jca status update to wjtsc 09-2 24-28 august 2009
DESCRIPTION
JCA Status Update to WJTSC 09-2 24-28 August 2009. Joint Staff J-7, JFDID. JCA WG Agenda. Time Topic/Subject Briefer 1300 – 1310Welcome Remarks LtCol Larry Miller 1310 – 1330JCA Status Update Brief LtCol Larry Miller Mr. Steve Brown - PowerPoint PPT PresentationTRANSCRIPT
1
UNCLASSIFIED
UNCLASSIFIED
JCA Status Updateto WJTSC 09-2
24-28 August 2009
Joint Staff J-7, JFDID
UNCLASSIFIED
2
UNCLASSIFIED
JCA WG Agenda
Time Topic/Subject Briefer
1300 – 1310 Welcome Remarks LtCol Larry Miller
1310 – 1330 JCA Status Update Brief LtCol Larry Miller
Mr. Steve Brown
1330 – 1420 UJTL / JCA Mapping, Staffing &
JCAMS Staffing Tool Mr. Steve Brown
1430 – 1530 UJTL / JCA Mapping & Readiness Mr. Steve Brown
1530 – 1600 Questions LtCol Larry Miller
Mr. Steve Brown
UNCLASSIFIED
3
UNCLASSIFIED
Acquisition and Requirements Reform – 9 Apr 09
Secretary Gate’s response to a President’s Tank Session question regarding Acquisition Reform
OP 3.2.1 Provide Close Air Spt Integ for Surface Forces
OP 3.2.6 Provide Firepower in Support of Opnl Maneuver
OP 3.2 Attack Opnl Targets
Non-KineticMeans
KineticMeans
NTA 3.2.8 Conduct Fire SptART 3.3.1.1 Conduct
Surface-to-surface Atk
MCTL 3.4.1.4 CoordNaval Surface Fire Spt
AFT 4.2.1.2 Conduct Close Air SptNTA 3.2.8 Conduct Fire SptART 3.3.1.2.2 EmployClose Air SptMCTL 3.2.2 Employ Close Air Spt
UJTL Tasks
JCA Tiers 1 - 3
Engagement
AV-8B
F/A-18 Sqdn
A-10 Sqdn
F-16 Sqdn
B-52 SqdnMCTL 3.2 Conduct Indirect Fires
DDG-51
155mm SP Bn
GMLRS Unitary155mm SP Bn
120 mm Mtr Plt
Units / PlatformsUnits / Platforms Programs
F/A-22 Sqdn
F-35 SqdnF-35 SqdnExcaliber
5"/62 Gun/ERGM
Programs
Capability to Task Linkage
Service Tasks
Maneuver
ForceApplication
Fixed Target
Stationary Target
Moving Target
ST 3.2 Attack Theater
Strat Targets
JCA Tier 4and below
UNCLASSIFIED
5
UNCLASSIFIED
• Way Forward
– UJTL to JCA mapping (staffing in early Sept)
– Joint Capabilities Requirement Manager (JCRM) integration
– Adaptive Planning integration (APEX)
– Readiness Reporting
• Chairman’s Readiness System
• DRRS Conversion
– JCAMS Spiral 3
Where JCAs are Going
UNCLASSIFIED
Joint Requirements Code (JRC)
UNCLASSIFIED
7
UNCLASSIFIED
Proposal: Map the JCAs to the JRC
JCA Tier 1 Logistics
JCA Tier 2 Engineering
JCA Tier 3General Engineering
Combat Engineering
Geospatial Engineering
JCA Tier 1 Logistics
JCA Tier 2 Engineering
JCA Tier 3
Capability Search
JCA Tier 1 Logistics
JCA Tier 2 Engineering
JCA Tier 3
Capability Search
UNCLASSIFIED 10
APEX Organizing Framework
SituationAwareness
Planning Execution
C2
Operational Activities
UnderstandOrganize, Planning,
DecideDirect, Monitor
Global Force Management
Intelligence
Logistics
Interagency
Lead
JCA
Key
X-F
un
ctio
nal
Cap
ab
ilit
ies
Use JCAs / UJTLs to describe required capabilities
Multinational
Corporate Management & Support
UNCLASSIFIED
11
UNCLASSIFIED
JCAMS
http://www.dtic.mil/futurejointwarfare/cap_areas.htm
UNCLASSIFIED
12
UNCLASSIFIED
JCA Timeline
Jan 10
Jan 09
Jul 09
12 Jan 09 JCA Refinement Tiers 1 – 7 approved
Initial UJTL to JCAMapping Completed
Socialize MappingJul – Aug
JS 136 StaffingSep - Oct
JCA ReviewSep - Dec
Svc Task to JCA Mapping
JCA – JCRM Integration
JCA – DRRS/CRS Integration
UNCLASSIFIED
13
UNCLASSIFIED
• JCAMP Approval
• JCAMS on SIPR
• Broadly Worded UJTs
• Service and Agency Task Mapping
• Alignment with other Architectures
JCA Issues