Determination of Generic LevellisedGeneration Tariff
for Renewable Energy Sources (RES) for FY2014-15
Jammu & Kashmir State Electricity Regulatory Commission Website:http://www.jkserc.nic.in& Email ID: [email protected], [email protected]
Winter (Nov. to April): Ambedkar (Panama) Chowk, Railway Road, Jammu-180006 (J&K)
Ph No’s 0191-2470160, 2470183 Fax: 0191-2479367, 0191-2470163
Summer (May to Oct): H.No.101, Sector-A, Bagh-I-Hyder, HyderporaChowk, (near fly over
bridge), Srinagar-190014 (J&K) Ph: 0194-2434582, Fax: 0194-2431817
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Order Page 1
Before
Jammu & Kashmir State Electricity Regulatory Commission
Suo-motoPetition No: JKSERC/45 of 2014
In the Matter of:
Determination of generic levellised generation tariff for the FY2014-15 under Regulation 8 of
the Jammu and Kashmir StateElectricity Regulatory Commission (Terms and Conditions for
Tariffdetermination from Renewable Energy Sources) Regulations, 2013.
OrderNo.:JKSERC/ 38 of 2014
(Dated:18th
July, 2014)
1. The Jammu & Kashmir State Electricity Regulatory Commission (hereinafter referred to
as JKSERC or the Commission) has notified the Jammu and Kashmir StateElectricity
Regulatory Commission (Terms and Conditions for Tariffdetermination from Renewable
Energy Sources) Regulations, 2013 on 17th
May 2013 (hereinafter referred to as
“the RE Tariff Regulations 2013”) which provide for terms and conditions and the
procedure for determination of tariff of the following categories of Renewable Energy
(RE) generating stations:
a. Wind Power Project;
b. Biomass Power Projects with Rankine Cycle Technology;
c. Non-fossil fuel-based co-generation project;
d. Small Hydro plants;
e. Solar Photo Voltaic (PV) / Solar Thermal Power Projects;
f. Biomass Gasifier based Power Projects; and
g. Biogas based Power Project.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Order Page 2
2. The Regulations enjoin upon the Commission to determine the generic tariff on the basis
of the suo-motu petition, for the RE technologies for which norms have been provided in
the RE Tariff Regulations 2013. Generic Tariff is different from the project specific tariff
for which a project developer has to file petition before the Commission as per the format
provided in the RE Tariff Regulations 2013. Pertinently, project specific tariff has been
envisaged for the new RE technologies and the technologies which are still at the nascent
stage of development, and the Commission shall determine the project specific tariff for
such technologies on a case to case basis.
3. Clause (1) of Regulation 8 of the RE Tariff Regulations 2013 provides that
“the Commission shall determine the generic tariff on the basis of suo-motu petition at
least six months in advance at the beginning of each year of the Control period for
renewable energy technologies for which norms have been specified under the
Regulations”.
4. The Commission, in due discharge of the mandate under Regulation 8(1) of RE Tariff
Regulations 2013, brought out the proposal in the matter of determination of the generic
tariff for renewable energy technologies for the year FY 2014-15 vide the suo-motu
Petition No. JKSERC/45 of 2014 dated 13th
day of March, 2014.
5. The Commission gave a presentation on the proposed generic tariff for generation of
power from Renewable Energy Sources (RES)for the year FY 2014-15 in a meeting
convened with the Members of the State Advisory Committee (SAC) on 22nd
April 2014.
6. The SAC Members advised that JKSERC should go ahead with the notification of the
Draft Tariff Order after seeking suggestions/comments from the stakeholders.
7. In due regard to the Model Code of Conduct imposed by the Election Commission of
India in connection with the 16th
Lok Sabha Elections, the Commission published the gist
of the suo-motu Petition in several widelyread newspapers of the State in June 2014.The
list of newspapers in which gist was published is as follows:
Table 1: List of Newspapers in whichthe gist was published
Sl. No. Newspaper Date of Publication
1. Aftab 04.06.2014
2. Rising Kashmir 04.06.2014
3. Excelsior 04.06.2014
4. Amar Ujala 04.06.2014
5. Greater Kashmir 05.06.2014
8. The Petition was also made available on the website of the Commission. The stakeholders
were requested to submit their written comments / suggestions / objections latest by 30th
June 2014. The suggestions made by the members of the State Advisory Committee and
other points discussed have been considered by the Commission in this Order.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Order Page 3
Approved generic levellised tariff for RES for FY 2014-15
9. The approved genericlevellised tariff for generation from renewable energy sourcesfor
FY 2014-15 is summarized in the following tables. The determination and basis of
approval of generic levellised tariff for generation from renewable energy technologies
for FY 2014-15 has been explained in ensuing chapter of this Tariff Order.
Table 2: Generic Levellised tariff for RE technologies without fuel component for FY 2014-15
Particulars
Levellised Total
Tariff
(FY 2014-15)
Benefit of
Accelerated
Depreciation (if
availed)
Net Levellised Tariff
(upon adjusting for
Accelerated
Depreciation
benefit) (if availed)
(Rs/kWh) (Rs/kWh) (Rs/kWh)
WIND ENERGY
Wind Zone -1 (CUF 20%) 6.16 0.36 5.80
Wind Zone -2 (CUF 22%) 5.60 0.33 5.27
Wind Zone -3 (CUF 25%) 4.93 0.29 4.64
Wind Zone -4 (CUF 30%) 4.11 0.24 3.87
Wind Zone -5 (CUF 32%) 3.85 0.23 3.62
SMALL HYDRO
Capacity below 5 MW 4.30 0.39 3.91
Capacity 5 MW upto 25 MW 3.67 0.35 3.32
SOLAR PV & THERMAL
Solar PV 7.50 0.83 6.67
Solar Thermal 11.55 1.32 10.23
Table 3: Generic tariff for RE technologies with fuel component for FY 2014-15
Particulars
Levellised
fixed cost
Variable cost
(FY 2014-15)
Applicable
Tariff
(FY 2014-
15)
Benefit of
Accelerated
Depreciation
(if availed)
Net Levellised
Tariff
(upon adjusting
for
Accelerated
Depreciation
benefit,
if availed)
(Rs/kWh) (Rs/kWh) (Rs/kWh) (Rs/kWh) (Rs/kWh)
BIOMASS 2.11 3.73 5.84 0.16 5.68
NON FOSSIL FUEL
BASED COGENERATION 2.48 3.10 5.58 0.22 5.36
BIOMASS GASIFIER 2.34 4.93 7.27 0.14 7.13
BIOGAS 3.04 2.00 5.04 0.35 4.69
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Order Page 4
10. This Order does not take into account the incentive or subsidy or financial assistance,
other than accelerated depreciation benefits,as may be available from the Central / State
Government for renewable energy technologies. Accordingly, the Commission directs
the developer availing any such incentive or subsidy (other than accelerated
depreciation benefits) to submit a Petition in accordance with the Regulations 7 and
Regulation 8 of the RE Tariff Regulations 2013 for determination of project specific
tariff.
Implementation of Order
11. In exercise of the powers vested in it under the Jammu & Kashmir Electricity Act, 2010
(Act XIII of 2010), the Commission hereby passes this Order today i.e. on the
18th
July 2014. The tariff approved by the Commission herewith, shall remain in force till
31st March 2015 unless amended or modified by an Order of the Commission.
Ordered as above, read with attached detailed reasons, grounds and conditions.
Dated:18
thJuly2014
Place: Srinagar
Determination of Generic Levellised Generation Tariff for RES FY2014-15
THIS SPACE IS INTENTIONALLY LEFT BLANK
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 2
TABLE OF CONTENTS
GENERIC LEVELLISED GENERATION TARIFF FOR VARIOUS RENEWABLE
ENERGY TECHNOLOGIES FOR FY 2014-15 ................................................................... 3
Generic norms ............................................................................................................................ 3
Generation norms ....................................................................................................................... 5
Determination of Capital cost .................................................................................................... 6
Determination of fixed cost components ................................................................................. 13
Determination of fuel cost components ................................................................................... 18
Subsidy or incentive by the Central / State Government ......................................................... 21
APPENDIX-1CAPITAL COST FOR WIND ENERGYPROJECT ................................. 24
APPENDIX-2CAPITAL COST FOR SMALL HYDRO PROJECT................................ 25
APPENDIX-3CAPITAL COST FORBIOMASS BASED PROJECT ............................. 26
APPENDIX-4CAPITAL COST FOR NON FOSSIL FUEL BASED
COGENERATION ................................................................................................................. 27
APPENDIX-5CAPITAL COST FOR BIOMASS GASSIFIER BASED POWER
PROJECTS ............................................................................................................................. 28
APPENDIX-6 CAPITAL COST FOR BIOGAS BASED PROJECTS ............................ 29
APPENDIX-7BIOMASS FUEL PRICE ............................................................................. 30
APPENDIX-8BAGASEE PRICE ........................................................................................ 32
APPENDIX-9BIOGAS PRICE ............................................................................................ 34
ANNEXURES ....................................................................................................................... 37
Annexure 1 AWind Power Projects – Wind Zone 1…….………………………………...40
Annexure 1 BWind Power Projects – Wind Zone 2…….………………………………...43
Annexure 1 CWind Power Projects – Wind Zone 3…….………………………………...46
Annexure 1 DWind Power Projects – Wind Zone 4…….………………………………...49
Annexure 1 EWind Power Projects – Wind Zone 5…….………………………………...52
Annexure 2 ASmall Hydro Power Projects –Capacity below 5 MW…...………………...55
Annexure 2B Small Hydro Power Projects –Capacity 5 MW up to 25 MW…..…………58
Annexure 3 Biomass Power Projects………………….………………………………...61
Annexure 4Non Fossil Fuel Based Cogeneration Power Projects………………………64
Annexure 5Solar PV Power Projects ….……...…..….…………….…...……………....67
Annexure 6Solar Thermal Power Projects………………….……….……..…………...70
Annexure 7 BiomassGassifier Power Projects………………….….…...……………...73
Annexure 8Biogas Power Projects ………………….……………………………….....76
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 3
GENERIC LEVELLISED GENERATION TARIFF FOR VARIOUS
RENEWABLE ENERGY TECHNOLOGIES FOR FY 2014-15
1.1. The generic levellised generation tariff for various Renewable Energy Technologies
(RETs) for FY 2014-15 are discussed below:
Generic norms
Useful life
1.2. Clause (aa) of sub-Regulation (1) of Regulation 2 of the RE Tariff Regulations 2013
defines ‘useful life’ in relation to a unit of a generating station including evacuation
system to mean the following duration from the date of commercial operation (COD)
of such generation facility:
Table 4: Useful life of RE Projects
Renewable energy projects Useful Life (in years)
Wind energy 25
Biomass power project with rankine cycle technology 20
Non-fossil fuel based co-generation 20
Small hydro plant 35
Solar PV/ Solar thermal power project 25
Biomass gasifier 20
Biogas 20
Control period
1.3. Regulation 5 of the RE Tariff Regulations 2013 provides that the control period for
determination of tariff for renewable energy projects (RE projects) shall be of five
years. The first year of the control period was from FY 2013-14.
1.4. The Provision to the said regulation stipulates that the tariff determined for the RE
projects commissioned duringthe control period shall continue to be applicable for the
entire duration of the tariff period as specified in Regulation 6 of the RE Tariff
Regulations 2013.
Tariff period
1.5. In terms of Regulation 6 of the RE Tariff Regulations 2013, the tariff period in respect
of the RE projects is as under:
Table 5: Tariff period for RE Projects
Renewable energy projects Useful Life (in years)
Wind energy 13*
Biomass power project with rankine cycle technology 13*
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 4
Renewable energy projects Useful Life (in years)
Non-fossil fuel based co-generation 13*
Small hydro plant below 5 MW capacity 35
Small hydro plant - 5 MW upto 25 MW capacity 13*
Solar PV/ Solar thermal power project 25
Biomass gasifier& Biogas 20
*The RE Tariff Regulations provide for a minimum tariff period of thirteen years
1.6. In terms of clauses (e) and (f) of the said regulation, the tariff period specified above
shall be reckoned from the date of commercial operation of the RE projects and the
tariff determined under the regulations shall be applicable for the duration of the tariff
period.
Tariff structure
1.7. Clause (1) of Regulation 9 of the RE Tariff Regulations 2013 stipulates that the tariff
for RE projects shall be single part tariff consisting of the following fixed cost
components:
(a) Return on equity;
(b) Interest on loan capital;
(c) Depreciation;
(d) Interest on working capital;
(e) Operation and maintenance expenses;
1.8. For renewable energy technologies having fuel cost component, like biomass power
projects and non-fossil fuel based cogeneration, single part tariff with two
components, fixed cost component and fuel cost component, is to be determined
Tariff design
1.9. In terms of Regulation 10 of the RE Tariff Regulations 2013, the tariff design for
renewable energy generating stations is as under:
"(1) The generic tariff shall be determined on levellised basis for the Tariff Period.
Provided that for renewable energy technologies having single part tariff with
two components, tariff shall be determined on levellised basis considering the
year of commissioning of the project for fixed cost component while the fuel cost
component shall be specified on year of operation basis.
(2) For the purpose of levellised tariff computation, the discount factor equivalent to
Post Tax weighted average cost of capital shall be considered.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 5
(3) Levellisation shall be carried out for the ‘useful life’ of the Renewable Energy
project while Tariff shall be specified for the period equivalent to ‘Tariff Period.”
1.10. Accordingly, levellisedtariff is calculated by carrying out levellisation for ‘useful life’ of
each technology considering the discount factor for time value of money.
1.11. The discount factor considered for this purpose is equal to the Post Tax weighted
average cost of the capital on the basis of normative debt: equity ratio (70:30)
specified in the RE Tariff Regulations 2013. Considering the normative debt equity
ratio and weighted average of the post tax rates for interest and equity component, the
discount factor is calculated.
1.12. Interest Rate considered for the loan component (i.e.70% of capital cost) is 13.25%
(as explained later). For equity component (i.e. 30% of capital cost) rate of Return on
Equity (ROE) is considered at Post Tax ROE of 16%. The discount factor derived by
this method for all technology is 10.92 % i.e. ((13.25% × 0.70 × (1 – 33.99%)) +
(16.0% × 0.30)).
Generation norms
Capacity utilisation factor (CUF)/ Plant load factor (PLF)
1.13. Regulations 26, 30, 58 and 62 of the RE Tariff Regulations 2013 specify the norms
for Capacity Utilization Factor (CUF) in respect of the Wind Energy, Small Hydro,
Solar PV and Solar Thermal based power generating stations as per the details given
in the table below which has been considered for determination of tariff.
Table 6: Capacity utilisation factor for RE projects
Sl. No. Renewable energy projects CUF (%)
(A) Wind energy
i. Wind Zone 1 (annual Mean Wind Power Density upto 200 w/m2) 20%
ii. Wind Zone 2 (annual Mean Wind Power Density 201 - 250 w/m2) 22%
iii. Wind Zone 3 (annual Mean Wind Power Density 251 - 300 w/m2) 25%
iv. Wind Zone 4 (annual Mean Wind Power Density 301 - 400 w/m2) 30%
v. Wind Zone 5 (annual Mean Wind Power Density above 400 w/m2) 32%
(B) Small hydro plant 45%
(C) Solar PV power project 18%
(D) Solar thermal power project 23%
1.14. Regulations 36, 49, 68 and 78 of the RE Tariff Regulations 2013 specify the plant
load factor (PLF) for Biomass, Non-fossil fuel based cogeneration, Biomass Gasifier
and Biogas based renewable energy generating stations as given in the following
table which has been considered for determination of fixed charges component
of tariff.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 6
Table 7: Plant Load factor for RE projects
Sl. No. Renewable energy projects PLF (%)
(A) Biomass based on rankine cycle technology project
i. During stabilization (first 6 months of operation) 60%
ii. During remaining period of first year (i.e. after stabilization) 70%
iii. Second year onwards 80%
(B)
Non-fossil fuel based cogeneration power project
(based on plant availability for 210 operating days i.e. 150
crushing days and 60 off-season days and load factor of 92%)
53%
(C) Biomass gasifier based power project 85%
(D) Biogas based power project 90%
Auxiliary consumption factor
1.15. TheRegulations 31, 37, 50, 64, 69 and 79 of the RE Tariff Regulations 2013
stipulate the auxiliary power consumption factor as under which has been considered
for determination of tariff of the RE projects.
Table 8: Auxiliary consumption factor for RE projects
Sl. No. Renewable energy projects Auxiliary consumption
factor (%)
(A) Small hydro plant 1%
(B) Biomass based on rankine cycle technology project 10%
(C) Non-fossil fuel based cogeneration power project 8.50%
(D) Solar thermal power project 10%
(E) Biomass gasifier based power project 10%
(F) Biogas based power project 12%
Determination of Capital cost
1.16. Regulation 12 of the RE Tariff Regulations 2013 stipulates that the norms for the
capital cost as specified in the technology specific chapter shall be inclusive of all
capital works like plant and machinery, civil works, erection and commissioning,
financing and interest during construction, and evacuation infrastructure up to inter-
connection point.
1.17. The Commission has specified the normative capital cost, applicable for the first year
of control period i.e. FY 2013-14, for various RE technologies viz. Wind Energy,
Small Hydro Power, Biomass Power, Non-Fossil Fuel based Cogeneration, Solar PV,
Solar Thermal, Biomass Gasifier and Biogas based power projects.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 7
1.18. In order to determine the normative capital cost for FY 2014-15, the regulations
stipulate the indexation mechanism for Wind Energy, Small Hydro Power, Biomass
Power, Non-Fossil Fuel based Cogeneration, Biomass Gasifier and Biogas based
power projects. The indexation mechanism shall take into account adjustments in
capital cost with the changes in Wholesale Price Index of Steel and Wholesale Price
Index of Electrical Machinery as per formulation stipulated under the RE Tariff
Regulations 2013, which is reproduced below:
CC(n) = P&M(n)* (1+F1+F2+F3)
P&M(n) = P&M(0) * (1+d(n))
d(n) = [a*{(SI(n-1)/SI(0))– 1} + b
*{(EI(n-1)/EI(0)) – 1}]/(a+b)
Where,
CC (n) = Capital Cost for nth year i.e. in this case for FY 2014-15
P&M (n) = Plant and Machinery Cost for nth year
P&M (0) = Plant and Machinery Cost for base yeari.e. in this case for FY 2013-14
Note: P&M (0) is to be computed by dividing the base capital cost (for the first
year of the control period) by (1+F1+F2+F3). Factors F1, F2, F3 for each RE
technology has been specified separately, as summarized in following table.
d (n) = Capital Cost escalation factor for year (n) of Control Period
SI (n-1) = Average WPI Steel Index prevalent for calendar year (n-1) of the Control
Period (2013)
SI (0) = Average WPI Steel Index prevalent for calendar year (0) at the beginning of
the Control Period (2011)
EI (n-1) = Average WPI Electrical Machinery Index prevalent for calendar year (n-1)
of the Control Period
EI(0) = Average WPI Electrical Machinery Index prevalent for calendar year (0)
at thebeginning of the Control Period
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 8
a = Constant to be determined by Commission from time to time,(for weightage
to Steel Index)
b = Constant to be determined by Commission from time to time,(for weightage
to Electrical Machinery Index)
F1 = Factor for Land and Civil Works
F2 = Factor for Erection and Commissioning
F3 = Factor for IDC and Financing Cost
1.19. The default values of the factors for various RE technologies as stipulated under the
said Regulations, is summarized in the following table:
Table 9: Default value of constant parameters as per RE Tariff Regulations 2013
Constant
Parameters
Wind
energy
projects
Small
hydro
projects
Biomass based on rankine cycle technology,
non-fossil fuel based co-generation, Biomass
Gasifier and Biogas projects
a 0.6 0.6 0.7
b 0.4 0.4 0.3
F1 0.08 0.16 0.10
F2 0.07 0.10 0.09
F3 0.10 0.14 0.14
1.20. However, the Capital Cost norms for Solar PV and Solar Thermal Power Projects as
determined in the RE Tariff Regulations 2013 shall be reviewed on annual basis and
has been discussed in detail in following sub-section.
1.21. Technology specific capital cost of each type of RE projects is discussed here in
under:
(A) Capital cost for wind energy projects for FY 2014-15
1.22. Regulation 24 of the RE Tariff Regulations 2013 provides that the capital cost for
wind energy project shall include wind turbine generator including its auxiliaries, land
cost, site development charges and other civil works, transportation charges,
evacuation cost up to inter-connection point, financing charges and IDC.
1.23. The Commission under Regulation 24 (2) has specified the normative capital cost for
wind energy projects asRs. 575.00 Lakh/MW for FY 2013-14 which shall be linked to
the indexation mechanism specified under Regulation 25 of the above-mentioned
regulations. Thus, the normative capital cost of the Wind energy Projects shall be
Rs. 603.70 Lakh/MW for FY 2014-15. The detailed computations of the indexation
mechanism and determination of the capital cost for wind energy projects for FY
2014-15 thereof, has been enclosed as Appendix-1 of this Order.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 9
(B) Capital cost for small hydro projects for FY 2014-15
1.24. Small Hydro Projects for the purpose of the RE Tariff Regulations 2013 cover those
projects which are located at the sites approved by the State Nodal Agencies/ State
Governments using new plant and machinery and with installed power plant capacity
lower than or equal to 25 MW at single location.
1.25. It should be noted that tariff for existing small hydro projects i.e. projects
commissioned prior to notification of RE Tariff Regulations 2013, using old plant and
machinery and with installed power plant capacity lower than or equal to 25 MW at
single location will be determined in accordance with provisions of JKSERC (Hydro
Generation Tariff) Regulations, 2011 and Notification No. JKSERC/13/2011 dated
April 20, 2011.
1.26. The Commission under Regulation 28 (1) of the RE Tariff Regulations 2013 has
specified the normative capital cost for small hydro projects for FY 2013-14 and
summarised in following table.
Table 10: Capital cost for small hydro projects for FY 2013-14
Project size Capital cost (Rs Lakhs/MW)
Below 5 MW 770
5 MW upto 25 MW 700
1.27. In line with the indexation mechanism specified under Regulation 29 of the RE Tariff
Regulations 2013, the normative capital cost for small hydro Projects for FY 2014-15
shall be as under:
Table 11: Capital cost for small hydro projects for FY 2014-15
Project size Capital cost (Rs Lakhs/MW)
Below 5 MW 808.439
5 MW upto 25 MW 734.945
1.28. The detailed computations of the indexation mechanism and determination of the
capital cost for small hydro projects for FY 2014-15 thereof, has been enclosed as
Appendix-2 of this Order.
(C) Capital cost for biomass projects based on Rankine cycle technology for
FY 2014-15
1.29. Biomass power project for the purpose of these Regulations covers the projects using
new plant and machinery based on Rankine cycle technology and using biomass fuel
sources, provided use of fossil fuel is restricted only up to 15% of total fuel
consumption on annual basis.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 10
1.30. The Commission under Regulation 34 has specified the normative capital cost for the
biomass power projects based on Rankine cycle technology as Rs. 445 Lakh/MW for
FY 2013-14.
1.31. The normative capital cost for FY 2013-14 shall be linked to the indexation
mechanism specified under Regulation 35 of the RE Tariff Regulations 2013 to
determine the capital cost for FY 2014-15. Thus, the normative capital cost of
biomass power projects based on Rankine cycle technology shall be Rs. 466.811
Lakh/MW for FY 2014-15. The detailed calculations of the indexation mechanism
and determination of the capital cost for FY 2014-15 thereof, has been enclosed as
Appendix -3 of this Order
(D) Capital cost for non-fossil fuel based cogeneration projects for FY 2014-15
1.32. Non-fossil based cogeneration has been defined as the process in which more than one
form of energy (such as steam and electricity) are produced in a sequential manner by
use of biomass. As per Regulation 4(d) of RE Tariff Regulations 2013, for a project to
qualify as non-fossil based co-generation project must be using new plant and
machinery with topping cycle mode of operation which uses non-fossil fuel input for
power generation and also utilizes the thermal energy generated for useful heat
applications in other industrial activities simultaneously, and where sum of useful
power output and half useful thermal output is greater than 45% of plant’s energy
consumption during season.
1.33. The Commission under Regulation 47 has specified the normative capital cost for the
Non-Fossil Fuel Based Cogeneration Projects as Rs. 420 Lakh/MW for FY 2013-14
which shall be linked to the indexation mechanism specified under Regulation 48 of
the RE Tariff Regulations 2013. Thus the normative capital cost of Non-Fossil Fuel
based Cogeneration power projects shall be Rs. 440.59 Lakh/MW for FY 2014-
15.The detailed computations of the indexation mechanism and determination of the
capital cost for FY 2014-15 thereof, has been enclosed as Appendix-4 of this Order
(E) Capital cost for Solar PV based projects for FY 2014-15
1.34. Solar Photo Voltaic (PV) power projects which directly convert solar energy into
electricity using the crystalline silicon or thin film technology or any other technology
as approved by the Ministry of New and Renewable Energy (MNRE) and are
connected to the grid, qualify for purpose of tariff determination under RE Tariff
Regulations 2013.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 11
1.35. The Regulation 57 of the above-mentioned Regulations specifies the normative
capital cost for the Solar PV power projects as Rs 1000 Lakh/MW for the FY 2013-
14. However, the Commission notes that with the recent decline in capital cost for
Solar PV projects owing to regulatory and technological developments, the normative
capital cost specified in the RE Tariff Regulations 2013 is on the higher side. The
Regulation 5 of the above mentioned regulationsspecify that the benchmark capital
cost for Solar PV and Solar thermal projects may be reviewed annually by the
Commission.
1.36. The Central Electricity Regulatory Commission (CERC) has also taken similar
recourse while determining the benchmark capital cost for Solar PV Projects. The
CERC vide the CERC (RE Tariff Regulations), 2012 specified the benchmark capital
cost norm for Solar PV projects for FY 2012-13 as Rs. 1000 Lakh/MW. However,
owing to the decline in capital cost in the market for Solar PV technology, the CERC
vide Order dated 28th February 2013 in exercise of its powers under Regulation 5 of
the CERC (RE Tariff Regulations), 2012 determined the Benchmark Capital Cost
Norm for Solar PV power projects and Solar thermal power projects for FY 2013-14
as Rs 800 Lakh/MW and Rs 1200 Lakh/MW, respectively. Similarly, the CERC vide
its Order dated 15thMay 2014 had determined the benchmark capital cost for Solar
PV and Solar Thermal for FY 2014-15 as Rs. 691 Lakh/MW and Rs 1200 Lakh/MW,
respectively.
1.37. Based on above, and in exercise of its powers under Regulation 5 of the RE Tariff
Regulations 2013, the JKSERC determines the benchmark capital cost for Solar PV
power projects as Rs. 691 Lakh/MW for FY 2014-15.
(F) Capital cost for Solar Thermal based projects for FY 2014-15
1.38. In order to qualify for tariff determination under the RE Tariff Regulations 2013,
Solar Thermal Power Project shall be based on concentrated solar power technologies
with line focusing or point focusing as may be approved by the MNRE and which
uses direct sunlight to generate sufficient heat to operate a conventional power cycle
to generate electricity.
1.39. The Commission under Regulation 61 has specified the normative capital cost for the
Solar Thermal power projects as Rs 1300 Lakh/MW for the FY 2013-14.
1.40. The CERC vide the CERC (RE Tariff Regulations), 2012 specified the benchmark
capital cost norm for Solar thermal projects for FY 2012-13 as Rs. 1300 Lakh/MW.
However, owing to the decline in capital cost in the market for Solar PV and thermal
technology, the CERC vide Order dated 28th February 2013 in exercise of its powers
under Regulation 5 of the CERC (RE Tariff Regulations), 2012 determined the
Benchmark Capital Cost Norm for Solar PV power projects and Solar thermal power
projects for FY 2013-14 as Rs 800 Lakh/MW and Rs 1200 Lakh/MW, respectively.
Similarly, the CERC vide its Order dated 15th May 2014 had determined the
benchmark capital cost for Solar PV and Solar Thermal for FY 2014-15 as Rs. 691
Lakh/MW and Rs 1200 Lakh/MW, respectively.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 12
1.41. Based on above, and in exercise of its powers under Regulation 5 of the RE Tariff
Regulations 2013, the JKSERC determines the benchmark capital cost for Solar thermal
power projects as Rs. 1200 Lakh/MW for FY 2014-15.
(G) Capital cost for biomass gasifier based power projects for FY 2014-15
1.42. The Commission under Regulation 66 has specified the normative capital cost for
the Biomass Gasifier power projects based on Rankine cycle shall be Rs550.00
Lakh/MW for the FY 2013-14 and after taking into account of capital subsidy of
Rs150.00 Lakh/MW; net project cost shall beRs400.00 Lakh/MW for the
FY 2013-14. The normative capital cost specified for FY 2013-14 shall be linked to
the indexation mechanism specified under Regulation 67 of the RE Tariff
Regulations 2013 to determine normative capital cost for FY 2014-15.
1.43. Accordingly, the normative capital cost of Biomass gasifierpower projects shall be
Rs576.957 Lakh/MW for FY 2014-15. After taking into account capital subsidy of
Rs150.00 Lakh/MW, net project cost shall be Rs426.957 Lakh/MW for the
FY 2014-15. The detailed computations of the indexation mechanism and
determination of the capital cost for FY 2014-15 thereof, has been enclosed as
Appendix-5 of this Order.
(H) Capital cost for biogas based power projects for FY 2014-15
1.44. In order to qualify for tariff determination under the RE Tariff Regulations 2013,
the project should use new plant and machinery and having grid connected system
that uses 100% Biogas fired engine, coupled with Biogas technology for co-
digesting agriculture residues, manure and other bio waste as may be approved by
the MNRE.
1.45. The Commission under Regulation 76 has specified the normative capital cost for
the Biogas based power projects shall be Rs 1100.00 Lakh/MW for the FY 2013-
14 and after taking into account the capital subsidy of Rs 300.00 Lakh/MW, net
project cost shall be Rs 800.00Lakh/MW for the FY 2013-14.
1.46. The normative capital cost specified for FY 2013-14 shall be linked to the
indexation mechanism specified under Regulation 77 of the RE Tariff
Regulations 2013 to determine normative capital cost for FY 2014-15.
1.47. Accordingly, the normative capital cost of Biogas based power projects shall be
Rs1153.915 Lakh/MW for FY 2014-15. After taking into account the capital
subsidy of Rs300.00 Lakh/MW, net project cost shall be Rs 853.915 Lakh/MW
for the FY 2014-15. The detailed computations of the indexation mechanism and
determination of the capital cost for FY 2014-15 thereof, has been enclosed as
Appendix-6 of this Order.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 13
1.48. The generic tariff is determined on the basis of normative capital cost without
considering capital subsidy except in case of small hydro, biomass gasifier and
biogas power projects. However in case capital subsidy is available, the capital
cost shall be considered after considering capital subsidy.
1.49. The normative capital cost for FY 2014-15 in respect of the renewable energy
power generating stations is summarized as under:
Table 12: NormativeCapital cost for RE projects for FY 2014-15
Sl. No. Renewable energy project Normative Capital cost
(Rs Lakhs/MW)
1. Wind energy projects 603.705
2. Small hydro projects
a) Below 5 MW 808.439
b) 5 MW upto 25 MW 734.945
3. Biomass power projects 466.811
4. Non-fossil fuel based cogeneration power
projects 440.586
5. Solar PV power projects 691.000
6. Solar thermal power projects 1200.00
7. Biomass gasifier power projects (after subsidy) 426.957
8. Biogas power projects (after subsidy) 853.915
1.50. Regulation 22 of the RE Tariff Regulations 2013 provides that the Commission
shall take into consideration any incentive or subsidy offered by the Central or State
Government for the renewable energy power plants while determining the tariff
under these Regulations. Accordingly, the Commission directs the developer
availing any such incentive or subsidy (other than accelerated depreciation benefits)
to submit a Petition in accordance with the Regulations 7 and Regulation 8 of the
RE Tariff Regulations 2013 for determination of project specific tariff.
1.51. The Commission clarifies that the generic tariffs approved in this Order shall not be
applicable to projects availing incentive or subsidy other than accelerated
depreciation benefits from the Central or State Government.
Determination of fixed cost components
Debt-Equity ratio
1.52. Sub-Regulation (1) of Regulation 13 of the RE Tariff Regulations 2013 provides
that the debt-equity ratio of 70:30 is to be considered for determination of generic
tariff based on suomotu petition. Accordingly, the debt and equity components of the
normative capital cost for determination of tariff for the RE projects have been
worked out as under:
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 14
Table 13: Debt-Equity component for RE projects for FY 2014-15
Sl. No. Renewable energy project Debt
(Rs Lakhs/MW)
Equity
(Rs Lakhs/MW)
1. Wind energy projects 422.593 181.111
2. Small hydro projects
a) Below 5 MW 565.908 242.532
b) 5 MW upto 25 MW 514.461 220.483
3. Biomass power projects 326.768 140.043
4. Non-fossil fuel based
cogeneration power projects 308.410 132.176
5. Solar PV power projects 483.700 207.300
6. Solar thermal power projects 840.00 360.00
7. Biomass gasifier power
projects 298.870 128.087
8. Biogas power projects 597.740 256.174
Return on equity
1.53. Sub-Regulation (1) of Regulation 16 of the RE Tariff Regulations 2013 provides
that the value base for the equity shall be 30% of the capital cost for generic tariff
determination. Sub-Regulation (2) of the said Regulation stipulates the normative
return on equity (ROE) shall be as under:
(a) 18% per annum for the first 10 years, and
(b) 22% per annum from the 11th year onwards.
Interest on loan capital
1.54. Sub-Regulation (1) of Regulation 14 of the RE Tariff Regulations 2013 provides
that the loan tenure is to be considered as 12 years for the purpose of determination
of generic tariff for RE projects. Sub-Regulation (2) of the said Regulation provides
for computation of the rate of interest on loan as under:
“(a) The loans arrived at in the manner indicated in the Regulation 13 shall be
considered as gross normative loan for calculation for interest on loan. The
normative loan outstanding as on April 1st of every year shall be worked out
by deducting the cumulative repayment up to March 31st of previous year from
the gross normative loan.
(b) For the purpose of computation of tariff, the normative interest rate shall be
considered as average Jammu and Kashmir Bank Base rate prevalent during
the first six months of the previous year plus 300 basis points.
(c) Notwithstanding any moratorium period availed by the generating company,
the repayment of loan shall be considered from the first year of commercial
operation of the project and shall be equal to the annual depreciation
allowed.”
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 15
1.55. The average Jammu and Kashmir Bank Base rate prevalent during the first six
months considered for determination of tariff is 10.25% applicable as on February
2013.
1.56. Accordingly, the computations of interest on loan carried out for determination of
tariff in respect of the RE projects treating the value base of loan as 70% of the
capital cost and the weighted average of J&K Bank Base rate prevalent during the
first six months of the (i.e. 10.25%) plus 300 basis points which works out to
13.25%.
Depreciation
1.57. Regulation 15 of the RE Tariff Regulations 2013 provides for computation of
depreciation in the following manner:
“(1) The value base for the purpose of depreciation shall be the Capital Cost of the
asset admitted by the Commission. The Salvage value of the asset shall be
considered as 10% and depreciation shall be allowed up to maximum of 90%
of the Capital Cost of the asset.
(2) Depreciation per annum shall be based on ‘Differential Depreciation
Approach' over loan period beyond loan tenure over useful life computed on
‘Straight Line Method’. The depreciation rate for the first 12 years of the
Tariff Period shall be 5.83% per annum and the remaining depreciation shall
be spread over the remaining useful life of the project from 13th year onwards.
(3) Depreciation shall be chargeable from the first year of commercial operation.
Provided that in case of commercial operation of the asset for part of the year,
depreciation shall be charged on pro rata basis”
1.58. In accordance with the above, the rate of depreciation for the first 12 years has
been considered as 5.83% and the rate of depreciation from the 13th
year onwards
has been spread over the balance useful life of the RE project as summarised in
following table.
Table 14: Applicable depreciation rates for RE projects
Details Wind Small
hydro Biomass
Non-fossil
fuel
Solar
PV
Solar
thermal
Biomass
gasifier Biogas
Useful life
(in years) 25 35 20 20 25 25 20 20
Depreciation
rate for first
12 years (%)
5.83 5.83 5.83 5.83 5.83 5.83 5.83 5.83
Depreciation
rate after first
12 years (%)
1.54 0.87 2.50 2.50 1.54 1.54 2.50 2.50
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 16
Interest on working capital
1.59. The working capital requirements for RE projects in accordance with Regulation 17
of the RE Tariff Regulations 2013 has been summarised in following table.
Table 15: Working capital requirement for RE projects
Particulars Wind/ Small hydro/
Solar PV/ Solar Thermal
Biomass/ Non-fossil fuel/
Biomass gasifier/ Biogas
Operation & maintenance (O&M) expenses 1 month 1 month
Receivables (equivalent to energy charges for
sale of electricity calculated on normative CUF) 2 months 2 months*
Maintenance spares 15% of O&M 15% of O&M
Fuel costs (equivalent to normative PLF) N.A. 4 months
Note: *In case of Biomass/ non-fossil fuel/ Biomass gasifier and biogas based projects receivables are estimated on
the basis fixed and variable chargesfor sale of electricity calculated on the target PLF.
1.60. The rate of interest for computation of interest on working capital is considered in
accordance with the sub-Regulation (3) of Regulation 17 of the RE Tariff Regulation
2013, which provides as under:
“Interest on Working Capital shall be at interest rate equivalent to the average Jammu
and Kashmir Bank Base Rate prevalent during the first six months of the previous year
plus 350 basis points”
1.61. The average Jammu and Kashmir Bank Base rate prevalent during the first six
months considered for determination of tariff is 10.25% applicable as on February
2013. Accordingly, rate of interest for computation of interest on working capital
requirements works out to 13.75% (i.e. 10.25% plus 350 basis points) for all RE
technologies.
Operation and maintenance (O&M) expenses
1.62. Regulation 18 of the RE Tariff Regulations 2013 provides for O&M expenses in respect
of RE projects as under:
“(1) ‘Operation and Maintenance or O&M expenses’ shall comprise repair and
maintenance (R&M), establishment including employee expenses and
administrative & general expenses.
(2) Operation and maintenance expenses shall be determined for the Tariff Period
based on normative O&M expenses specified by the Commission subsequently in
these Regulations for the first Year of Control Period.
(3) Normative O&M expenses allowed during first year of the Control Period (i.e.
FY 2013-14) under these Regulations shall be escalated at the rate of 5.72% per
annum over the Tariff Period.”
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 17
1.63. The normative O&M expenses for various RE technologies specified under the
relevant provisions of the RE Tariff Regulations 2013 have been summarised as
under:
(a) Wind Energy: Regulation 27 of RE Tariff Regulations 2013 provides that
the normative O&M expenses for FY 2013-14 as Rs 9 lakh per MW and
shall be escalated at the rate of 5.72% per annum over the tariff period for
determination of the levellised tariff. Accordingly, the Commission has
considered O&M cost norm for wind energy as Rs 9.51 Lakh/MW for
FY 2014-15.
(b) Small Hydro:Regulation 32 of RE Tariff Regulations 2013 provided for
the normative O&M expenses for small hydro projects for the FY 2013-14
which shall be escalated at the rate of 5.72% per annum over the tariff
period for determination of the levellised tariff. The table below presents
the normative O&M Expenses considered by the Commission for small
hydro projects for FY 2013-14:
Table 16: O&M cost for small hydro projects for FY 2013-14
Project size O&M cost (Rs Lakhs/MW)
Below 5 MW 25
5 MW upto 25 MW 18
Based on escalation rate of 5.72% p.a.,the normative O&M Expenses
considered by Commission for small hydro projects for FY 2014-15:
Table 17: O&M cost for small hydro projects for FY 2014-15
Project size O&M cost (Rs Lakhs/MW)
Below 5 MW 26.43
5 MW upto 25 MW 19.03
(c) Biomass: Regulation 39 of RE Tariff Regulations 2013 provides that the
normative O& M expenses for biomass based projects for the FY 2013-14
shall be Rs 24 Lakh per MW and which shall be escalated at the rate of
5.72% per annum over the tariff period for determination of the levellised
tariff. Accordingly, the Commission has considered O&M cost norm for
biomass power as Rs25.37 Lakh/MW for FY 2014-15.
(d) Non-fossil fuel based co-generation: As per Regulation 55 of RE Tariff
Regulations 2013, the normative O&M Expenses for non-fossil fuel based
co-generation projects for the FY 2013-14 has been specified as Rs 16
Lakh per MW which shall be escalated at the rate of 5.72% per annum
over the tariff period for determination of the levellised tariff.
Accordingly, the Commission has considered O&M cost norm for non-
fossil fuel based co-generation as Rs16.92 Lakh/MW for FY 2014-15.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 18
(e) Solar PV: Regulation 59 of RE Tariff Regulations 2013 provides that the
normative O&M expenses for solar PV projects for the FY 2013-14 shall
be Rs11 Lakh per MW which shall be escalated at the rate of 5.72% per
annum over the tariff period for determination of the levellised tariff.
Accordingly, O&M expense norm for solar PV power project has been
considered as Rs11.63 Lakh/MW for FY 2014-15.
(f) Solar Thermal: Regulation 63 of RE Tariff Regulations 2013 provides
that the normative O&M expenses for solar thermal projects for the
FY 2013-14 shall be Rs15 Lakh per MW which shall be escalated at the
rate of 5.72% per annum over the tariff period for determination of the
levellised tariff. Accordingly, O&M expense norm for solar thermalpower
project has been considered as Rs15.86 Lakh/MW for FY 2014-15.
(g) Biomass Gasifier: Regulation 71 of the RE Tariff Regulations 2013 specified
the normative O&M expenses for biomass gasifier based power projects shall
be Rs40 Lakh/MW for the FY 2013-14, which shall be escalated at the rate of
5.72% per annum over the tariff period for determination of the levellised
tariff. Accordingly, the Commission has considered O&M cost norm for
biomass gasifier based power plant as Rs42.29 Lakh/MW for FY 2014-15.
(h) Biogas: Regulation 80 of the RE Tariff Regulations 2013 specified the
normative O&M expenses for biogas based power projects shall be
Rs40 Lakh/MW for the FY 2013-14, which shall be escalated at the rate of
5.72% per annum over the tariff period for determination of the levellised
tariff. Accordingly, the Commission has considered O&M cost norm for
biogas based power plant as Rs42.29 Lakh/MW for FY 2014-15.
1.64. The normative O&M expenses have been worked out as specified above for
determination of generic levellisedtariff for the renewable energy generating stations.
Determination of fuel cost components
Station heat rate (SHR)
1.65. The Regulations 38 and 51 of the RE Tariff Regulations 2013 specify the SHR for
biomass and non-fossil fuel based co-generation projects as under:
Table 18: SHR for RE Projects
RE Project SHR (kCal/kWh)
Biomass power projects 4000
Non-fossil fuel based
cogeneration power projects 3600
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 19
Fuel mix
1.66. Sub-Regulation (1) of Regulation 40 and 72 of the RE Tariff Regulations 2013 stipulates
that the Biomass and Biomass gasifier based power generating stations are to be
designed in a way that it uses different types of non-fossil fuels available within the
vicinity of biomass power project such as crop residues, agro-industrial residues, forest
residues etc. and other biomass fuels as may be approved by the MNRE.
1.67. Further, the biomass and biomass gasifier based power generating companies are to
ensure fuel management plan to ensure adequate availability of fuel to meet the
respective project requirements.
1.68. In addition to above, Regulation 70 of the RE Tariff Regulations 2013 stipulates that the
normative specific fuel consumption shall be 1.25 kg per kWh for Biomass Gasifier
based power generating stations, while the Regulation 81 of the RE Tariff Regulations
2013 stipulates that the normative specific fuel consumption shall be 3 kg of substrate
mix per kWh for Biogas based power generating stations.
Use of fossil fuel
1.69. In case of biomass based projects, as per Regulation 41 of the RE Tariff Regulations
2013, the use of fossil fuel is to be limited to the extent of 15% of total fuel consumption
on annual basis and Regulation 42 of the RE Tariff Regulations provides the mechanism
for monitoring the use of fossil fuel for these projects.
Gross Calorific value
1.70. Regulation 43 of the RE Tariff Regulations 2013 provides that the gross calorific
value of biomass fuel used for determination of tariff shall be at 3300 kCal/kg.
1.71. Further, Regulation 52 of the RE Tariff Regulations 2013 provides that the gross
calorific value for bagasse to be considered in case of non-fossil fuel co-generation
projects is 2250 kCal/kg and for the use of biomass fuels other than bagasse, the
calorific value as specified above shall be applicable.
Fuel cost
A) Biomass power project
1.72. The Commission, in terms of Regulation 44 of the RE Tariff Regulations 2013, has
specified the biomass fuel price applicable during the period 2013-14 as Rs. 2500 per
tonne and has specified fuel price indexation mechanism, in case developer wishes to
opt, for the remaining years of the control period.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 20
1.73. The data for price of diesel and WPI, as per regulations, latest figures for April, 2013
and April, 2012 corresponding to nth and (n-1)th year has been considered while
calculating the fuel price indexation for biomass and also non-fossil fuel based co-
generation power projects.
1.74. The detailed computations of the fuel price indexation mechanism and the
determination of the biomass fuel prices for FY 2014-15 thereof, has been enclosed
as Appendix-7 to this order. Accordingly, the biomass fuel price applicable for
FY 2014-15 is computed as Rs. 2773 per tonne.
B) Non-fossil fuel based cogeneration projects
1.75. The Commission, in terms of Regulation 53 of the RE Tariff Regulations 2013, has
specified the price of bagasse applicable during the period 2013-14 for non-fossil fuel
based cogeneration projects as Rs. 1600 per tonne and has specified fuel price
indexation mechanism, in case developer wishes to opt, for the remaining years of
the control period.
1.76. The detailed computations of the fuel price indexation mechanism and the
determination of the bagasse fuel prices for FY 2014-15 thereof, has been enclosed
as Appendix-8of this Order. Accordingly, the price of bagasse (for non-fossil fuel
based co-generation projects) applicable for FY 2014-15 shall beRs. 1775 per tonne.
C) Biomass gasifier projects
1.77. The Commission, in terms of Regulation 73 of the RE Tariff Regulations 2013, has
specified the biomass fuel price during first year of the Control Period i.e. FY 2013-
14 as Rs 2500 per tonne and has specified fuel price indexation mechanism for the
Biomass Gasifier project developer. Accordingly, the biomass fuel price for the
Biomass gasifier based power project applicable for FY 2014-15 shall be the same as
for the biomass based power project (Rankine cycle) i.e. Rs. 2773 per tonne. The
detailed computations of the fuel price indexation mechanism and the determination
of the biomass fuel prices for FY 2014-15 thereof, has been enclosed as Appendix-7
of this Order.
D) Biogas projects
1.78. The Commission, in terms of Regulation 82 of the RE Tariff Regulations 2013, has
specified the feed stock price during first year of the Control Period i.e. FY 2013-14
at Rs 990/MT(net of any cost recovery from digester effluent) and has specified fuel
price indexation mechanism for the Biogas project developer.
1.79. The detailed computations of the fuel price indexation mechanism and the
determination of the fuel prices for FY 2014-15 thereof, has been enclosed as
Appendix-9 of this Order. The price of fuel applicable for the biogas based power
plant for FY 2014-15 shall be at Rs 1098/MT(net of any cost recovery from digester
effluent).
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 21
1.80. In case of Biomass Power Projects, non-fossil fuel based co-generation projects,
Biomass Gasifier based power Projects and Biogas based power projects, variable
component of tariff is calculated based on the fuel cost for FY 2014-15. This variable
component will change each year based on whether a Renewable Energy Power
Project developer opts for fuel price indexation or escalation factor of 5% p.a. Hence,
while calculating the total applicable tariff for Biomass Power Projects, non-fossil
fuel based co-generation projects, Biomass Gasifier based power Projects and Biogas
based power projects, levellisation of only fixed component is considered and the
variable component for the first year of operation (i.e. 2014-15) is specified.
Subsidy or incentive by the Central / State Government
1.81. Regulation 22 of the RE Tariff Regulations 2013 provides as under:
“The Commission shall take into consideration any incentive or subsidy offered by
the Central or State Government, including accelerated depreciation benefit if
availed by the generating company, for the renewable energy power plants while
determining the tariff under these Regulations.
Provided that the following principles shall be considered for ascertaining income
tax benefit on account of accelerated depreciation, if availed, for the purpose of tariff
determination:
i) Assessment of benefit shall be based on normative capital cost, accelerated
depreciation rate as per relevant provisions under Income Tax Act and corporate
income tax rate.
ii) Capitalization of RE projects during second half of the fiscal year. Per unit benefit
shall be derived on levellised basis at discount factor equivalent to Post Tax
weighted average cost of capital.”
1.82. In terms of the above regulation, for the projects availing the benefit of accelerated
depreciation as per applicable Income tax rate @ 33.99% (30% IT rate+ 10%
surcharge +3% Education cess) has been considered. For the purpose of determining
net depreciation benefits, depreciation @ 5.28% as per straight line method (Book
depreciation as per Companies Act) has been compared with depreciation as per
Income Tax rate i.e. 80% of the written down value method (except for Wind energy
generator, as per Income-tax (Fourth Amendment Rules), 2012, depreciation is now
restricted to 15% on wind mills installed after 31-3-2012), Notification No. 15/2012
[F.No.149/21/2010-SO(TPL)] S.O.694(E), dated 30-3-2012). Moreover, additional
20% depreciation in the initial year is proposed to be extended to new assets acquired
by power generation companies vide amendment in the section 32, sub-section (1)
clause (iia) of the Income Tax Act.
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 22
1.83. Depreciation for the first year has been calculated at the rate of 50% of accelerated
depreciation of 80% and 50% of additional depreciation 20% (as project is
capitalized during the second half of the financial year as per proviso (ii) to
Regulation 22). Income tax benefits of accelerated depreciation and additional
depreciation, has been worked out as per normal tax rate on the net depreciation
benefit. Per unit levellised accelerated depreciation benefit has been computed
considering the post tax weighted average cost of capital as discount factor.
1.84. Regulation 22 of the RE Tariff Regulations 2013 provides that the Commission
shall take into consideration any incentive or subsidy offered by the Central or State
Government for the renewable energy power plants while determining the tariff
under these Regulations. Accordingly, the Commission directs the developer
availing any such incentive or subsidy (other than accelerated depreciation benefits)
to submit a Petition in accordance with the Regulations 7 and Regulation 8 of the
RE Tariff Regulations 2013 for determination of project specific tariff.
1.85. The Commission clarifies that the generic tariffs approved in this Order shall not be
applicable to projects availing incentive or subsidy other than accelerated
depreciation benefits from the Central or State Government.
1.86. In the light of the discussion made in the preceding paragraphs, the generic tariffs of
the following RE projects for the financial year 2014-15 have been summarisedin the
following tables.
Table 19: Generic Levellised tariff for RE technologies without fuel component for FY 2014-15
Particulars
Levellised Total
Tariff
(FY 2014-15)
Benefit of
Accelerated
Depreciation (if
availed)
Net Levellised Tariff
(upon adjusting for
Accelerated
Depreciation
benefit) (if availed)
(Rs/kWh) (Rs/kWh) (Rs/kWh)
WIND ENERGY
Wind Zone -1 (CUF 20%) 6.16 0.36 5.80
Wind Zone -2 (CUF 22%) 5.60 0.33 5.27
Wind Zone -3 (CUF 25%) 4.93 0.29 4.64
Wind Zone -4 (CUF 30%) 4.11 0.24 3.87
Wind Zone -5 (CUF 32%) 3.85 0.23 3.62
SMALL HYDRO
Capacity below 5 MW 4.30 0.39 3.91
Capacity 5 MW upto 25 MW 3.67 0.35 3.32
SOLAR PV & THERMAL
Solar PV 7.50 0.83 6.67
Solar Thermal 11.55 1.32 10.23
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 23
Table 20: Generic tariff for RE technologies with fuel component for FY 2014-15
Particulars
Levellised
fixed cost
Variable cost
(FY 2014-15)
Applicable
Tariff
(FY 2014-
15)
Benefit of
Accelerated
Depreciation
(if availed)
Net Levellised
Tariff
(upon adjusting
for
Accelerated
Depreciation
benefit,
if availed)
(Rs/kWh) (Rs/kWh) (Rs/kWh) (Rs/kWh) (Rs/kWh)
BIOMASS 2.11 3.73 5.84 0.16 5.68
NON FOSSIL FUEL
BASED COGENERATION 2.48 3.10 5.58 0.22 5.36
BIOMASS GASIFIER 2.34 4.93 7.27 0.14 7.13
BIOGAS 3.04 2.00 5.04 0.35 4.69
1.87. The detailed computations for the generic tariff for various RE technologies have
been enclosed to this Order as per the details given hereunder:
Sl. No. Renewable Energy Projects Annexures
1. Wind Power Projects
Wind Zone – 1 Annexure 1A
Wind Zone – 2 Annexure 1B
Wind Zone – 3 Annexure 1C
Wind Zone – 4 Annexure 1D
Wind Zone - 5 Annexure 1E
2. Small Hydro Power Projects
Capacity below 5 MW Annexure 2A
Capacity 5 MW upto 25 MW Annexure 2B
3. Biomass Power Projects Annexure 3
4. Non-fossil fuel based cogeneration Power Projects Annexure 4
5. Solar PV Power Projects Annexure 5
6. Solar Thermal Power Projects Annexure 6
7. Biomass GasifierPower Projects Annexure 7
8. Biogas Power Projects Annexure 8
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 24
Appendix-1
Capital cost for wind energy project (FY 2014-15)
Indexation Formulation:
CC( n ) = P&M (n) * [1 + F1 + F2 + F3]
P&M(n) = P&M(0)*(1+ d (n))
P&M(0) = CC (0) / [1 + F1 + F2 + F3]
d (n) = (a * (SI(n-1)/SI(0))-1) +b* (EI(n-1)/EI(0))-1)) / (a+b)
Variable Description Value
a Weightage for Steel Index 0.60
b Weightage for Electrical Machinery Index 0.40
F1 Factor for Land and Civil Work 0.08
F2 Factor for Erection and Commissioning 0.07
F3 Factor for IDC and Financing 0.10
Month ElectricalMachinery Steel
2013 2011 2013 2011
January 133.900 125.100 126.200 118.600
February 133.800 125.100 126.200 113.000
March 134.100 126.400 126.200 113.000
April 134.500 127.200 126.200 113.000
May 135.500 127.600 126.200 113.000
June 135.600 128.000 126.200 119.600
July 135.600 128.700 126.200 126.200
August 135.700 129.200 126.200 126.200
September 136.300 130.900 126.200 126.200
October 137.100 130.600 126.200 126.200
November 137.000 130.800 126.200 126.200
December 136.800 131.000 126.200 126.200
Average 135.492 128.383 126.200 120.617
Source: Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in)
Description Parameters Value
Capital Cost for the Base Year i.e. FY 2013-14 (Rs Lakh/MW) CC(0) 575.000
Plant & Machinery Cost for the Base Year i.e. for FY 2013-14 (Rs Lakh/MW) P&M(0) 460.000
Capital Cost escalation Factor (%) d(n) (%) 4.992%
Plant & Machinery Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) P&M(n) 482.964
Capital Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) CC(n) 603.704
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 25
Appendix-2
Capital cost for small hydro project (FY 2014-15)
Indexation Formulation:
CC( n ) = P&M (n) * [1 + F1 + F2 + F3]
P&M(n) = P&M(0)*(1+ d (n))
P&M(0) = CC (0) / [1 + F1 + F2 + F3]
d (n) = (a * (SI(n-1)/SI(0))-1) +b* (EI(n-1)/EI(0))-1)) / (a+b)
Variable Description Value
a Weightage for Steel Index 0.60
b Weightage for Electrical Machinery Index 0.40
F1 Factor for Land and Civil Work 0.16
F2 Factor for Erection and Commissioning 0.10
F3 Factor for IDC and Financing 0.14
Month ElectricalMachinery Steel
2013 2011 2013 2011
January 133.900 125.100 126.200 118.600
February 133.800 125.100 126.200 113.000
March 134.100 126.400 126.200 113.000
April 134.500 127.200 126.200 113.000
May 135.500 127.600 126.200 113.000
June 135.600 128.000 126.200 119.600
July 135.600 128.700 126.200 126.200
August 135.700 129.200 126.200 126.200
September 136.300 130.900 126.200 126.200
October 137.100 130.600 126.200 126.200
November 137.000 130.800 126.200 126.200
December 136.800 131.000 126.200 126.200
Average 135.492 128.383 126.200 120.617
Source: Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in)
Description Parameters SHP
(<5MW)
SHP
(5-25 MW)
Capital Cost for the Base Year i.e. FY 2013-14 (Rs Lakh/MW) CC(0) 770.000 700.000
P&M Cost for the Base Year i.e. for FY 2013-14 (Rs Lakh/MW) P&M(0) 550.000 500.000
Capital Cost escalation Factor (%) d(n) (%) 4.992% 4.992%
P&M Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) P&M(n) 577.457 524.961
Capital Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) CC(n) 808.439 734.945
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 26
Appendix-3
Capital cost for biomassbased project (FY 2014-15)
Indexation Formulation:
CC( n ) = P&M (n) * [1 + F1 + F2 + F3]
P&M(n) = P&M(0)*(1+ d (n))
P&M(0) = CC (0) / [1 + F1 + F2 + F3]
d (n) = (a * (SI(n-1)/SI(0))-1) +b* (EI(n-1)/EI(0))-1)) / (a+b)
Variable Description Value
a Weightage for Steel Index 0.70
b Weightage for Electrical Machinery Index 0.30
F1 Factor for Land and Civil Work 0.10
F2 Factor for Erection and Commissioning 0.09
F3 Factor for IDC and Financing 0.14
Month ElectricalMachinery Steel
2013 2011 2013 2011
January 133.900 125.100 126.200 118.600
February 133.800 125.100 126.200 113.000
March 134.100 126.400 126.200 113.000
April 134.500 127.200 126.200 113.000
May 135.500 127.600 126.200 113.000
June 135.600 128.000 126.200 119.600
July 135.600 128.700 126.200 126.200
August 135.700 129.200 126.200 126.200
September 136.300 130.900 126.200 126.200
October 137.100 130.600 126.200 126.200
November 137.000 130.800 126.200 126.200
December 136.800 131.000 126.200 126.200
Average 135.492 128.383 126.200 120.617
Source: Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in)
Description Parameters Value
Capital Cost for the Base Year i.e. FY 2013-14 (Rs Lakh/MW) CC(0) 445.000
Plant & Machinery Cost for the Base Year i.e. for FY 2013-14 (Rs Lakh/MW) P&M(0) 334.586
Capital Cost escalation Factor (%) d(n) (%) 4.901%
Plant & Machinery Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) P&M(n) 350.986
Capital Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) CC(n) 466.811
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 27
Appendix-4
Capital cost for non-fossil fuel cogeneration projects (FY 2014-15)
Indexation Formulation:
CC( n ) = P&M (n) * [1 + F1 + F2 + F3]
P&M(n) = P&M(0)*(1+ d (n))
P&M(0) = CC (0) / [1 + F1 + F2 + F3]
d (n) = (a * (SI(n-1)/SI(0))-1) +b* (EI(n-1)/EI(0))-1)) / (a+b)
Variable Description Value
a Weightage for Steel Index 0.70
b Weightage for Electrical Machinery Index 0.30
F1 Factor for Land and Civil Work 0.10
F2 Factor for Erection and Commissioning 0.09
F3 Factor for IDC and Financing 0.14
Month ElectricalMachinery Steel
2013 2011 2013 2011
January 133.900 125.100 126.200 118.600
February 133.800 125.100 126.200 113.000
March 134.100 126.400 126.200 113.000
April 134.500 127.200 126.200 113.000
May 135.500 127.600 126.200 113.000
June 135.600 128.000 126.200 119.600
July 135.600 128.700 126.200 126.200
August 135.700 129.200 126.200 126.200
September 136.300 130.900 126.200 126.200
October 137.100 130.600 126.200 126.200
November 137.000 130.800 126.200 126.200
December 136.800 131.000 126.200 126.200
Average 135.492 128.383 126.200 120.617
Source: Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in)
Description Parameters Value
Capital Cost for the Base Year i.e. FY 2013-14 (Rs Lakh/MW) CC(0) 420.000
Plant & Machinery Cost for the Base Year i.e. for FY 2013-14 (Rs Lakh/MW) P&M(0) 315.789
Capital Cost escalation Factor (%) d(n) (%) 4.901%
Plant & Machinery Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) P&M(n) 331.267
Capital Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) CC(n) 440.586
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 28
Appendix-5
Capital cost for biomass gasifier based power projects (FY 2014-15)
Indexation Formulation:
CC( n ) = P&M (n) * [1 + F1 + F2 + F3]
P&M(n) = P&M(0)*(1+ d (n))
P&M(0) = CC (0) / [1 + F1 + F2 + F3]
d (n) = (a * (SI(n-1)/SI(0))-1) +b* (EI(n-1)/EI(0))-1)) / (a+b)
Variable Description Value
a Weightage for Steel Index 0.70
b Weightage for Electrical Machinery Index 0.30
F1 Factor for Land and Civil Work 0.10
F2 Factor for Erection and Commissioning 0.09
F3 Factor for IDC and Financing 0.14
Month ElectricalMachinery Steel
2013 2011 2013 2011
January 133.900 125.100 126.200 118.600
February 133.800 125.100 126.200 113.000
March 134.100 126.400 126.200 113.000
April 134.500 127.200 126.200 113.000
May 135.500 127.600 126.200 113.000
June 135.600 128.000 126.200 119.600
July 135.600 128.700 126.200 126.200
August 135.700 129.200 126.200 126.200
September 136.300 130.900 126.200 126.200
October 137.100 130.600 126.200 126.200
November 137.000 130.800 126.200 126.200
December 136.800 131.000 126.200 126.200
Average 135.492 128.383 126.200 120.617
Source: Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in)
Description Parameters Value
Capital Cost for the Base Year i.e. FY 2013-14 (Rs Lakh/MW) CC(0) 550.000
Plant & Machinery Cost for the Base Year i.e. for FY 2013-14 (Rs Lakh/MW) P&M(0) 413.534
Capital Cost escalation Factor (%) d(n) (%) 4.901%
Plant & Machinery Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) P&M(n) 433.803
Capital Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) CC(n) 576.957
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 29
Appendix-6
Capital cost for biogas based power projects (FY 2014-15)
Indexation Formulation:
CC( n ) = P&M (n) * [1 + F1 + F2 + F3]
P&M(n) = P&M(0)*(1+ d (n))
P&M(0) = CC (0) / [1 + F1 + F2 + F3]
d (n) = (a * (SI(n-1)/SI(0))-1) +b* (EI(n-1)/EI(0))-1)) / (a+b)
Variable Description Value
a Weightage for Steel Index 0.70
b Weightage for Electrical Machinery Index 0.30
F1 Factor for Land and Civil Work 0.10
F2 Factor for Erection and Commissioning 0.09
F3 Factor for IDC and Financing 0.14
Month ElectricalMachinery Steel
2013 2011 2013 2011
January 133.900 125.100 126.200 118.600
February 133.800 125.100 126.200 113.000
March 134.100 126.400 126.200 113.000
April 134.500 127.200 126.200 113.000
May 135.500 127.600 126.200 113.000
June 135.600 128.000 126.200 119.600
July 135.600 128.700 126.200 126.200
August 135.700 129.200 126.200 126.200
September 136.300 130.900 126.200 126.200
October 137.100 130.600 126.200 126.200
November 137.000 130.800 126.200 126.200
December 136.800 131.000 126.200 126.200
Average 135.492 128.383 126.200 120.617
Source: Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in)
Description Parameters Value
Capital Cost for the Base Year i.e. FY 2013-14 (Rs Lakh/MW) CC(0) 1100.00
Plant & Machinery Cost for the Base Year i.e. for FY 2013-14 (Rs Lakh/MW) P&M(0) 827.068
Capital Cost escalation Factor (%) d(n) (%) 4.901%
Plant & Machinery Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) P&M(n) 867.605
Capital Cost for the nth Year i.e. FY 2014-15 (Rs Lakh/MW) CC(n) 1153.915
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 30
Appendix-7
Biomass fuel price (FY 2014-15)
(As per fuel price Index Mechanism outlined under Regulation 45 & 74
and the availability of required information)
Fuel Price Indexation Formulation:
P(n) = P(n-1)*{a
*(WPI(n)/WPI(n-1)+b
*(1+IRC(n-1)+c
*(Pd(n)/Pd(n-1))}
Description Parameter Value
Wholesale Price Index for all commodities for month of April 2012 * WPI n-1 163.500
Wholesale Price Index for all commodities for month of April 2013 * WPI n 171.300
Average Annual Inflation Rate for Indexed Energy Charge Component
for (n-1) i.e. FY 2013-14 ** IRC n-1 9.81%
Price/Ton for HSD for (n-1)th (2012) year * Pd n-1 175.242
Price/Ton for HSD for (n)th (2013) year* Pd n 210.908
Factor Representing Fuel Handling Cost a 0.20
Factor Representing Fuel Cost b 0.60
Factor Representing Transportation Cost c 0.20
Biomass fuel price for FY 2013-14 (Rs/MT) P n-1 2500
Biomass Fuel Price for FY 2014-15 (Rs/MT) P n 2773
Sources: * Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in);
**CERC Order for determination of Annual Inflation Rate for Indexed Energy charge component for
‘payment purpose’ of Competitive bidding guidelines for FY 2013-14 (www.cercind.gov.in)
Notes:
1. The Calculation of WPI (n) and WPI (n-1) is based on the figures available on April
2013 and April 2012 respectively.
2. The Calculation of Pd (n) is based on the weighted average of the WPI (Price of HSD)
figures available for the months from January 2013 to December 2013 and the
Calculation of Pd (n-1) is based on the weighted average of the WPI (Price of HSD)
figures available for the months from January 2012 to December 2012, as shown
below.
Month 2013 2012
Jan 198.800 167.800
Feb 202.700 167.800
Mar 201.700 167.800
Apr 202.300 167.800
May 203.400 167.800
Jun 207.000 167.800
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 31
Jul 212.000 167.800
Aug 215.400 168.600
Sep 219.800 182.800
Oct 220.500 192.300
Nov 222.400 192.300
Dec 225.000 192.300
Average Pd (n): 210.908 Pd (n-1): 175.242
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 32
Appendix-8
Bagasse price (FY 2014-15)
(As per fuel price Index Mechanism outlined under Regulation 54
and the availability of required information)
Fuel Price Indexation Formulation:
P(n) = P(n-1)*{a
*(WPI(n)/WPI(n-1)+b
*(1+IRC(n-1)+c
*(Pd(n)/Pd(n-1))}
Description Parameter Value
Wholesale Price Index for all commodities for month of April 2012 * WPI n-1 163.500
Wholesale Price Index for all commodities for month of April 2013 * WPI n 171.300
Average Annual Inflation Rate for Indexed Energy Charge Component
for (n-1) i.e. FY 2013-14 ** IRC n-1 9.81%
Price/Ton for HSD for (n-1)th (2012) year * Pd n-1 175.242
Price/Ton for HSD for (n)th (2013) year* Pd n 210.908
Factor Representing Fuel Handling Cost a 0.20
Factor Representing Fuel Cost b 0.60
Factor Representing Transportation Cost c 0.20
Biomass fuel price for FY 2013-14 (Rs/MT) P n-1 1600
Biomass Fuel Price for FY 2014-15 (Rs/MT) P n 1775
Sources: * Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in);
**CERC Order for determination of Annual Inflation Rate for Indexed Energy charge component for
‘payment purpose’ of Competitive bidding guidelines for FY 2013-14 (www.cercind.gov.in)
Notes:
3. The Calculation of WPI (n) and WPI (n-1) is based on the figures available on April
2013 and April 2012 respectively.
4. The Calculation of Pd (n) is based on the weighted average of the WPI (Price of HSD)
figures available for the months from January 2013 to December 2013 and the
Calculation of Pd (n-1) is based on the weighted average of the WPI (Price of HSD)
figures available for the months from January 2012 to December 2012, as shown
below.
Month 2013 2012
Jan 198.800 167.800
Feb 202.700 167.800
Mar 201.700 167.800
Apr 202.300 167.800
May 203.400 167.800
Jun 207.000 167.800
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 33
Jul 212.000 167.800
Aug 215.400 168.600
Sep 219.800 182.800
Oct 220.500 192.300
Nov 222.400 192.300
Dec 225.000 192.300
Average Pd (n): 210.908 Pd (n-1): 175.242
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 34
Appendix-9
Biogas price (FY 2014-15)
(As per fuel price Index Mechanism outlined under Regulation 83
and the availability of required information)
Fuel Price Indexation Formulation:
P(n) = P(n-1)*{a
*(WPI(n)/WPI(n-1)+b
*(1+IRC(n-1)+c
*(Pd(n)/Pd(n-1))}
Description Parameter Value
Wholesale Price Index for all commodities for month of April 2012 * WPI n-1 163.500
Wholesale Price Index for all commodities for month of April 2013 * WPI n 171.300
Average Annual Inflation Rate for Indexed Energy Charge Component
for (n-1) i.e. FY 2013-14 ** IRC n-1 9.81%
Price/Ton for HSD for (n-1)th (2012) year * Pd n-1 175.242
Price/Ton for HSD for (n)th (2013) year* Pd n 210.908
Factor Representing Fuel Handling Cost a 0.20
Factor Representing Fuel Cost b 0.60
Factor Representing Transportation Cost c 0.20
Biomass fuel price for FY 2013-14 (Rs/MT) P n-1 990
Biomass Fuel Price for FY 2014-15 (Rs/MT) P n 1098
Sources: * Office of Economic Advisor, Ministry of Commerce and Industry (www.eaindustry.nic.in);
**CERC Order for determination of Annual Inflation Rate for Indexed Energy charge component for
‘payment purpose’ of Competitive bidding guidelines for FY 2013-14 (www.cercind.gov.in)
Notes:
5. The Calculation of WPI (n) and WPI (n-1) is based on the figures available on April
2013 and April 2012 respectively.
6. The Calculation of Pd (n) is based on the weighted average of the WPI (Price of HSD)
figures available for the months from January 2013 to December 2013 and the
Calculation of Pd (n-1) is based on the weighted average of the WPI (Price of HSD)
figures available for the months from January 2012 to December 2012, as shown
below.
Month 2013 2012
Jan 198.800 167.800
Feb 202.700 167.800
Mar 201.700 167.800
Apr 202.300 167.800
May 203.400 167.800
Jun 207.000 167.800
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 35
Month 2013 2012
Jul 212.000 167.800
Aug 215.400 168.600
Sep 219.800 182.800
Oct 220.500 192.300
Nov 222.400 192.300
Dec 225.000 192.300
Average Pd (n): 210.908 Pd (n-1): 175.242
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 36
THIS SPACE IS INTENTIONALLY LEFT BLANK
Determination of Generic Levellised Generation Tariff for RES FY2014-15
JKSERC Page 38
THIS SPACE IS INTENTIONALLY LEFT BLANK
Sl. No. Renewable Energy Projects Annexures
1 Wind Power ProjectsWind Zone – 1 Annexure 1A
Wind Zone – 2 Annexure 1B
Wind Zone – 3 Annexure 1C
Wind Zone – 4 Annexure 1D
Wind Zone - 5 Annexure 1E
2 Small Hydro Power ProjectsCapacity below 5 MW Annexure 2A
Capacity 5 MW upto 25 MW Annexure 2B
3 Biomass Power Projects Annexure 3
4 Non-fossil Fuel Based Cogeneration Power Projects Annexure 4
5 Solar PV Power Projects Annexure 5
6 Solar Thermal Power Projects Annexure 6
7 Biomass Gasifier Power Projects Annexure 7
8 Biogas Power Projects Annexure 8
INDEX
JKSERC Page 39
Annexure 1AWind Power Projects (Wind Zone 1)Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Capacity Utilization Factor % 20%Auxiliary consumption % 0.00%Commercial operation date mm/yyyy Apr-14Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 575Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 603.70
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 604
3 Sources of FundTariff Period Years 13
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 422.593Total Equity Amout Rs Lacs 181.111
Debt ComponentLoan Amount Rs Lacs 423Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 181Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.4%Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 1.54%Years for 5.83% rate Years 12Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2on energy chargesInterest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 9.00FY 2014-15 9.51Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00Period for GBI Years 0.00
JKSERC Page 40
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 9.51 10.06 10.63 11.24 11.89 12.57 13.28 14.04 14.85 15.70 16.59 17.54 18.55 19.61 20.73 21.92 23.17 24.49 25.90 27.38 28.94 30.60 32.35 34.20 36.16Depreciation Rs Lakh 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29Interest on term loan Rs Lakh 53.66 48.99 44.33 39.66 35.00 30.33 25.66 21.00 16.33 11.67 7.00 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 3.38 3.31 3.23 3.15 3.08 3.01 2.94 2.87 2.81 2.75 2.86 2.80 2.20 2.26 2.32 2.39 2.46 2.53 2.61 2.69 2.78 2.87 2.97 3.08 3.19Return on Equity Rs Lakh 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84Total Fixed Cost Rs Lakh 134.38 130.18 126.01 121.87 117.78 113.72 109.70 105.73 101.80 97.93 101.51 97.74 69.88 71.00 72.18 73.43 74.76 76.16 77.64 79.20 80.86 82.61 84.45 86.41 88.48
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 0.86 0.54 0.57 0.61 0.64 0.68 0.72 0.76 0.80 0.85 0.90 0.95 1.00 1.06 1.12 1.18 1.25 1.32 1.40 1.48 1.56 1.65 1.75 1.85 1.95 2.06Depreciation Rs/kWh 1.67 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53Int. on term loan Rs/kWh 1.48 3.06 2.80 2.53 2.26 2.00 1.73 1.46 1.20 0.93 0.67 0.40 0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.17 0.19 0.19 0.18 0.18 0.18 0.17 0.17 0.16 0.16 0.16 0.16 0.16 0.13 0.13 0.13 0.14 0.14 0.14 0.15 0.15 0.16 0.16 0.17 0.18 0.18RoE Rs/kWh 1.99 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27Total COG per unit Rs/kWh 6.16 7.67 7.43 7.19 6.96 6.72 6.49 6.26 6.03 5.81 5.59 5.79 5.58 3.99 4.05 4.12 4.19 4.27 4.35 4.43 4.52 4.62 4.71 4.82 4.93 5.05
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 107.95 Rs LakhsLevellised Tariff 6.16 Rs/Unit
JKSERC Page41
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 15%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.990%Capital Cost 603.705
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 15.94 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 17.39 0.00 0.00
Accelerated DepreciationOpening % 100.00% 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91%Allowed during the year % 17.50% 20.63% 9.28% 7.89% 6.71% 5.70% 4.84% 4.12% 3.50% 2.98% 2.53% 2.15% 1.83% 1.55% 1.32% 1.12% 0.95% 0.81% 0.69% 0.59%Closing % 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91% 3.32%Accelerated Deprn. Rs Lakh 105.65 124.51 56.03 47.63 40.48 34.41 29.25 24.86 21.13 17.96 15.27 12.98 11.03 9.38 7.97 6.77 5.76 4.89 4.16 3.54
Net Depreciation Benefit Rs Lakh 89.71 92.64 24.16 15.75 8.61 2.53 -2.63 -7.01 -10.74 -13.91 -16.61 -18.90 -20.84 -22.50 -23.91 -25.10 -26.12 -12.49 4.16 3.54Tax Benefit Rs Lakh 30.49 31.49 8.21 5.35 2.93 0.86 -0.89 -2.38 -3.65 -4.73 -5.64 -6.42 -7.09 -7.65 -8.13 -8.53 -8.88 -4.25 1.41 1.20Energy generation MU 0.88 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75Per unit benefit Rs/Unit 3.48 1.80 0.47 0.31 0.17 0.05 -0.05 -0.14 -0.21 -0.27 -0.32 -0.37 -0.40 -0.44 -0.46 -0.49 -0.51 -0.24 0.08 0.07Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15Tax Benefit Levellised 5.97 Rs LakhElectricity Generation (Levellised) 1.65 MULevellised benefit 0.36 Rs/Unit
JKSERC Page 42
Annexure 1BWind Power Projects (Wind Zone 2)
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1
Capacity Utilization Factor % 22%
Auxiliary consumption % 0.00%
Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 575
Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 603.70
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 604
3 Sources of FundTariff Period Years 13
Debt: Equity
Debt % 70%
Equity % 30%
Total Debt Amount Rs Lacs 422.593
Total Equity Amout Rs Lacs 181.111
Debt Component
Loan Amount Rs Lacs 423
Moratorium Period years 0
Repayment Period(incld Moratorium) years 12
Interest Rate % 13.25%
Equity Component
Equity amount Rs Lacs 181
Return on Equity for first 10 years % p.a 18.0%
RoE Period Year 10
Return on Equity 11th year onwards % p.a 22.0%
Weighted average of ROE % 20.4%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%
MAT Rate (for first 10 years) % 20.01%
80 IA benefits Yes/No Yes
Depreciation
Depreciation Rate for first 12 years % 5.83%
Depreciation Rate 13th year onwards % 1.54%
Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed Charges
O&M Charges Months 1
Maintenance Spare (% of O&M exepenses) % 15%
Receivables for Debtors Months 2
on energy charges
Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 9.00
FY 2014-15 9.51
Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 43
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93
Tariff Components(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 9.51 10.06 10.63 11.24 11.89 12.57 13.28 14.04 14.85 15.70 16.59 17.54 18.55 19.61 20.73 21.92 23.17 24.49 25.90 27.38 28.94 30.60 32.35 34.20 36.16Depreciation Rs Lakh 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29Interest on term loan Rs Lakh 53.66 48.99 44.33 39.66 35.00 30.33 25.66 21.00 16.33 11.67 7.00 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 3.38 3.31 3.23 3.15 3.08 3.01 2.94 2.87 2.81 2.75 2.86 2.80 2.20 2.26 2.32 2.39 2.46 2.53 2.61 2.69 2.78 2.87 2.97 3.08 3.19Return on Equity Rs Lakh 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84Total Fixed Cost Rs Lakh 134.38 130.18 126.01 121.87 117.78 113.72 109.70 105.73 101.80 97.93 101.51 97.74 69.88 71.00 72.18 73.43 74.76 76.16 77.64 79.20 80.86 82.61 84.45 86.41 88.48
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 0.78 0.49 0.52 0.55 0.58 0.62 0.65 0.69 0.73 0.77 0.81 0.86 0.91 0.96 1.02 1.08 1.14 1.20 1.27 1.34 1.42 1.50 1.59 1.68 1.77 1.88Depreciation Rs/kWh 1.52 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48Int. on term loan Rs/kWh 1.34 2.78 2.54 2.30 2.06 1.82 1.57 1.33 1.09 0.85 0.61 0.36 0.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.15 0.18 0.17 0.17 0.16 0.16 0.16 0.15 0.15 0.15 0.14 0.15 0.15 0.11 0.12 0.12 0.12 0.13 0.13 0.14 0.14 0.14 0.15 0.15 0.16 0.17RoE Rs/kWh 1.81 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07Total COG per unit Rs/kWh 5.60 6.97 6.75 6.54 6.32 6.11 5.90 5.69 5.49 5.28 5.08 5.27 5.07 3.63 3.68 3.75 3.81 3.88 3.95 4.03 4.11 4.20 4.29 4.38 4.48 4.59
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 5.60 Rs/Unit
JKSERC Page 44
Accelerated Depreciation
Depreciation amount 90%
Book Depreciation rate 5.28%
Tax Depreciation rate 15%
Additional Depreciation 20.00%
Income Tax (Normal Rates) 33.990%
Capital Cost 603.705
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%
Book Depreciation Rs Lakh 15.94 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 17.39 0.00 0.00
Accelerated Depreciation
Opening % 100.00% 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91%
Allowed during the year % 17.50% 20.63% 9.28% 7.89% 6.71% 5.70% 4.84% 4.12% 3.50% 2.98% 2.53% 2.15% 1.83% 1.55% 1.32% 1.12% 0.95% 0.81% 0.69% 0.59%
Closing % 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91% 3.32%
Accelerated Deprn. Rs Lakh 105.65 124.51 56.03 47.63 40.48 34.41 29.25 24.86 21.13 17.96 15.27 12.98 11.03 9.38 7.97 6.77 5.76 4.89 4.16 3.54
Net Depreciation Benefit Rs Lakh 89.71 92.64 24.16 15.75 8.61 2.53 -2.63 -7.01 -10.74 -13.91 -16.61 -18.90 -20.84 -22.50 -23.91 -25.10 -26.12 -12.49 4.16 3.54
Tax Benefit Rs Lakh 30.49 31.49 8.21 5.35 2.93 0.86 -0.89 -2.38 -3.65 -4.73 -5.64 -6.42 -7.09 -7.65 -8.13 -8.53 -8.88 -4.25 1.41 1.20
Energy generation MU 0.96 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93
Per unit benefit Rs/Unit 3.16 1.63 0.43 0.28 0.15 0.04 -0.05 -0.12 -0.19 -0.25 -0.29 -0.33 -0.37 -0.40 -0.42 -0.44 -0.46 -0.22 0.07 0.06
Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Tax Benefit Levellised 5.97 Rs Lakh
Electricity Generation (Levellised) 1.82 MU
Levellised benefit 0.33 Rs/Unit
JKSERC Page 45
Annexure 1CWind Power Projects (Wind Zone 3)
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Capacity Utilization Factor % 25%Auxiliary consumption % 0.00%
Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 575Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 603.70
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 604
3 Sources of FundTariff Period Years 13
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 422.593Total Equity Amout Rs Lacs 181.111
Debt ComponentLoan Amount Rs Lacs 423Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 181Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.4%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 1.54%Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2on energy chargesInterest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 9.00FY 2014-15 9.51Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 46
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 9.51 10.06 10.63 11.24 11.89 12.57 13.28 14.04 14.85 15.70 16.59 17.54 18.55 19.61 20.73 21.92 23.17 24.49 25.90 27.38 28.94 30.60 32.35 34.20 36.16Depreciation Rs Lakh 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29Interest on term loan Rs Lakh 53.66 48.99 44.33 39.66 35.00 30.33 25.66 21.00 16.33 11.67 7.00 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 3.38 3.31 3.23 3.15 3.08 3.01 2.94 2.87 2.81 2.75 2.86 2.80 2.20 2.26 2.32 2.39 2.46 2.53 2.61 2.69 2.78 2.87 2.97 3.08 3.19Return on Equity Rs Lakh 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84Total Fixed Cost Rs Lakh 134.38 130.18 126.01 121.87 117.78 113.72 109.70 105.73 101.80 97.93 101.51 97.74 69.88 71.00 72.18 73.43 74.76 76.16 77.64 79.20 80.86 82.61 84.45 86.41 88.48
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 0.69 0.43 0.46 0.49 0.51 0.54 0.57 0.61 0.64 0.68 0.72 0.76 0.80 0.85 0.90 0.95 1.00 1.06 1.12 1.18 1.25 1.32 1.40 1.48 1.56 1.65Depreciation Rs/kWh 1.33 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42Int. on term loan Rs/kWh 1.18 2.45 2.24 2.02 1.81 1.60 1.38 1.17 0.96 0.75 0.53 0.32 0.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.14 0.15 0.15 0.15 0.14 0.14 0.14 0.13 0.13 0.13 0.13 0.13 0.13 0.10 0.10 0.11 0.11 0.11 0.12 0.12 0.12 0.13 0.13 0.14 0.14 0.15RoE Rs/kWh 1.59 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82Total COG per unit Rs/kWh 4.93 6.14 5.94 5.75 5.57 5.38 5.19 5.01 4.83 4.65 4.47 4.64 4.46 3.19 3.24 3.30 3.35 3.41 3.48 3.55 3.62 3.69 3.77 3.86 3.95 4.04
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 4.93 Rs/Unit
JKSERC Page 47
Accelerated Depreciation
Depreciation amount 90%
Book Depreciation rate 5.28%
Tax Depreciation rate 15%
Additional Depreciation 20.00%
Income Tax (Normal Rates) 33.990%
Capital Cost 603.705
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%
Book Depreciation Rs Lakh 15.94 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 17.39 0.00 0.00
Accelerated Depreciation
Opening % 100.00% 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91%
Allowed during the year % 17.50% 20.63% 9.28% 7.89% 6.71% 5.70% 4.84% 4.12% 3.50% 2.98% 2.53% 2.15% 1.83% 1.55% 1.32% 1.12% 0.95% 0.81% 0.69% 0.59%
Closing % 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91% 3.32%
Accelerated Deprn. Rs Lakh 105.65 124.51 56.03 47.63 40.48 34.41 29.25 24.86 21.13 17.96 15.27 12.98 11.03 9.38 7.97 6.77 5.76 4.89 4.16 3.54
Net Depreciation Benefit Rs Lakh 89.71 92.64 24.16 15.75 8.61 2.53 -2.63 -7.01 -10.74 -13.91 -16.61 -18.90 -20.84 -22.50 -23.91 -25.10 -26.12 -12.49 4.16 3.54
Tax Benefit Rs Lakh 30.49 31.49 8.21 5.35 2.93 0.86 -0.89 -2.38 -3.65 -4.73 -5.64 -6.42 -7.09 -7.65 -8.13 -8.53 -8.88 -4.25 1.41 1.20
Energy generation MU 1.10 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19 2.19
Per unit benefit Rs/Unit 2.78 1.44 0.37 0.24 0.13 0.04 -0.04 -0.11 -0.17 -0.22 -0.26 -0.29 -0.32 -0.35 -0.37 -0.39 -0.41 -0.19 0.06 0.05
Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15
Tax Benefit Levellised 5.97 Rs Lakh
Electricity Generation (Levellised) 2.07 MU
Levellised benefit 0.29 Rs/Unit
JKSERC Page 48
Annexure 1DWind Power Projects (Wind Zone 4)
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Capacity Utilization Factor % 30%Auxiliary consumption % 0.00%
Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 575Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 603.70
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 604
3 Sources of FundTariff Period Years 13
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 422.593Total Equity Amout Rs Lacs 181.111
Debt ComponentLoan Amount Rs Lacs 423Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 181Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.4%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 1.54%Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2on energy chargesInterest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 9.00FY 2014-15 9.51Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 49
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63
Tariff Components(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 9.51 10.06 10.63 11.24 11.89 12.57 13.28 14.04 14.85 15.70 16.59 17.54 18.55 19.61 20.73 21.92 23.17 24.49 25.90 27.38 28.94 30.60 32.35 34.20 36.16Depreciation Rs Lakh 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29Interest on term loan Rs Lakh 53.66 48.99 44.33 39.66 35.00 30.33 25.66 21.00 16.33 11.67 7.00 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 3.38 3.31 3.23 3.15 3.08 3.01 2.94 2.87 2.81 2.75 2.86 2.80 2.20 2.26 2.32 2.39 2.46 2.53 2.61 2.69 2.78 2.87 2.97 3.08 3.19Return on Equity Rs Lakh 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84Total Fixed Cost Rs Lakh 134.38 130.18 126.01 121.87 117.78 113.72 109.70 105.73 101.80 97.93 101.51 97.74 69.88 71.00 72.18 73.43 74.76 76.16 77.64 79.20 80.86 82.61 84.45 86.41 88.48
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 0.57 0.36 0.38 0.40 0.43 0.45 0.48 0.51 0.53 0.56 0.60 0.63 0.67 0.71 0.75 0.79 0.83 0.88 0.93 0.99 1.04 1.10 1.16 1.23 1.30 1.38Depreciation Rs/kWh 1.11 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35Int. on term loan Rs/kWh 0.98 2.04 1.86 1.69 1.51 1.33 1.15 0.98 0.80 0.62 0.44 0.27 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.11 0.13 0.13 0.12 0.12 0.12 0.11 0.11 0.11 0.11 0.10 0.11 0.11 0.08 0.09 0.09 0.09 0.09 0.10 0.10 0.10 0.11 0.11 0.11 0.12 0.12RoE Rs/kWh 1.32 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52Total COG per unit Rs/kWh 4.11 5.11 4.95 4.79 4.64 4.48 4.33 4.17 4.02 3.87 3.73 3.86 3.72 2.66 2.70 2.75 2.79 2.84 2.90 2.95 3.01 3.08 3.14 3.21 3.29 3.37
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 4.11 Rs/Unit
JKSERC Page 50
Accelerated Depreciation
Depreciation amount 90%
Book Depreciation rate 5.28%
Tax Depreciation rate 15%
Additional Depreciation 20.00%
Income Tax (Normal Rates) 33.990%
Capital Cost 603.705
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%
Book Depreciation Rs Lakh 15.94 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 17.39 0.00 0.00
Accelerated Depreciation
Opening % 100.00% 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91%
Allowed during the year % 17.50% 20.63% 9.28% 7.89% 6.71% 5.70% 4.84% 4.12% 3.50% 2.98% 2.53% 2.15% 1.83% 1.55% 1.32% 1.12% 0.95% 0.81% 0.69% 0.59%
Closing % 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91% 3.32%
Accelerated Deprn. Rs Lakh 105.65 124.51 56.03 47.63 40.48 34.41 29.25 24.86 21.13 17.96 15.27 12.98 11.03 9.38 7.97 6.77 5.76 4.89 4.16 3.54
Net Depreciation Benefit Rs Lakh 89.71 92.64 24.16 15.75 8.61 2.53 -2.63 -7.01 -10.74 -13.91 -16.61 -18.90 -20.84 -22.50 -23.91 -25.10 -26.12 -12.49 4.16 3.54
Tax Benefit Rs Lakh 30.49 31.49 8.21 5.35 2.93 0.86 -0.89 -2.38 -3.65 -4.73 -5.64 -6.42 -7.09 -7.65 -8.13 -8.53 -8.88 -4.25 1.41 1.20
Energy generation MU 1.31 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63 2.63
Per unit benefit Rs/Unit 2.32 1.20 0.31 0.20 0.11 0.03 -0.03 -0.09 -0.14 -0.18 -0.21 -0.24 -0.27 -0.29 -0.31 -0.32 -0.34 -0.16 0.05 0.05
Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15
Tax Benefit Levellised 5.97 Rs Lakh
Electricity Generation (Levellised) 2.48 MU
Levellised benefit 0.24 Rs/Unit
JKSERC Page 51
Annexure 1EWind Power Projects (Wind Zone 5)
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1
Capacity Utilization Factor % 32%
Auxiliary consumption % 0.00%
Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 575
Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 603.70
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 604
3 Sources of FundTariff Period Years 13
Debt: Equity
Debt % 70%
Equity % 30%
Total Debt Amount Rs Lacs 422.593
Total Equity Amout Rs Lacs 181.111
Debt Component
Loan Amount Rs Lacs 423
Moratorium Period years 0
Repayment Period(incld Moratorium) years 12
Interest Rate % 13.25%
Equity Component
Equity amount Rs Lacs 181
Return on Equity for first 10 years % p.a 18.0%
RoE Period Year 10
Return on Equity 11th year onwards % p.a 22.0%
Weighted average of ROE % 20.4%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%
MAT Rate (for first 10 years) % 20.01%
80 IA benefits Yes/No Yes
Depreciation
Depreciation Rate for first 12 years % 5.83%
Depreciation Rate 13th year onwards % 1.54%
Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed Charges
O&M Charges Months 1
Maintenance Spare (% of O&M exepenses) % 15%
Receivables for Debtors Months 2
on energy charges
Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 9.00
FY 2014-15 9.51
Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 52
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 9.51 10.06 10.63 11.24 11.89 12.57 13.28 14.04 14.85 15.70 16.59 17.54 18.55 19.61 20.73 21.92 23.17 24.49 25.90 27.38 28.94 30.60 32.35 34.20 36.16Depreciation Rs Lakh 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 35.22 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.29Interest on term loan Rs Lakh 53.66 48.99 44.33 39.66 35.00 30.33 25.66 21.00 16.33 11.67 7.00 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 3.38 3.31 3.23 3.15 3.08 3.01 2.94 2.87 2.81 2.75 2.86 2.80 2.20 2.26 2.32 2.39 2.46 2.53 2.61 2.69 2.78 2.87 2.97 3.08 3.19Return on Equity Rs Lakh 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 32.60 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84 39.84Total Fixed Cost Rs Lakh 134.38 130.18 126.01 121.87 117.78 113.72 109.70 105.73 101.80 97.93 101.51 97.74 69.88 71.00 72.18 73.43 74.76 76.16 77.64 79.20 80.86 82.61 84.45 86.41 88.48
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 0.54 0.34 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.56 0.59 0.63 0.66 0.70 0.74 0.78 0.83 0.87 0.92 0.98 1.03 1.09 1.15 1.22 1.29Depreciation Rs/kWh 1.04 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33Int. on term loan Rs/kWh 0.92 1.91 1.75 1.58 1.41 1.25 1.08 0.92 0.75 0.58 0.42 0.25 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.11 0.12 0.12 0.12 0.11 0.11 0.11 0.10 0.10 0.10 0.10 0.10 0.10 0.08 0.08 0.08 0.09 0.09 0.09 0.09 0.10 0.10 0.10 0.11 0.11 0.11RoE Rs/kWh 1.24 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42 1.42Total COG per unit Rs/kWh 3.85 4.79 4.64 4.50 4.35 4.20 4.06 3.91 3.77 3.63 3.49 3.62 3.49 2.49 2.53 2.57 2.62 2.67 2.72 2.77 2.83 2.88 2.95 3.01 3.08 3.16
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 3.85 Rs/Unit
JKSERC Page 53
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 15%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.990%Capital Cost 603.705
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 15.94 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 31.88 17.39 0.00 0.00
Accelerated DepreciationOpening % 100.00% 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91%Allowed during the year % 17.50% 20.63% 9.28% 7.89% 6.71% 5.70% 4.84% 4.12% 3.50% 2.98% 2.53% 2.15% 1.83% 1.55% 1.32% 1.12% 0.95% 0.81% 0.69% 0.59%Closing % 82.50% 61.88% 52.59% 44.70% 38.00% 32.30% 27.45% 23.34% 19.84% 16.86% 14.33% 12.18% 10.35% 8.80% 7.48% 6.36% 5.41% 4.59% 3.91% 3.32%Accelerated Deprn. Rs Lakh 105.65 124.51 56.03 47.63 40.48 34.41 29.25 24.86 21.13 17.96 15.27 12.98 11.03 9.38 7.97 6.77 5.76 4.89 4.16 3.54
Net Depreciation Benefit Rs Lakh 89.71 92.64 24.16 15.75 8.61 2.53 -2.63 -7.01 -10.74 -13.91 -16.61 -18.90 -20.84 -22.50 -23.91 -25.10 -26.12 -12.49 4.16 3.54Tax Benefit Rs Lakh 30.49 31.49 8.21 5.35 2.93 0.86 -0.89 -2.38 -3.65 -4.73 -5.64 -6.42 -7.09 -7.65 -8.13 -8.53 -8.88 -4.25 1.41 1.20Energy generation MU 1.40 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80 2.80Per unit benefit Rs/Unit 2.18 1.12 0.29 0.19 0.10 0.03 -0.03 -0.09 -0.13 -0.17 -0.20 -0.23 -0.25 -0.27 -0.29 -0.30 -0.32 -0.15 0.05 0.04Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Tax Benefit Levellised 5.97 Rs LakhElectricity Generation (Levellised) 2.65 MULevellised benefit 0.23 Rs/Unit
JKSERC Page 54
Annexure 2A
Small Hydro Power Projects (capacity below 5 MW)
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1
Capacity Utilization Factor % 45%Auxiliary Consumption % 1.00%Useful Life Years 35
2 Project Cost Base Year (FY 2013-14) Rs Lacs 770
Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 808
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 808
3 Sources of FundTariff Period Years 35
Debt: Equity
Debt % 70%
Equity % 30%
Total Debt Amount Rs Lacs 565.908
Total Equity Amout Rs Lacs 242.532
Debt Component
Loan Amount Rs Lacs 566
Moratorium Period years 0
Repayment Period(incld Moratorium) years 12
Interest Rate % 13.25%
Equity Component
Equity amount Rs Lacs 243
Return on Equity for first 10 years % p.a 18.0%
RoE Period Year 10
Return on Equity 11th year onwards % p.a 22.0%
Weighted average of ROE % 20.9%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.990%
MAT Rate (for first 10 years) % 20.01%
80 IA benefits Yes/No Yes
Depreciation
Depreciation Rate for first 12 years % 5.83%
Depreciation Rate 13th year onwards % 0.87%
Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed Charges
O&M Charges Months 1
Maintenance Spare (% of O&M exepenses) % 15%
Receivables for Debtors Months 2
on energy charges
Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 25.00
FY 2014-15 26.43
Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 55
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Net Generation MU 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90
Tariff Components(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35O&M Expenses Rs Lakh 26.43 27.94 29.54 31.23 33.02 34.90 36.90 39.01 41.24 43.60 46.10 48.73 51.52 54.47 57.58 60.88 64.36 68.04 71.93 76.05 80.40 85.00 89.86 95.00 100.43 106.18 112.25 118.67 125.46 132.63 140.22 148.24 156.72 165.69 175.16Depreciation Rs Lakh 47.16 47.16 47.16 47.16 47.16 47.16 47.16 47.16 47.16 47.16 47.16 47.16 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03Interest on term loan Rs Lakh 71.86 65.61 59.36 53.11 46.86 40.62 34.37 28.12 21.87 15.62 9.37 3.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 5.30 5.24 5.19 5.13 5.09 5.05 5.01 4.99 4.96 4.95 5.17 5.17 4.32 4.48 4.66 4.84 5.04 5.25 5.47 5.70 5.94 6.20 6.47 6.76 7.07 7.39 7.73 8.10 8.48 8.88 9.31 9.76 10.24 10.74 11.28Return on Equity Rs Lakh 43.66 43.66 43.66 43.66 43.66 43.66 43.66 43.66 43.66 43.66 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36 53.36Total Fixed Cost Rs Lakh 194.41 189.61 184.90 180.29 175.78 171.38 167.10 162.93 158.89 154.99 161.16 157.55 116.22 119.34 122.63 126.11 129.79 133.67 137.78 142.13 146.73 151.58 156.72 162.15 167.89 173.96 180.37 187.15 194.32 201.90 209.92 218.39 227.35 236.81 246.83
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35O&M expn Rs/kWh 1.00 0.68 0.72 0.76 0.80 0.85 0.89 0.95 1.00 1.06 1.12 1.18 1.25 1.32 1.40 1.48 1.56 1.65 1.74 1.84 1.95 2.06 2.18 2.30 2.43 2.57 2.72 2.88 3.04 3.21 3.40 3.59 3.80 4.02 4.25 4.49Depreciation Rs/kWh 1.02 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18Int. on term loan Rs/kWh 0.94 1.84 1.68 1.52 1.36 1.20 1.04 0.88 0.72 0.56 0.40 0.24 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.13 0.14 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.11 0.11 0.12 0.12 0.13 0.13 0.14 0.15 0.15 0.16 0.17 0.17 0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.28 0.29RoE Rs/kWh 1.18 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37Total COG per unit Rs/kWh 4.27 4.98 4.86 4.74 4.62 4.50 4.39 4.28 4.17 4.07 3.97 4.13 4.04 2.98 3.06 3.14 3.23 3.33 3.43 3.53 3.64 3.76 3.88 4.02 4.15 4.30 4.46 4.62 4.80 4.98 5.17 5.38 5.60 5.83 6.07 6.32
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083 0.075 0.068 0.061 0.055 0.049 0.045 0.040 0.036 0.033 0.029Levellised Tariff 4.30 Rs/Unit
JKSERC Page 56
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 80%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.99%Capital Cost 808.439
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 21.34 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 42.69 23.28 0.00 0.00
Accelerated DepreciationOpening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Accelrated Deprn. Rs Lakh 404.22 363.80 32.34 6.47 1.29 0.26 0.05 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 382.88 321.11 -10.35 -36.22 -41.39 -42.43 -42.63 -42.68 -42.68 -42.69 -42.69 -42.69 -42.69 -42.69 -42.69 -42.69 -42.69 -23.28 0.00 0.00Tax Benefit Rs Lakh 130.14 109.15 -3.52 -12.31 -14.07 -14.42 -14.49 -14.51 -14.51 -14.51 -14.51 -14.51 -14.51 -14.51 -14.51 -14.51 -14.51 -7.91 0.00 0.00Energy generation MU 1.95 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90 3.90Per unit benefit Rs/Unit 6.67 2.80 -0.09 -0.32 -0.36 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.37 -0.20 0.00 0.00Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Tax Benefit Levellised 14.41 Rs LakhElectricity Generation (Levellised) 3.71 MULevellised benefit 0.39 Rs/Unit
JKSERC Page 57
Annexure 2B
Small Hydro Power Projects (capacity 5 MW and upto 25 MW)
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 6
Capacity Utilization Factor % 45%Auxiliary Consumption % 1.00%Useful Life Years 35
2 Project Cost Base Year (FY 2013-14) Rs Lacs 4200
Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 4410
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 4410
3 Sources of FundTariff Period Years 13
Debt: Equity
Debt % 70%
Equity % 30%
Total Debt Amount Rs Lacs 3,086.768
Total Equity Amout Rs Lacs 1,322.901
Debt Component
Loan Amount Rs Lacs 3,087
Moratorium Period years 0
Repayment Period(incld Moratorium) years 12
Interest Rate % 13.25%
Equity Component
Equity amount Rs Lacs 1323
Return on Equity for first 10 years % p.a 18.0%
RoE Period Year 10
Return on Equity 11th year onwards % p.a 22.0%
Weighted average of ROE % 20.9%
Discount Rate (WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.990%
MAT Rate (for first 10 years) % 20.01%
80 IA benefits Yes/No Yes
Depreciation
Depreciation Rate for first 12 years % 5.83%
Depreciation Rate 13th year onwards % 0.87%
Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed Charges
O&M Charges Months 1
Maintenance Spare (% of O&M exepenses) % 15%
Receivables for Debtors Months 2
on energy charges
Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 108.00
FY 2014-15 114.18
Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 58
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35Installed Capacity MW 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6Net Generation MU 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42
Tariff Components(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35O&M Expenses Rs Lakh 114.18 120.71 127.61 134.91 142.63 150.79 159.41 168.53 178.17 188.36 199.14 210.53 222.57 235.30 248.76 262.99 278.03 293.94 310.75 328.52 347.32 367.18 388.18 410.39 433.86 458.68 484.92 512.65 541.98 572.98 605.75 640.40 677.03 715.76 756.70Depreciation Rs Lakh 257.23 257.23 257.23 257.23 257.23 257.23 257.23 257.23 257.23 257.23 257.23 257.23 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35 38.35Interest on term loan Rs Lakh 391.96 357.87 323.79 289.71 255.62 221.54 187.46 153.37 119.29 85.21 51.12 17.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 27.24 26.81 26.40 26.01 25.64 25.30 24.99 24.70 24.45 24.22 25.27 25.11 20.25 20.97 21.73 22.53 23.38 24.27 25.22 26.22 27.28 28.39 29.58 30.83 32.15 33.54 35.02 36.58 38.23 39.98 41.82 43.77 45.84 48.02 50.32Return on Equity Rs Lakh 238.12 238.12 238.12 238.12 238.12 238.12 238.12 238.12 238.12 238.12 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04 291.04Total Fixed Cost Rs Lakh 1028.72 1000.74 973.15 945.98 919.25 892.98 867.21 841.96 817.26 793.14 823.80 800.95 572.21 585.65 599.87 614.90 630.79 647.59 665.35 684.12 703.97 724.96 747.14 770.60 795.39 821.61 849.32 878.62 909.59 942.34 976.96 1013.56 1052.25 1093.16 1136.40
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35O&M expn Rs/kWh 0.72 0.49 0.52 0.54 0.58 0.61 0.64 0.68 0.72 0.76 0.80 0.85 0.90 0.95 1.00 1.06 1.12 1.19 1.26 1.33 1.40 1.48 1.57 1.66 1.75 1.85 1.96 2.07 2.19 2.31 2.45 2.59 2.73 2.89 3.06 3.23Depreciation Rs/kWh 0.92 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16Int. on term loan Rs/kWh 0.85 1.67 1.53 1.38 1.24 1.09 0.95 0.80 0.66 0.51 0.36 0.22 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.11 0.12 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.10 0.10 0.11 0.11 0.09 0.09 0.09 0.10 0.10 0.10 0.11 0.11 0.12 0.12 0.13 0.13 0.14 0.14 0.15 0.16 0.16 0.17 0.18 0.19 0.20 0.21 0.21RoE Rs/kWh 1.08 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24 1.24Total COG per unit Rs/kWh 3.69 4.39 4.27 4.16 4.04 3.93 3.81 3.70 3.60 3.49 3.39 3.52 3.42 2.44 2.50 2.56 2.63 2.69 2.77 2.84 2.92 3.01 3.10 3.19 3.29 3.40 3.51 3.63 3.75 3.88 4.02 4.17 4.33 4.49 4.67 4.85
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083 0.075 0.068 0.061 0.055 0.049 0.045 0.040 0.036 0.033 0.029Levellised Tariff 3.67 Rs/Unit
JKSERC Page 59
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 80%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.99%Capital Cost 4409.669
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 116.42 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 232.83 127.00 0.00 0.00
Accelerated DepreciationOpening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Accelrated Deprn. Rs Lakh 2204.83 1984.35 176.39 35.28 7.06 1.41 0.28 0.06 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 2088.42 1751.52 -56.44 -197.55 -225.78 -231.42 -232.55 -232.77 -232.82 -232.83 -232.83 -232.83 -232.83 -232.83 -232.83 -232.83 -232.83 -127.00 0.00 0.00Tax Benefit Rs Lakh 709.85 595.34 -19.19 -67.15 -76.74 -78.66 -79.04 -79.12 -79.14 -79.14 -79.14 -79.14 -79.14 -79.14 -79.14 -79.14 -79.14 -43.17 0.00 0.00Energy generation MU 11.71 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42 23.42Per unit benefit Rs/Unit 6.06 2.54 -0.08 -0.29 -0.33 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.34 -0.18 0.00 0.00Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15Tax Benefit Levellised 78.59 Rs LakhElectricity Generation (Levellised) 22.24 MULevellised benefit 0.35 Rs/Unit
JKSERC Page 60
Annexure 3Biomass Power Projects
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Plant Load Factor % 80%Auxiliary consumption % 10.00%
Useful Life Years 20
2 Project Cost Base Year (FY 2013-14) Rs Lacs 445Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 467
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 467
3 Sources of FundTariff Period Years 13
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 326.768Total Equity Amout Rs Lacs 140.043
Debt ComponentLoan Amount Rs Lacs 327Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 140Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.0%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 2.50%Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2Fuel cost Months 4Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 24.00FY 2014-15 25.37Total O & M Expenses Escalation % 5.72%
7 Fuel related componentHeat Rate After Stabilisation period Kcal/kwh 4000
During Stablization Period Kcal/kwh 4000
Biomass Base Price(FY 2013-14) Rs/T 2500FY 2014-15 Rs/T 2773GCV - Biomass Kcal/kg 3300Biomass Price Escalation Factor 5%
8 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 61
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Net Generation MU 5.12 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31
Vaiable Cost Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Biomass Cost Rs Lakh 191.37 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53 235.53
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
O&M Expenses Rs Lakh 25.37 26.82 28.36 29.98 31.70 33.51 35.43 37.45 39.59 41.86 44.25 46.78 49.46 52.29 55.28 58.44 61.78 65.32 69.06 73.01Depreciation Rs Lakh 27.23 27.23 27.23 27.23 27.23 27.23 27.23 27.23 27.23 27.23 27.23 27.23 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67Interest on term loan Rs Lakh 41.49 37.88 34.28 30.67 27.06 23.45 19.84 16.24 12.63 9.02 5.41 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 17.10 20.20 20.20 20.21 20.22 20.24 20.26 20.29 20.33 20.37 20.55 20.61 20.35 20.51 20.68 20.86 21.05 21.25 21.46 21.68Return on Equity Rs Lakh 25.21 25.21 25.21 25.21 25.21 25.21 25.21 25.21 25.21 25.21 30.81 30.81 30.81 30.81 30.81 30.81 30.81 30.81 30.81 30.81Total Fixed Cost Rs Lakh 136.40 137.35 135.28 133.30 131.42 129.64 127.97 126.42 124.99 123.69 128.26 127.24 112.29 115.28 118.44 121.78 125.31 129.04 132.99 137.16
Levallised tariff corresponding to Useful life
Per Unit Cost of Generation Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Variable cost Rs/kWh 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73O&M expn Rs/kWh 0.50 0.43 0.45 0.48 0.50 0.53 0.56 0.59 0.63 0.66 0.70 0.74 0.78 0.83 0.88 0.93 0.98 1.04 1.09 1.16Depreciation Rs/kWh 0.53 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19Int. on term loan Rs/kWh 0.81 0.60 0.54 0.49 0.43 0.37 0.31 0.26 0.20 0.14 0.09 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.33 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.33 0.33 0.32 0.33 0.33 0.33 0.33 0.34 0.34 0.34RoE Rs/kWh 0.49 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49Total COG per unit Rs/kWh 6.40 5.91 5.88 5.85 5.82 5.79 5.76 5.74 5.72 5.70 5.77 5.75 5.51 5.56 5.61 5.67 5.72 5.78 5.84 5.91
Discount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Variable cost 3.73 Rs/Unit
Levellised Tariff (Fixed) 2.11 Rs/Unit
Levellised Tariff (for Tariff Period)5.84 Rs/Unit
JKSERC Page 62
Accelerated Depreciation
Depreciation amount 90%
Book Depreciation rate 5.28%
Tax Depreciation rate 80%
Additional Depreciation 20.00%
Income Tax (Normal Rates) 33.99%
Capital Cost 466.81
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%
Book Depreciation Rs Lakh 12.32 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 24.65 13.44 0.00 0.00
Accelerated Depreciation
Opening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Accelrated Deprn. Rs Lakh 233.41 210.06 18.67 3.73 0.75 0.15 0.03 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 221.08 185.42 -5.98 -20.91 -23.90 -24.50 -24.62 -24.64 -24.65 -24.65 -24.65 -24.65 -24.65 -24.65 -24.65 -24.65 -24.65 -13.44 0.00 0.00
Tax Benefit Rs Lakh 75.15 63.02 -2.03 -7.11 -8.12 -8.33 -8.37 -8.38 -8.38 -8.38 -8.38 -8.38 -8.38 -8.38 -8.38 -8.38 -8.38 -4.57 0.00 0.00
Energy generation MU 2.56 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31 6.31
Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15
Tax Benefit Levellised 9.34 Rs Lakh
Electricity Generation (Levellised) 5.89 MU
Levellised benefit 0.16 Rs/Unit
JKSERC Page 63
Annexure 4
Non-fossil Fuel Based Cogeneration Power Projects
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1
Plant Load Factor % 53%
Auxiliary consumption % 8.50%
Useful Life Years 20
2 Project Cost Base Year (FY 2013-14) Rs Lacs 420
Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 440.59
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 441
3 Sources of FundTariff Period Years 13
Debt: Equity
Debt % 70%
Equity % 30%
Total Debt Amount Rs Lacs 308.410
Total Equity Amout Rs Lacs 132.176
Debt Component
Loan Amount Rs Lacs 308
Moratorium Period years 0
Repayment Period(incld Moratorium) years 12
Interest Rate % 13.25%
Equity Component
Equity amount Rs Lacs 132
Return on Equity for first 10 years % p.a 18.0%
RoE Period Year 10
Return on Equity 11th year onwards % p.a 22.0%
Weighted average of ROE % 20.0%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%
MAT Rate (for first 10 years) % 20.01%
80 IA benefits Yes/No Yes
Depreciation
Depreciation Rate for first 12 years % 5.83%
Depreciation Rate 13th year onwards % 2.50%
Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed Charges
O&M Charges Months 1
Maintenance Spare (% of O&M exepenses) % 15%
Receivables for Debtors Months 2
Fuel cost Months 4
Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 16.00
FY 2014-15 16.92
Total O & M Expenses Escalation % 5.72%
7 Fuel related componentHeat Rate After Stabilisation period Kcal/kwh 3600
During Stablization Period Kcal/kwh 3600
Non fossil cogen Base Price(FY 2013-14) Rs/T 1600
FY 2014-15 Rs/T 1775
GCV Kcal/kg 2250Biomass Price Escalation Factor 5%
8 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 64
Determination of Tariff Component1 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Net Generation MU 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25
Vaiable Cost Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Biomass Cost Rs Lakh 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82 131.82Per unit Var Cost Rs/kWh 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10
Tariff Components(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20O&M Expenses Rs Lakh 16.92 17.88 18.91 19.99 21.13 22.34 23.62 24.97 26.40 27.91 29.50 31.19 32.97 34.86 36.85 38.96 41.19 43.55 46.04 48.67Depreciation Rs Lakh 25.70 25.70 25.70 25.70 25.70 25.70 25.70 25.70 25.70 25.70 25.70 25.70 11.01 11.01 11.01 11.01 11.01 11.01 11.01 11.01Interest on term loan Rs Lakh 39.16 35.76 32.35 28.95 25.54 22.13 18.73 15.32 11.92 8.51 5.11 1.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 12.31 12.28 12.26 12.24 12.22 12.21 12.20 12.20 12.20 12.21 12.34 12.36 12.07 12.18 12.29 12.41 12.53 12.67 12.81 12.96Return on Equity Rs Lakh 23.79 23.79 23.79 23.79 23.79 23.79 23.79 23.79 23.79 23.79 29.08 29.08 29.08 29.08 29.08 29.08 29.08 29.08 29.08 29.08Total Fixed Cost Rs Lakh 117.88 115.41 113.01 110.67 108.39 106.18 104.04 101.99 100.01 98.12 101.73 100.03 85.14 87.13 89.24 91.46 93.82 96.31 98.94 101.72Per unit Fixed Cost Rs/kWh 2.77 2.72 2.66 2.61 2.55 2.50 2.45 2.40 2.35 2.31 2.39 2.35 2.00 2.05 2.10 2.15 2.21 2.27 2.33 2.39
Total cost of generation Rs Lakh 249.70 247.24 244.83 242.49 240.21 238.00 235.87 233.81 231.83 229.94 233.55 231.85 216.96 218.95 221.06 223.29 225.64 228.13 230.76 233.54
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Variable cost Rs/kWh 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10O&M expn Rs/kWh 0.59 0.40 0.42 0.45 0.47 0.50 0.53 0.56 0.59 0.62 0.66 0.69 0.73 0.78 0.82 0.87 0.92 0.97 1.03 1.08 1.15Depreciation Rs/kWh 0.54 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26Int. on term loan Rs/kWh 0.47 0.92 0.84 0.76 0.68 0.60 0.52 0.44 0.36 0.28 0.20 0.12 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.28 0.29 0.29 0.29 0.30 0.30 0.30 0.30RoE Rs/kWh 0.59 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68Total COG per unit Rs/kWh 5.59 5.88 5.82 5.76 5.71 5.65 5.60 5.55 5.50 5.46 5.41 5.50 5.46 5.11 5.15 5.20 5.26 5.31 5.37 5.43 5.50
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140Variable cost 3.10 Rs/UnitLevellised Tariff (Fixed) 2.48 Rs/UnitLevellised Tariff (for Tariff Period)5.58 Rs/Unit
JKSERC Page 65
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 80%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.99%Capital Cost 440.59
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 11.63 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 23.26 12.69 0.00 0.00
Accelerated DepreciationOpening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Accelrated Deprn. Rs Lakh 220.29 198.26 17.62 3.52 0.70 0.14 0.03 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 208.66 175.00 -5.64 -19.74 -22.56 -23.12 -23.23 -23.26 -23.26 -23.26 -23.26 -23.26 -23.26 -23.26 -23.26 -23.26 -23.26 -12.69 0.00 0.00Tax Benefit Rs Lakh 70.92 59.48 -1.92 -6.71 -7.67 -7.86 -7.90 -7.91 -7.91 -7.91 -7.91 -7.91 -7.91 -7.91 -7.91 -7.91 -7.91 -4.31 0.00 0.00Energy generation MU 2.12 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Tax Benefit Levellised 8.82 Rs LakhElectricity Generation (Levellised) 4.01 MULevellised benefit 0.22 Rs/Unit
JKSERC Page 66
Annexure 5
Solar PV Power Projects
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1
Capacity Utilization Factor % 19%
Auxiliary consumption % 0.00%
Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 691
Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 691
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 691
3 Sources of FundTariff Period Years 25
Debt: Equity
Debt % 70%
Equity % 30%
Total Debt Amount Rs Lacs 483.700
Total Equity Amout Rs Lacs 207.300
Debt Component
Loan Amount Rs Lacs 484
Moratorium Period years 0
Repayment Period(incld Moratorium) years 12
Interest Rate % 13.25%
Equity Component
Equity amount Rs Lacs 207
Return on Equity for first 10 years % p.a 18.0%
RoE Period Year 10
Return on Equity 11th year onwards % p.a 22.0%
Weighted average of ROE % 20.4%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%
MAT Rate (for first 10 years) % 20.01%
80 IA benefits Yes/No Yes
Depreciation
Depreciation Rate for first 12 years % 5.83%
Depreciation Rate 13th year onwards % 1.54%
Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed Charges
O&M Charges Months 1
Maintenance Spare (% of O&M exepenses) % 15%
Receivables for Debtors Months 2
on energy charges
Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 11.00
FY 2014-15 11.63
Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 67
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 11.63 12.29 13.00 13.74 14.53 15.36 16.24 17.17 18.15 19.19 20.28 21.44 22.67 23.97 25.34 26.79 28.32 29.94 31.65 33.46 35.37 37.40 39.54 41.80 44.19Depreciation Rs Lakh 40.31 40.31 40.31 40.31 40.31 40.31 40.31 40.31 40.31 40.31 40.31 40.31 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63Interest on term loan Rs Lakh 61.42 56.08 50.74 45.40 40.06 34.72 29.37 24.03 18.69 13.35 8.01 2.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 3.92 3.83 3.74 3.66 3.58 3.50 3.42 3.35 3.28 3.21 3.34 3.28 2.60 2.67 2.75 2.83 2.91 3.00 3.10 3.20 3.31 3.42 3.54 3.67 3.81Return on Equity Rs Lakh 37.31 37.31 37.31 37.31 37.31 37.31 37.31 37.31 37.31 37.31 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61 45.61Total Fixed Cost Rs Lakh 154.59 149.82 145.10 140.42 135.78 131.20 126.66 122.17 117.74 113.37 117.55 113.31 81.50 82.87 84.32 85.85 87.47 89.18 90.99 92.90 94.92 97.06 99.32 101.71 104.23
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 1.11 0.70 0.74 0.78 0.83 0.87 0.92 0.98 1.03 1.09 1.15 1.22 1.29 1.36 1.44 1.52 1.61 1.70 1.80 1.90 2.01 2.13 2.25 2.38 2.51 2.65Depreciation Rs/kWh 2.01 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64Int. on term loan Rs/kWh 1.78 3.69 3.37 3.05 2.73 2.41 2.09 1.76 1.44 1.12 0.80 0.48 0.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.21 0.24 0.23 0.22 0.22 0.21 0.21 0.21 0.20 0.20 0.19 0.20 0.20 0.16 0.16 0.16 0.17 0.18 0.18 0.19 0.19 0.20 0.21 0.21 0.22 0.23RoE Rs/kWh 2.39 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74Total COG per unit Rs/kWh 7.50 9.29 9.00 8.72 8.44 8.16 7.88 7.61 7.34 7.07 6.81 7.06 6.81 4.90 4.98 5.07 5.16 5.26 5.36 5.47 5.58 5.70 5.83 5.97 6.11 6.26
Discount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 7.50 Rs/Unit
JKSERC Page 68
Accelerated Depreciation
Depreciation amount 90%
Book Depreciation rate 5.28%
Tax Depreciation rate 80%
Additional Depreciation 20.00%
Income Tax (Normal Rates) 33.99%
Capital Cost 691
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Book Depreciation Rs Lakh 18.24 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 36.48 19.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Accelerated Depreciation
Opening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Accelrated Deprn. Rs Lakh 345.50 310.95 27.64 5.53 1.11 0.22 0.04 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 327.26 274.47 -8.84 -30.96 -35.38 -36.26 -36.44 -36.48 -36.48 -36.48 -36.48 -36.48 -36.48 -36.48 -36.48 -36.48 -36.48 -19.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tax Benefit Rs Lakh 111.23 93.29 -3.01 -10.52 -12.03 -12.33 -12.39 -12.40 -12.40 -12.40 -12.40 -12.40 -12.40 -12.40 -12.40 -12.40 -12.40 -6.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Energy generation MU 0.83 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66
Per unit benefit Rs/Unit 13.37 5.61 -0.18 -0.63 -0.72 -0.74 -0.74 -0.74 -0.75 -0.75 -0.75 -0.75 -0.75 -0.75 -0.75 -0.75 -0.75 -0.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15
Tax Benefit Levellised 13.07 Rs Lakh
Electricity Generation (Levellised) 1.58 MU
Levellised benefit 0.83 Rs/Unit
JKSERC Page 69
Annexure 6Solar Thermal Power Projects
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Capacity Utilization Factor % 23%Auxiliary consumption % 10.00%
Useful Life Years 25
2 Project Cost Base Year (FY 2013-14) Rs Lacs 1200Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 1200
Capital subsidy (if any) Rs Lacs 0
Net capital cost Rs Lacs 1200
3 Sources of FundTariff Period Years 25
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 840.000Total Equity Amout Rs Lacs 360.000
Debt ComponentLoan Amount Rs Lacs 840Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 360Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.4%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 1.54%Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2on energy chargesInterest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 15.00FY 2014-15 15.86Total O & M Expenses Escalation % 5.72%
7 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 70
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Gross/Net Generation MU 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M Expenses Rs Lakh 15.86 16.77 17.72 18.74 19.81 20.94 22.14 23.41 24.75 26.16 27.66 29.24 30.91 32.68 34.55 36.53 38.62 40.82 43.16 45.63 48.24 51.00 53.91 57.00 60.26Depreciation Rs Lakh 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 18.46 18.46 18.46 18.46 18.46 18.46 18.46 18.46 18.46 18.46 18.46 18.46 18.46Interest on term loan Rs Lakh 106.66 97.39 88.11 78.84 69.56 60.29 51.01 41.74 32.46 23.19 13.91 4.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 6.56 6.39 6.23 6.07 5.91 5.75 5.60 5.46 5.32 5.18 5.38 5.25 4.03 4.13 4.24 4.35 4.46 4.59 4.72 4.86 5.01 5.16 5.33 5.50 5.68Return on Equity Rs Lakh 64.80 64.80 64.80 64.80 64.80 64.80 64.80 64.80 64.80 64.80 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20 79.20Total Fixed Cost Rs Lakh 263.88 255.34 246.86 238.44 230.08 221.78 213.56 205.40 197.32 189.33 196.15 188.33 132.60 134.47 136.45 138.53 140.74 143.07 145.54 148.15 150.91 153.82 156.90 160.16 163.60
Levallised tariff corresponding to Useful lifePer Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25O&M expn Rs/kWh 1.39 0.87 0.92 0.98 1.03 1.09 1.15 1.22 1.29 1.36 1.44 1.53 1.61 1.70 1.80 1.91 2.01 2.13 2.25 2.38 2.52 2.66 2.81 2.97 3.14 3.32Depreciation Rs/kWh 3.20 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 3.86 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02Int. on term loan Rs/kWh 2.84 5.88 5.37 4.86 4.35 3.84 3.32 2.81 2.30 1.79 1.28 0.77 0.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.31 0.36 0.35 0.34 0.33 0.33 0.32 0.31 0.30 0.29 0.29 0.30 0.29 0.22 0.23 0.23 0.24 0.25 0.25 0.26 0.27 0.28 0.28 0.29 0.30 0.31RoE Rs/kWh 3.81 3.57 3.57 3.57 3.57 3.57 3.57 3.57 3.57 3.57 3.57 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37Total COG per unit Rs/kWh 11.55 14.55 14.08 13.61 13.15 12.69 12.23 11.78 11.33 10.88 10.44 10.82 10.39 7.31 7.42 7.52 7.64 7.76 7.89 8.03 8.17 8.32 8.48 8.65 8.83 9.02
LevellisedDiscount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083Levellised Tariff 11.55 Rs/Unit
JKSERC Page 71
Accelerated Depreciation
Depreciation amount 90%
Book Depreciation rate 5.28%
Tax Depreciation rate 80%
Additional Depreciation 20.00%
Income Tax (Normal Rates) 33.99%
Capital Cost 1200
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Book Depreciation Rs Lakh 31.68 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 63.36 34.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Accelerated Depreciation
Opening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Accelrated Deprn. Rs Lakh 600.00 540.00 48.00 9.60 1.92 0.38 0.08 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 568.32 476.64 -15.36 -53.76 -61.44 -62.98 -63.28 -63.34 -63.36 -63.36 -63.36 -63.36 -63.36 -63.36 -63.36 -63.36 -63.36 -34.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tax Benefit Rs Lakh 193.17 162.01 -5.22 -18.27 -20.88 -21.41 -21.51 -21.53 -21.54 -21.54 -21.54 -21.54 -21.54 -21.54 -21.54 -21.54 -21.54 -11.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Energy generation MU 0.91 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81
Per unit benefit Rs/Unit 21.31 8.93 -0.29 -1.01 -1.15 -1.18 -1.19 -1.19 -1.19 -1.19 -1.19 -1.19 -1.19 -1.19 -1.19 -1.19 -1.19 -0.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140 0.126 0.113 0.102 0.092 0.083
Tax Benefit Levellised 22.69 Rs Lakh
Electricity Generation (Levellised) 1.72 MU
Levellised benefit 1.32 Rs/Unit
JKSERC Page 72
Annexure 7Biomass Gasifier Power Projects
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Plant Load Factor % 85%Auxiliary consumption % 10.00%
Useful Life Years 20
2 Project Cost Base Year (FY 2013-14) Rs Lacs 400Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 577
Capital subsidy (if any) Rs Lacs 150
Net capital cost Rs Lacs 427
3 Sources of FundTariff Period Years 20
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 298.870Total Equity Amout Rs Lacs 128.087
Debt ComponentLoan Amount Rs Lacs 299Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 128Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.0%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 2.50%Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2Fuel cost Months 4Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 40.00FY 2014-15 42.29Total O & M Expenses Escalation % 5.72%
7 Fuel related component Sp. Fuel consumption kg/kWh 1.25Heat Rate After Stabilisation period Kcal/kwh 3600
During Stablization Period Kcal/kwh 3600
Non fossil cogen Base Price(FY 2013-14) Rs/T 2500FY 2014-15 Rs/T 2773GCV Kcal/kg 2250Biomass Price Escalation Factor 5%
8 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 73
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Net Generation MU 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70
Vaiable Cost Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Biomass Cost Rs Lakh 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34 330.34Per unit Var Cost Rs/kWh 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93
Tariff Components(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20O&M Expenses Rs Lakh 42.29 44.71 47.26 49.97 52.83 55.85 59.04 62.42 65.99 69.76 73.75 77.97 82.43 87.15 92.13 97.40 102.97 108.87 115.09 121.68Depreciation Rs Lakh 24.91 24.91 24.91 24.91 24.91 24.91 24.91 24.91 24.91 24.91 24.91 24.91 10.67 10.67 10.67 10.67 10.67 10.67 10.67 10.67Interest on term loan Rs Lakh 37.95 34.65 31.35 28.05 24.75 21.45 18.15 14.85 11.55 8.25 4.95 1.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 27.64 27.70 27.76 27.84 27.92 28.01 28.12 28.23 28.35 28.49 28.76 28.92 28.79 29.06 29.34 29.64 29.95 30.28 30.63 31.00Return on Equity Rs Lakh 23.06 23.06 23.06 23.06 23.06 23.06 23.06 23.06 23.06 23.06 28.18 28.18 28.18 28.18 28.18 28.18 28.18 28.18 28.18 28.18Total Fixed Cost Rs Lakh 155.84 155.02 154.34 153.82 153.46 153.27 153.27 153.46 153.85 154.46 160.55 161.62 150.08 155.06 160.33 165.89 171.78 178.00 184.58 191.53Per unit Fixed Cost Rs/kWh 2.33 2.31 2.30 2.30 2.29 2.29 2.29 2.29 2.30 2.30 2.40 2.41 2.24 2.31 2.39 2.48 2.56 2.66 2.75 2.86
Total cost of generation Rs Lakh 486.17 485.35 484.68 484.15 483.80 483.61 483.61 483.80 484.19 484.80 490.88 491.96 480.42 485.40 490.66 496.23 502.12 508.34 514.91 521.87
Per Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Variable cost Rs/kWh 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93 4.93O&M expn Rs/kWh 0.94 0.63 0.67 0.71 0.75 0.79 0.83 0.88 0.93 0.98 1.04 1.10 1.16 1.23 1.30 1.37 1.45 1.54 1.62 1.72 1.82Depreciation Rs/kWh 0.33 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16Int. on term loan Rs/kWh 0.29 0.57 0.52 0.47 0.42 0.37 0.32 0.27 0.22 0.17 0.12 0.07 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.42 0.41 0.41 0.41 0.42 0.42 0.42 0.42 0.42 0.42 0.43 0.43 0.43 0.43 0.43 0.44 0.44 0.45 0.45 0.46 0.46RoE Rs/kWh 0.36 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42Total COG per unit Rs/kWh 7.27 7.25 7.24 7.23 7.22 7.22 7.22 7.22 7.22 7.23 7.23 7.33 7.34 7.17 7.24 7.32 7.40 7.49 7.59 7.68 7.79
Discount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140Variable cost 4.93 Rs/UnitLevellised Tariff (Fixed) 2.34 Rs/UnitLevellised Tariff (for Tariff Period)7.27 Rs/Unit
JKSERC Page 74
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 80%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.99%Capital Cost 427
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 11.27 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 22.54 12.30 0.00 0.00
Accelerated DepreciationOpening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Accelrated Deprn. Rs Lakh 213.48 192.13 17.08 3.42 0.68 0.14 0.03 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 202.21 169.59 -5.47 -19.13 -21.86 -22.41 -22.52 -22.54 -22.54 -22.54 -22.54 -22.54 -22.54 -22.54 -22.54 -22.54 -22.54 -12.30 0.00 0.00Tax Benefit Rs Lakh 68.73 57.64 -1.86 -6.50 -7.43 -7.62 -7.65 -7.66 -7.66 -7.66 -7.66 -7.66 -7.66 -7.66 -7.66 -7.66 -7.66 -4.18 0.00 0.00Energy generation MU 3.35 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70 6.70Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Tax Benefit Levellised 8.54 Rs LakhElectricity Generation (Levellised) 6.32 MULevellised benefit 0.14 Rs/Unit
JKSERC Page 75
Annexure 8
Biogas Power Projects
Assumptions
S. No. Assumption Head Sub-Head Sub-Head (2) Unit Amount
1 Power GenerationCapacity
Installed Power Generation Capacity MW 1Plant Load Factor % 90%Auxiliary consumption % 12.00%
Useful Life Years 20
2 Project Cost Base Year (FY 2013-14) Rs Lacs 800.00Capital Cost/MW Power Plant Cost - FY 2014-15 Rs Lacs 1153.91
Capital subsidy (if any) Rs Lacs 300
Net capital cost Rs Lacs 853.915
3 Sources of FundTariff Period Years 20
Debt: EquityDebt % 70%Equity % 30%Total Debt Amount Rs Lacs 597.740Total Equity Amout Rs Lacs 256.174
Debt ComponentLoan Amount Rs Lacs 598Moratorium Period years 0Repayment Period(incld Moratorium) years 12Interest Rate % 13.25%
Equity ComponentEquity amount Rs Lacs 256Return on Equity for first 10 years % p.a 18.0%RoE Period Year 10Return on Equity 11th year onwards % p.a 22.0%Weighted average of ROE % 20.0%
Discount Rate (Equiv. to WACC) % 10.92%
4 Financial AssumptionsFiscal Assumptions
Income Tax % 33.99%MAT Rate (for first 10 years) % 20.01%80 IA benefits Yes/No Yes
DepreciationDepreciation Rate for first 12 years % 5.83%Depreciation Rate 13th year onwards % 2.50%Years for 5.83% rate Years 12
Salvage value % 10%
5 Working CapitalFor Fixed ChargesO&M Charges Months 1Maintenance Spare (% of O&M exepenses) % 15%Receivables for Debtors Months 2Fuel cost Months 4Interest On Working Capital % 13.75%
6 Operation & MaintenanceBase Year - FY 2013-14 Rs Lakh 40.00FY 2014-15 42.29Total O & M Expenses Escalation % 5.72%
7 Fuel related component Sp. Fuel consumption kg/kWh 3.00Heat Rate After Stabilisation period Kcal/kwh 3600
During Stablization Period Kcal/kwh 3600
Non fossil cogen Base Price(FY 2013-14) Rs/T 990FY 2014-15 Rs/T 1098GCV Kcal/kg 2250Biomass Price Escalation Factor 5%
8 Incentives (if any)GBI Rs Lakh p.a. 0.00
Period for GBI Years 0.00
JKSERC Page 76
Determination of Tariff Component
Units Generation Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Installed Capacity MW 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Net Generation MU 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94
Vaiable Cost Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Biogas Cost Rs Lakh 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51 138.51Per unit Var Cost Rs/kWh 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Tariff Components
(Fixed Charge) Unit Year---> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
O&M Expenses Rs Lakh 42.29 44.71 47.26 49.97 52.83 55.85 59.04 62.42 65.99 69.76 73.75 77.97 82.43 87.15 92.13 97.40 102.97 108.87 115.09 121.68Depreciation Rs Lakh 49.81 49.81 49.81 49.81 49.81 49.81 49.81 49.81 49.81 49.81 49.81 49.81 21.35 21.35 21.35 21.35 21.35 21.35 21.35 21.35Interest on term loan Rs Lakh 75.90 69.30 62.70 56.10 49.50 42.90 36.30 29.70 23.10 16.50 9.90 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Interest on working Capital Rs Lakh 16.16 16.14 16.13 16.12 16.13 16.15 16.17 16.21 16.25 16.31 16.62 16.70 16.21 16.47 16.75 17.05 17.36 17.70 18.05 18.42Return on Equity Rs Lakh 46.11 46.11 46.11 46.11 46.11 46.11 46.11 46.11 46.11 46.11 56.36 56.36 56.36 56.36 56.36 56.36 56.36 56.36 56.36 56.36Total Fixed Cost Rs Lakh 230.27 226.07 222.01 218.12 214.38 210.82 207.44 204.25 201.26 198.50 206.44 204.15 176.35 181.33 186.59 192.16 198.05 204.27 210.85 217.80Per unit Fixed Cost Rs/kWh 3.32 3.26 3.20 3.14 3.09 3.04 2.99 2.94 2.90 2.86 2.98 2.94 2.54 2.61 2.69 2.77 2.85 2.94 3.04 3.14
Total cost of generation Rs Lakh 368.78 364.58 360.52 356.62 352.89 349.32 345.94 342.76 339.77 337.00 344.95 342.65 314.86 319.84 325.10 330.67 336.55 342.78 349.35 356.31
Levallised tariff corresponding to Useful life
Per Unit Cost of Generation Unit Levellised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Variable cost Rs/kWh 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00O&M expn Rs/kWh 0.90 0.61 0.64 0.68 0.72 0.76 0.80 0.85 0.90 0.95 1.01 1.06 1.12 1.19 1.26 1.33 1.40 1.48 1.57 1.66 1.75Depreciation Rs/kWh 0.64 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31Int. on term loan Rs/kWh 0.56 1.09 1.00 0.90 0.81 0.71 0.62 0.52 0.43 0.33 0.24 0.14 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Int. on working capital Rs/kWh 0.24 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.24 0.24 0.24 0.23 0.24 0.24 0.25 0.25 0.26 0.26 0.27RoE Rs/kWh 0.70 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81Total COG per unit Rs/kWh 5.04 5.32 5.25 5.20 5.14 5.09 5.04 4.99 4.94 4.90 4.86 4.97 4.94 4.54 4.61 4.69 4.77 4.85 4.94 5.04 5.14
Levellised
Discount Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
Variable cost 2.00 Rs/Unit
Levellised Tariff (Fixed) 3.04 Rs/Unit
Levellised Tariff 5.04 Rs/Unit
JKSERC Page 77
Accelerated DepreciationDepreciation amount 90%Book Depreciation rate 5.28%Tax Depreciation rate 80%Additional Depreciation 20.00%Income Tax (Normal Rates) 33.99%Capital Cost 1153.91
Years -----------------> Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Book Depreciation % 2.64% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 5.28% 2.88% 0.00% 0.00%Book Depreciation Rs Lakh 30.46 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 60.93 33.23 0.00 0.00
Accelerated DepreciationOpening % 100% 50% 5% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%Allowed during the year % 50.00% 45.00% 4.00% 0.80% 0.16% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Closing % 50.00% 5.00% 1.00% 0.20% 0.04% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%Accelrated Deprn. Rs Lakh 576.96 519.26 46.16 9.23 1.85 0.37 0.07 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Depreciation Benefit Rs Lakh 546.49 458.33 -14.77 -51.70 -59.08 -60.56 -60.85 -60.91 -60.92 -60.93 -60.93 -60.93 -60.93 -60.93 -60.93 -60.93 -60.93 -33.23 0.00 0.00Tax Benefit Rs Lakh 185.75 155.79 -5.02 -17.57 -20.08 -20.58 -20.68 -20.70 -20.71 -20.71 -20.71 -20.71 -20.71 -20.71 -20.71 -20.71 -20.71 -11.30 0.00 0.00Energy generation MU 3.47 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94 6.94Discounting Factor 1.000 0.902 0.813 0.733 0.661 0.596 0.537 0.484 0.436 0.393 0.355 0.320 0.288 0.260 0.234 0.211 0.190 0.172 0.155 0.140
0.95 0.86 0.77 0.70 0.63 0.57 0.51 0.46 0.41 0.37 0.34 0.30 0.27 0.25 0.22 0.20 0.18 0.16 0.15Tax Benefit Levellised 23.09 Rs LakhElectricity Generation (Levellised) 6.55 MULevellised benefit 0.35 Rs/Unit
JKSERC Page 78