PHOTO COPY OF ON - GOING CONSTRUCTION OF POWER PLANT PROJECT : Contractor : POWER MANUFACTURING AND MARINE WORKS , INC. ( PMM WORKS , INC. ) Project Name : CONSTRUCTION OF 2 UNITS X 6.9 MW POWER PLANT Location : BARANGAY , APOPONG , GENERAL SANTOS CITY PHILIPPINES Owner : PEAK POWER SOCCSAEGEN , INC. 2

Upload: jovenal-enson

Post on 17-Feb-2017

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JBE PICS COMPLETED PROJECT

PHOTO COPY OF ON - GOING CONSTRUCTION OF POWER PLANT PROJECT:

Contractor : POWER MANUFACTURING AND MARINE WORKS , INC. ( PMM WORKS , INC. )

Project Name : CONSTRUCTION OF 2 UNITS X 6.9 MW POWER PLANT

Location : BARANGAY , APOPONG , GENERAL SANTOS CITY

PHILIPPINES

Owner : PEAK POWER SOCCSAEGEN , INC.

Hauling and transfering of Wartsila Engine from Pier to plant site 1

2

Page 2: JBE PICS COMPLETED PROJECT

Installation of smoke stack structure and Engine silencer

2

2

Page 3: JBE PICS COMPLETED PROJECT

Installation of 6 “ diameter cooling water pipe line from radiator to Engine

Installation of exhaust ducting with sllencer device and intake air duct

3

2

Page 4: JBE PICS COMPLETED PROJECT

Leveling of Engine and Spring base plate :

Leveling and alignment of Wartsila Engine

2

Page 5: JBE PICS COMPLETED PROJECT

2