japan’s oda projects in water supply sector
TRANSCRIPT
8
TBONG KHMUM
OTDAR MEANCHEY
BANTEAYMEANCHEY
PREAH SIHANOUK
Major Cities National Roads
Notes GA: Grant AidTC: Technical Cooperation ProjectYL: Yen LoanNumber : Settled Year for GA/YL Implemention Period for TC
Completed
Under Feasibility StudyUnder Construction
As of February, 2016
The Project for Expansion of Water Supply System in Kampot (GA: ¥2,985mil. ’15)
The Project for Improvement of Water Supply System in Siem Reap Town (GA: ¥1,537mil. ’04)
The Project for Replacement and Expansion of Water Distri-bution Systems in Provincial Capitals (GA: ¥2,760mil. ’11)
Siem Reap Water Supply Expansion Project(YL: ¥7,161mil. ’12)
Battambang
Pursat
Preah Sihanouk Kampot Svay Rieng
Kampong ThomSiem Reap
in 8 ProvincesSiem Reap, Kampong Thom, Kampong Cham,
Battambang, Pursat, Kampot, Svay Rieng
The Project on Capacity Buildingfor Urban Water Supply Systems
in Cambodia (Ⅲ) (TC: ’12-)
Kampong Cham
The Project for Expansion of Water Supply System in Kampong Cham and Battambang(GA: ¥3,355mil. ’13)
The Niroth Water Supply Project (YL: ¥3,513mil. ’09)
Project for Improvement of the Water Supply Facilities in Phnom Penh (Ⅰ-Ⅱ) (GA: ¥5,283mil. ’94,’97)The Project for Expansion of Phum Prek Water Treatment Plant (GA: ¥2,580mil. ’01)The Project for Introduction of Clean Energy by Solar Electricity Generation System (GA: ¥720mil. ’10)
in Water Supply SectorJapan’s ODA Projects