jms . new flexibility in gse · j-sel – the smart choice in engine removal / installation!...

4
J-SEL SMART ENGINE LIFT J M S . T H E N E W F L E X I B I L I T Y I N G S E .

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JMS . NEW FLEXIBILITY IN GSE · J-SEL – the smart choice in Engine Removal / Installation! Planned as well as unscheduled engine changes are commonly known as time consuming and

J-SELSMART ENGINE L IFT

J M S . T H E N E W F L E X I B I L I T Y I N G S E .

Page 2: JMS . NEW FLEXIBILITY IN GSE · J-SEL – the smart choice in Engine Removal / Installation! Planned as well as unscheduled engine changes are commonly known as time consuming and

|

J-SELSMART ENGINE LIFT

E A S Y P O S I T I O N I N G

P R E C I S EM O V E M E N T S

F U L LY E L E C T R I C A L O P E R AT I O N (NO HYDRAULICS)

I N T U I T I V EH A N D L I N G

J-SEL-1105

Application range

OEM / Aircraft Engine

Airbus A320-family CFM 56-5A/BIAE V2500

B737 NG CFM 56-7

Embraer 170/195 CF34-8/-10

Sukhoi SJ-100 SaM-146

Technical Data

Safe Working Load: 5.000 kg / 11.020 lbs

Vertical Lift: 1.100 mm / 43,3“ at variable speeds

Lateral travel: +/- 200 mm / 7,9” at variable speeds

Longitudinal travel: +/- 200 mm / 7,9” at variable speeds

Angular adjustment: +/- 5° around vertical axis (rot ‘z’)+/- 6° around lateral axis (rot ‘y’) +/- 6° around longitudinal axis (rot ‘x’)

Electrical power supply: 3-phase 400V AC, 50 / 60Hz, total power consumption approx. 12kW

Further applications upon request!

Page 3: JMS . NEW FLEXIBILITY IN GSE · J-SEL – the smart choice in Engine Removal / Installation! Planned as well as unscheduled engine changes are commonly known as time consuming and

|

Application principle Easy and safe transportation of 4 compact identical lifting units

the smar t so lu t ionfor a qu ick and sa fe eng ine change

J M S . T H E N E W G E N E R A T I O N I N G S E .

Further J-SEL models for other applications are available as well.

Send us your request under [email protected] or call us at +49 7821 99469-0

With the J-SEL-1105, Smart Engine Lift – JMS

once more proves to be ahead with innovative and

fl exible GSE solutions:

• The system consists of 4 identical compact lifting pillars (attached to the engine transport stand) plus

a mobile control panel; engine removal/installation

is conducted through precise PLC-controlled

manipulation of all lifting pillars

• every lifting pillar executes its movements by

three servo-driven gearmotors with absolute

stroke measurement system allowing highest precision and repeatability in operation

• due to the elimination of any hydraulic component no risk of leakage or oil spill during

operation or transportation

• load measuring devices in every lifting pillar

allow a precise monitoring of loads induced

including the control of pre-load requirements

during the installation process

• lift, lateral and longitudinal travel as well as all

angular adjustments (adjustability of the engine

is provided in all 6 axis) provides you with the

highest fl exibility when removing/installing an aero engine

• the control panel features an intuitive MMI which allows quick guidance through all functions

of the engine removal/installation procedures

including an aircraft/engine database. Safe and

logic control levels are guiding the user step-by-

step through the entire operation

• All 4 lifting pillars can be conveniently tilted for air transportation and loaded/stored on standard

ULD pallets (one J-SEL-1105 system requires

2 ULD pallets size P1P, PAG, PAJ) for airlift in any

common wide-body aircraft’s cargo bay

Interested? We will be pleased to provide you with further infor-

mation including an investment calculation where

your local conditions and fi gures can be implemented

in order to prove the superiority of our system.

J-SEL – the smart choice inEngine Removal / Installation!

Planned as well as unscheduled engine changes are commonly known as time consuming and expensive MRO tasks when executed conventionally by bootstrapping method.

Be smart and reduce your aircraft‘s downtime through the use of an intelligent solution: J-SEL, the Smart Engine Lift.

Page 4: JMS . NEW FLEXIBILITY IN GSE · J-SEL – the smart choice in Engine Removal / Installation! Planned as well as unscheduled engine changes are commonly known as time consuming and

JMS wide range of GSE

Ground Support Equipment available for

commercial and regional aircraft: axle and

tripod jacks, tow bars, fl uid dispensers, smart

engine lifts, seat change dollies, wheel brake

changers, maintenance steps and further related

services for the maintenance on the ground.

Aircraft maintenance tooling

Sale of aircraft maintenance tooling for all types

of BOEING aircraft – manufactured by the world‘s

no. 1 supplier of BOEING licensed maintenance

tooling, FARWEST AIRCRAFT INC./USA

Hydraulic Ground Power Units

Sale of aircraft hydraulic ground power units as

well as RAT-test equipment for commercial air-

crafts - manufactured by the world no. 1 supplier

HYCOM BV/ Netherlands.

JMS AG

Jet Maintenance & Service

Rainer-Haungs-Str. 42

77933 Lahr/Germany

Tel. +49 7821 99469-0

Fax +49 7821 99469-100

[email protected]

www.jms.aeroReseller/sales partner

J M S . T H E N E W F L E X I B I L I T Y I N G S E .

04/1

2 M

otiv

Euro

pa-K

arte

: © T

anja

Bag

usat

- F

otol

ia.c

omW

e re

serv

e th

e rig

ht to

mak

e te

chni

cal m

odifi

catio

ns.