jeffco open school · jeffco open school 7655 w. 10th ave. lakewood, co good if funding were...

1
FACILITY FACTS For additional information, please visit www.jeffcopublicschools.org/futurefunding Age of Facility: 88 years (built in 1930) Square Footage: 102,628 Enrollment: 564 *FCI: 9.3% *FCI is a measurement of the physical condition of the school’s interior, exterior & grounds. Good: less than 10% Fair: 11% to 30% Poor: greater than 30%. Jeffco Open School 7655 W. 10th Ave. Lakewood, CO GOOD If funding were available, below is a list of priorities to enhance the student learning experience. Expand facility with an addition. Remodel of building interior. New, more secure & energy-efficient windows. New, more secure exterior doors. Update security cameras & classroom security door hardware. Secure building vestibules, entries & office location. Improvement to landscaping & athletic fields. Update existing technology for student learning. Update old electrical wiring, panels & increase capacity. Update old heating & cooling equipment, plumbing fixtures & piping. Replace interior lighting with energy-efficient LEDs. • Replace worn roofing.

Upload: others

Post on 14-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jeffco Open School · Jeffco Open School 7655 W. 10th Ave. Lakewood, CO GOOD If funding were available, below is a list of priorities to enhance the student learning experience. •

FACILITY FACTS

For additional information, please visitwww.jeffcopublicschools.org/futurefunding

Age of Facility: 88 years (built in 1930)Square Footage: 102,628

Enrollment: 564

*FCI: 9.3%

*FCI is a measurement of the physical condition of the school’s

interior, exterior & grounds.

Good: less than 10%Fair: 11% to 30%

Poor: greater than 30%.

Jeffco Open School7655 W. 10th Ave.Lakewood, CO

GOOD

If funding were available, below is a list of priorities to enhance the student learning experience.

• Expand facility with an addition.• Remodel of building interior.• New, more secure & energy-efficient windows.• New, more secure exterior doors.• Update security cameras & classroom security door hardware. • Secure building vestibules, entries & office location.• Improvement to landscaping & athletic fields. • Update existing technology for student learning.• Update old electrical wiring, panels & increase capacity.• Update old heating & cooling equipment, plumbing fixtures & piping.• Replace interior lighting with energy-efficient LEDs.• Replace worn roofing.