    Roadmap for Transport Infrastructure Developmentfor Metro Manila and Its Surrounding Areas(Region III and Region IV-A)

    Summary of the Outputs

    Technical Assistance from the JapanInternational Cooperation Agency (JICA)

    12 September 2013

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    2/51

    Contents

    2

    Study Scope and Process Regional Development Issues

    Regional Development Direction

    Urban Issues of Metro Manila

    Mega Manila Transport Dream Plan

    Short-term Investment Program (2014-2016)

    Draft Final Report

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    3/51

    Study scope and process

    Objectives

    To formulate Transportation Infrastructure

    Roadmap for sustainable development of

    Metro Manila region

    Dream Plan (2030) and Short-term (2014-

    2016)

    Study Period

    MarchAugust 2013 Meeting and Discussions

    1st Inter-agency Meeting (5 April)

    NEDA Infra Staff Meeting (21 May)

    2ndInter-agency Meeting (23 May)

    Meeting with DPWH Secretary (10 June)

    Meeting with DOTC Secretary (13 June) Meeting with MMDA Chairman (13 June)

    NEDA Infra Staff Meeting (24 June)

    Meeting with Donors (July 5)

    INFRACOM Meeting (30 July)

    Meeting with DOTC Secretary (7 August)

    Meeting with DPWH Secretary (15 August) Meeting with DOTC Secretary (6 September) 3

    100km

    50km

    MetroManila

    Region III

    Region IV-A

    AuroraNueva Ecija

    Tarlac

    Pampanga

    Bulacan

    Rizal

    CaviteLaguna

    Batangas

    GCR: Metro Manila, Region III, Region IV-A

    Mega Manila: Metro Manila, Bulacan, Rizal, Laguna, Cavite

    Metro Manila : 17 cities/municipality

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    4/51

    Regional Development Issues

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    5/51

    Study area profile

    5

    Metro Manila shares 35.5% of countrys GRDP

    Greater Capital Region (GCR) shares 62.0% of countrys GRDP

    Population (no. & growth rate) GRDP (value & growth rate) GRDP/capita (value & growth rate)

    Metro

    ManilaR-III R-IV-A Visayas Mindanao Metro

    ManilaR-III R-IV-A Visayas Mindanao Metro

    ManilaR-III R-IV-A Visayas Mindanao

    Primary

    Secondary

    Tertiary

    Legend

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    6/51

    Regional development issues

    6

    Region III & IV-A

    Developments are in progressinselected locations (Clark, Subic, Tarlac,others) with uncoordinated andunsynchronized pattern of urban growth.

    Economic development potentials areuntapped (agro-based, manufacturing,tourism)

    High logistics costs along SCMB (Subic-Clark-MManila-Batangas) corridor wheremore than 80% of total national cargothroughput concentrate. (PhilippineDevelopment Plan 2011 - 2016)

    Metro Manila

    Concentration of the activities and wealthin Metro Manila continues while the benefitsdo not spillover sufficiently to outer regions.

    Carrying capacity of Metro Manila isbeing reached; traffic congestions worsen,pollutions increase, hazard risk increase,population density reaches very high level;sustainable growth threatened.

    Low income groups suffer more seriously.

    Metro Manilas problems can no longer be solved within MetroManila.

    BRLC provinces must be prepared to avoid negative impact ofMetro Manilas urbanization.

    BRLC and Region III and Region IV must work out effective ways

    to maximize the impacts of Metro Manila and mitigate MetroManilas problems.

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    7/51

    Regional Development Direction

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    8/51

    Vision and key interventions

    8

    Gate to wellspring of hopePlace for livable communities

    Space for dynamic business centers

    GCR as tri-engine of growth with GPS for the country

    Key interventions

    Integrated transport and urban and rural mobility

    Disaster preparedness and resilience

    Environment and high-quality public space

    Affordable housing policy and delivery Land use management and development control

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    9/51

    Key development strategies

    Promote planned and guided expansion of

    urban areas toward adjoining provinces(specially Bulacan and Cavite) in integration withpublic transport services

    Provide affordable housing and improvedliving environment for low income groups,those residing in high hazard risk areas andslums/squatter areas

    Retrofit existing urban areas in integrationwith public transport (Transit OrientedDevelopment)

    Expand and improve multi-modal publictransport network and services

    Strengthen traffic and demand management

    including control of private car use

    Accelerate economic growth through expansion

    of manufacturing, BPO, services and tourism

    Protect prime agricultural areas for foodsecurity

    Avoidurban sprawl , especially in hazard riskareas

    Promote growth of regional centers

    Strengthen connectivity between the regionand Metro Manila, and among growth centers inthe region

    Improve public transport services andlogistics in the region

    Regional Level Metro Manila Level

    9

    Changing Socio-economic Environment

    Growing economy and affluence Increasing demand for better living environment and QOL

    Changing behavior of the people

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    10/51

    Changes in spatial structure of Greater Capital Region(GCR)

    Today Future

    Metropolis

    Provincial Capital

    Urban center

    City population

    10

    Batangas

    Olongapo

    Balanga

    Tarlac

    Mabalacat

    San Fernando

    Baler

    Palayan

    Malolos

    Lucena

    Sta Cruz

    San Pabro

    Gen. Trias

    Dasmarinas

    ImusBacoor

    Calamba

    Cabuyao

    Sta. Rosa

    Antipolo

    San Jose Del Monte

    Sta. Maria

    Balanga

    San Fernando

    Baler

    Palayan

    Cabanatuan

    Gapan

    Malolos

    San PabloTanauan

    Tagaytay

    Dasmarinas

    Bacoor

    Calamba

    Sta. Rosa

    Antipolo

    San Jose Del MonteMeycauayan

    Imus

    Cabuyao

    Baliuag

    25km

    50km

    100km

    125km

    150km

    25km

    50km

    100km

    125km

    150km

    Regional Center

    Sub-regional Center

    Urban CenterCity population

    Sta Cruz

    75km 75km

    Development ofhierarchicalregionalcenters/clusters

    Economic

    development Agro-based

    Manufacturing

    Services, BPO

    Tourism, others

    ImprovedconnectivityBinan

    San Pedro

    Binangonan

    CaintaTaytay

    Rodriguez

    San Mateo

    Cabamatuan

    Lipa

    Sta.Maria

    Binangonan

    Cainta

    Rodriguez

    San Mateo

    Taytay

    Gen. Trias

    Binan

    San Pedro

    Batangas

    Olongapo

    Tarlac

    Angels

    Tayabas

    Lucena

    Lipa

    Mabalacat

    Trece Martires

    Lubao

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    11/51

    Gateway airports and seaports

    Clark

    Airport(DMIA)

    NAIA

    New NAIA

    (tentative)

    100km

    11

    Gateway Airports Gateway Seaports

    Shift cargo-handling function of Metro Manilato Subic and Batangas

    Regenerate Manila Port to high value-addeddiversified waterfront areas

    Development of New NAIA (existing NAIAwill be closed and converted for NewCBD

    Development of CLARK (core airport forcentral and northern cluster; alternativeto New NAIA)

    Port Area Capacity

    MICT (ICTSI) 1,500,000

    South (ATI) 850,000

    Subic 600,000

    Batangas 400,00

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    12/51

    Proposed transport network for GCR

    12

    Transport as a catalyst to: integrate cities, growth centers, gateways,

    urban and rural areas within a region facilitate local economic development,

    enhance social integrity, and promoteenvironmental sustainability

    facilitate planned/guided urban growth andexpansion of Metro Manila

    Transport network in the regionmust be: hierarchical multimodal disaster-resilient intelligent

    service-oriented, rather than hardinfrastructure

    Main components improve gateway ports (Subic & Batangas)

    and airport (CLARK) north-south transport backbone expressway

    & mass-transit) secondary roads for Region III & Region IV-A

    Proposed Transport Network for GCR

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    13/51

    Impact of proposed transport network(estimated travel time from Manila)

    Today Future (Dream Plan)

    13

    60 min

    90 min

    120 min

    150 min

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    14/51

    Urban Issues of Metro Manila

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    15/51

    Rapid growth of Metro Manila

    15

    Population Density (persons/ha)

    Seoul : 170

    Jakarta : 131

    Shanghai : 124

    Metro Manila (2010) (Tokyo/23 wards)

    Area620 km2 (621km2)

    Population11.86 mil (9.05 mil)

    Population density 191 pax/ha

    (146pax/ha)

    5,926

    7,929

    9,933

    11,85813,109

    13,904

    3,396

    5,005

    7,970

    11,170

    13,425

    15,486

    0

    4,000

    8,000

    12,000

    16,000

    1980 1990 2000 2010 2020 2030

    (000)

    Mmanila BRLC (Bulacan, Rizal, Laguna, Cavite)

    Tokyo 1920-1960 3.3 8.3 mil (5 mil)

    MManila 1950-1990 1.6

    7.9 mil (6.3 mil)1990-2010 7.9 - 11.9 mil (4 mil)

    Expansion of Urban Area

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    16/51

    Core issue #1 : Management of population distribution and spatial expansion is the keyfor sustainable development of Metro Manila.

    Continuous population inflow to MManila:additional 1.8 million by 2030 if current trendcontinues. Population density increased from 158

    person/ha to 195 person/ha between 1996 and2010.

    Growth in peri-urban areas (BRLC): additional 3.9million by 2030

    Population DensityPopulation Growth

    Earthquake Flood

    Population Distribution

    Expansion of urban area should be directed the north-south,because lands in the east and west are high risk of hazard. 16

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    17/5117

    Core issue #2: Increasing hazard risk and degrading environment

    No. of households living in hazard areas

    High risk areas: 1.4 mil. (GCR), 0.5 mil. (MManila) Moderate risk areas: 1.8 mil. (GCR), 0.7 mil.

    (MManila)

    No. of ISFs living along waterways; 60,130(MManila)

    No. of ISFs in priority waterways; 19,440(San Juan River, Manggahan Floodway, EsteroTripa de Gallina, Maricaban Creek, Tullahan River,Pasig River, Estero de Maypajo, Estero de SunogApog)

    Where and how they can beresettled?

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    18/5118

    Core issue #3: Need for affordable housing

    Distribution of Informal Settlers

    Affordable housing needs (Metro Manila 2006)

    Backlog: 800,000 households Resettlement: 300,000

    Upgrading: 500,000

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    19/51

    0%

    1%

    2%

    3%

    4%

    5%

    6%

    7%

    02 07 13 19 24

    %o

    fDailyTraffic

    Direction1

    Direction 2

    2-way

    Core issue #4 : Traffic congestion

    Traffic demand and impact (Mega Manila)

    19

    2030 Do Nothing

    Hourly Traffic Distribution on MManila Roads 1)

    1) Results from 11 survey stations, 2012

    *Bulacan, Rizal, Laguna, Cavite

    Volume/ Capacity Ratio

    V/C > 1.50 (beyond capacity)

    V/C = 1.00 1.50 (at & above capacity)

    V/C = 0.75 1.00 (reaching capacity)

    V/C < 0.75 (below capacity)

    2012 2030 30/12

    Traffic demand(mil. trips/day

    Metro Manila 12.8 14.5 1.13BRLC* 6.0 8.0 1.33

    Public transport share in total demand 69% 69% 1.00

    Occupancy of road space by private vehicles 78% 78% 1.00

    Transport cost

    (Php bil./day)

    Metro Manila 2.4 6.0 2.50

    BRLC 1.0 3.5 3.50

    Air quality

    (mil. Tons/year)Metro Manila

    GHG 4.79 5.72 1.19

    PM 0.014 0.019 1.36

    BRLCGHG 3.20 4.49 1.40PM 0.005 0.010 2.00

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    20/51

    20

    Popular traffic congestion scenes in daily life of Metro Manila

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    21/51

    Core issue #5 : Paradigm shift of spatial structure

    21

    1977 Metro Plan

    From radial/circumferential to ladder type

    Dedensification of congested urban center

    Guided expansion of peri-urban areas

    Development of sub-centers

    Recovery of open space

    Redevelopment of central areas

    Conventional

    1

    Proposed

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    22/51

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    23/51

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    24/51

    Where and how toresettle them?

    opulation increase (1230)

    Metro Manila: 1.8 million

    BRLC: 3.9 million

    24

    Batangas

    Balanga

    Tarlac

    Angels

    San Fernand

    Palayan

    Cabanatuan

    Gapan

    Malolos

    Tayabas

    LucenaLipa

    San PabloTanauan

    Tagaytay

    Trece Martires

    Dasmarinas

    Bacoor

    Calamba

    Sta. Rosa

    Antipolo

    San Jose Del Monte

    Meycauayan

    Imus

    Cabuyao

    25km

    50km

    100km

    125km

    Distribution of Large-scalePrivately-owned Properties

    3,600ha

    1,000ha

    45ha

    100ha

    85ha

    88ha1,500ha

    6,800ha

    100ha 260ha

    1,000ha600ha

    400ha

    342ha

    100ha

    100ha

    50ha

    75km

    Opportunities exist for large-scale new towns

    Availability of large-scale properties

    along the north-south corridor Active subdivision developments by

    private sector

    Decree to provide 20% of total units forlow cost housing

    Formulate a PPP model based oncontrol and guidance

    Public: planning and enforcement,north-south mass transit, access tostations, basic infrastructure, publicfacilities

    Private: housing (resettlement, low tomedium cost), commercial/businessfacilities, industrial parks, relocation ofuniversities

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    25/51

    Core issue #6: Need for improved urban management

    25

    Coordinated and integrated growth

    management strategy Transport, land use and environment

    Land use and hazard risk reduction

    Updated land use plan and zoningregulations

    Enforcement and developmentcontrol

    Strategy and more effective cross-sector approach to curb urban sprawland promote urban expansion in

    integration with mass-transit

    Transport and traffic

    Technical/ physical coordinationand integration of transportinfrastructures and facilities

    Role of LGUs; Row acquisition,articulated secondary/ local roads,

    more attention to sidewalks/pedestrian friendly facilities, localtraffic management, opening up ofselected roads within gatedcommunities, promotion of NMT,support to public transport

    More effective involvement ofstakeholders for trafficenforcement, awarenessenhancement

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    26/51

    Mega Manila Transport Dream Plan

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    27/51

    What is Dream Plan?

    27

    Notraffic congestion

    Nohouseholds living in high hazard risk areas

    Nobarrier for seamless mobility

    Noexcessive transport cost burden for low-incomegroups

    Noair pollution

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    28/51

    Main components of dream plan

    28

    At-grade roads(urban roads)

    Missing links: C3, C5, bridges and others 137km of new roads

    Flyovers Sidewalks and pedestrian facilities

    Expressways Intercity expressway (426 km) Urban expressway network (78 km)

    Urban/Suburbanrail

    Main lines: 246 km (6 lines) Secondary lines: 72 km (5 lines) Integrated lines and improved accessibility

    Bus/Jeepneys Modern fleet and operation Rationalized route structure Improved terminals/interchange facilities

    Trafficmanagement

    Traffic signals (ITS) Traffic safety

    Traffic environment and education

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    29/51

    29

    Main transport network at metropolitan level

    Road/Expressway ProjectsSuburban/Urban Rail Projects

    To strengthen north-south transport axis toguide future urbanexpansion

    To promote shift fromroad-based traffic to

    rail-based mass transit To strengthen network

    resiliencethroughintegrated multi-modaltransport system (urbanroads, expressways andrail-transit includingMRT, LRT, AGT and BRT)

    29

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    30/51

    Main transport network in the central areas

    Road/Expressway ProjectsSuburban/Urban Rail Projects

    30

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    31/51

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    32/51

    Mass-transit systems and TOD for improved mobility (examples)

    32

    Commuter rail

    (Odakyu Line)

    Tokyo Metro

    (MRT)

    LRT Greenmover

    (Hiroshima)

    Monorail (Chiba)

    Guideway Bus

    (Nagoya)

    Total length of railway in Tokyo

    metropolitan 3,000km

    Station plaza (interchange facilities)

    (Kawasaki)

    LRT & feeder bus (Toyama)

    Monorail (integrated with commercial/

    other buildin Kokura

    BRT (Gifu city)

    Linear motor car (Aichi)

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    33/51

    Mega Manila commuter service expansion program

    Objectives

    To strengthen connectivity between MetroManila and adjoining municipalities in RegionIII and IV-A

    To establish a competitive (high quality andcapacity) north south public transportbackbone

    To guide urban development of new urbancenters along the route to meet large

    resettlement demands Program components

    Coordinated design and construction of railway,expressway and at-grade roads for maximumutilization of existing PNR ROW

    Improved traffic management along the route

    Planning and implementation of TOD and land-use management

    Project (Malolos - Calamba)

    Route length; 91 km (total)

    Elevated with modern high capacity train Future extension to CLARK and the rest of

    Luzon island

    33

    Key considerations

    Technical adjustment of expressways and rail structures and institutional coordinationbetween/among relevant organizations to ensure efficient railway operation and services.

    Impacts

    no level crossings at main roads

    landuse are connected at-grade urban roads created

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    34/51

    CBD transit system development

    Need for strengthening transit accessto/from CBD

    Strengthen Network connectivity of railnetwork

    Vitalize CBD activities

    34

    EDSA Subway (San Jose Del MonteDasmarinas)

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    35/51

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    36/51

    Road-based public transport modernization

    Bus modernization program Comprehensive approach is necessary to modernize bus system

    and services

    Bus fleet, bus terminals, route planning, fare setting andcollection are all interrelated.

    Need for a participatory study Jeepney modernization program

    Improvement of vehicles (safety, air pollution)

    Improvement of operation and management

    Shift to low emission vehicles (LEVs)

    Bus/jeepney support program Infrastructure: terminals, interchange facilities

    Route rationalization

    Subsidy

    Roads and railways will be insufficient in solving traffic congestion . . .71% of trips today and 30 % in 2030 still rely on buses and jeepneys . . .

    Bus exclusive lane

    Modern bus and facilities

    Improvement of jeepney terminals

    Need for a comprehensive road-based public

    transport study36

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    37/51

    Traffic management : Smart Traffic (TEAM 5) Program

    37

    Infrastructure/facilities:signaling, intersectionimprovement, flyovers,parking, IT, others

    Traffic safety

    Demand management

    Pedestrian/NMTenvironmentimprovement

    Traffic management is the most fundamental action to maximize

    capacities and use of available infrastructure in the most efficient andeffective manner.

    Capacity building: enforcement and education

    Component of intelligent transport system (example)

    Incident Detection Electronic Road Pricing

    Road Maintenance

    Scheduling & Monitoring

    Bus Scheduling Assistance

    Transit Priority

    Travel Time Prediction

    Intelligent Parking

    Signal Control Systems

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    38/51

    Park & Ride facilities

    Community Cycle (Bicycle sharing)

    Car sharing at convenience storeElectric vehicle and charging station

    Personal urban mobility car

    Pedestrian zone

    Bus stop facilities with billboard business

    Mobile navigation system for rail

    Automatedticketing system Mechanical multi-storey parking38

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    39/51

    ProjectLength

    (km)

    Cost

    (Php mil.)Status

    Mega Manila North-South CommuterRailway (MalolosCalamba, Elevated) 91.3 195,520 Proposed

    Malolos-Tarlac & Calamba-Batangas 128.8 47,680 Proposed

    MainLi

    nes

    Line_1-3 Upgrades Existing Lines 47.2 62,040 Proposed

    LRT 1

    North (to Malabon) 2.7 9,960 Proposed

    South (to Dasmarinas)* 30.2 111,640Committed

    / Proposed

    LRT 2

    East (to Antipolo)* 13.2 61,640Committed

    / ProposedWest (to MM North Harbor) 4.7 30,840 Proposed

    MRT 3 Ext. (to Malabon & MoA) 9.4 68,600 Proposed

    MRT-7 (Recto-Comm.Av.- Banaba)* 26.1 128,360 Committed

    N-S Subway (Dasmarinas East - San

    Jose Delmonte)68.6 514,160 Proposed

    Total Primary (Incl. Upgrade) 202.1 987,240

    Total Main 422.2 1,230,440

    SecondaryLines

    Ortigas - Angono 13.7 31,720 Proposed

    Paco - Pateros 11.3 33,800 Proposed

    Marikina - Katipunan 16.8 31,480 Proposed

    Alabang - Zapote 9.3 13,400 Proposed

    ZapoteCaviteGen Trias 20.6 25,560 Proposed

    Total Secondary 71.1 135,960

    Total Metro Rail 493.9 1,366,400

    ProjectLength

    (km)

    Cost

    (Php mil.)Status

    Road

    C3 Missing Link (Sanjuan - Makati)* 5.9 24,000 Proposed

    C5 Missing Link 6.9 680Committed/

    Proposed

    Pasig River Bridge (BGC

    Ortigas)*1.2 8,120 Proposed

    Skyway-FTI-C5 Connector* 3.0 17,880 Committed

    Other Interchanges/Flyovers 6.7 8,040 Committed

    Other Urban Roads 32.9 2,400 Committed

    NCR (Secondary Roads Package) 208.4 145,760 Proposed

    BRCL (Secondary Road Package) 432.2 82,360 Proposed

    Region III (Sec Roads - Approx.) 200.0 16,000 Proposed

    Region IV-A (Sec RoadsApprox.) 400.0 32,000 Proposed

    Road Total 1,297 337,240

    Expressway

    SEG 9 & 10/ connection to R10* 8 8,600 Committed

    NLEX-SLEX Connector* 13.3 18,800 Committed

    Skyway Stage 3* 13.3 9,000 Committed

    NAIA Expressway Phase2* 7.1 15,000 Committed

    Pasay - MakatiBGC 9.3 24,200 Proposed

    Sta. Mesa - Pasig (Shaw

    Boulevard)7.1 23,440 Proposed

    CALA Exp. (Bacoor - Sta. Rosa)* 47.2 30,200 Committed

    Other Expressways 388.3 221,840Committed/

    Proposed

    Expressways Upgrade 208.4 33,040 Proposed

    Expressway Total 702 384,120Roads & Expressway Total 1,999 721,360

    Road/Expressway ProjectsSuburban/Urban Rail Projects

    Projects of Dream Plan (1)

    *Short term project

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    40/51

    Name of Project

    Amount

    (Phpmillion)

    Status

    1. NAIAa. NAIA Improvementairside package*

    4,240Committed

    b. NAIA improvementslandside package* Committed

    2. Clark

    a. Clark improvement - airside package*6,800

    Committed

    b. Clark improvementlandside package* Committed

    c. Clark Future Development 40,000 Proposed

    3. New NAIA 140,500 Proposed

    Airport Infrastructure Total 191,040 -

    40

    A. Airports

    B. Ports D. Road-based Public Transport

    Sub-total (A-D) PhP 323 billion ( USD8.1 billion)

    Name of Project

    Amount

    (Php

    million)

    Status

    1. ITS (3 Provincial Bus Terminals)* 6,320 Committed

    2. 2-BRT Lines*7,000

    Proposed

    3. Jeepney Fleet Modernization 30,000 Proposed

    4. Urban Bus Fleet Modernization 25,000 Proposed

    Road-based Public Transport 68,320 -

    Name of Project

    Amount

    (Phpmillion)

    Status

    1. Modernization of traffic signaling system * 5,000 Committed

    2. ITS & Other Road safety Interventions 2,800 Proposed

    3. Pedestrian Facilities 2,000 Proposed

    Traffic Management / Capacity Expansion -Total 9,800 -

    C. Traffic Management Projects

    Name of Project

    Amount

    (Php

    million)

    Status

    1. Replacement of North Harbor 40,000 Proposed

    2. Other regional Ports 2,000 Proposed

    3. Other Port Program* 12,080 Proposed

    Port Projects Total 54,080 -

    Total Investment Program for Transport: Php 2,411 billion (USD 60.3 billion)

    Projects of Dream Plan (2)

    *Short term project

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    41/51

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    42/51

    42

    Preliminary evaluation of Dream Plan

    Economic impact:

    VOC saving: Php 2.1 bil./day = Php 630 bil./year

    Time cost saving: Php 1.9 bil./day = Php 570 bil./year

    Financial impact:

    Toll and fare revenue:Php 397 mil./day = Php 119 bil./year

    Social impact:

    Public transport fare saving: Php 18/person/day (from Php 42 to Php 24)

    Travel time reduction: 55 min./persontrip (from 80 min. to 25 min.)

    Environmental impact: Reduction in GHG: 5,760 ton/day (from 19,100 to 13,300 ton/day)

    Reduction in PM: 47 ton/day (from 63 to 16 ton/day

    Reduction in NOx: 65 ton/day (from 197 to 132 ton/day)

    Total investment cost up to 2030: Php 2,411 bil. (US$ 60.3 bil.)

    f f

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    43/51

    Impact of Dream Plan (estimated travel time from Manila)

    43

    Today Future (Dream Plan)

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    44/51

    Short-term investment program(2014-2016)

    C i i f l i i i j

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    45/51

    Criteria for selecting priority projects

    Consistency with policies and strategies: Projects must beconsistent with the chosen policy, must optimize use of existingassets (such as traffic engineering and management, as well as newroads that improve overall network connectivity and efficiency), andmust promote public transport usage take precedence overprojects that encourage private cars.

    Doability or high possibility of being completed or of startingconstruction on or before 2016. This implies a high degree ofproject maturity, e.g., availability of feasibility studies, and a bias forclearing the backlog of unimplemented transport infrastructure.

    Robustness : Ability of the project in resolving present and futurecapacity constraints.

    45

    Sh P (2014 2016)

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    46/51

    Short-term Program (2014 2016)

    Name of ProjectAmount

    (Php Mil.)Status

    1. MissingLinks of C5

    a. Flyover on CP Garcia in Sucat 251 Committedb. Coastal Rd/C5 Extn. South Flyover 210 Committedc. C5 South Extn. Flyover at SLEX 235 Proposed

    2. Global City-Ortigas Link Road 8,120 Proposed3. Skyway/FTI/C5 Link 17,880 Committed4. C3 Missing Links (S. Juan to Makati (Sta Ana oval)) 24,000 Proposed5. EDSA Rehabilitation 3,744 Committed6. Plaridel Bypass, packages 3 & 4 900 Committed7. Metro

    Manila

    Interchanges

    /Flyovers

    a. C4 EDSA-Taft Ave. to Roxas Blvd. 2,430 Committedb. C4: Roosevelt/Congressional 941 Committedc. C4: West Ave. /North

    Ave./Mindano Ave.1,502 Committed

    d. C5: Greenmeadows/Acropolis 1,575 Committede. C5: Pasig-Bagong Ilog 435 Committedf. C2: Gov Forbes/Espana 1,070 Committed

    Roads Total 63,293 -

    Name of ProjectAmount

    (Php Mil.)Status

    1. Daang Hari-SLEX Link Tollroad 2,000 Committed2. NLEX-SLEX

    Connectors

    a. Link Expressway (MNTC) 7,800 Committedb. Skyway 3 section (Citra) 9,000 Committedc. Common section (DPWH) 11,000 Committedd. Seg. 9&10, and connection to R10 8,600 Committed

    3. NAIA Expressway, phase 2 15,520 Committed4. CALA Expressway, stages 1 and 2 14,232 Committed5. CLLEX Phase I (La Paz, TarlacCabanatuan) 12,833 Committed6. Calamba-Los Baos Expressway 16,900 Proposed7. C6 extensionLakeshore Dike Road 43,380 Proposed

    8. Segment 8.2 of NLEx to Comm. 7,000 Proposed

    Expressways Total 148,265 -

    Name of ProjectAmount

    (Php Mil.)Status

    1. Secondary Road Packages 69,100 Proposed

    2. Preparatory studies for several projects 500 Proposed

    3. Other Central Luzon Road Projects 16,000Committed4. Other Southern Luzon Road Projects 36,360CommittedOther Roads Total 121,960 -

    A. Roads B. Expressways

    C. Other Roads

    46

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    47/51

    47

    Name of ProjectAmount

    (Php Mil.)Status

    1. LRT1 - Cavite Extension (Niyog) 30,764 Committed2. LRT2 - East Extension 9,446 Committed3. MRT3 Capacity Expansion 10,200 Committed4. MRT 7 stage1 (Quezon Ave.Commonwealth Ave.) 51,870 Committed5. AFCS Common Ticketing System 1,722 Committed6. System Rehabilitations for LRT1 and 2 4,500 Committed7. Mega

    Manila

    North-

    SouthCommuter

    Railway

    a. AER Phase 1 (Malolos-Manila)

    24,800

    Proposedb. South Com. Stg.1 (Manila-Calamba) Committedc. Remedial for Phase 1 of NS Rail Link Proposed

    8. Metro Manila CBD Transit System Project Study 120 Proposed

    9. F/S of New Transport System (e.g. Monorail , AGT) 75 Proposed

    Railways Total 146,897 -

    Name of ProjectAmount

    (Php Mil.)Status

    1. ITS (3 Provincial Bus Terminals) 6,300 Committed2. Public Road Passenger Transport Reform Study 60 Proposed

    3. BRT System 1 3,500 Proposed

    Road-based Public Transport 9,860 -

    Name of ProjectAmount

    (Php Mil.)Status

    1. Modernization of traffic signalling system 5,000 Committed2. Systematic Road Safety Interventions 1,000 Proposed

    3. Comprehensive Traffic Management Study 50 Proposed

    Traffic Management Projects Total 6,050 -

    Name of ProjectAmount

    (Php Mil.)Status

    1. NAIAa. NAIA Improvementairside package

    4,249Committed

    b. NAIA improvementslandside package Committed2. Clark

    a. Clark improvement - airside package

    6,802

    Committedb. Clark improvement

    landside package Committed

    3. Feasibility Study of a New NAIA 50 Proposed

    Airport Infrastructure Total 11,125 -

    Name of ProjectAmount

    (Php Mil.)Status

    1. Projects for North Harbor 6,000 Committed2. Projects for South Harbor 1,000 Committed

    3. MICT 4,000 Committed4. Feasibility Study of NH Redevelopment 75 Proposed

    5. Other ports 1,010 Proposed

    Port Projects Total 12,085 -

    D. Railways

    E. Road-based public Transport

    F. Traffic Management Projects

    G. Airports

    H. Ports*

    *Planned expansion projects recommended for rescheduling to promote diversion of cargo to Batangasand Subic ports as well as decongest roads of Metro Manila.

    Short-term Program (2014 2016) = Php 520 billion

    L ti f h t t j t

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    48/51

    Urban/Suburban Rails

    Main Roads/Expressways/Etc.

    Locations of short-term projects

    Malolos

    Calamba

    48

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    49/51

    D ft Fi l R t

  • 8/13/2019 JICA Presentation Roadmap for Transport Infrastructure Development

    50/51

    Draft Final Report

    Chapter Sections

    1. Introduction 1.1 Background and Objective

    1.2 Study Approach

    2. Development

    of the Metro

    Region

    2.1 The Greater Capital Region

    2.2 Development Issues Facing

    Metro Manila

    2.3 Vision and Strategies

    3. Transport

    Development

    Strategies

    3.1 Current Transport Infrastructure

    and Services

    3.2 Current Transport Services

    3.3 Estimated Travel Demand

    3.4 Development Challengers and

    Key Strategies

    3.5 The Dream Plan

    Chapter Sections

    4. TransportInvestment

    Program

    4.1 Criteria for Priority Setting

    4.2 Review of Agency Investment

    Programs

    4.3 Recommended Short Term Investment

    Program

    (2014-16)

    4.4 Tentative Medium and Long TermInvestment Program

    4.5 Financing Strategy

    4.6 Necessary Preparatory Studies

    5. Conclusions

    and Recom-

    mendations

    5.1 The Roadmap Context

    5.2 Budget Envelop5.3 Sector Governance

    Appendices

    50

    A. Main Report (prepared and submitted for comments)

    B. Technical Reports

    C. ATLAS

    D. Roadmap Projects