Profile
Establishment April 22nd, 2004
Location (HQ)
Seoul OfficeSamhung officetel 1613, 705-9, Yeoksam-dong, Gangnam-gu,Seoul, South Korea
Employees 120 people
Capital US$ 5.5Million
Main BusinessesPV Module Manufacturing Business
671-2, Yong-dong, Gwangsan-gu,Gwangju 506-503, South Korea
PROFILE▐
PV Power Plant
Parent Company
SHINHAN PRIVATE EQUITY
SHINHANFINANCIALGROUP
Fortune Global 500
NONGHYUP INVESTMENT & SECURITIES CO., LTD.
100 KOREAN COMPANY
77 INCHEON PORT AUTHORITY
78 NONGHYUP
79 DAEKYO
US$ 201 Billion
US$ 1.2 Billion Total Capital
AssetsUS$ 162 Billion
US$ 536 Million Total Capital
Assets
77.57 %
Ratio ofshareholding:
10 %
Ratio ofshareholding:
Production Capacity
20072004 2010200820062005 2011
Annual Sales Volume
Annual Sales Volume
Certificates Products Approved By Approval Date
CEC PV Module California(U.S.A) Oct. 2009
UL 1703 PV Module C/UL (U.S.A) Sep. 2009
IEC 61215(ED.2), IEC 61730 PV Module TÜV (Germany) Oct. 2008
ISO14001 Environment Management System AFAQ-EAQA Feb. 2008
ISO9001 Quality Management System AFAQ-EAQA Feb. 2008
IEC 61215(ED.2) Safety Class II PV Module ÖVE (Austria) Nov. 2007
IEC 61215(ED.1) Safety Class II PV Module TÜV (Germany) Nov. 2005
35 New & Renewable equipments PV Module KEMCO(South Korea) Aug. 2007 - Jul. 2009
Int’l Certificates
PTC RECORD
STC: Solar irradiance 1,000W/m2, Cell temperature 25℃, Air Mass: 1.5PTC: Solar irradiance 1,000W/m2, Air temperature 20℃, Wind speed: 1m/sec at 10m above ground levelThe PTC rating, which is lower than the STC rating, is generally recognized as a more realistic measure of PV output because the test conditions better reflect "real world“ solar and climatic conditions, compare to the STC rating.Beginning July 1, 2009, only modules which are on the SB1 Guidelines compliant module list will be eligible for incentive in California.
PTC(PVUSA Test Condition) Record
Products
SE6S60210-235 Wp
SE6M60210-235 Wp
* 250 Wp module will be introduced by 2010
* Warranty90% of minimum warranty power output for 10 years80% of minimum warranty power output for 25 yearsFree from defect in materials and workmanship for 5 years
Products
OTHER MODULES
3 BUS BAR MODULE AR-ETCHING GLASS MODULE COLOR MODULE
- Use the 2mm 3 bus bar to maximizeits’ efficiency
- 0.5% higher efficiency than the 2 bus bar module - Less resistance and reliable
-AR(Anti Refection) technology is applied to make different color
-Functional Decoration for exterior-Stylish 8 different colored modules* Diamond blue, Fresh green,
Glitter red, Refined gray, Starry bluSparkling gold, Cocoa Brown,Aurora silver
-AR(Anti Refection) coating forthe low iron tempered glass
-Minimized the reflection loss-Better performance as it maximized the efficiency
POWER PLANTS No Name of plantCapa.(kW)
On-grid Date System Location
1 Namdong power plant 1,000 Apr, 2010 Fixed Tracker Samchunpo
2 Hyein power plant 1,000 Oct, 2007 Fixed Tracker Haenam
3 Yeonggwang power plant 1,000 Nov, 2007 One Axis Tracker Yeonggwang
4 Huangshan Shindonga pp 1,000 Mar, 2008 One Axis Tracker Haenam
5 Changhwan power plant 1,000 Dec, 2007 One Axis Tracker Yeongdeok
6 Yeongju sunwoo power plant 1,200 Mar, 2008 One Axis Tracker Yeongju
7 Hwawon power plant 1,000 Nov, 2007 One Axis Tracker Gaenom
8 Jaesan energy power plant 1,000 May, 2008 One Axis Tracker Bonghwa
9 Hampyeong Daedong pp 1,000 May, 2008 One Axis Tracker Hampyeong
10 Jangheung Jangpyung pp 1,000 Sep, 2008 One Axis Tracker Jangheung
11 Usuyeong power plant 1,000 Sep, 2008 One Axis Tracker Haenam
12 Buan power plant 750 Jun, 2008 One Axis Tracker Buan
13 Heungyang power plant 500 May, 2008 One Axis Tracker Goheung
14 Namgye power plant 400 Jan, 2008 One Axis Tracker Goheung
15 Seoul cheonggye power plant 300 Jan, 2008 Fixed Tracker Seoul
16 Other power plant 5,570 2007~2008 Fixed Tracker Korea
17 Namhae power plant 1,000 Oct, 2006 One Axis Tracker Gangjin
18 General spread, Home project 2,780 2005~2008 Fixed Tracker Korea
Total 21,500 2005~2008 Korea
Installation Cases
SOLARPOWER PLANT
HAENAM GYEGOK / 1 MegawattSOUTH KOREA
Installation Cases
SOLARPOWER PLANT
EL BONILLO / 4.5 MegawattSPAIN