january 2018 division meeting - campus construction
Upload: university-of-south-carolina-division-of-student-affairs-and-academic-support
Post on 28-Jan-2018
21 views
TRANSCRIPT
Slide 11911 Aerial view of campus
“Throughout the cultural changes of mankind the physical embodiments of the Church, the State and the University have most successfully survived. It would seem as if the phantasmagoria of change were not wholly satisfying to man, but that something must remain stable before his eyes to provide a firm foundation… To invest an educational institution with an architectural form is, therefore, a serious matter, for it should be building for all time, in like manner as churches and houses of state are conceived and undertaken.” -Klauder and Wise, 1929
Student Affairs Planning PresentationJanuary 12, 2018
Slide 11958/1959 Aerial view of campus
Slide 11959 view of the Thomas Cooper Library
Slide 1Thomas Cooper Library now
Slide 1The new Center For Health And Well-Being
Slide 1The new Center For Health And Well-Being
Slide 1The new Center For Health And Well-Being
Slide 1The new Law Center
Academic
ResidentialUnion/Wellness/Library/Event
Support and Operations
Athletic
Parking Garages
2017 DataTotal Building Summary
215 Buildings
13.4 Million GSF (Approx.)
2018
Planning
Projects in Planning
2018
Construction
Under Construction in 2018
Slide 1
Slide 1
Slide 1
Slide 11955 view of the Russell House
Slide 11954 Russell House
Slide 11957 Russell House Addition
Slide 11965 Russell House Addition
Slide 11974 Russell House Addition
Slide 12018/2019? Russell House Addition
Slide 1Existing Russell House Aerial Photo
Slide 12018/2019? Russell House Addition
Slide 1
Slide 1
Slide 1
South Main Street
Slide 1
Existing South Main Street
Slide 1
Greene Street/Foundation Square Phase I‐ Completed
Slide 1
Future Innovista Projects
Greene Street Phase 2 Bridge over the railroad
Future Commuter Parking Lot
Future Parking Garage
Slide 1
ProposedSite
Greek Village
Innovista Parking Garage
Blossom Street
Devine Street
West Campus Parking Garage
Blossom Street
Devine Street
Railroa
d
Gad
sden
Stree
t
Parking Garage
Greek Village
Slide 1
Project Description:
• The third wing will be added to include Honors College academic space and 136 student beds.
• Four classrooms and a lecture hall.• Student study spaces throughout.
Honors College Residence Hall Expansion
Slide 1Existing Aerial View of South Campus
Slide 1
Slide 1Recreation Fields on 300 Acres by the river
Slide 1Rocky Branch Greenway
Slide 1The Freight Farm hydroponic growing system
Slide 1The Freight Farm hydroponic growing system
38
Questions