TIDEWATER ENGINEERING & SURVEYING, INC. | 89 ROUTE 236 SUITE 3, KITTERY, ME 03904 January 3, 2020 Ms. Heather Ross Land Use Technician Town of York 186 York Street York, Maine 03909 Re: Plan Revision 1 and Supplemental Documents Lupine Park - Mixed Use Development 4 Vacation Drive (Map 86 Lot 2), York, Maine (Job No. 19-131) Dear Ms. Ross: Thank you for taking the time to meet with me on January 2, 2020 to review the minor site plan application. Based upon our discussions, we have made several minor edits to the plan set as followed: 1. Added the York/Kittery Town line as shown on the Town of York GIS maps; 2. Labeled the status of existing roads in the vicinity of the project as public or private; 3. Added the locations of all existing buildings within 100 feet of the subject parcel; 4. Added note 16 with regard to restrictions within the well protection areas; 5. Designated an area in which a future single family residence may be constructed; 6. Added the notes requested by the York Village Fire Chief (see note 15 on Sheet C3); 7. Addressed comments from Public Works Director; a. Added MDOT sign location requirement to note 13; b. Added note 14 to add a light fixture to illuminate the entrance to Vacation Drive; We have also enclosed the following additional supplemental documents to be included as part of the application: 1. Response from MHPC. 2. Response from York Police 3. Response from York Fire 4. Response from York Public Works 5. MDEP Field Determination Letter We look forward to the opportunity to present this project to the Planning Board at the next available meeting. If you have any questions, please do not hesitate to contact us at (207) 439-2222.

Upload: others

Post on 27-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

TIDEWATER ENGINEERING & SURVEYING, INC. | 89 ROUTE 236 SUITE 3, KITTERY, ME 03904

January 3, 2020 Ms. Heather Ross Land Use Technician Town of York 186 York Street York, Maine 03909 Re: Plan Revision 1 and Supplemental Documents

Lupine Park - Mixed Use Development 4 Vacation Drive (Map 86 Lot 2), York, Maine (Job No. 19-131) Dear Ms. Ross: Thank you for taking the time to meet with me on January 2, 2020 to review the minor site plan application. Based upon our discussions, we have made several minor edits to the plan set as followed:

1. Added the York/Kittery Town line as shown on the Town of York GIS maps; 2. Labeled the status of existing roads in the vicinity of the project as public or private; 3. Added the locations of all existing buildings within 100 feet of the subject parcel; 4. Added note 16 with regard to restrictions within the well protection areas; 5. Designated an area in which a future single family residence may be constructed; 6. Added the notes requested by the York Village Fire Chief (see note 15 on Sheet C3); 7. Addressed comments from Public Works Director;

a. Added MDOT sign location requirement to note 13; b. Added note 14 to add a light fixture to illuminate the entrance to Vacation Drive;

We have also enclosed the following additional supplemental documents to be included as part of the application:

1. Response from MHPC. 2. Response from York Police 3. Response from York Fire 4. Response from York Public Works 5. MDEP Field Determination Letter

We look forward to the opportunity to present this project to the Planning Board at the next available meeting. If you have any questions, please do not hesitate to contact us at (207) 439-2222.

Minor Site Plan Application Lupine Park - Mixed Use Development 4 Vacation Drive, York ME

TIDEWATER ENGINEERING & SURVEYING, INC. | 89 ROUTE 236 SUITE 3, KITTERY, ME 03904

Sincerely,

Ryan M. McCarthy, P.E., P.L.S. President Tidewater Engineering & Surveying, Inc. (207) 439-2222 [email protected] Enclosures

AS NOTED

RD

FM

RD

FM

TIDEWATERENGINEERING & SURVEYING, INC.

DRAWING

DATE:

SCALE:

DEC. 2, 2019

NOT VALID UNLESSSIGNED AND STAMPED

SU

BMIS

SIO

N/R

EVIS

ION

DES

CR

IPTI

ON

NO

.D

ATE:

JOB #: 19-131

PRO

JEC

T:

SHEE

T:

CLI

ENT:

TIDEWATER

EN

GIN

EER

IN

G &

SU

RV

EY

IN

G,

IN

C.

89 R

ou

te 236 Su

ite 3, K

ittery, M

E 03904

(207)439-2222

www.tidew

atercivil.co

m R

EVIS

ED P

ER C

OM

MEN

TS F

RO

M L

AND

USE

TEC

HN

ICIA

N O

N 1

/2/2

020

11/

3/20

20

AutoCAD SHX Text
INTERSTATE 95
AutoCAD SHX Text
ROUTE 1
AutoCAD SHX Text
VACATION DRIVE
AutoCAD SHX Text
CREATION LANE
AutoCAD SHX Text
PARSONS LANE
AutoCAD SHX Text
SUBJECT PARCEL TAX MAP 86 LOT 2
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
C1
AutoCAD SHX Text
SITE PLAN APPLICATION LUPINE PARK - MIXED USE DEVELOPMENT 4 VACATION DRIVE IN YORK, MAINE PREPARED FOR: JOSHUA STAUBLE 8 SHORT FARM ROAD KITTERY POINT, MAINE 03904
AutoCAD SHX Text
SCALE: 1" = 250'
AutoCAD SHX Text
GV
AutoCAD SHX Text
ABBREVIATIONS BOTTOM OF CURB BC BC BITUMINOUS CONCRETE CURB BCC BCC BEST MGMT PRACTICE BMP BMP CATCH BASIN CB CB CAPE COD BERM CCB CCB CORRUGATED METAL PIPE CMP CMP CLEANOUT CO CO CHAIN LINK FENCE CLF CLF CONCRETE SURFACE CONC. CONC. DOUBLE YELLOW LINE DYL DYL DRILL HOLE FOUND/SET DHF/DHS DHF/DHS DRAIN MANHOLE DMH DMH IRON PIPE/PIN FOUND IPF IPF IRON REBAR FOUND/SET IRF/IRS IRF/IRS EMERGENCY SPILLWAY ES ES FLARED END SECTION FES FES HIGH DENSITY POLYETHYLENE HDPE HDPE INVERT ELEVATION INV.= INV.= LINEAL FEET LF LF LIMIT OF WORK LOW LOW MATCH EXISTING ME ME METAL PICKET FENCE MPF MPF NOW OR FORMERLY N/F N/F OUTLET CONTROL STRUCTURE OCS OCS RAILROAD SPIKE FOUND/SET RRSF/RRSS RRSF/RRSS RIM ELEVATION RIM= RIM= ROOF DRAIN RD RD SINGLE WHITE LINE SWL SWL SINGLE YELLOW LINE SYL SYL SLIPFORM CONC. CURB SFC SFC SLOPED GRANITE CURB SGC SGC SPLIT RAIL FENCE SRF SRF TEMPORARY BENCHMARK TBM TBM TOP OF CURB TC TC TOP OF FOUNDATION TF TF UNDERDRAIN UD UD UTILITY POLE UP UP VERTICAL GRANITE CURB VGC VGC VINYL PICKET FENCE VPF VPF VINYL STOCKADE FENCE VSF VSF WOOD PICKET FENCE WPF WPF WOOD STOCKADE FENCE WSFWSF
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
S
AutoCAD SHX Text
SEWER SERVICE CONNECTION
AutoCAD SHX Text
ss
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
PROPOSED BUILDING PAD FOOTPRINT
AutoCAD SHX Text
RIPRAP AREA
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
TREE LINE
AutoCAD SHX Text
D
AutoCAD SHX Text
DRAIN MANHOLE
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
DRAIN PIPE
AutoCAD SHX Text
SEWER MANHOLE
AutoCAD SHX Text
GAS LINE
AutoCAD SHX Text
OVERHEAD WIRES
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
SEWER LINE
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
MAJOR CONTOUR
AutoCAD SHX Text
MINOR CONTOUR
AutoCAD SHX Text
CONSTRUCTION FENCE
AutoCAD SHX Text
ACCESSIBLE PAVEMENT MARKINGS
AutoCAD SHX Text
IRON PIPE/IRON PIN
AutoCAD SHX Text
TEST PIT LOCATION
AutoCAD SHX Text
TOP/BOTTOM CURB ELEVATION
AutoCAD SHX Text
SPOT ELEVATION
AutoCAD SHX Text
100.5x
AutoCAD SHX Text
CURB/PAVEMENT RADIUS
AutoCAD SHX Text
2'R
AutoCAD SHX Text
98
AutoCAD SHX Text
100
AutoCAD SHX Text
98
AutoCAD SHX Text
100
AutoCAD SHX Text
GUIDERAIL
AutoCAD SHX Text
FORCE MAIN
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
STONE WALL
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
FLARED END SECTION
AutoCAD SHX Text
CONSTRUCTION ENTRANCE
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
100.5x
AutoCAD SHX Text
TC 101.5 BC 100.5
AutoCAD SHX Text
TC 101.5 BC 100.5
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
WATER SHUTOFF
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
GUY WIRE
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
WETLANDS
AutoCAD SHX Text
TP4
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
UNDERGROUND UTILITIES
AutoCAD SHX Text
N
AutoCAD SHX Text
SS
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
PRIOR TO CONSTRUCTION
AutoCAD SHX Text
CONTACT DIG SAFE 72 HOURS
AutoCAD SHX Text
N
AutoCAD SHX Text
U
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
G
AutoCAD SHX Text
P
AutoCAD SHX Text
D
AutoCAD SHX Text
N
AutoCAD SHX Text
U
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
V
AutoCAD SHX Text
U
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
Y
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
4 VACATION DRIVE, YORK, MAINE 03909
AutoCAD SHX Text
LUPINE PARK - MIXED USE DEVELOPEMENT
AutoCAD SHX Text
JOSHUA STAUBLE
AutoCAD SHX Text
8 SHORT FARM ROAD
AutoCAD SHX Text
KITTERY POINT, MAINE 03905
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
MCCARTHY
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
#12895
AutoCAD SHX Text
F
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
RYAN M.
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
JANUARY 3, 2020
AutoCAD SHX Text
SHEET INDEX: C1 COVER SHEET COVER SHEET C2 BOUNDARY AND EXISTING CONDITIONS PLAN* BOUNDARY AND EXISTING CONDITIONS PLAN* * COMPLETED BY KIMBALL SURVEY & DESIGN C3 PROPOSED SITE & GRADING PLAN PROPOSED SITE & GRADING PLAN C4 EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL PLAN C5 CONSTRUCTION DETAILSCONSTRUCTION DETAILS
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVAL OF THE PLANNING BOARD
AutoCAD SHX Text
OF YORK, MAINE
AutoCAD SHX Text
THE SIGNATURES OF 3 OR MORE PLANNING
AutoCAD SHX Text
BOARD MEMBERS CAN BE FOUND ON PLAN SHEET C3.

U.S

. RO

UTE

1

(PU

BLIC

)

PARSONS LANE

YORKKITTERY

VACATION DRIVE (PRIVATE)

1" = 50'DRAWING

DATE:

SCALE:

DEC. 2, 2019

NOT VALID UNLESSSIGNED AND STAMPED

SU

BMIS

SIO

N/R

EVIS

ION

DES

CR

IPTI

ON

NO

.D

ATE:

JOB #: 19-131

PRO

JEC

T:

SHEE

T:

CLI

ENT:

TIDEWATER

EN

GIN

EER

IN

G &

SU

RV

EY

IN

G,

IN

C.

89 R

ou

te 236 Su

ite 3, K

ittery, M

E 03904

(207)439-2222

www.tidew

atercivil.co

m R

EVIS

ED P

ER C

OM

MEN

TS F

RO

M L

AND

USE

TEC

HN

ICIA

N O

N 1

/2/2

020

11/

3/20

20

AutoCAD SHX Text
5"x5" 0.2'A.G.
AutoCAD SHX Text
1" #1197 0.3'B.G.
AutoCAD SHX Text
1" 1.1'A.G.
AutoCAD SHX Text
5"x5" 0.5'A.G.
AutoCAD SHX Text
5"x5" 1.1'A.G.
AutoCAD SHX Text
POND
AutoCAD SHX Text
N/F JOSHUA W. STAUBLE 17957/896 MAP 86, PARCEL 2 9.19 Ac. (INCLUDES ROW)
AutoCAD SHX Text
N/F STAUBLE REALTY, LLC 17957/98 MAP 86, PARCEL 2-D 2.04 Ac.
AutoCAD SHX Text
N/F MYRON E. & KAREN L. GILMAN 8117/244 MAP 86, PARCEL 5
AutoCAD SHX Text
N/F TY-MARK ENTERPRISES, LLC 16169/46 MAP 86, PARCEL 2-C
AutoCAD SHX Text
N/F WILLIAM P. THERIAULT 3812/184 MAP 86, PARCEL 2-B
AutoCAD SHX Text
N/F ADAM M. & JESSICA L. BUSSEY 17295/154 MAP 86, PARCEL 1-A
AutoCAD SHX Text
N/F ERNEST A. GOLISANO 4971/269 MAP 86, PARCEL 2-A
AutoCAD SHX Text
12" CIP
AutoCAD SHX Text
12" CMP
AutoCAD SHX Text
GRAVEL PARKING
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
EXISTING DWELLING
AutoCAD SHX Text
COMMERCIAL BUILDING
AutoCAD SHX Text
W
AutoCAD SHX Text
2" 0.1'A.G.
AutoCAD SHX Text
1" 0.4' A.G. BENT
AutoCAD SHX Text
1-1/2" 1.5' A.G. BENT
AutoCAD SHX Text
12" CIP INV OUT 43.8'
AutoCAD SHX Text
8" PVC INV OUT 54.17'
AutoCAD SHX Text
8" PVC INV IN 54.9'
AutoCAD SHX Text
ELEC. PANEL
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
N/F DONALD O. KENNISON 16974/384 MAP 66, PARCEL 26B
AutoCAD SHX Text
N/F 4 U.S. ROUTE 1, LLC 17887/483 MAP 86, PARCEL 1
AutoCAD SHX Text
N/F MICHAEL A. BORNSTEIN 16380/210 MAP 86, PARCEL 3E
AutoCAD SHX Text
N/F PELLETIER FAMILY IRREVOCABLE TRUST 16629/370 MAP 86, PARCEL 3B
AutoCAD SHX Text
N/F DESROCHERS FAMILY TRUST OF 2017 17469/603 MAP 86, PARCEL 3C
AutoCAD SHX Text
N/F DEREK A. & MELISSA A. GAULTIER 17805/850 MAP 87, PARCEL 65A
AutoCAD SHX Text
N/F THERESE A. & STEVEN W. JOHNSON 16959/196 MAP 87, PARCEL 65
AutoCAD SHX Text
EDGE OF POND
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
MB
AutoCAD SHX Text
EXISTING 12" CI CULVERT
AutoCAD SHX Text
EXISTING CMP CULVERT
AutoCAD SHX Text
EXISTING COTTAGE
AutoCAD SHX Text
ERM=59.6'
AutoCAD SHX Text
ERM=53.6'
AutoCAD SHX Text
INVERT IN = 48.5'
AutoCAD SHX Text
12"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
20"
AutoCAD SHX Text
10"
AutoCAD SHX Text
7"
AutoCAD SHX Text
6"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
11"
AutoCAD SHX Text
14"
AutoCAD SHX Text
6"
AutoCAD SHX Text
7"
AutoCAD SHX Text
10"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
7"
AutoCAD SHX Text
10"
AutoCAD SHX Text
7"
AutoCAD SHX Text
14"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
9"
AutoCAD SHX Text
8"
AutoCAD SHX Text
7"
AutoCAD SHX Text
7"
AutoCAD SHX Text
7"
AutoCAD SHX Text
8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
10"
AutoCAD SHX Text
6"
AutoCAD SHX Text
7"
AutoCAD SHX Text
7"
AutoCAD SHX Text
9"
AutoCAD SHX Text
12"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
7"
AutoCAD SHX Text
8"
AutoCAD SHX Text
(4)10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
7"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
(2)14"
AutoCAD SHX Text
15"
AutoCAD SHX Text
12"
AutoCAD SHX Text
14"
AutoCAD SHX Text
12"
AutoCAD SHX Text
26"
AutoCAD SHX Text
(2)7"
AutoCAD SHX Text
19"
AutoCAD SHX Text
6"
AutoCAD SHX Text
(4)10"
AutoCAD SHX Text
12"
AutoCAD SHX Text
7"
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
EXISTING ABUTTER'S WELL
AutoCAD SHX Text
EXISTING ABUTTER'S WELL
AutoCAD SHX Text
INV. OUT = 41.9'
AutoCAD SHX Text
INV. IN = 42.7'
AutoCAD SHX Text
ABUTTER'S SEPTIC SYSTEM PER TOWN RECORDS
AutoCAD SHX Text
ABUTTER'S SEPTIC SYSTEM PER TOWN RECORDS
AutoCAD SHX Text
BULK MATERIAL STOCKPILE AREA
AutoCAD SHX Text
W
AutoCAD SHX Text
MANMADE POND (BUILT CIRCA 1964)
AutoCAD SHX Text
(GRAVEL SURFACE)
AutoCAD SHX Text
PROPOSED BUILDING (80'X62.5')
AutoCAD SHX Text
UNIT 1
AutoCAD SHX Text
UNIT 2
AutoCAD SHX Text
UNIT 3
AutoCAD SHX Text
W
AutoCAD SHX Text
48
AutoCAD SHX Text
50
AutoCAD SHX Text
52
AutoCAD SHX Text
54
AutoCAD SHX Text
56
AutoCAD SHX Text
58
AutoCAD SHX Text
60
AutoCAD SHX Text
52
AutoCAD SHX Text
54
AutoCAD SHX Text
SIGHT DISTANCE POSTED SPEED LIMIT = 45MPH
AutoCAD SHX Text
750'+
AutoCAD SHX Text
1,000'+
AutoCAD SHX Text
D
AutoCAD SHX Text
Y
AutoCAD SHX Text
H
AutoCAD SHX Text
MATERIAL STORAGE BINS (24 FT DEEP X VARIABLE WIDTH)
AutoCAD SHX Text
6 PARKING SPACES (9'X18' TYP.)
AutoCAD SHX Text
8 PARKING SPACES (9'X18' TYP.)
AutoCAD SHX Text
PROPOSED GRAVEL DRIVE (12 FT WIDE)
AutoCAD SHX Text
EXISTING COTTAGE TO BE DEMOLISHED AND REPLACED WITH A NEW SINGLE FAMILY DWELLING TO BE APPROVED BY YORK CODE DEPARTMENT AT A FUTURE DATE
AutoCAD SHX Text
WIDEN EXISTING GRAVEL AS NEEDED TO MAINTAIN 20 FT MINIMUM WIDTH
AutoCAD SHX Text
PROPOSED DRILLED WELL
AutoCAD SHX Text
EDGE OF WETLAND (TYP.)
AutoCAD SHX Text
EDGE OF POND (TYP.)
AutoCAD SHX Text
PAVE DRIVEWAY APRON
AutoCAD SHX Text
PERMANENT ECM BERM TO BE INSTALLED AND MAINTAINED AROUND STOCKPILE AREA
AutoCAD SHX Text
PROPOSED SUBSURFACE WASTEWATER DISPOSAL SYSTEM (SEE HHE200 FOR DETAILS)
AutoCAD SHX Text
PROPOSED SUBSURFACE WASTEWATER DISPOSAL SYSTEM (SEE HHE200 FOR DETAILS)
AutoCAD SHX Text
8 PARKING SPACES (9' X 30' EACH) UNDER POLE BARN (30' X 72') FOR EQUIPMENT & COMPANY VEHICLES
AutoCAD SHX Text
PROPOSED WETLAND CROSSING (IMPACTS = 600 SF±)
AutoCAD SHX Text
REPLACE EXISTING CULVERT WITH A 36" HDPE CULVERTEMBEDDED 12" BELOW GRADE
AutoCAD SHX Text
3 PARKING SPACES (9'X18' TYP.)
AutoCAD SHX Text
PROPOSED FARM STAND (MINOR ACCESSORY STRUCTURE)
AutoCAD SHX Text
GRAVEL TURNAROUND AND PARKING SPACE FOR FARM STAND
AutoCAD SHX Text
PROPOSED DRILLED WELL
AutoCAD SHX Text
PROPOSED WHITE PINE TREES TO BE TRANSPLANTED
AutoCAD SHX Text
DUMPSTER ENCLOSURE
AutoCAD SHX Text
STOP SIGN (SEE DETAIL)
AutoCAD SHX Text
INSTALL CONTROL OUTLET STRUCTURE (PRECAST CONCRETE F-BASIN - SEE DETAIL) RIM = 46.0' (CAST GRATE FLUSH WITH TOP) INV. IN = 42.7' (12"W X 5"TALL ORIFICE) INV. OUT = 42.30' (12" HDPE)
AutoCAD SHX Text
INSTALL STONE OUTLET PROTECTION (SEE DETAIL) INV. OUT OF 12" HDPE = 41.9'±
AutoCAD SHX Text
12" HDPE CULVERTLENGTH = 40 FT SLOPE = 1%
AutoCAD SHX Text
INSTALL TIMBER POST TO MARK END OF CONDUIT
AutoCAD SHX Text
INSTALL 5' WIDE STONE DRIP EDGE W/ 4" PVC UNDERDRAIN(SEE DETAIL)
AutoCAD SHX Text
4" PVC OUTLETINSTALL 4FT DIA. PLUNGE POOL W/ 4" RIPRAP
AutoCAD SHX Text
ROOF OVERHANG
AutoCAD SHX Text
PROPOSED BUSINESS SIGN WITH OVERHEAD LIGHT (SEE NOTE 13)
AutoCAD SHX Text
INSTALL STONE INLET PROTECTION STONE D50 = 6" DEPTH = 12"
AutoCAD SHX Text
TREELINE (TYP.)
AutoCAD SHX Text
ALLOWABLE BUILDING ENVELOPE DESIGNATED FOR FUTURE SINGLE FAMILY RESIDENCE
AutoCAD SHX Text
INSTALL KNOX BOX ON FRONT OF BUILDING
AutoCAD SHX Text
INSTALL DRY HYDRANT W/ BOLLARD PROTECTION (SEE NOTE 15)
AutoCAD SHX Text
PROPOSED SITE & GRADING PLAN
AutoCAD SHX Text
C3
AutoCAD SHX Text
4 VACATION DRIVE, YORK, MAINE 03909
AutoCAD SHX Text
LUPINE PARK - MIXED USE DEVELOPEMENT
AutoCAD SHX Text
JOSHUA STAUBLE
AutoCAD SHX Text
8 SHORT FARM ROAD
AutoCAD SHX Text
KITTERY POINT, MAINE 03905
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
MCCARTHY
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
#12895
AutoCAD SHX Text
F
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
RYAN M.
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
JANUARY 3, 2020
AutoCAD SHX Text
PRIOR TO CONSTRUCTION
AutoCAD SHX Text
CONTACT DIG SAFE 72 HOURS
AutoCAD SHX Text
N
AutoCAD SHX Text
U
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
G
AutoCAD SHX Text
P
AutoCAD SHX Text
D
AutoCAD SHX Text
N
AutoCAD SHX Text
U
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
V
AutoCAD SHX Text
U
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
Y
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
0
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
50
AutoCAD SHX Text
200
AutoCAD SHX Text
25
AutoCAD SHX Text
N
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVAL OF THE PLANNING BOARD OF YORK, MAINE
AutoCAD SHX Text
THE SIGNATURES OF 3 OR MORE PLANNING BOARD MEMBERS INDICATE APPROVAL OF THIS PLAN.
AutoCAD SHX Text
YORK POLICE DEPT.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
TOWN DEPARTMENT REVIEWS
AutoCAD SHX Text
THIS APPLICATION HAS BEEN REVIEWED BY THESE DEPARTMENTS, WHICH HAVE OFFERED COMMENTS TO THE PLANNING BOARD.
AutoCAD SHX Text
YORK VILLAGE FIRE DEPT.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
YORK PUBLIC WORKS DEPT.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
GENERAL NOTES: 1. THE PURPOSE OF THIS PLAN SET IS TO DEPICT A PROPOSED MINOR SITE PLAN THE PURPOSE OF THIS PLAN SET IS TO DEPICT A PROPOSED MINOR SITE PLAN DEVELOPMENT OF TAX MAP 86 LOT 2. 2. OWNER OF RECORD: OWNER OF RECORD: JOSHUA W. STAUBLE 8 SHORT FARM ROAD KITTERY POINT, MAINE 03905 Y.C.R.D. BOOK 17957 PAGE 896 3. THE PROPERTY IS LOCATED WITHIN THE ROUTE ONE-2 ZONING DISTRICT. THE THE PROPERTY IS LOCATED WITHIN THE ROUTE ONE-2 ZONING DISTRICT. THE FOLLOWING DIMENSIONAL REGULATIONS ARE IN EFFECT AT THE TIME OF THIS SITE PLAN SUBMISSION AND ARE SUBJECT TO THE REVIEW BY THE TOWN OF YORK. MIN. LAND AREA: 1 ACRE 1 ACRE MIN. STREET FRONTAGE: 150 FEET 150 FEET MIN. FRONT YARD SETBACK: 50 FEET 50 FEET MIN. SIDE YARD SETBACK: 30 FEET 30 FEET MIN. REAR YARD SETBACK: 30 FEET* 30 FEET* MAX. COVERAGE: 50% 50% MAX. BUILDING HEIGHT: 35 FEET 35 FEET * FOR PROPERTIES OCCUPIED BY NON-RESIDENTIAL USE ABUTTING PROPERTIES OF RESIDENTIAL USE, THE REAR SETBACK IS 50 FEET. 4. ZONING REGULATIONS ARE SUBJECT TO CHANGE. OWNER SHALL CONFIRM ALL ZONING REGULATIONS ARE SUBJECT TO CHANGE. OWNER SHALL CONFIRM ALL ZONING REGULATIONS WITH THE TOWN OF YORK PRIOR TO ANY DEVELOPMENT. 5. BASIS OF BEARING IS MAINE STATE PLANE WEST ZONE NAD 83 . BASIS OF BEARING IS MAINE STATE PLANE WEST ZONE NAD 83 . 6. ABUTTER LINES SHOWN HEREON SHALL BE CONSIDERED APPROXIMATE AND ARE ABUTTER LINES SHOWN HEREON SHALL BE CONSIDERED APPROXIMATE AND ARE FOR REFERENCE PURPOSES ONLY. ABUTTER LINES SHALL NOT BE RELIED UPON AS BOUNDARY INFORMATION. 7. THE BOUNDARY SHOWN HEREON WAS COMPLETED BY KIMBALL SURVEY & THE BOUNDARY SHOWN HEREON WAS COMPLETED BY KIMBALL SURVEY & DESIGN AND IS BASED ON SHEET C2 ON THIS PLAN SET ONLY. TIDEWATER ENGINEERING & SURVEYING, INC HAS NOT COMPLETED A BOUNDARY SURVEY AND DOES NOT CERTIFY TO THE ACCURACY OF THE BOUNDARY BY KIMBALL SURVEY & DESIGN. 8. THE WETLAND LIMITS SHOWN HEREON WERE DELINEATED/FLAGGED BY KENNETH THE WETLAND LIMITS SHOWN HEREON WERE DELINEATED/FLAGGED BY KENNETH GARDNER IN APRIL 2019. THE LOCATIONS SHOWN HEREON IS BASED UPON SHEET C2. 9. THE COMMERCIAL BUILDING AND SINGLE-FAMILY DWELLING WILL BE SERVED BY THE COMMERCIAL BUILDING AND SINGLE-FAMILY DWELLING WILL BE SERVED BY SEPARATE PRIVATE SUBSURFACE WASTEWATER DISPOSAL SYSTEMS AS DESIGNED BY KENNETH GARDNER, SITE EVALUATOR #73. SEE HHE-200 FORMS DATED 11-25-2019 FOR THE COMMERCIAL BUILDING AND 11-24-2019 FOR THE SINGLE-FAMILY DWELLING SUBMITTED FOR APPROVAL BY THE TOWN OF YORK. 10. NET BUILDABLE SITE ACREAGE (6.3.25): ALL ON-SITE WETLANDS ARE NET BUILDABLE SITE ACREAGE (6.3.25): ALL ON-SITE WETLANDS ARE ALL ON-SITE WETLANDS ARE CLASSIFIED AS POORLY DRAINED (SCANTIC). ALL UPLANDS ARE CLASSIFIED SOMEWHAT EXCESSIVELY DRAINED (LYMAN LOAM), WELL DRAINED (MARLOW FINE SANDY LOAM) AND MODERATELY WELL DRAINED (PERU FINE SANDY LOAM) PER THE YORK COUNTY SOIL SURVEY. ALL AREAS OF OPEN WATER WERE ASSUMED TO BE VERY POORLY DRAINED FOR PURPOSES OF THIS CALCULATION. TOTAL LOT AREA (EXCLUDING R.OW.) = 369,432 SF TOTAL AREA OF WETLANDS (POORLY DRAINED) = 81,374 X 0.50 = 40,687 SF TOTAL AREA OF OPEN WATER (VERY POORLY DRAINED) = 72,670 X 0.25 = 18,168 SF TOTAL REMAINING LAND (NET BUILDABLE SITE AREA) = 310,577 SF 11. LOT COVERAGE LOT COVERAGE BUILDINGS = 7,160 SF GRAVEL = 25,308 SF X 0.75 = 18,981 SF TOTAL IMPERVIOUS AREA = 26,141 SF LOT COVERAGE = 26,141 / 310,577 = 8.4% (REQUIREMENT MET) 12. PROPOSED CONSTRUCTION TIMELINE: THE FOLLOWING CONSTRUCTION SCHEDULE PROPOSED CONSTRUCTION TIMELINE: THE FOLLOWING CONSTRUCTION SCHEDULE IS SUBJECT TO CHANGE DEPENDING ON CEO REVIEW AND CONTRACTOR AVAILABILITY. PROPOSED START DATE: MARCH 2020 MARCH 2020 PROPOSED COMPLETION DATE: JULY 2021 JULY 2021 13. PROPOSED FREESTANDING BUSINESS SIGN TO BE DESIGNED TO COMPLY WITH PROPOSED FREESTANDING BUSINESS SIGN TO BE DESIGNED TO COMPLY WITH ARTICLE 16 SIGN STANDARDS AS SPECIFIED WITHIN THE ZONING ORDINANCE. A SIGN PERMIT MUST BE OBTAINED BY THE YORK CODE ENFORCEMENT OFFICE FOR THE SIGN. SIGN MAY BE ILLUMINATED BY A STEADY, STATIONARY, SHIELDED LIGHT SOURCE. SIGN SHALL ALSO MEET MAINE DOT SETBACK STANDARDS AND BE LOCATED A MIN. OF 33 FEET FROM THE CENTERLINE OF ROUTE ONE UNLESS OTHERWISE SPECIFIED BY CURRENT REGULATIONS. 14. A LIGHT FIXTURE SHALL BE INSTALLED AT THE ENTRANCE OF VACATION DRIVE A LIGHT FIXTURE SHALL BE INSTALLED AT THE ENTRANCE OF VACATION DRIVE TO ILLUMINATE THE DRIVEWAY ENTRANCE PER THE REQUEST OF THE DIRECTOR OF PUBLIC WORKS. SAID LIGHT MAY BE INCORPORATED INTO THE SIGN POST OR BE MOUNTED OF A SEPARATE LIGHT POLE. 15. YORK FIRE DEPARTMENT REQUIREMENTS YORK FIRE DEPARTMENT REQUIREMENTS A. NEW BUILDING MUST HAVE SMOKE DETECTION EQUIPMENT HARD WIRED IN NEW BUILDING MUST HAVE SMOKE DETECTION EQUIPMENT HARD WIRED IN TO A CENTRAL ALARM PANEL CONTAINED WITHIN BUILDING. NOUN NAMED ZONES MUST BE CLEARLY ANNOTATED ON ALARM PANEL. HEAT DETECTORS MUST BE INSTALLED IN CONCEALED ATTIC SPACES. ALARM SYSTEMS MUST BE ADDRESSABLE SYSTEMS. B. KNOX BOX MUST BE PROVIDED ON FRONT OF BUILDING, NEAREST MAIN KNOX BOX MUST BE PROVIDED ON FRONT OF BUILDING, NEAREST MAIN ENTRANCE. C. REASONABLE FIRE APPARATUS ACCESS (NOT NECESSARILY PAVED) MUST REASONABLE FIRE APPARATUS ACCESS (NOT NECESSARILY PAVED) MUST BE PROVIDED TO THREE SIDES. D. PROVIDE CONSTRUCTION DETAILS ON BUILDING DESIGN PRIOR TO BUILDING PROVIDE CONSTRUCTION DETAILS ON BUILDING DESIGN PRIOR TO BUILDING PERMIT APPLICATION TO THE FIRE DEPARTMENT. E. DRY STANDPIPE FIRE HYDRANT WILL BE REQUIRED TO BE INSTALLED IN THE DRY STANDPIPE FIRE HYDRANT WILL BE REQUIRED TO BE INSTALLED IN THE POND WITH GRAVEL APRON TO ALLOW FIRE APPARATUS ACCESS FOR WATER SUPPLY IN CASE OF FIRE. ADDITIONAL DETAIL AVAILABLE FROM YFD FOR THIS DEVICE. MANUFACTURER: KOCHEK - TO BE INSTALLED PER MANUFACTURER'S REQUIREMENTS. F. ALL BUILDINGS MUST HAVE THE STREET NUMBER CLEARLY MARKED ON THE ALL BUILDINGS MUST HAVE THE STREET NUMBER CLEARLY MARKED ON THE OUTSIDE OF THE BUILDING IN BOLD LETTERS OR NUMBERS FOR EASE OF LOCATING IN CASE OF EMERGENCY. G. THE ABOVE NOTED FIRE SAFETY REQUIREMENTS MUST APPEAR IN PRINT ON THE ABOVE NOTED FIRE SAFETY REQUIREMENTS MUST APPEAR IN PRINT ON ANY FINAL PROJECT PLANS BEFORE APPROVAL SIGNATURE(S) WILL BE GRANTED. 16. NO SUBSURFACE WASTEWATER DISPOSAL SYSTEMS SHALL BE LOCATED WITHIN NO SUBSURFACE WASTEWATER DISPOSAL SYSTEMS SHALL BE LOCATED WITHIN THE 100 FOOT PROTECTIVE WELL RADIUS SHOWN ON THIS PLAN.

U.S

. RO

UTE

1

PARSONS LANE

YORKKITTERY

VACATION DRIVE (PRIVATE)

1" = 50'DRAWING

DATE:

SCALE:

DEC. 2, 2019

NOT VALID UNLESSSIGNED AND STAMPED

SU

BMIS

SIO

N/R

EVIS

ION

DES

CR

IPTI

ON

NO

.D

ATE:

JOB #: 19-131

PRO

JEC

T:

SHEE

T:

CLI

ENT:

TIDEWATER

EN

GIN

EER

IN

G &

SU

RV

EY

IN

G,

IN

C.

89 R

ou

te 236 Su

ite 3, K

ittery, M

E 03904

(207)439-2222

www.tidew

atercivil.co

m R

EVIS

ED P

ER C

OM

MEN

TS F

RO

M L

AND

USE

TEC

HN

ICIA

N O

N 1

/2/2

020

11/

3/20

20

AutoCAD SHX Text
POND
AutoCAD SHX Text
N/F JOSHUA W. STAUBLE 17957/896 MAP 86, PARCEL 2 9.19 Ac. (INCLUDES ROW)
AutoCAD SHX Text
N/F STAUBLE REALTY, LLC 17957/98 MAP 86, PARCEL 2-D 2.04 Ac.
AutoCAD SHX Text
N/F MYRON E. & KAREN L. GILMAN 8117/244 MAP 86, PARCEL 5
AutoCAD SHX Text
N/F TY-MARK ENTERPRISES, LLC 16169/46 MAP 86, PARCEL 2-C
AutoCAD SHX Text
N/F WILLIAM P. THERIAULT 3812/184 MAP 86, PARCEL 2-B
AutoCAD SHX Text
N/F ADAM M. & JESSICA L. BUSSEY 17295/154 MAP 86, PARCEL 1-A
AutoCAD SHX Text
N/F ERNEST A. GOLISANO 4971/269 MAP 86, PARCEL 2-A
AutoCAD SHX Text
12" CIP
AutoCAD SHX Text
12" CMP
AutoCAD SHX Text
GRAVEL PARKING
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
EXISTING DWELLING
AutoCAD SHX Text
COMMERCIAL BUILDING
AutoCAD SHX Text
W
AutoCAD SHX Text
12" CIP INV OUT 43.8'
AutoCAD SHX Text
8" PVC INV OUT 54.17'
AutoCAD SHX Text
8" PVC INV IN 54.9'
AutoCAD SHX Text
ELEC. PANEL
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
S69°01'11"E
AutoCAD SHX Text
313.48'
AutoCAD SHX Text
273.68'
AutoCAD SHX Text
S35°38'04"W
AutoCAD SHX Text
S59°56'38"E
AutoCAD SHX Text
403.63'
AutoCAD SHX Text
N31°39'36"E
AutoCAD SHX Text
40.64'
AutoCAD SHX Text
N39°03'55"E
AutoCAD SHX Text
13.69'
AutoCAD SHX Text
N35°30'02"E
AutoCAD SHX Text
111.05'
AutoCAD SHX Text
N34°06'38"E
AutoCAD SHX Text
144.34'
AutoCAD SHX Text
N39°19'44"E
AutoCAD SHX Text
48.38'
AutoCAD SHX Text
N32°17'59"E
AutoCAD SHX Text
145.90'
AutoCAD SHX Text
N34°52'08"E
AutoCAD SHX Text
288.40'
AutoCAD SHX Text
14.25'
AutoCAD SHX Text
N52°31'14"W
AutoCAD SHX Text
103.76'
AutoCAD SHX Text
N48°20'24"W
AutoCAD SHX Text
74.73'
AutoCAD SHX Text
S44°06'13"W
AutoCAD SHX Text
266.94'
AutoCAD SHX Text
N52°22'40"W
AutoCAD SHX Text
121.37'
AutoCAD SHX Text
S34°51'25"W
AutoCAD SHX Text
S26°59'07"W
AutoCAD SHX Text
18.68'
AutoCAD SHX Text
47.63'
AutoCAD SHX Text
S32°40'22"W
AutoCAD SHX Text
276.56'
AutoCAD SHX Text
N69°00'25"W
AutoCAD SHX Text
256.95'
AutoCAD SHX Text
S21°00'04"W
AutoCAD SHX Text
105.33'
AutoCAD SHX Text
N69°01'11"W
AutoCAD SHX Text
49.86'
AutoCAD SHX Text
N46°52'36"W
AutoCAD SHX Text
259.27'
AutoCAD SHX Text
N59°54'32"W
AutoCAD SHX Text
50.00'
AutoCAD SHX Text
S30°22'57"W
AutoCAD SHX Text
S59°54'32"E
AutoCAD SHX Text
199.79'
AutoCAD SHX Text
S59°54'32"E
AutoCAD SHX Text
54.02'
AutoCAD SHX Text
S46°52'36"E
AutoCAD SHX Text
53.93'
AutoCAD SHX Text
211.44'
AutoCAD SHX Text
N69°01'11"W
AutoCAD SHX Text
N35°38'04"E
AutoCAD SHX Text
51.68'
AutoCAD SHX Text
N/F DONALD O. KENNISON 16974/384 MAP 66, PARCEL 26B
AutoCAD SHX Text
N/F 4 U.S. ROUTE 1, LLC 17887/483 MAP 86, PARCEL 1
AutoCAD SHX Text
N/F MICHAEL A. BORNSTEIN 16380/210 MAP 86, PARCEL 3E
AutoCAD SHX Text
N/F PELLETIER FAMILY IRREVOCABLE TRUST 16629/370 MAP 86, PARCEL 3B
AutoCAD SHX Text
N/F DESROCHERS FAMILY TRUST OF 2017 17469/603 MAP 86, PARCEL 3C
AutoCAD SHX Text
EDGE OF POND
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
MB
AutoCAD SHX Text
EXISTING 12" CI CULVERT
AutoCAD SHX Text
EXISTING CMP CULVERT
AutoCAD SHX Text
EXISTING COTTAGE
AutoCAD SHX Text
ERM=59.6'
AutoCAD SHX Text
ERM=53.6'
AutoCAD SHX Text
INVERT IN = 48.5'
AutoCAD SHX Text
12"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
20"
AutoCAD SHX Text
10"
AutoCAD SHX Text
7"
AutoCAD SHX Text
6"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
11"
AutoCAD SHX Text
14"
AutoCAD SHX Text
6"
AutoCAD SHX Text
7"
AutoCAD SHX Text
10"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
7"
AutoCAD SHX Text
10"
AutoCAD SHX Text
7"
AutoCAD SHX Text
14"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
9"
AutoCAD SHX Text
8"
AutoCAD SHX Text
7"
AutoCAD SHX Text
7"
AutoCAD SHX Text
7"
AutoCAD SHX Text
8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
10"
AutoCAD SHX Text
6"
AutoCAD SHX Text
7"
AutoCAD SHX Text
7"
AutoCAD SHX Text
9"
AutoCAD SHX Text
12"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
7"
AutoCAD SHX Text
8"
AutoCAD SHX Text
(4)10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
7"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
(2)14"
AutoCAD SHX Text
15"
AutoCAD SHX Text
12"
AutoCAD SHX Text
14"
AutoCAD SHX Text
12"
AutoCAD SHX Text
26"
AutoCAD SHX Text
(2)7"
AutoCAD SHX Text
19"
AutoCAD SHX Text
6"
AutoCAD SHX Text
(4)10"
AutoCAD SHX Text
12"
AutoCAD SHX Text
7"
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
EXISTING ABUTTER'S WELL
AutoCAD SHX Text
EXISTING ABUTTER'S WELL
AutoCAD SHX Text
INV. OUT = 41.9'
AutoCAD SHX Text
INV. IN = 42.7'
AutoCAD SHX Text
ABUTTER'S SEPTIC SYSTEM PER TOWN RECORDS
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
48
AutoCAD SHX Text
50
AutoCAD SHX Text
52
AutoCAD SHX Text
54
AutoCAD SHX Text
56
AutoCAD SHX Text
58
AutoCAD SHX Text
60
AutoCAD SHX Text
52
AutoCAD SHX Text
54
AutoCAD SHX Text
TEMPORARY ECM BERM
AutoCAD SHX Text
PERMANENT ECM BERM AROUND STOCKPILE AREA
AutoCAD SHX Text
TEMPORARY ECM BERM
AutoCAD SHX Text
TEMPORARY COFFERDAM DURING WETLAND CROSSING CONSTRUCTION ONLY
AutoCAD SHX Text
TEMPORARY CONSTRUCTION ENTRANCE
AutoCAD SHX Text
TEMPORARY COFFERDAM DURING CONTROL OUTLET STRUCTURE INSTALLATION
AutoCAD SHX Text
TEMPORARY ECM BERM
AutoCAD SHX Text
INSTALL PERMANENT PLUNGE POOL PRIOR TO REPLACING CONTROL OUTLET STRUCTURE
AutoCAD SHX Text
D
AutoCAD SHX Text
Y
AutoCAD SHX Text
H
AutoCAD SHX Text
STANDARD EROSION AND SEDIMENTATION CONTROL MEASURES: 1. ALL WORK SHALL COMPLY WITH THE CURRENT VERSION OF THE MAINE ALL WORK SHALL COMPLY WITH THE CURRENT VERSION OF THE MAINE EROSION AND SEDIMENT CONTROL BMP MANUAL PUBLISHED BY MAINE DEP. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH SAID MANUAL. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE PRIOR ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY SOIL DISTURBING ACTIVITIES. 3. THE CONTRACTOR SHALL STRIP AND GRADE ONLY THOSE AREAS SUBJECT TO THE CONTRACTOR SHALL STRIP AND GRADE ONLY THOSE AREAS SUBJECT TO IMMEDIATE CONSTRUCTION. ALL DISTURBED AREAS MUST BE STABILIZED WITHIN 7 DAYS OF FINAL GRADING. ANY EXPOSED SOIL THAT WILL NOT BE WORKED FOR MORE THAN 7 DAYS SHALL BE STABILIZED WITH MULCH. STABILIZE AREAS WITHIN 75 FEET OF A WETLAND OR WATER BODY WITHIN 48 HOURS OF THE INITIAL DISTURBANCE OF THE SOIL OR PRIOR TO ANY STORM EVENT, WHICHEVER COMES FIRST. 4. ALL TOPSOIL STRIPPED FROM THE AREA SHALL BE STOCKPILED, TEMPORARILY ALL TOPSOIL STRIPPED FROM THE AREA SHALL BE STOCKPILED, TEMPORARILY MULCHED WITH HAY AND SURROUNDED BY A HAY BALE BARRIER UNTIL IT IS SPREAD AND FINAL GRADING IS COMPLETE. 5. PERMANENT STABILIZATION MUST BE IMPLEMENTED WITHIN 60 DAYS OF SOIL PERMANENT STABILIZATION MUST BE IMPLEMENTED WITHIN 60 DAYS OF SOIL DISTURBANCE OR BY OCTOBER 1, WHICH EVER IS EARLIER. 6. PERMANENT SEEDING WILL BE DONE AS EARLY AS POSSIBLE IN THE GROWING PERMANENT SEEDING WILL BE DONE AS EARLY AS POSSIBLE IN THE GROWING SEASON. PERMANENT SEEDING SHOULD BE MADE PRIOR TO AUGUST 15. IF SEEDING CANNOT BE DONE PRIOR TO OCTOBER 1, DORMANT SEEDING WILL BE DONE ACCORDING TO THE MAINE EROSION AND SEDIMENT CONTROL BMP MANUAL WITH TEMPORARY MULCHING. 7. TOPSOIL WILL BE UNIFORMLY SPREAD A MINIMUM OF 4 INCHED DEEP OVER TOPSOIL WILL BE UNIFORMLY SPREAD A MINIMUM OF 4 INCHED DEEP OVER ALL AREAS TO BE RE-VEGETATED. WHERE THE SOIL HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS, LOOSEN SOIL TO A DEPTH OF TWO (2) INCHES BEFORE APPLYING FERTILIZER, LIME AND SEED. 8. LIME SHALL BE APPLIED AS FAR IN ADVANCE OF SEEDING AS POSSIBLE. LIME SHALL BE APPLIED AS FAR IN ADVANCE OF SEEDING AS POSSIBLE. WORK LIME AND FERTILIZER INTO THE SOIL TO A DEPTH OF 4 INCHES EITHER BEFORE OR DURING FINAL SEED BED PREPARATION 9. IF SEEDING DOES NOT TAKE AT LEAST 80% IN ANY AREA WITHIN 30 DAYS IT IF SEEDING DOES NOT TAKE AT LEAST 80% IN ANY AREA WITHIN 30 DAYS IT SHOULD BE RESEEDED IMMEDIATELY OR TEMPORALLY MULCHED AND RESEEDED WITHIN ONE PLANTING SEASON. 10. SEDIMENT CONTROL BARRIERS CAN BE REMOVED UPON STABILIZATION OF THE SEDIMENT CONTROL BARRIERS CAN BE REMOVED UPON STABILIZATION OF THE FINISHED GRADES AND USED AS ADDITIONAL MULCHING MATERIAL (IF APPLICABLE). 11. THE SEEDED AREAS SHALL BE INSPECTED EVERY 15 DAYS AND MAINTAINED THE SEEDED AREAS SHALL BE INSPECTED EVERY 15 DAYS AND MAINTAINED BY WATERING, WEEDING, MOWING, TRIMMING, REGRADING AND REPLANTING AS REQUIRED TO ESTABLISH A LAWN FREE OF ERODED OR BARE AREAS. 12. BIODEGRADABLE EROSION CONTROL BLANKET SHALL BE INSTALLED ON ALL BIODEGRADABLE EROSION CONTROL BLANKET SHALL BE INSTALLED ON ALL SLOPES TO BE VEGETATED THAT ARE GREATER THAN 3:1 SLOPE UNLESS OTHERWISE SPECIFIED ON THE PLANS. 13. MINIMUM APPLICATION RATES: MINIMUM APPLICATION RATES: TEMPORARY HAY OR STRAW MULCH: 2 BALES PER 1,000 SF 2 BALES PER 1,000 SF (DOUBLE IN WINTER) EROSION CONTROL MIX: < 3:1 SLOPE = 2 INCHES < 3:1 SLOPE = 2 INCHES 3:1-2:1 SLOPE = 4 INCHES TEMPORARY SEEDING: WINTER RYE 112 LB/ACRE (FALL) 112 LB/ACRE (FALL) (FALL) OATS 80 LB/ACRE (SPRING) 80 LB/ACRE (SPRING) (SPRING) ANNUAL RYEGRASS 40 LB/ACRE 40 LB/ACRE SUDANGRASS 40 LB/ACRE (SUMMER) 40 LB/ACRE (SUMMER) (SUMMER) PERENNIAL 40 LB/ACRE 40 LB/ACRE 14. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, OR HYDROSEED (SLURRY APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, OR HYDROSEED (SLURRY INCLUDING SEED AND FERTILIZER). HYDROSEEDINGS, WHICH INCLUDE MULCH, MAY BE LEFT ON SOIL SURFACE. SEEDING RATES MUST BE INCREASED 10% WHEN HYDROSEEDING. 15. ALL TEMPORARY SEDIMENT CONTROL MEASURED SHALL BE REMOVED WITHIN ALL TEMPORARY SEDIMENT CONTROL MEASURED SHALL BE REMOVED WITHIN 30 DAYS AFTER PERMANENT STABILIZATION IS ATTAINED. REMOVE ANY ACCUMULATED SEDIMENTS AND RESTABALIZE IF NECESSARY. MAINTENANCE AND INSPECTION PROCEDURES FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES A. GENERAL: THE FOLLOWING GENERAL INSPECTION AND MAINTENANCE PRACTICES GENERAL: THE FOLLOWING GENERAL INSPECTION AND MAINTENANCE PRACTICES SHALL BE USED THROUGHOUT THE PROJECT. 1. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF 0.5 INCHES OR GREATER. 2. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT SHALL BE COMPLETED WITHIN 24 HOURS. 3. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE OR SEDIMENT BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE OR SEDIMENT BARRIERS WHEN IT HAS REACHED ONE THIRD THE HEIGHT OF THE FENCE OR BALE, OR WHEN "BULGES" OCCURS. 4. ALL DIVERSION DIKES SHALL BE INSPECTED AND ANY BREACHES PROMPTLY ALL DIVERSION DIKES SHALL BE INSPECTED AND ANY BREACHES PROMPTLY REPAIRED. 5. TEMPORARY SEEDING AND PLANTING SHALL BE INSPECTED FOR BARE SPOTS, TEMPORARY SEEDING AND PLANTING SHALL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND UNHEALTHY GROWTH. 6. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION. 7. THE CONTRACTOR'S SITE SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE CONTRACTOR'S SITE SUPERINTENDENT SHALL BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE AND REPAIR ACTIVITIES, AND FILLING OUT THE INSPECTION AND MAINTENANCE REPORT. 8. THE OWNER'S AUTHORIZED REPRESENTATIVE SHALL INSPECT THE SITE ON A THE OWNER'S AUTHORIZED REPRESENTATIVE SHALL INSPECT THE SITE ON A PERIODIC BASIS TO REVIEW COMPLIANCE WITH THE PLANS. 9. AN AREA SHALL BE CONSIDERED STABLE IF ONE OF THE FOLLOWING HAS AN AREA SHALL BE CONSIDERED STABLE IF ONE OF THE FOLLOWING HAS OCCURRED: a. BASE COURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED; BASE COURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED; b. A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED; A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED; c. A MINIMUM OF 3 INCHES OF NON-EROSIVE MATERIAL SUCH AS STONE A MINIMUM OF 3 INCHES OF NON-EROSIVE MATERIAL SUCH AS STONE OR RIPRAP HAS BEEN INSTALLED OR d. EROSION CONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED, EROSION CONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED, 10. SODDING - SODDING IS DONE WHERE IT IS DESIRABLE TO RAPIDLY ESTABLISH SODDING - SODDING IS DONE WHERE IT IS DESIRABLE TO RAPIDLY ESTABLISH COVER ON A DISTURBED AREA. SODDING AN AREA MAY BE SUBSTITUTED FOR PERMANENT SEEDING PROCEDURES ANYWHERE ON SITE. PREPARATION, FERTILIZING, AND PLACEMENT OF SOD SHALL BE PERFORMED ACCORDING TO SUPPLIER'S SPECIFICATIONS. SODDING IS RECOMMENDED FOR STEEP SLOPED AREAS. AREAS IMMEDIATELY ADJACENT TO SENSITIVE WATER COURSES, EASILY ERODIBLE SOILS (FINE SAND/SILT) ETC.
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVAL OF THE PLANNING BOARD
AutoCAD SHX Text
OF YORK, MAINE
AutoCAD SHX Text
THE SIGNATURES OF 3 OR MORE PLANNING
AutoCAD SHX Text
BOARD MEMBERS CAN BE FOUND ON PLAN SHEET C3.
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL PLAN
AutoCAD SHX Text
C4
AutoCAD SHX Text
4 VACATION DRIVE, YORK, MAINE 03909
AutoCAD SHX Text
LUPINE PARK - MIXED USE DEVELOPEMENT
AutoCAD SHX Text
JOSHUA STAUBLE
AutoCAD SHX Text
8 SHORT FARM ROAD
AutoCAD SHX Text
KITTERY POINT, MAINE 03905
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
MCCARTHY
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
#12895
AutoCAD SHX Text
F
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
RYAN M.
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
JANUARY 3, 2020
AutoCAD SHX Text
EROSION CONTROL MIX (ECM) BERM DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
2 MIN.
AutoCAD SHX Text
1" MIN.
AutoCAD SHX Text
EXISTING GROUND SURFACE
AutoCAD SHX Text
STRUMP GRINDINGS BERM
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
NOTES: 1. IT MAY BE NECESSARY TO CUT, PACK DOWN OR REMOVE TALL GRASSES, IT MAY BE NECESSARY TO CUT, PACK DOWN OR REMOVE TALL GRASSES, BRUSH OR WOODY VEGETATION TO AVOID VOIDS AND BRIDGES THAT ALLOW THE WASHING AWAY OF FINE SOIL PARTICLES. 2. THE ECM BERM SHOULD BE A MINIMUM OF 12" HIGH AND A MINIMUM OF 2' THE ECM BERM SHOULD BE A MINIMUM OF 12" HIGH AND A MINIMUM OF 2' WIDE. ON LONGER OR STEEPER SLOPES, THE BERM WILL NEED TO BE WIDER AND HIGHER. 3. BERMS COMPOSED OF ECM CAN BE RESHAPED WHEN NECESSARY.BERMS COMPOSED OF ECM CAN BE RESHAPED WHEN NECESSARY.
AutoCAD SHX Text
EXISTING EDGE OF PAVEMENT
AutoCAD SHX Text
MAIN ROAD
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
DIVERSION RIDGE (IF APPLICABLE)
AutoCAD SHX Text
NOTES: 1. THE ENTRANCE SHALL BE MAINTAINED THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRED TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAYS. 3. WHEN WASHING IS REQUIRED, IT WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP. 4. STONE SHALL BE 2"-3" COURSE STONE SHALL BE 2"-3" COURSE AGGREGATE AND A MINIMUM OF 6" THICK. 5. DIVERSION BERM REQUIRED WHERE DIVERSION BERM REQUIRED WHERE SLOPE OF DRIVEWAY EXCEED 2% TOWARDS MAIN ROAD.
AutoCAD SHX Text
2"-3" STONE
AutoCAD SHX Text
TEMPORARY CONSTRUCTION ENTRANCE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
0
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
50
AutoCAD SHX Text
200
AutoCAD SHX Text
25

·

·

·

·

·

DRAWING

DATE:

SCALE:

DEC. 2, 2019

NOT VALID UNLESSSIGNED AND STAMPED

SU

BMIS

SIO

N/R

EVIS

ION

DES

CR

IPTI

ON

NO

.D

ATE:

JOB #: 19-131

PRO

JEC

T:

SHEE

T:

CLI

ENT:

TIDEWATER

EN

GIN

EER

IN

G &

SU

RV

EY

IN

G,

IN

C.

89 R

ou

te 236 Su

ite 3, K

ittery, M

E 03904

(207)439-2222

www.tidew

atercivil.co

m R

EVIS

ED P

ER C

OM

MEN

TS F

RO

M L

AND

USE

TEC

HN

ICIA

N O

N 1

/2/2

020

11/

3/20

20

AS SHOWN

AutoCAD SHX Text
CONSTRUCTION DETAILS
AutoCAD SHX Text
C5
AutoCAD SHX Text
14" BOLT
AutoCAD SHX Text
14" BOLT
AutoCAD SHX Text
FACE OF CURB OR EDGE OF PAVEMENT
AutoCAD SHX Text
GROUND
AutoCAD SHX Text
GALVANIZED U-CHANNEL POST
AutoCAD SHX Text
SIGN POST
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. POSTS SHALL BE PLUMB; ANY POSTS SHALL BE PLUMB; ANY POST BENT OR OTHERWISE DAMAGED SHALL BE REMOVED AND PROPERLY REPLACED. 2. POSTS MAY BE SET OR DRIVEN. POSTS MAY BE SET OR DRIVEN. 3. WHEN POSTS ARE SET, HOLES WHEN POSTS ARE SET, HOLES SHALL BE DUG TO PROPER DEPTH. AFTER INSERTING POSTS, THE HOLES SHALL BE BACKFILLED WITH SUITABLE MATERIAL IN 6" LIFTS AND THOROUGHLY COMPACTED. 4. WHEN POSTS ARE DRIVEN, A WHEN POSTS ARE DRIVEN, A SUITABLE DRIVING CAP SHALL BE USED. POSTS SHALL NOT BE DRIVEN WHILE SIGN IS ATTACHED. 5. SIGNS SHALL MEET THE SIGNS SHALL MEET THE REQUIREMENTS OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) AND INSTALLED IN ACCORDANCE WITH THE MANUAL. 6. THE POST SHALL NOT EXTEND THE POST SHALL NOT EXTEND ABOVE THE TOP OF THE SIGN. 7. POST SHALL BE GALVANIZED POST SHALL BE GALVANIZED GRADE 60 STEEL (ASTM A-499) OR GRADE 1070-1080 (ASTM A-576).
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVAL OF THE PLANNING BOARD
AutoCAD SHX Text
OF YORK, MAINE
AutoCAD SHX Text
THE SIGNATURES OF 3 OR MORE PLANNING
AutoCAD SHX Text
BOARD MEMBERS CAN BE FOUND ON PLAN SHEET C3.
AutoCAD SHX Text
SETTLING BASIN
AutoCAD SHX Text
LEVEL LIP EDGE
AutoCAD SHX Text
CONCENTRATED FLOW
AutoCAD SHX Text
DISPERSED FLOW
AutoCAD SHX Text
KEY FABRIC
AutoCAD SHX Text
LEVEL LIP
AutoCAD SHX Text
RIPRAP LAYER THICKNESS 2.25XD60
AutoCAD SHX Text
NON-WOVEN GEOTEXTILE FABRIC
AutoCAD SHX Text
CONCENTRATED FLOW
AutoCAD SHX Text
MAXIMIZE BASIN AREA AND DEPTH
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
CROSS-SECTION
AutoCAD SHX Text
PLUNGE POOL SIZING (MINIMUM)
AutoCAD SHX Text
12"
AutoCAD SHX Text
5"
AutoCAD SHX Text
3-4'
AutoCAD SHX Text
4-6'
AutoCAD SHX Text
8-10'
AutoCAD SHX Text
18"
AutoCAD SHX Text
8"
AutoCAD SHX Text
4-6'
AutoCAD SHX Text
6-8'
AutoCAD SHX Text
12-18'
AutoCAD SHX Text
24"
AutoCAD SHX Text
10"
AutoCAD SHX Text
6-8'
AutoCAD SHX Text
8-10'
AutoCAD SHX Text
18-22'
AutoCAD SHX Text
30"
AutoCAD SHX Text
12"
AutoCAD SHX Text
8-10'
AutoCAD SHX Text
12-14'
AutoCAD SHX Text
22-28'
AutoCAD SHX Text
36"
AutoCAD SHX Text
14"
AutoCAD SHX Text
10-12'
AutoCAD SHX Text
14-16'
AutoCAD SHX Text
28-32'
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
RIPRAP SIZING D50
AutoCAD SHX Text
WIDTH AT THE NARROW END OF PIPE
AutoCAD SHX Text
LENGTH FOR SLOW FLOWS (NO PRESSURE HEAD)
AutoCAD SHX Text
LENGTH FOR HIGH FLOWS (WITH PRESSURE HEAD)
AutoCAD SHX Text
THE DIAMETER OF THE LARGEST STONE SIZE IN THE MIX SHOULD BE ABOUT 1.5 TIMES THE D50 AND THE SMALLEST ONE ABOUT ONE HALF THE SIZE. THE THICKNESS OF RIPRAP SHOULD NEVER BE LESS THAN 2 TIMES THE ROCK D50.
AutoCAD SHX Text
CONSTRUCTION SPECIFICATIONS IF THE PIPE DISCHARGES ONTO A FLAT AREA THE APRON SHOULD HAVE A WIDTH THAT IS THREE TIMES THE OUTLET PIPE'S DIAMETER. IF THE PIPE FLOWS HAVE THE POTENTIAL OF CAUSING A GULLY, A LEVEL SPREADER SHOULD BE PROVIDED. THE CHANNEL SIDE SLOPES SHOULD BE NO STEEPER THAN 2:1. RIPRAP ON THE SIDES OF THE PLUNGE POOL SHOULD EXTEND TO THE TOP OF THE CHANNEL. THE PLUNGE POOL SIZING AND THE MEDIAN SIZED RIPRAP CAN BE DETERMINED FROM THE FOLLOWING TABLE. THE THICKNESS OF RIPRAP SHOULD NOT BE LESS THAN 2 TIMES THE ROCK D50 A GEOTEXTILE OR APPROPRIATE GRAVEL FILTER SHOULD BE USED TO PROTECT AGAINST PIPING OF SOIL FINES FROM BENEATH THE ROCK. IN A CHANEL THAT CAN BE REVEGETATED, SEED AND MULCH SHOULD BE APPLIED WITHIN 7 DAYS FROM FINAL CONSTRUCTION.
AutoCAD SHX Text
PLUNGE POOL DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PONDED EL
AutoCAD SHX Text
3" MDOT TYPE A AGGREGATE MAINE DOT SPEC 703.06
AutoCAD SHX Text
18" MDOT TYPE D AGGREGATE MAINE DOT SPEC 703.06
AutoCAD SHX Text
COMPACTED FILL MAINE DOT SPEC 703.20 GRAVEL BORROW
AutoCAD SHX Text
GENERAL MATERIAL NOTES - APPLIED TO ALL DETAILS UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
1. MATERIAL AND CONSTRUCTION METHODS SHALL CONFORM TO THE STATE OF MAINE STANDARD SPECIFICATIONS REVISION OF NOV. 2014. 2. ALL ORGANIC MATERIALS, ROCKS AND BOULDERS WITHIN TWO FEET BELOW THE SUBGRADE OF THE ROAD SHALL BE REMOVED AND REPLACED WITH SUITABLE COMPACTED FILL MEETING MAINE DOT SPEC 703.20 GRAVEL BORROW. 3. FILL UNDER SURFACES TO BE PAVED SHALL BE INSTALLED AND COMPACTED IN ACCORDANCE WITH THE STATE OF MAINE STANDARD SPECIFICATIONS.
AutoCAD SHX Text
TYPICAL ROADWAY SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
4" LOAM & SEED
AutoCAD SHX Text
4 VACATION DRIVE, YORK, MAINE 03909
AutoCAD SHX Text
LUPINE PARK - MIXED USE DEVELOPEMENT
AutoCAD SHX Text
JOSHUA STAUBLE
AutoCAD SHX Text
8 SHORT FARM ROAD
AutoCAD SHX Text
KITTERY POINT, MAINE 03905
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
MCCARTHY
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
#12895
AutoCAD SHX Text
F
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
RYAN M.
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
JANUARY 3, 2020
AutoCAD SHX Text
BOLLARD (TYP.)
AutoCAD SHX Text
DUMPSTER ENCLOSURE DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
6 CY DUMPSTER
AutoCAD SHX Text
SOLID PANEL FENCE (6FT TALL)
AutoCAD SHX Text
SOLID PANEL GATE (6FT TALL)
AutoCAD SHX Text
STOP SIGN (R1-1)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. WHITE LEGEND & BORDER ON RED BACKGROUND WHITE LEGEND & BORDER ON RED BACKGROUND 2. SIGN SHALL BE RETROFLECTIVE SIGN SHALL BE RETROFLECTIVE 3. SIGN SHALL COMPLY W/ MUTCD STANDARDSSIGN SHALL COMPLY W/ MUTCD STANDARDS
AutoCAD SHX Text
MUTCD R1-1
AutoCAD SHX Text
HANDICAP & VAN ACCESSIBLE SIGN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. VAN ACCESSIBLE SIGN TO BE ATTACHED TO THE SIGN VAN ACCESSIBLE SIGN TO BE ATTACHED TO THE SIGN POST UNDER THE STANDARD HANDICAPPED PARKING SIGN WHERE NOTED ON PLANS. 2. SIGN SHALL COMPLY WITH MUTCD STANDARDSSIGN SHALL COMPLY WITH MUTCD STANDARDS
AutoCAD SHX Text
MUTCD R7-1
AutoCAD SHX Text
MUTCD R7-8P
AutoCAD SHX Text
BOLLARD DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CROWN CONCRETE FILL TO SHED WATER
AutoCAD SHX Text
4" STEEL PIPE: PIPE SHALLCONTINUE LENGTH OF FOOTING. FILL LENGTH OF PIPE WITH CONCRETE.
AutoCAD SHX Text
CONCRETE FOOTING
AutoCAD SHX Text
12" EXPANSION JOINT
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
CROWN CONCRETE FILL TO SHED WATER
AutoCAD SHX Text
INLET GRATE W/ FRAME CAST INTO TOP OF CONCRETE
AutoCAD SHX Text
INLET FRAME & GRATE
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
CONTROL OUTLET STRUCTURE DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
RIM = 46.0'
AutoCAD SHX Text
INV. = 42.7'
AutoCAD SHX Text
12" WIDE X 5" TALL ORIFICE
AutoCAD SHX Text
INV. = 42.3'
AutoCAD SHX Text
KOR-N-SEAL WATERPROOF BOOT FOR 12" HDPE PIPE
AutoCAD SHX Text
12" HDPE OUTLET PIPE
AutoCAD SHX Text
INLET GRATE W/ FRAME CAST INTO TOP OF CONCRETE
AutoCAD SHX Text
RIM = 46.0'
AutoCAD SHX Text
ORIFICE OPENING IN CONCRETE
AutoCAD SHX Text
INV. = 42.7'
AutoCAD SHX Text
SIDE VIEW
AutoCAD SHX Text
FRONT VIEW FACING POND
AutoCAD SHX Text
3/4"-1 1/2" CLEAN CRUSHED STONE
AutoCAD SHX Text
BUILDING FOUNDATION
AutoCAD SHX Text
ROOF DRIPLINE W/ UNDERDRAIN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
4" PVC PERFORATED UNDERDRAIN (SLOPE MIN. OF 0.5% TO OUTLET)

1

Ryan McCarthy

From: Owen T. Davis <[email protected]> on behalf of Owen T. Davis

Sent: Thursday, December 12, 2019 12:25 PM

To: Ryan McCarthy

Subject: 4 Vacation Drive

Ryan The York Police Department has not issues or special conditions with regards to the Mixed Use Development at 4 Vacation Dr. York , Maine Reference No. 19-131. If you have any questions please feel free to contact me, thank you Owen Deputy Chief Owen T. Davis York Police Department 9 Hannaford Drive York, ME 03909 Email: [email protected] Phone: 207-363-4444

CONFIDENTIALITY: The information contained in this electronic mail message and any electronic files attached to it may be confidential information, and may also be the subject of legal professional privilege and/or public interest immunity. If you are not the intended recipient you are required to delete it. Any use, disclosure or copying of this message and any attachments is unauthorized. If you have received this electronic message in error, please inform the sender or contact [email protected]. This footnote also confirms that this email message has been checked for the presence of computer viruses.

1

Ryan McCarthy

From: Christopher Balentine <[email protected]> on behalf of Christopher Balentine

Sent: Saturday, December 14, 2019 8:55 AM

To: [email protected]

Cc: Dylan Smith

Subject: Vacation Drive-Stauble Project York Maine

Attachments: VacationDriveStauble121419.docx

To: Ryan McCarthy, Tidewater Engineering From: Chris Balentine, Chief, YFD Date: 14 Dec 2019 Dear Sir, The plans provided to me have been reviewed and comments are enclosed on the attachment. Thanks for the opportunity. Regards, Chris Balentine

YORK FIRE DEPARTMENT PROJECT REQUIREMENTS

1. New building must have smoke detection equipment hard wired in to a central alarm panel

contained within building. Noun named zones must be clearly annotated on alarm panel.

Heat detectors must be installed in concealed attic spaces. Alarm systems must be

addressable systems.

2. Knox box must be provided on front of building, nearest main entrance.

3. Reasonable fire apparatus access (not necessarily paved) must be provided to three sides.

4. Provide construction details on building design prior to building permit application to the

fire department.

5. Dry standpipe fire hydrant will be required to be installed in the pond with gravel apron to

allow fire apparatus access for water supply in case of fire. Additional detail available from

YFD for this device. (Kochek)

6. All buildings must have the street number clearly marked on the outside of the building in

bold letters or numbers for ease of locating in case of emergency.

7. The above noted fire safety requirements must appear in print on any final project plans

before approval signature(s) will be granted.

1

Ryan McCarthy

From: Dean Lessard <[email protected]> on behalf of Dean Lessard

Sent: Thursday, January 2, 2020 5:21 PM

To: Heather Ross

Cc: Dylan Smith; Ryan McCarthy ([email protected])

Subject: Lupine Park - 4 Vacation Drive

Hi Heather, Thank you for the opportunity to comment on the proposed Lupine Park mixed use development. I have reviewed the traffic assessment provided by Ryan McCarthy of Tidewater Engineering & Surveying Inc. and Bill Bray of Traffic Solutions for the development based on the proposed uses. I concur with their trip generation assumptions, Land use codes (#817 Nursery- Garden Center) and calculations. The trip generation for the proposed development is slightly more than 35 trips in the Saturday and Sunday peak hour. Based on the ITE trip generation criteria I asked Mr. Bray to analyze the existing safety conditions and accident history in the vicinity of Vacation Drive. Mr. Bray has done that and he included the results with the submittal. Therefore at this time no additional traffic analysis is required. The report shows that there are no high crash locations adjacent to the development. Based on Mr. Bray’s Traffic Assessment report I recommend the following improvements:

I recommend that we require the developer to install a Street light to be owned and maintained by the Developer at the existing entrance/exit of Vacation Drive.

I asked the a note be added to the plan that requires the proposed business sign to meet DOT’s requirement for signs installed on Route 1.

These improvements will improve safety at the existing entrance/exit. Let me know if you need anything else from me. Thanks again Dean

Dean A. Lessard, P.E. | Director of Public Works Town of York, Maine 186 York Street | York, Maine 03909 Phone: (207) 363-1010, Ext. 6201 Fax: (207) 363-1012 E-Mail: [email protected] Online: www.yorkpublicworks.org

Follow us! Facebook: www.facebook.com/YorkMainePublicWorks

CONTACT ID

FIELD DETERMINATION FORM

12/17/2019DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF LAND RESOURCES

12342

89 ROUTE 2364 vacation drive can be accessed of route 1. vacation drive is located between

creation lane and parsons lane.

YORK

LANGLOIS, LUCIEN

JOSHUA STAUBLE

DIRECTIONS

PROPERTY_OWNER

MAP LOT

SITE_TOWN

RESOURCE_

STAFF

CONTACT

8 SHORT FARM ROAD

TIDEWATER MCCARTHY

KITTERY, ME 03904

KITTERY, ME 03905

MEMO

On November 13, 2019, Department staff met on-site with Ryan McCarthy of Tidewater Engineering & Surveying, Inc. at 4 Vacation

Drive in York. Staff was asked to review an area on the parcel near a dilapidated structure. The area was accessed by traveling

approximately 500 feet down Vacation Drive and following a trail leading south. The trail leads to the dilapidated structure.

Staff observed surface water flowing west across the trail. The water originates from a man-made pond within a wetland area that abuts

Route 1. Staff observed human alterations to the drainage feature that crosses the trail. The drainage feature was determined to not be a

jurisdictional 'river, stream or brook' as defined in the Natural Resources Protection Act (NRPA), 38 M.R.S. § 480-B(9). The drainage

feature would still be regulated as 'freshwater wetlands' (wetlands) as defined in the Natural Resources Protection Act (NRPA), 38 M.R.S.

§ 480-B(4). Any activities located in, on or over the wetlands may require a NRPA permit. However, replacement of an existin crossing

may not require a permit from DEP pursuant to the NRPA, 38 M.R.S. § 480-Q(2-D).

Please make sure that all local permits, as well as applicable federal permits, have been obtained prior to starting any work. Erosion

control devices must be installed and maintained on the project site during any soil disturbance activity. A Stormwater Management Law

PBR or Maine Construction General Permit "NOI" and "NOT" must be filed with the Department if more than 1 acre of area is going to

be disturbed on the project site at any given time during construction.

1

12/17/201911/13/2019RECEIVED COMPLETED11/13/2019SITE_VISIT