job order performa iso
DESCRIPTION
iso level 4 documentTRANSCRIPT
7/17/2019 Job Order Performa iso
http://slidepdf.com/reader/full/job-order-performa-iso 1/2
OB ORDER PERFORMA
DATE __________________ Sr.No.___________________
DEPT’ NAME:____________________________ MACHINE NAME:_____________________________________
FAULT/JOB: ____________________________________________________________________________________________
MACHINE STOP TIME _______________________ MACHINE START TIME _______________________
DEPT- SUPERVISOR DEPT’ HEAD FACTORY MANAGER
FOR ENGINEERING DEPT’ USE ONLY
INSPECTED BY__________________________
REMARKS AFTERINSPECTION______________________________________________________________________________
______________________________________________________________________________________________________
IF LOCAL MARKET REPAIRING JOB
OUTARD GATE PASS No. ________________ INARD GATE PASS.No.________________
MATERIAL USED:-
DATE ITEM NAME !TY RATE AMOUN ISSUING RECIVED REMARKS
LABOUR:-
NAME DESIGNATIO DAYS O/TIME DAYS O/T AMOUNT TOTAL
MATERIAL COST " _______________ LABOUR COST " _______________ TOTAL AMOUNT" _____________
DEPT- SUPERVISOR DEPT’ HEAD MECHANICAL HEAD FACTORY MANAGER