jithtlm~e washington suburban sanitary commission · loin r.g&iffk d1spity gf.3alm.anager p....

22
WASHINGTON SUBURBAN SANITARY COMMISSION COSWS5IUMMM JithtlM~e rmWidE.ChbiF ram P. Aaawi Joyoc Stmu" W& ae. i OENMRL MAKWENR loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes of Standards and Technology 00 Muddy Branch Road Gaithersburg, M)D 20899 Correspondence Address: 100 Bureau Drive, Stop 3540 Gaithersburg, MD 20899-3540 Permit Numbe. 05813 In accordance with the provisions of the Washington Suburban Sanitary Commission's (WSSC's) Plumbing and Gasfitting Regulations, Chapter 9, "Industrial and Special Waste Rcgulations," and applicable provisions of Federal and State law, tde National Institutes of Standards and Technology, a government establishment engaged in performing non-comnmercial research, and classified generally by NAIC Codes 921190 and 541710. hereinafter referred to as "Industrial User," is hereby granted permission to discharge industrial wastewater into the WSSC's sewer system in accordance with the General and Special Conditions contained herein. This wastewater will be treated at the District of Columbia Water and Sewer Authorit)s Blue Plains Wastcwater Treatment Plant. In the cvent that this Discharge Authorization Permit is revoked or otherwise made invalid, all industrial discharges Into the WSSCs sewr system shall immediately cease. This Discharge Authorization Permit is issued to the Industrial Uscr, at the specified site address, by the Washington Suburban Sanitaty Commission for the time period set forth as follows: SEffectivei Date: 06)10104 Expiration Date: 05/31/08 Deadline To Apply For Renewal: 02(28/08 Issued Date: #I 14 ~4fl.2(IA~I~A1, * I-h -4~K.M1') * Tfl 3OI-~Ot~.b1JS * www.~~cwterxom

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

WASHINGTON SUBURBANSANITARY COMMISSION

COSWS5IUMMMJithtlM~e rmWidE.ChbiF

ram P. Aaawi

Joyoc Stmu"W& ae. i

OENMRL MAKWENRloin R.G&iffk

D1SPITY GF.3ALM.ANAGERP. M'¶chad Euico

DISCHARGE AUTHORIZATION PERMIT

Industry Namc:

Site Address

National Institutes of Standards and Technology

00 Muddy Branch RoadGaithersburg, M)D 20899

Correspondence Address: 100 Bureau Drive, Stop 3540Gaithersburg, MD 20899-3540

Permit Numbe. 05813

In accordance with the provisions of the Washington Suburban Sanitary Commission's(WSSC's) Plumbing and Gasfitting Regulations, Chapter 9, "Industrial and Special Waste Rcgulations,"and applicable provisions of Federal and State law, tde National Institutes of Standards and Technology,a government establishment engaged in performing non-comnmercial research, and classified generally byNAIC Codes 921190 and 541710. hereinafter referred to as "Industrial User," is hereby grantedpermission to discharge industrial wastewater into the WSSC's sewer system in accordance with theGeneral and Special Conditions contained herein. This wastewater will be treated at the District ofColumbia Water and Sewer Authorit)s Blue Plains Wastcwater Treatment Plant.

In the cvent that this Discharge Authorization Permit is revoked or otherwise made invalid, allindustrial discharges Into the WSSCs sewr system shall immediately cease.

This Discharge Authorization Permit is issued to the Industrial Uscr, at the specified site address,by the Washington Suburban Sanitaty Commission for the time period set forth as follows:

SEffectivei Date: 06)10104 Expiration Date: 05/31/08

Deadline To Apply For Renewal: 02(28/08

Issued Date: #I 14

~4fl.2(IA~I~A1, * I-h -4~K.M1') * Tfl 3OI-~Ot~.b1JS * www.~~cwterxom

Page 2: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

L GENERAL CONDITIONS

A. GencraLfDischarae RMcIuirenent

The Industrial User shall meet all requirmients of Chapter 9 of the Washington SuburbanSanitary Commission's (WSSCs) Plumbing and Gasfitting Regulations.

B. Permit Reauirements

i. D-utV to Mitiaate

The Industrial User shalLtake all reasonable steps to minimize or correct any adverseimpact resulting from noncompliance with this permit, including such accelerated oradditional monitoring as necessary to determine the nature and impact of thenoncompliant discharge.

2. Duty to Consols

The Industrial User shall comply with all conditions of this permit. Failure to complywith pretreatment standards and requiremncts, and any applicable compliance schedule,may result in civil or criminal liability under applicable State or Federal law and may begrounds to impose the following penalties, as outlined in the WVSSC's EnforcementResponse Plan:

a) Publication of Industrial User's name and nature of violation in the largest daily local

newspaper;

b) Suspension or revocation of ndustUal User's Discharge Authorization Pcmit-

c) Termination ofwater and scwcr service;

d) Civil Citation with a maximum fine of SI,OOO/day;

c) Incurrenc¢ ofall WSSC costs associated with investigations, monitoring, analyses, orenforcement actions resulting from violation(s) of Federal, State, or localpretreatnent standards or r-quircmcnts;

0 Increase in sclf-monitoring frequency; or

g) Administrative Order with associated monetary penalty.

3. Da to Rnpl

If the Industrial User wishes to continue an activity regulated by this permit beyond theexpiration date, the Industrial User must apply for and obtain a now permit. The permitapplication must be submitted at least 90 days before the expiration date of this permit.In the event that a timely and sufficient application has been submitted and the WSSC is

2) MON,

Page 3: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

unable, through no fault of the Industrial User, to issuc a new permit before the expirationdate of this permit, the terms and conditions of this permit arc automatically continuedand remain fiuly effecuive and enforceable.

4. "uty o Pronide Infonnation

The Industrial User shall furnish to the WSSC, in a tirneframe set by the Commission,any information Which the WSSC may request to determine whether cause exists formodifying or terminating this permit, or to determine compliance with this permit. TheIndustrial User shall also funmish to the WSSC. upon request, copies of records requiredby this permit to be kept.

5. Requests for Reconsideration

Requests for reconsideration of any condition or other requirement contained in aDischarge Authorization Permit must be fiMed within 15 days from the issuance of theDischarge Authorization Permit, provided such request does not create a violation of an"existing applicable requirements, standards, laws, or rules and regulations. The filing of arequcst by the Industrial User for a Permit modification or a notifrkation of plannedchanges or anticipated noncompliance does not.stay any Permit condition.

a) Requests for reconsideration shall be made in writing, shall be addressed to and filedwith the Regulatory Services Group Leader, and shall state in detail the reasonssupporting a reconsideration of a Discharge Authorization Permit limitationcondition or other requirMnc.L

b) Failure to file a request for reconsideration within the time specified in this Sectionshall be deemed a waiver of the right to challenge or appeal a DischargeAutlorization Permit limitation, condition, or other rquirnmcnt

c) The decision oI'the Rgtulatory Services Group Leader on a request forreconsideration shall be final and binding upon the parties.

d) If the Regulatory Setvices Group Leader fails to reach a decision on a request forreconsideration within 30 days from the date the request for reconsideration is filed,the failure shall be deemed a final denial of the request.

6. Confidentiality

Records concerning Industrial Users and the nature of their discharges shall be publicinformation unless the User declares at the time a document is submitted, and is able todemonstrate to the satisfaction of the Commission. that the release of the informationwould divulge infonmatin, proccsses, or methods of operation entitled to protection astrade secrets pursuant to the requirements of the Maryland Public Information Act.EMuent data is publi rewied and shall not be withheld.

3

Page 4: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

7. UrMe Provision (For Categorical Industries Only)

An upset shall constitute an incident in which there is unintentional and tempormrynoncompliance with categorical pretreatment standards because of fitctors beyond thereasonable control of the Industrial User. An upset does not include noncompliance tothe extent caused by operational error, improperly designed treatment facilities, luck ofpreventative maintenance, or careless or improper operation.

An upset can be used as an affirmative defense to an action brought for noncompliancewith categorical pretreatment itandards only if the Industrial User demonstrates, throughproperly signed contemporaneous logs, or other relevant evidence, that:

a) An upset occurred and the Industrial User can identify the specific cause(s) of theupset.

b) The permitted facility was, at the time, being operated in a prudent and workmanlikemanner and in compliance with applicablc operation and maintenance procedures.

c) The Industrial User has submitted the following information to the Commissionwithin 24 hours of becoming aware of the upset (if this information is providedorally, a written submission must follow within 5 days): a description of the indirectdischare and cause of noncompliance; the period of noncompliance, including exactdates and times, or if not corrected, the anticipated time the noncomplianc isexpected to continue, steps being token or planned to reduce, eliminate, and preventrecumece of the noncompliance.

d) The Industrial User complied with any remedial measures required to minimizeadverse impact on the wastewater treatment plant and collection system.

8. Maintenance and _O tion of Pretreatment Facilitie

The Industrial User shall at all times properly operate and maintain all treatment systems,facilities, and controls (and related appurtenances) which ar= installed or used by theIndustrial User to achieve compliance with the conditions of this permit. Properoperation and maintenance includes, but is not limited to: effectivc performanc;.adequate f(iding; adequate operator staffing and training; and adequate laboratory Mnprocess controls, including appropriate quality assurance procedures.

Any changes or modifications made to the pretreatment system subsequent to issuance ofthis permit must be reported to the WSSC in writing, and authorized by the WSSC priorto the proposed change. Each report shall be accompanied by a soa of plans outlining thesystem modification(s).

9. Dpuv to Halt or Reduce Activity

Upon reduction of efficiency of operation, or loss or failure of all or part of thepreteatment system, the permittee shall, to the extent necessary to maintain compliance

4 W03

Page 5: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

with its permit, control its production discharges until operation ofthe treatment facilityis restored or an alternative method oftreatment is provided (i.e., the primary source ofpoe•vr to the pretrcatmcnt system fails or is reducd)

10. hivpa of Treatmen~t F:acilities

A bypass shall be defined as the intentional diversion of wastestrvams from any portion ofan Industrial User's treatment facility.

Bypass is prohibited unless it is unavoidable to prevent loss of life, personal ijury, orsevere property damage, or no feasible alternative exists, such as the use ofauxiliarytreatment facilities.

The Industrial User may allow any bypass to occur which does not cause prtmentstandards or requirements to be violated, but only if it also is for essential maintenance toassure efficient operations. ifbypass is neaded for maintenance, the Industrial User mustnotify the WSSC within 24 hours of prforming the necessary maintenance. TheIndustrial User must submit data documenting that standards were being met and submita written report within 30 days of the event.

If an Industrial User knows in advance ofthe need for a bypass, it shall submit priornotice to the Commission, if possible at least 10 days before the date of the bylpass.

An Industrial User shall submit oral notice of an unanticipated bypass that exceedsapplicable prctrcatment standards to the Commission within 24 hours from the time theIndustrial User becomes ame of the bypass. A written submission shall also beprovided within 5 days of the time the Industrial User becomes aware of the cause: theduration of the bypass, including exact dates and times, and if the bypass has not beencorrected, the anticipated time It Is expected to continue, and steps taken or planned toreduce, eliminate, and prevent recurrence of the bypass.

I1. PErmit Conditio

This permit may be modified, suspended, or terminated for good cause including, but notlimited to, the following:

a) Material or substantial alterations or additions to the Industrial User's operation,which were not covered in the effective permit;

b) A change in any condition that requires either a temporary or permanent reduction orelimination of the authorized discharge;,

c) Information indicating that thc permitted discharge poses a threat to the collectiontreatment system, WSSC personnel, or the receiving wates;"

d) Violation of any terms or conditions ofthis permit;

5

Page 6: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

e) Obtaining this paemit by misrepresentation or failure to disclose fthy all relevantfacts; or

f) Upon request of te Industrial User, provided such request does not create a violationof any existing applicable rcquiements, standards, laws, or rules and regulations.The filing of a request by the Industrial User fora permit modification, suspensio,or termination, or a notification of planned changes or anticipated noncompliance,does not stay any permit condition.

12. ReoneMer Clause

This pcmh may be reopened and modified with any applicable more stringentrequirements as contained In the National Categorical Prctrcatment Standard promulgatedper 40 CFR 403 or any applicable more stringent rcquircment resulting from the re-evaluation of Local Limits as necessary to ensure POTW compliance with sludgcmanagement requirmcnts promulgated by the Environmcnual Protection Agency or theState of Maryland.

13. Significant Noncompliance

Ifat any time during the prcvious 12 months an Industrial User is in SignificantNoncompliance of applicable prertment requirencnts, the Industrial User's name andnature of the violation will be published in the largest daily local newspaper. The Userwill be required to monitor 5 additional days until consistent compliance is demonstrated,and may also be subject to additional enforcement action as specified In Section I.B.2.

An Industrial User is in Significant Noncompliance if its violation meets one or more ofthe following criteria:

a) chronic violations of o=tc%%atcr discharge limits, defined as those in whtich 66% ormomr of all of the mcasurements taken during a 6-month period exceed (by anymagnitude) the daily maximum limit or the average limit for the same pollutantparameter;

b) Technical Review Criteria (TRC) violations, defined as those in which 33% or moreof all measurements taken during a 6-month period equal or exceed the product ofthe daily maximum limit or the average limit multiplied by the applicable TRC(TRC = 1.4 for DOD, TSS, fats, oils, and grease, and 1.2 for all other pollutantsexcept pH));

c) any violation of a pretreatment effluent limit (daily maximum or longer-termaverage) that the \VSSC determines has caused, alone or in combination %ith otherdischarges, interk~runce or pass-through with the POTW (including endangering thehealth of POTW personnel or the genaM public);

6

Page 7: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

d) any discharge of a pollutant that has caused imminent endangerment to humanhealth, welfare, or to the environment or has resulted in the WSSC's exercise of itsemergency authority;

e) failure to meet, within 90 days after the schedule date, a compliance schedulemilestone contained in a local control mechanism or enforcement ordcr for startingconstruction, completing construction, or attaining final compliance;

f) faiure to provide, within 30 days after the due date, required reports such as baselinemonitoring reports, 90-day compliance reports, periodic self-monitoring reports, andreports on compliance with compliance schedules;

g) failure to accurately report noncompliance (see Section II.C. on Sclfl-MonitoringBeut*, or

h) any other violation or group of violations which tlw %VSSC determines will adverselyaffect the operation or implementation of thc local prctreatment program.

In the event the Industrial User is in Significant Noncompliance during a 6-month period,the WSSC will notify the User. Once notified, the User will be required to conductadditional monitoring during the next reporting period for the parameters for which theyvere in Significant Noncompliance. Industrial Users in Significant Noncompliance for a

daily maximum discharge limitation shall monitor 5 additional days during the nextreporting period. Industrial Users in Significant Noncompliance for a monthly averagedischarge limitation shall monitor I additional day per month for 5 months. IndustrialUsers in Significant Noncompliance for a 4-day average discharge limitation mustaccumulate 5 4-day averages (20 days) during the next reporting period. The IndustrialUser may use its Periodic Compliance Report data in accumulating the 5 4-day averagcesAdditional monitoring shall continue until the Industrial User demonstrates consistentcmpliance •ith the specified limitation.

Permit monitoring requirements are a minimum. An Industrial User may conductadditional monitoring at any time. All additional monitoring shall be submitted inaccordance with the requirements outlined In Section 1,B.29, Additional Momitoring bythe Iussidil Usa. Enforcement action may be escalated for violations that constituteSignificant Noncompliance.

14. Right orEnry

The Industrial User hereby grants the WSSC the right of entry to its premises for thepurpose of inspecting any wastealwter generating processes, chemical or wastewaterstorage facilities and pretreatment facilities, and for collecting samples and viewingrecords. Failure ofan Industrial User to allow the WSSC access to its premises mayresult in immediate termination ofservice.

7

Page 8: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

IS. Accidental Dirchara.s

The Industrial User shall notify the WSSC immediately in the event of any accident,ncgligence, or other occurrnce which may result in a violation of this permit or couldcause a problcm to the treatment plant, including any slug loading. A slug loading beingdefined as any pollutant, including, but not limited to, flammables, explosives, acids, andoxygen demanding pollutants released in a discharge at a flow rate andlor pollutantconcentration which will cause interference with the treatment plant. Notification shallbe made immediately by phoning:

301-206-8525

301-206-4002

202-787-4177202-787-4178

Washington Suburban Sanitary CommissionRegulatory Services Group8:15 a.m. to 5:00 p.mx, Monday - Friday

Washington Suburban Sanitary CommissionMaintenance Trouble DeskAll Other Tinmes

and

District of Columbia Water and Se%%vr AuthorityPretreatment Section8:00 am. to 4-30 p.m., Monday - Friday

District of Columbia Water and Sewer AuthorityWater and Sewer EmergencyAll Other Times.202-787-2068

The following information will be requested:

a) industuy name, address, and precise location of spill;

b) Date, time. and duration orspill;

c) Type of waste, concentration, and volume:

d) Conrctive action takcn, or to be taken;

e) Contact person and telcphone number; and

f) Any additional information, as appropriate.

Within five d the Industrial User shall file a written report stating the aboveinformation as well as:

a) A description of the accidental discharge and its cause;

8

Page 9: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

b) The duration of the discharge, including exact date(s) and timc(s); and

c) A description of all steps taken, or to be taken, to reduce, eliminate, and prevent arccurrence of future accidental discargc. other conditions, or noncompliance.

Mail or deliver this report to:

Washington Suburban Sanitary CommissionRegulatory Services GroupIndustrial Discharge Cohliance/Enforcement Unit14501 Swelitzr Lae, I I Floor.Laurel, MD 20707-5902

and

District of Columbia WVater and Seevr AuthorityPretreatment Section5000 Overlook Avenue, SWWashington, DC 20032

16. Notification of Changed DischVrgc

Any changes which result in the addition of new production shifts, chemicals, processes,pollutants, or result in a 30% or more increase or decrease in the Industrial User'swastewater flow must be reported to the WSSC in writing, 30 days prior to the proposedchange. This notification shall also apply to the shutdown of any processes or facilitiescovered by this permit.

17. Notificaidon of the Discharae of Hazardous Waste

The Industrial User shall notify the WSSC, the Environmental Protection Agency,Regional Waste Management Division Director. and State hazardous waste authorities, inwriting, of any discharge into the POTW of a hazardous substance which, if otherwisedisposed of, would be a hazardous waste under 40 CFR Part 261.

Exempt from this notification are pollutants already reported on self-monitoring reportsand discharges of less than 15 kilograms of non-acute hazardous waste within it calendarmonth.

Ii. Jsords& lenton

a) The Industrial User shall retain and preserve any records, books, documents.memorauda, reports, conrrspondetc and summaries of these nmatrials relating totesting, internal or xternal monitoring, investigations, and chemical analyses madeby or on behalf of the Industrial User in connection with its dischapg for not issthan five years from the date ordraffing or preparation.

9

Page 10: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

b) All records that pertain to matters that arc the subjects of special orders or any othercnforcement or litigation activities brought by the Commission shall be retained andpreserved until all enforcement activities have concluded and all periods of limitationwith respect to any and all appeals have expird. Such materials as mentioned aboveshall be made available to Commission personnel upon request.

19. Sampline Locations

The WSSC reserves the right to monitor process discharges, or to requir the IndustialUser to install a manhole or other suitable structure for the purpose of monitoring processand/or facility discharges, if no suitable monitoring points exist

20. Dismosal of Pretreatment $Mudtes and SWnt Chemicals

The disposal of sludge and spent chemicals generated shall be accomplished in,accordance with Section 40S of the Clean Water Act and Subtiles C and D of theResource Conservation and Recovery Act. Prctreatment sludges may not be disposed ofto the sanitary sewer.

21. Dilutmn

Increasing the usage of potable or process water by the Industrial User in any manner toachieve compliance with limitations is prohibited.

22. Paisifvini lofimation

Any person %sim knowingly makes any false statements, representation, or ertification inany application, records, plan, or other document filed or required to be maintainedpursuam to these regulations, or who falsifies, tampers with, or knowingly rendersinaccurate any monitoring device or method required under these regulations, shall beprosecuted by the \VSSC according to the provisions of Sections 221 and 911 of theWVSSC's Plumbing and Casfiting Regulations.

In addition to prosecution by the WSSC, the person awy also be liable for criminal and/or

civil penalties under applicable State and Foderal law.

23. Permit Transflembili'

Discharge Awborization Permits are issued to the Industrial User for specificd operationsat the time of issuance and shall not be reassigned. tansferred, or sold to a new owner,new user, different premises, or a new or changed operation without the prior writtenapproval of the Commission.

Discharge Authorization Permits may be transferred to a new owner or opcratr only ifthe pernittee gives at least 30 days advance notice to the Commission and theCommission approves the Discharge Authorization Permit rmafer. The notice to theCommission must include a writen certification by the new owner or operator which:

I0 04.-.

Page 11: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

a) States that the new owner and/or operator has no immediate intent to change thefaclity's operations and processes;

b) Idcntifics the specific date on which the transfer is to occur, and

c) Acknowledges full mrsomsibility for complying with the existing DischargeAuthorization Permit.

Failure to provide aivancm notice of a transfer renders the Discharge AuthorizationPermit void as of the date of facility transfer.

24. Severabilit

The provisions of this Discdrge Audthization Permit are severable. Ifany provision ofthis Vischarge Authorization Permit or the application thereof is held invalid, theapplication or such provision to other circumstances as well as the remainder oftheDischarge Authorization Permit, shall not be affected thereby.

25. PEA ighsl0

The issuance of this permit does not convey any property rights in either real or personalproperty, or any exclusive privileges, nor does it authorize any invasion of personalrighM, nor any infringement of Federal, State, or local laws.

26. Extension of Complance Dates

Any requests for an emtsion of a compliance date must be submitted in writing, at leastseven days prior to the compliance date, and shall include the reason for the extensionand actions taken, or to be taken, to return to the original schedule.

The %VSSC will review the request and make a determination of approval. Federalpretreatment standard compliance dates cannot be extended.

27. Industrial Use[ReUM

Each Industrial User is rsponsible for performing the sampling associated with thispermit. Industrial Users shall submh self-monitoring reports in the 2MIu s, ified byihk WSSC.

The WSSC reserves the right to require the submission ofplans, reports, questionnaires,notices, or analytical data to evaluate waste discharge charactristics and ensurecompliance with this permit.

I! WON004

Page 12: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

28. AnalviigW Protocol

All analyses performed on samples collected from the regulated monitoring point(s)dcfincd in Section It shall be conducted in accordance with approved EPA methodsspecifled in 40 CFR Pan 136. "Guidelines Establishing Test Procedures for the Analysisof Pollutants Under the Clean Water Act."

29. Additional Monitorine by the ndu User

[a the event an Industrial User voluntarily samples at the regulated monitoring point(s)more frcquently than required by this permit, the results of such monitoring shall besubmitted to the WSSC by the due date of the next Periodic Compliance Reportsubmission. The results of additional monitoring conducted in response to a violationshall be submitted within 30 days. A certification statement attesting to the accuracy andcompleteness of the data submitted shall accompany all Industrial User self-monitoring.

30. Grab S§Mpls

The following five pollutant parameters shall be collected as grab samples: cyanide; totalphenol; fats, oils, and wreae; sulride; and volatile organics. Samples for thesc pollutantsshall consist of one grab for the day's production. Itself-monitoring is required for anyof these pollutants, collect the required sample volume in its appropriate container asspecified in 40 CFR Part 136.

31. Total Toxic Ormmic M-TO) Exemotion

In order to obtain excmption from TrO monitoring, a TTO Sef-Monitoring ExemptionApplication must be completed. Effluent results conducted by the Industrial User andlorthe WSSC must be less than 1.07 mg/ and a Toxig Organic Mnagement Plan (TOMP)must be submitted. Once the TOMP is reviewed and approved, the Industrial User maymaintain exemption by submitting a certification statement with each compliance report.

32. SigaMtMr Requirements

All reports shall be signed as follows:

a) By a responsible corporate officer if the Industrial User submitting the reports is acorporation. For the purpose otftis paragraph, a responsible corporatc officermeans:

(1) a president, secretary, treasurer, or vice-prcsident of the corporation in charge ofa principal business function, or any other person wito performs similar policyor decision-making functions for the corporation; or

(2) the manager of one or more manufacturing, production, or operation facilitiesemploying mare than 250 persons or having gross annual sales or eXpeaditumscxcecding W25 million (in second-quarter 1980 dollars), if authority to sign

12

Page 13: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

documents has been assigned or delegated to the manager in accordance withcorporate procedures.

b) By a general partner or proprietor if the Industrial User submitting the reports is apartn.,rship or sole proprietorship, respectively.

c) The principal executivc officer or director having responsibility for the overalloperation of the discharging facility if the Industrial User submitting the reports is aFederal, State. or local governmental entity. or their agent.

d) By a duly authorized representative of the individual designated in paragraph n., bI,or c. of this Section if:

(1) the authorization is made in writing by the individual described in paragraph a.,b., ore.;

(2) the authorization specifies either an individual or a position havingresponsibility for the overall operation of the facility from which the industrialdischarge originates, such as the position of plant manager, operator of a well ora well field superintendent, or a position of equivalent responsibility, or havingoverall responsibility for environmental matters for the company; and

(3) the wriinen authorization is submitted to the WSSC.

e) If an authorization under pargaph d. of this Section is no longer accurate because adifferent individual or position has responsibility for the overall opcration of thefacility, or overall responsibility for the environmental matters for the company, anew authorization satisfying the requirements of paragraph d. of this Section must besubmitted to the WSSC prior to, or together with, any reports to be sitncd by anauthorized representative.

33. Prhibited Di[harges (Chapter 9, Section 906. WSSC's Plumbing and GasfiltingRegulations)

No lndusti al User shall discharge, or cause to be discharged, directly or indirectly, intothe Commission's sanitary sewcr.

a) Any liquids or vapors having a temperature greater than 10S Fahrenheit (65" C). Inno case shall discharged waste raise the temperature at the treatment works influentabove 104" Fahrenheit (40" C);

b) Any liquids, solids, or gases that by reason of their nature or quantity arm, or nay be,either alone or by interaction with other substances, sufficient to cause fire orexgplosion hamzd in the POTW or its processes including, but not limited to,watestreams with a closed cup flashpoint of less than 140" Fahrenheit or 60PCentigrade using the test methods specified in 40 CFR 261.21. At no time shall anIndustrial User discharge any substance which results in a reading ofgreater than 5%

13 13 ~.IMc

Page 14: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

of the Lower Explosive Limit (LEL) for that substance, whether at the point ofdischarge or at any point in the system;

c) Any malodorous or toxic gases, vapors, fumes, orother substances that, either singlyor by interaction with otha wastcs, an= capable of creating a public nuisance, ahazard to human health or the environment, or the prevcntion.of entry byCommission personnel into sewers for maintenance and repair,

d) Any liquids, solids, or gases not amenable to treatment or reduction by the sewagetreatment processes employed, or =menable to treatment only to such a degree thatthe wastewater treatment plant violates its NPDES permit;

e) Any liquids, solids, or gases that, singly or by interaction with other naterial, causeexcessive coloration which may pass-through the POTW to the receiving water,

f) Any garbage, other than that which has been properly shredded;

g) Any ashes, cinders, sand, mud, straw, shavings, metals, glass, bones, wood, plastics,stone dusts, rags, paunch manure, butcher's offal, or any solids, liquids, or othersubstances capable of causing obstruction to the flow in sewers or other interferencewith the proper operation of the wastewmter system;

h) Any slug load, release rate of pollutants, concentration of pollutants, includingoxygen demanding pollutants either singly or by Interaction with other pollutants orwastestrcams, which may cause interference with any wastewater tzatm ent process,constitute a hazard to humans or animals, contaminate sludge, may pass-through thePOTV to receiving wvatces, or could result in a violation of the POT\V's NPDESpermit-

I) An average daily flow greater than two percent of the average daily sewage flow atthe wastewater treatment plant receiving the industrial waste unless otherwisepermitted in writing;

j) Any water or wastewater containing substances in excess ofthc limitations. Theselimits shall be subject to revision and may be modified to represent concentration ormass-based standards;'

k) Any radioactive wastes or Isotopes of such half4ife or concentration as to exceedmies• established by applicable local, State, or Federal regulations. Reports of

discharges to the Commission's system shall reflect actual discharge concentrationsrather than any time or dilution adjustments;

I) Any liquids, solids, or gases containing viable pathogenic or parasitic organismsincluding, but not limited to, viruses,.bacteria, algae, protozoa, and amocbas that maypose a health hazard or interfere with the proper operation of the watewatercollection or treatment systems;

14

Page 15: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

m) Any storm water, surface water, ground water, roof runoff, subslurficc drainage, orother non-metered waters

n) Any substances that may solidify or become highly viscous at temperatures betwevn40' Fahrenheit (40 C) and ISO" Fahrenheit (650 C), or that may cause obstructionand/or interference with the eonveyance system or the POT•V processes;

o) Wny %%ter added for the purpose of dilating wastes that would otherwise exceedapplicable conccntration limitations for any wastewater constituent:

p) Any trucked or hauled pollutants, except at discharge points designated by theCommission;

q) Any wastes containing petroleun oil, nonbiodegradable cutting oil, or products ofmineral oil origin in amounts that %ill cause inteferencc or pass-througk

r) Any substance which may interfere with or pass-through the POTW into thereceiving waters untrcated or without adequate treatment; or

s) Any glycol compound or derivative added to or contained in internal combustionengine cooling systems or liquid conveyance systems for the purposes of ateringliquid freezing and/or boiling points.

15

Page 16: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

Ii. SPFCIAL CONDITIONS

A. ,LucnJmitatignLsiinm m Monitoring RauircmenLq

During the period o June I, 2004, to May 31, 2008, the pernittee is auwhorived to discuruc w, stcwatcr from their .ite-wideneutralization system into the Washington Suburban Sanitary Commission's sewcr system. These discharges are authorized fromOutfall FAC. The pcrniuce shall perform monitoring at Monitoring Point FAC (A), established as the fiberglass meteringmanhole labeled "WSSC IWMP," located inside NIST Gate E downstream olic pH treatment system. Such dischargcs shall bemonitored by thc Industrial Uscr and limited as specified below. The WSSC will conduct monitoring ror arsenic, mercury,and molyhdeuum.

During the period ofJune 1,2004, to May 31, 2008, Monitoring Point PAC (B) has been established as the metering vaultlabeled "WSSC IWMP." located outside NIST Gate E on Muddy Branch Road domstream of the pll treatment system and fromMonitoring Point FAC (A). Analytical data collected at Monitoring Point FAC (13) will be evaluated with the sclf-monhoringdata forom Monitoring Point FAC (A). The below-listed limitations shall apply.

parst~~

Flow (gpd)

pH (unils) 0 )

Cadmium (7)Chromium iT)Copper()

Land (1)Nickel (T)

Silver (F)

7inc(T)

Cyide (•)

TTO - VOA I BNAP

Anrsenic (1)Mercury (1)

DaY Maximum (mgal

NiA

6.0-10.0

0.20

7.0

2.3

0.7

2.2

1.2

41.

0.56

2.13

0.23

Monitoring Only

LI~bla 4 ,N/AWSSC

Blue Plains

'vSSC

Blue Plains

WSSC

Blue Plains

WSSC

WSSC

Blue Plains

WSSC

Blue Plains

Blue Plains

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

2 days per quarter

I day par year

I day per )'car

Sample TvpF~stmaied@•

Continuous Meter

12 hour Composite'"

12 hour Composite'4

12 hour Composite"t )

12 hour Composite("

12 hour Composite'4 1

12 hour Compositce4 )

12 hour Composat©(4)

Grab

Grab / 12 hour Composite(')

Composite

Composite

16 *LOMH

Page 17: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

Pamme-ter 1m aily Maximum (moll) LJmIt OriGin Sarnpliu.i Freuencyv1 _MVt IpT=yp

Molybdenum (1) 3.1 Blue Plains I day per year Composite

I, Samples collectcd and measnmcots taken as requirwd herein shall be representative of the volume and natue oflhe moukcowd dischwag over di course ofproductioa for each calendar day. All pammer shall be monilored on each monitoring day.

(J Wastewater discharge flows shall be estimated for each samplingday. Where estimated, the Industrial User shall specify the manner in which the flow isestimated.

' pl mus be anl•yzed by a continuous rncoder over whe couse of the sampling day. A pH vioLation shall be construed as any excuuia less than e6.0 or6raterthan I0.Oformoretlhan IS miautes at my•onetime, or mote than 30 fnutes In agrcpt " arany calclar day. Thme asurvu pl!shallnotbelessthm 5.0 for any periwod oethne

Each mnitoring day, the pH of the specified emffl m watestream must be analyzed oi-sitce. All pil me$er must be calibrated tithe beginning of eachmonitoring day and a rWld check condcted at the cad of each molloting day. All calibmtion and firmd check records must be submitted with PeriodicCompliance Repots.

'o Composite samples "ha be m-•ag.ive of Oew process wastegream. collected flow proportionately for a 124hour period, or for the length of tine ikelcility is In operation and shall not esceed a 24-hour calendar day. If flow proportional sampling is not feasible, samples may be collected timepropostionaely at I S-minute ibtervals. The total composite shall consist of 4 liters mini•lum. Iftbatch discharges are to occu during the reporting period,sampling shall be scheduled to coincide with these dischargs.

17 700004

Page 18: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

$ B. Renrning Rcui-rnents

A Periodic Compliance Report shall be submitted on a quarterly basis by the following dates:

Report due April 7 for. FIRST REPORTING PERIO,,January through March

Report due July 7 for. SECOND REPORTING PERIODApril through June

Report due October 7 for: THIRD REPORTING PERIJODJuly through Sepember

Report due January 7 for FOURTH REPORTING PERIODOctober through December

It is the responsibility of the Industrial User to schedule sampling In advance ofthe reportingdates to allow for sample analysis and submittal of the Periodic Compliance Report by theJanuary 7. April 7, July 7, and October 7 dates. Sampling and reporting requirements shall bein effect for the duration of the existence of tde regulated proccss(cs).

In the event sampling performed by the Industrial User indicates a violation ofa dollymaximum or average limit, the Industrial User shall notify the WSSC of the evioltionwithin 24-hours of becoming aware of the violation. Within 5 days of the notifiction tothe WSSC, the Industrial User shall submit a copy of the analytical data associated withthe violation, a copy or the chain of custody, and an original certification statement. TheIndustrial User shall repeat the sampling and analysis of the parameter in violation, andsubmit the results or the analysis, a copy of the chain of custody, and an originalcertification statement to the WSSC within 30 days of becoming aware of the violation.The Industrial User may not substitute scheduled self-monitorlig in place of resamplingfor a violation.

If the violation is questionable, report the violation within the requited 24-hour period.Reporting of violations may not be delayed during an investigation into the sampling datavalidity. In the event that the WSSC invalidtes an Indusrial User's sampling data, theIndustrial User shall resample each invalidated parameter for the number of days invalidated.

All reports required by this permit shall be submitted to the Commission at the followingaddress:

Washington Suburban Sanitary CommissionRegulatory Services GroupIndustrial Discharge CoealianceEfnforeement Unit14501 Sweitzcr Lane, I1 FloorLaurel, MD 20707.5902

18

Page 19: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

C. Minimum L.boraow R eortingRegui ents f' dust ..l User Sl-Monorng Rcmrt

Indicate iran outside laboratory conduclcd monitoring. Include copies of all analytical data.Laboratory data sheets shall include, at a minimum, the followving:

" Laboratory sample 1D;,

" Date(s) and time(s) sample(s) collected;

" Preservation techniques;

" Date sample received at laboratory;

" Date sample extracted (ifapplicable);

" DIae(s) and time(s) sawpic(s) analyzed;

" Parameter analyzed;

* Mcthodologry

I lnstrumcntation;

* Dilution factor (if applicable);

" Detection limits -Numeric values must be submitted for all analyses. If values are belowdetection limit, indicate the numeric detection limit, (e.g., <0.01 mrg/);

" Concentration/units;

* Signature by qualified professional;

" Completed Chain of Custody form documenting receipt of samples by analyticallaboratory; and

* Related comments.

Please provide a copy of these requirements to your analytical laboratory. it is the IndustrialUser's responsbility to veify that the laboratory provides the requested information.

Page 20: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

ill. DEFINITION OF TERMS

Calibration - The adjustment of pF equipment at the onset of monitoring by using buffersolutions to determine deviations.

Composite sample - A combination of individual samples collected at regular intervals over atime period not to exceed 24 hours in any given calendar day. The volumne of each individualsample my be either proportional to the flow rate during dte sample period (flow composite), orconstant and collected at equal imec intervals during the composite period (time composite).Composite sampling shall be representative ofthe process wastcstream for that day.

Consistent eompliance - Compliance with all applicable pretreatment standardsjmd reportingrequirements during a reporting period.

Continuous pH monitoring - A pti reading taken automatically at a frequency of at leastonce/minute. In the event that an Industrial User montous its pH continuously, a pH violationshall be construd as ny excursion less than 6.0 or greater than 10.0 for more than 15 minutes atany one time, or more than 30 minutes in aggregate, for any calendar day. The p11 shall not be lessthan 5.0 for any period of time.

Daily maximum - The maximum allowable discharge concentration of a pollutant in awastestreamn during a calndar day.

Estimated flow - A calculated volume or discharge rate which is based on a technical evaluationof the sources contributing to the discharge including, but not limited to, pump capabilities, watermeters, and batch discharge volumes.

Field Check - A check on pH equipment at the end of a monitoring day using buffer solutions. 1No

adjusunment is made to equipment.

Four-day average - The arithmetic average of daily values for four consecutive monitoring days.

Grab sample - An individual sample collected over a time period not exceeding 15 minutes,without regard for flow or time. In the event that an Industrial User monitors its pH by collectinggrab sampics, a violation shall exist ifgreater than 6.25% of the grabs taken that day are less than6.0 or greater than 10.0, or If any of the grabs taken arm less than 5.0.

Measured flow - Flow obtained from appropriate flow measurement devices and methodsconsistent with scientific practices to ensure accuracy and reliability. Such devices shall bemaintained to ensure thint the accuracy of the measurements is consistcnt with the acceptedcapability of that type of device. Devices selected shall be capabie of measuring flows with amaximum deviation of less than 10% for true discharge rates throughout the range of xpecteddischarge volumes.

Monthly average - The arithmetic average of the values for effluent samples collected over acalendar month.

20

Page 21: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

POTW - A Publicly Ovued Treatment Works, which includes any device and system used instorage, treatment, recycling, and reclamation ofmunieipal sewage or industrial waste era liquidnatume Also included are scwers, pipes. mnd other conveyances only if they convey wastwater toa POWT treatment plant. The term also means the municipality as defrmed in Section S02.(4). ofthe Clean Water Act, which has jurisdiction over the indirect discharges to and the discharges fromsuch a treatment works.

Quarter - For reporting purposes, a quarter shall consist of the months ofJanuay - March,April - June, July - September, and Octobe - December.

Severe Property Damage - Substantial physical damage to property, damage to the treatmentfacilities which causes them to become inoperable, or substantial and pemanent loss of naturalreources which can reasonably be expected to occur in the absence of a bypass. Severe propertydamage does not mean economic loss caused by delays in production.

Total Toxic Organics - The summation of all toxic organic compounus with a concentmtion ofgreatcr than 10 microgtoms/liter. This list consists ofthose compounds appearing in thecategorical standard to which the industry is subject. Noncanegorical Industrial Users shall besubject to the total toxic organics list appearing in 40 CFR 433.11.

Variances in duplicate sample results (excluding pit*) - The following equation will be used todetermine the acceptability of any variances between WVSSC and Industrial User monitoring datacollected on the same day.

21A-Bl x 100 A =WSSC Results(A+B) B = dstry Results

If the results of this calculation exceed 20%, the variance between the remlts is unacceptable andthe Industrial User's monitoring data will not be used.

*14 the event that the Industrial User and the WSSC monitor for pH on the same day. the WSSCsdata %ill be used to detecmine compliance.

21 SNt4

Page 22: JithtlM~e WASHINGTON SUBURBAN SANITARY COMMISSION · loin R.G&iffk D1SPITY GF.3ALM.ANAGER P. M'¶chad Euico DISCHARGE AUTHORIZATION PERMIT Industry Namc: Site Address National Institutes

REAUIRED CONTAINERs. PRESERVATION TECHNIOUES. AND HOLDING TIMES(40 CFR Part 136.3. Table ID

cmmainr)

Ammonia

Biochemical Oxygn Demand

Chemical Oxygen Demand

Cyanide, Total and Am-,nableto Chlorination

Chromium VI

Mercury

Metals (lExcept Chromium VIand Merc•y)

Oil and Grease

pH

Phosphorus, Total

Sulfide

Temperature

Volatile Organics

semi-volatile Organics

Radioogical Tests

P,O

PoP, aP, 0

PoP.O

PG

Cool, 4*C, H2S04 to pH <2Cool, 4"CCool, 4-C, H2SO to pH <2

Cool, 4"C, NaOH to pH >12

Col, 40C

.INO3 to pH <2111401to pH <2

Maximum H1olding lime

29 Days48 Hours28 Days14 Days

24 Hours28 Days

6 Months

28 Days

Analyze Immediately

28 Days

7 Days

Analyze Inumediately

14 Days(4M

7 Days Until Extraction,40 Days Alfer Extraction

6 Months

0paP, aP.G

PaG, Teflon-lined SeptumG, Teflon-lived Cap

P.O

Cool to 4°C, IC I or H2%04 to pH <2None Required

Cool, 40C, H2S04 to pi <2Cool, 4t C Add Zinc Acetale and Sodium

Hydroxide to p1 >9NoneCool., 4C, 0.008/ Na2S20.i IICL to pi12

Cool, 4*C, 0.009% Na2S2O3

IINO3 to pH <2

1) Palyethylen or Q=01 Psenration shmmld be pet•fmwd ihm•miately vipo smple colectian.0) UnIess athiwime vluesed analyn for tWWa dnmkaum.M' S p mfIvlag no pt adjusme, t ms be anl"ed within 7 dWs ofsumi.h%

22