© 2005-2016 Fire & Safety Consulting, LLC Neenah, Wisconsin 54956 © 2005-2016 Fire & Safety Consulting, LLC Neenah, Wisconsin 54956 Photo Album for Hadley, MA Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled to be merged with the chassis and pump. The body may have harnessing and trim added.

Upload: others

Post on 12-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956 © 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

Photo Album for

Hadley, MA

Job 29840

September 30, 2016

This week the cab and chassis continued assembly.

The body began the paint process. Next week the cab

is scheduled to be merged with the chassis and pump.

The body may have harnessing and trim added.

Page 2: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04244 DSC04245

DSC04246 DSC04247

Page 3: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04248 DSC04096

DSC04097 DSC04098

Page 4: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04099 DSC04100

DSC04101 DSC04102

Page 5: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04103 DSC04104

DSC04105 DSC04106

Page 6: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04107 DSC04108

DSC04109 DSC04110

Page 7: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04111 DSC04112

DSC04113 DSC04114

Page 8: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04115 DSC04116

DSC04117 DSC04118

Page 9: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC04119 DSC04120

DSC00468 DSC00469

Page 10: Job 29840 September 30, 2016 - Amazon S3 · Job 29840 September 30, 2016 This week the cab and chassis continued assembly. The body began the paint process. Next week the cab is scheduled

© 2005-2016 Fire & Safety Consulting, LLC

Neenah, Wisconsin 54956

DSC00470 DSC00471

DSC00472