DISTRIBUTED GENERATIONE-FINITY
Capstone Technology
Air Cooled / Air Lubricated
Single Stage Jet Engine
• 1750°F combustion
• 3 air bearings
• “Electronic” gearbox
• Standalone capability
• Clean, quiet
• Zero vibration
One Moving Part
• Air lubricated
• No oil or grease
• Air cooled
• No anti-freeze or liquids
• Variable speed
45,000 to 96,000 RPM
• Variable electrical & thermal output
Spring
Foil
Shaft
Inverter Based Electronics
Power with Ultra Low Emissions
• Low emission design
• Ultra-low NOX
• Less than 9ppm
• .14 to .16 g/hb-br
• LE unit less than 5ppm
• No additional catalysis requirement
Capstone Products
Capstone C30 Microturbine
9
30kW
433,000 Btu
Capstone C65 & C65 ICHP Microturbines
10
65kW
408,000 Btu/hr
842,000 Btu
20+ tons
Capstone C200 & C200 ICHP Microturbines
11
200kW 1,000,000 Btu 85+ tons
2,280,000 Btu
C600 Expandable to C800 & C1000
C600 Power Package
C800 Power Package
C1000 Power Package
C600, C800, C1000
13
1000kW 5,000,000 Btu 425+ tons
11,400,000 Btu
C1000 1MW Power Package • Five C200 power modules in one package
• Inherent N+1 redundancy
• Site availabilities of 98%+
Efficiency – CHP/CCHP for C200
CHP/Type Efficiency Notes
Electric Total
Hot water 33.0% 80.0% Heat exchanger
Steam 33.0% 60.0–75.0% Steam generator
Capstone chilled water 33.0% 80.0% Absorption chiller
Waste Heat Generator
Clean Cycle CC125 Organic
Rankine Cycle
• Provides electricity for grid
connect application
• Utilizes low grade waste heat:
• Any waste heat source
• Exhaust from microturbines
• Achieves high electrical efficiency
Remote Monitoring
• Data logging & storage • Monitors and records key system
data 24x7
• Real-time notification • Alert and local CPST technician
notification
• Balance of plant
interactivity • Monitoring of compressors, water
flow, and temperatures, etc.
Small Scale Distributed Generation &
CHP Applications
Production site Primary power
• Capstone C30 MicroTurbine
• (mTIM) PLC control system
Results
• Wellhead gas used to power site operations
• Replaced the need for an electric utility line –
utility power not economically feasible
• Saved installation cost of over $100,000
and up to 6 months of construction time
• Site depends on Capstone to operate
station 24x7
Industrial Midstream DG Applications
White Oak Compression & Dehydration Site
Ritchie County, WV
• (2) Capstone C200 MicroTurbines installed in
parallel as standalone power
Ardell Transmission and Compression Site
Benezette, PA
• C800 standalone Capstone Power Package
providing 800kW of onsite power for the
facility
Green County Water Pumping Facility
Cameron, WV
• C800 dual mode Capstone Power Package
operating (2) 500HP water pumps and auxiliary
electrical equipment
Industrial Midstream CHP Applications
Crayne Compressor Station – Waynesburg, PA
• (3) Capstone C65 ICHP MicroTurbines
provide electricity & heating for buildings
and fuel gas
Blacksville Gas Gathering, Dehydration & Compression Station – Blacksville, WV
• (6) C65 ICHP standalone MicroTurbines operate the station 24/7 and provides 100% electricity and fuel gas heating
Silver Springs Transmission Station –
Silver Springs, NY
• (3) Capstone C65 MicroTurbines provide
electricity & heating for buildings and fuel gas
• Utility meter set at zero kW
• Capstone makes 100%
of building electric
Electric Load Following
Base Load Distributed Generation
• C1000 dual mode Capstone
Power Package
• Generates 7,500,000+ kWh
annually
• Backup power capable
• Electric only
• Electric co-op customer
• Provides 30% saving
Apartment Complex
Cogeneration – Combined Heating & Power
• Capstone C65 ICHP (integrated combined heat
and power) dual mode MicroTurbine
• (mTIM) PLC control system
Output
• 65kW gross electrical capacity
• 408 MBH gross thermal output
Results
• 50% power limited
• Unit provides backup power to elevators
• Small footprint – C65 fits in corner of parking lot
• 9 year FPP with 24/7 remote monitoring
Luxury Hotel
Baseload Cogeneration (Hot Water)
• (3) Capstone C65 ICHP (integrated combined heat
and power) MicroTurbines
• (mTIM) PLC control system
Output
• 195kW gross electrical capacity
Results
• Saved $80,000 during the first 2 months of
microturbine operation
• Small footprint – C65s fits in 37-square-meter
space on rooftop
• 9 year FPP with 24/7 remote monitoring
Combined Heat & Power
• 100% hot water
• 30% building electric
• 15% building heat
Emphasis was on:
• Controlling energy costs
• Reduce greenhouse-gas emissions
Luxury Hotel
Business Center Combined Heat & Power
• 100% building electricity
• 100% building hydronic heat
• Future 90 tons absorption chilling
• Islanding capable
• Dedicated back up power for exhaust
hood containing dangers fumes
Trigeneration – Combined Cooling, Heating & Power
• Capstone C200 Microturbine
• Hot water heat exchanger
• 60-ton hot water absorption absorber
• (mTIM) PLC control system
Output
• 200kW electrical output
Results
• Electrical load following
• Hot and chilled water used for climate control
• Host to hundreds of visitors each year
• 9 year FPP with 24/7 remote monitoring
• Received American Council of Engineering Companies
of Pennsylvania 2012 Diamond Honor Award
Corporate Office Building
• CR600 Power Package – Digester Gas
• C1000 Dual Mode Power Package – Natural Gas
• Gas conditioning skid
• (mTIM) PLC control system
Output
• 600kW electrical output – CR600
• 1MW electrical output – C1000 for peak shaving
Results
• Digester gas generates 2.5 million kWh
of generation annually
• $275,000 savings in annual energy costs
• Recovered heat is used to heat digesters and
onsite buildings
• Received American Council of Engineering Companies
of Pennsylvania (ACEC/PA) Honor Award in 2011
Wastewater Treatment Plant
Medical Facilities Combined Cooling, Heat & Power
• 4 Capstone C65 to generate 260kW
• Carrier absorption chiller can produce • 110 tons chilled water or
• 900,000 BTU/hr of hot water
Benefits
• CCHP system operates at about 80%
overall efficiency
• Reduces hospital’s carbon footprint
by 460 tons per year
• NOx emissions are reduced by over
3 tons per year
Ran 8 Days after Sandy powered only by the Capstone Turbines
30
Trigeneration – Combined Cooling,
Heating & Power
• C800 dual mode Capstone
Power Package
• Hot water heat exchanger
• 250-ton exhaust fired absorption chiller
• (mTIM) PLC control system
Output
• 800kW electrical output
• 4,250 MBH gross thermal output
• 250 ton chilling output
Standalone clean power
for data center UPS
Data Center
Trigeneration – Commercial Combined Cooling, Heating & Power
• C1000 dual mode Capstone Power Package
• Hot water heat exchanger
• 300-ton exhaust-fired absorption chiller
• (mTIM) PLC control system
Output
• 1000kW gross electrical capacity
• 5,100 MBH gross thermal output
• 300 ton chilling output
Backup power to keep the manufacturing facility in full operation
Manufacturing Facility
Marine Power MTS Argonon Auxiliary CHP
• 2 Capstone C30 turbines
power and heat using LNG
as fuel
• Turbine exhaust is used in
the LNG vaporizer
• The remaining heat is for
comfort in the living quarters
and hot domestic water
• Lower overall emissions
What is Needed –
Incentives
Federal Incentives
Investment Tax Credit (ITC)
• $200/kW for MicroTurbines
• 10% project cost for CHP
applications
• Wind and solar enjoy 30%
Modified Accelerated Corporate Depreciation MACRS
Recovery year Applicable %
Year 1 20.00
Year 2 32.00
Year 3 19.20
Year 4 11.52
Year 5 11.52
Year 6 5.76
Mid Atlantic Incentives
• New Jersey Clean Energy CHP Rebate
• Empower Maryland CHP Rebate
• Pennsylvania Act 129 Rebate
State Incentive ($/Watt) Cap per project
New Jersey $2.00 $2 million
Maryland $1.20 $2 million
Pennsylvania $0.25 $250,000
Questions & Answers