jca status update to wjtsc 09-2 24-28 august 2009

13
1 UNCLASSIFIED UNCLASSIFIED JCA Status Update to WJTSC 09-2 24-28 August 2009 Joint Staff J-7, JFDID

Upload: lan

Post on 13-Jan-2016

55 views

Category:

Documents


2 download

DESCRIPTION

JCA Status Update to WJTSC 09-2 24-28 August 2009. Joint Staff J-7, JFDID. JCA WG Agenda. Time Topic/Subject Briefer 1300 – 1310Welcome Remarks LtCol Larry Miller 1310 – 1330JCA Status Update Brief LtCol Larry Miller Mr. Steve Brown - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: JCA Status Update to WJTSC 09-2 24-28 August 2009

1

UNCLASSIFIED

UNCLASSIFIED

JCA Status Updateto WJTSC 09-2

24-28 August 2009

Joint Staff J-7, JFDID

Page 2: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

2

UNCLASSIFIED

JCA WG Agenda

Time Topic/Subject Briefer

1300 – 1310 Welcome Remarks LtCol Larry Miller

1310 – 1330 JCA Status Update Brief LtCol Larry Miller

Mr. Steve Brown

1330 – 1420 UJTL / JCA Mapping, Staffing &

JCAMS Staffing Tool Mr. Steve Brown

1430 – 1530 UJTL / JCA Mapping & Readiness Mr. Steve Brown

1530 – 1600 Questions LtCol Larry Miller

Mr. Steve Brown

Page 3: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

3

UNCLASSIFIED

Acquisition and Requirements Reform – 9 Apr 09

Secretary Gate’s response to a President’s Tank Session question regarding Acquisition Reform

Page 4: JCA Status Update to WJTSC 09-2 24-28 August 2009

OP 3.2.1 Provide Close Air Spt Integ for Surface Forces

OP 3.2.6 Provide Firepower in Support of Opnl Maneuver

OP 3.2 Attack Opnl Targets

Non-KineticMeans

KineticMeans

NTA 3.2.8 Conduct Fire SptART 3.3.1.1 Conduct

Surface-to-surface Atk

MCTL 3.4.1.4 CoordNaval Surface Fire Spt

AFT 4.2.1.2 Conduct Close Air SptNTA 3.2.8 Conduct Fire SptART 3.3.1.2.2 EmployClose Air SptMCTL 3.2.2 Employ Close Air Spt

UJTL Tasks

JCA Tiers 1 - 3

Engagement

AV-8B

F/A-18 Sqdn

A-10 Sqdn

F-16 Sqdn

B-52 SqdnMCTL 3.2 Conduct Indirect Fires

DDG-51

155mm SP Bn

GMLRS Unitary155mm SP Bn

120 mm Mtr Plt

Units / PlatformsUnits / Platforms Programs

F/A-22 Sqdn

F-35 SqdnF-35 SqdnExcaliber

5"/62 Gun/ERGM

Programs

Capability to Task Linkage

Service Tasks

Maneuver

ForceApplication

Fixed Target

Stationary Target

Moving Target

ST 3.2 Attack Theater

Strat Targets

JCA Tier 4and below

Page 5: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

5

UNCLASSIFIED

• Way Forward

– UJTL to JCA mapping (staffing in early Sept)

– Joint Capabilities Requirement Manager (JCRM) integration

– Adaptive Planning integration (APEX)

– Readiness Reporting

• Chairman’s Readiness System

• DRRS Conversion

– JCAMS Spiral 3

Where JCAs are Going

Page 6: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

Joint Requirements Code (JRC)

Page 7: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

7

UNCLASSIFIED

Proposal: Map the JCAs to the JRC

JCA Tier 1 Logistics

JCA Tier 2 Engineering

JCA Tier 3General Engineering

Combat Engineering

Geospatial Engineering

Page 8: JCA Status Update to WJTSC 09-2 24-28 August 2009

JCA Tier 1 Logistics

JCA Tier 2 Engineering

JCA Tier 3

Capability Search

Page 9: JCA Status Update to WJTSC 09-2 24-28 August 2009

JCA Tier 1 Logistics

JCA Tier 2 Engineering

JCA Tier 3

Capability Search

Page 10: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED 10

APEX Organizing Framework

SituationAwareness

Planning Execution

C2

Operational Activities

UnderstandOrganize, Planning,

DecideDirect, Monitor

Global Force Management

Intelligence

Logistics

Interagency

Lead

JCA

Key

X-F

un

ctio

nal

Cap

ab

ilit

ies

Use JCAs / UJTLs to describe required capabilities

Multinational

Corporate Management & Support

Page 11: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

11

UNCLASSIFIED

JCAMS

http://www.dtic.mil/futurejointwarfare/cap_areas.htm

Page 12: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

12

UNCLASSIFIED

JCA Timeline

Jan 10

Jan 09

Jul 09

12 Jan 09 JCA Refinement Tiers 1 – 7 approved

Initial UJTL to JCAMapping Completed

Socialize MappingJul – Aug

JS 136 StaffingSep - Oct

JCA ReviewSep - Dec

Svc Task to JCA Mapping

JCA – JCRM Integration

JCA – DRRS/CRS Integration

Page 13: JCA Status Update to WJTSC 09-2 24-28 August 2009

UNCLASSIFIED

13

UNCLASSIFIED

• JCAMP Approval

• JCAMS on SIPR

• Broadly Worded UJTs

• Service and Agency Task Mapping

• Alignment with other Architectures

JCA Issues