale: 1"=1'-0"

WAYFINDING KIOSK - ELEVATION, TYP1A9.02B-

Scale: 1"=1'-0"

WAYFINDING KIOSK - PLAN, TYP2A9.02B- N.T.S.

WAYFINDING KIOSK - PERSPECTIVE, TYP.3A9.02B-

Scale: 1"=1'-0"

NOT USED4A9.02B-

N.T.S.

FLOOD DATUM LINE CONCEPT6A9.02B- N.T.S.

ACRYLIC SIGNAGE ATTACHMENT DETAIL7A9.02B-

Scale: 1"=1'-0"

FLOOD DATUM LINE PANEL, TYPE 45A9.02B-

1

1

1

1

Page 10: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PEDESTRIAN BRIDGE - 10

Page 11: JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS · JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard

JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 SITE FURNITURE - 11