JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment Appendix 8A: Hydrology Baseline Assessment September 2011 APPENDIX 8A Hydrology Baseline Assessment

Upload: others

Post on 04-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment Appendix 8A: Hydrology Baseline Assessment September 2011

APPENDIX 8A Hydrology Baseline Assessment

Page 2: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part
Page 3: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Appendix 8A: Hydrology Baseline Assessment September 2011

8A-i

Table of Contents

APPENDIX 8A HYDROLOGY BASELINE ASSESSMENT EXECUTIVE SUMMARY .........................................................................................................................8A-1 8A.1 INTRODUCTION .........................................................................................................................8A-1

8A.1.1 Background and Setting .............................................................................................8A-1 8A.1.2 Objectives ...................................................................................................................8A-1 8A.1.3 Spatial Boundaries ......................................................................................................8A-1

8A.2 HYDROLOGIC ASSESSMENT OVERVIEW ..............................................................................8A-1 8A.3 METHODOLOGY ........................................................................................................................8A-1

8A.3.1 Research Methods ......................................................................................................8A-1 8A.3.2 Field Data Collection ...................................................................................................8A-2 8A.3.3 Analysis Methods ........................................................................................................8A-9

8A.4 CHARACTERIZATION OF CLIMATIC AND HYDROLOGIC VARIABLES ................................8A-9 8A.4.1 Regional and Local Climate ........................................................................................8A-9 8A.4.2 Surface Drainage Patterns ...................................................................................... 8A-10 8A.4.3 Field Monitoring Results .......................................................................................... 8A-10 8A.4.4 Seasonal Variation of Flow ...................................................................................... 8A-10 8A.4.5 Basin Yields ............................................................................................................. 8A-11 8A.4.6 Extreme Peak Flows ................................................................................................ 8A-11 8A.4.7 Extreme Low Flows ................................................................................................. 8A-11 8A.4.8 Water levels in Waterbodies in LSA and RSA ......................................................... 8A-11 8A.4.9 Sediment Yield ......................................................................................................... 8A-11 8A.4.10 Water Balance for the LSA ...................................................................................... 8A-12 8A.4.11 Water Users ............................................................................................................. 8A-12

8A.5 CONCLUSIONS ....................................................................................................................... 8A-12 8A.6 REFERENCES ......................................................................................................................... 8A-12

8A.6.1 Literature Cited ........................................................................................................ 8A-12 8A.6.2 Internet Sites ............................................................................................................ 8A-12

List of Figures

Figure 8A-1 Spatial Boundaries (Updated) .....................................................................................8A-3 Figure 8A-2 Regional Hydrologic and Climatic Monitoring Station Locations (Updated) ...............8A-5 Figure 8A-3 Local Drainage Patterns and 2009 Field Monitoring Locations (Updated) .................8A-7

Page 4: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part
Page 5: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment Appendix 8A: Hydrology Baseline Assessment September 2011

8A-1

The only change to Appendix 8A are figures updates related to the minor change to the Expansion Project Footprint. This update is reflected in Figures 8A-1 to 8A-3. There are no other changes to this section.

Executive Summary

There are no changes to the Executive Summary.

8A.1 Introduction

8A.1.1 Background and Setting

There are no changes to Section 8A.1.1.

8A.1.2 Objectives

There are no changes to Section 8A.1.2.

8A.1.3 Spatial Boundaries

There are no changes to Section 8A.1.3.

8A.1.3.1 Project footprint

There are no changes to Section 8A.1.3.1.

8A.1.3.2 Local Study Area (LSA)

There are no changes to Section 8A.1.3.2.

8A.1.3.3 Regional Study Area (RSA)

There are no changes to Section 8A.1.3.3.

8A.2 Hydrologic Assessment Overview

There are no changes to Section 8A.2.

8A.3 Methodology

There are no changes to Section 8A.3.

8A.3.1 Research Methods

There are no changes to Section 8A.3.1.

Page 6: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and

Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment

Appendix 8A: Hydrology Baseline Assessment September 2011

8A-2

8A.3.1.1 Regional Climatic Data Collation

There are no changes to Section 8A.3.1.1.

8A.3.1.2 Regional Hydrologic Data Collation

There are no changes to Section 8A.3.1.2.

8A.3.1.3 General Regional Information Collation

There are no changes to Section 8A.3.1.3.

8A.3.2 Field Data Collection

There are no changes to Section 8A.3.2.

Page 7: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

Date:2011-07-20

Drawn By:CH

Clearwater River

Chr

istin

a Ri

ver

Hang

ings

tone

Rive

r

Horse CreekHorse River

Athabasca River

UV63

UV881

UV69

UV63

FORT MCMURRAY

420000 440000 460000 480000

6200

000

6220

000

6240

000

6260

000

6280

000

6300

000

Rge. 7Rge. 8Rge. 9Rge. 10Rge. 11Rge. 12Rge. 13Rge. 14Rge. 15Rge. 16 Twp.

79

Twp.

80

Twp.

81

Twp.

82

Twp.

83

Twp.

84

Twp.

85

Twp.

86

Twp.

87

Twp.

88

Twp.

89

Twp.

90

Twp.

91

LEGEND

FIGURE 8A-1

0 4 8 12 16

SCALE (km) 1:350,000

WatershedsHangingstone River

Horse Creek

Horse River

City

Flow Direction

Regional Study Area

Local Study Area

Highway

SPATIAL BOUNDARIES

C69580000\C69582042

Edited By:LF

Page 8: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part
Page 9: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

Date:2011-07-20 ÜDrawn By:CH

LEGEND

FIGURE 8A-2

0 6 12 18 24

SCALE (km) 1:500,000

##* Climatic Station (ID)

##* Hydrometric Station (ID)

!! Waterbody Location

!! Field Monitoring Stations

Highway

Regional Study Area

Local Study Area

City

WatershedsHangingstone River

Horse Creek

Horse River

REGIONAL HYDROLOGIC AND CLIMATE MONITORING STATION LOCATIONS

!!

!!!!

!!

!!

!!!!

!!

!!

!!

!!

!!!!

!!

!!

!!

!!!!

!!

##*

##*

##*

##*##*##*

##*

##*

##*

##*

##*

Clearwater River

Chr

istin

a River

Hangi

ngst

one

Rive

r

Horse CreekHorse River

Athabasca Ri v er

UV63

UV881

UV69

UV63

Christina RiverH

ouse

Riv

er

FORT MCMURRAY

1

5

7

6

34

2

FORT MCMURRAY AIRPORT (3062693)

PONY CREEK NEAR CHARD (07CE003)

ROBERT CREEK NEAR ANZAC

(07CE004)

BIRCH CREEK NEAR CONKLIN(07CE006)

HOUSE RIVER AT HIGHWAY 63 (07CB002)

CLEARWATER RIVER AT DRAPER (07CD001)

CHRISTINA RIVER NEAR CHARD (07CE002)

HORSE RIVER AT ABASANDS PARK (07CC001) HANGINGSTONE RIVER AT FT. MCMURRAY (07CD004)

JACKFISH RIVER BELOW CHRISTINA LAKE (07CE005)

ATHABASCA RIVER BELOW FORT MCMURRAY (07DA001)

Lake 56

Lake 27

PH1 OBSE

A29 Lake

L12 Lake

JL9 Lake

JL8 Lake JL1 Lake

Ohoo Lake

Dawes Lake

Sweetheart Lake

420000 440000 460000 480000 500000

6160

000

6180

000

6200

000

6220

000

6240

000

6260

000

6280

000

6300

000

6320

000

Rge. 5Rge. 6Rge. 7Rge. 8Rge. 9Rge. 10Rge. 11Rge. 12Rge. 13Rge. 14Rge. 15Rge. 16Rge. 17

Twp.

76

Twp.

77

Twp.

78

Twp.

79

Twp.

80

Twp.

81

Twp.

82

Twp.

83

Twp.

84

Twp.

85

Twp.

86

Twp.

87

Twp.

88

Twp.

89

Twp.

90

Twp.

91

Twp.

92

Twp.

93

C69580000\C69582042

Edited By:LF

Page 10: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part
Page 11: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

Date:2011-07-20 ÜDrawn By:CH

LEGEND

2,000 0 2,000 4,000 6,000

SCALE (m)1:200,000

FIGURE 8A-3

WatershedsHangingstone River

Horse Creek

!!

!!!!

!!

!!

!!!!

!!

!!

!!

!!

!!!!

!!

!!

!!

!!!!

!!

UV63

UV881

570

560

550

500

490

480

510 520

470

530

460

540

580

590

600

610

620

630

640

650

660

670

680

690

700

710

450

440

430

420

410

720

400

730

390

380

370

360

350

340

330

320

310

740

300

290

280

750

76 0

770

760

750

580

730

480

730

500

730

650

640

7 20

510

630

460

750

740

630

470

470

740

740

390

460

470

440

560

740

740

740

590

740

470

750

550

740

740

740

51 0

720

650

730

46 0

740

470

730

570

690

660

570

480

740

760

740

620

440

720

660

720

47 0

65 0

460

720

410

720

460

730

740

630

750

700

720

530

720

730

720

700

720

570

700

5 50

7 30

730

46 0

370

630

730

410

530

620

460

420

730

740

480

570

460

720

730

460

560

610

520

720

550

470

720

4 50

720

690

720

760

640

730

750

740

470

460

740

740

520

750

730

740

710

470

550

730

720630

730

720

730

680

540

470

740

720

720

460

4 80

460

750

750

550

730

740

450

720

570

470

410

670

740

740

730

730

470

690

430

730

540

750

660

560

740

500

730

540

740

730

460

670

400

690

540

460

720

730

730

430

450

740

740

720

730

750

740

550

460

72 0

530

700

620

500

730

470

460

6 90

740740

730730

630

72 0

5 10

480

670

570

740

730

7 20

470

670

720

460

560

470

490

470

730

710560

500

710

550

730

730

720

460

500

700

390

460

740

550

570

460

440

730

730

720

380

7 20

740

750

600

740

5 70

710

700

480

470

740

480

470

530

380

700

7 50

480

750

700

730

710

720

720

730

730

470

720

650

390

470

710

740

570

570

580

580

730

460

500

470

4 60

730

450

560

490

470

730

570

720

610

720

740

740

640

480

720

56 0

710

740

460

700

740

730

540

520

700

550

720

730

450

580

740

530

460

680

710

720

480

710

730

460

740

740

400

500

710

730

750

470

530

740

460

460

730

680

740

530

720

720

740

470

680

630

740

650

560

740

730

750

730

670

540

520

470

7 50

740

470

74 0

500

720

630

360

590

710

740

680

730

590

470

390

460

550

530

470

580

540

740

530

750

740

710

640

730

470

630

710

730

730

450

740

560

460

750

650

720

720

470

520

550

730

730

470

720

570

740

740

730

540

680

740

4 70

69 0

750

460

740

720

660

730

740

4 10

700

720

740

650

750

690

680

750

730

760

730

400

730

750

460

5 20

4 60

710

430

730

700

730

55 0

730

470

560

460

460

720

660

730

720

460

670

460

640

720

460

720

730

740

5 60730

4 70

710

750

470

420

720

750

740

390

510

530

470

640

700

730

590

73 0

460

670

750

740

720

690

600

460

740

560

720

490

520

690

560

620

510

460

460

720

740

700

740

720

73 0

470

470

440

530

430

480

700

750

520

480

460

410

710

430

740

500

430

750

730

450

530

740

720

710

460

670

730

500

670

720

730

690

470

46 0

730

470

73 0

680

740

620

720

720

4 40

470

700

500

700

670

490

440

740

720

5 40

620

750

600

460490

730

490

680

440

700

470

460

460

710

730

500

490

740

550

700

740

720

410

700

740

48 0

560

450

350

480

720

750

450

720

670

740

720

550

720

480

710

440

470

720

470

470

410

740

550

720

430

73 0

7 20

750

740

600

630

720

480

740

740

470

290

740

660

730

490

730

720

460

640

470

740

730

740

550

490

5 60

570

730

740

740

750

540

660

460

680

750

470

530

420

460

640

750

740

740

740

280

460

530

740

720

720

730

700

620

750

400

560

520

530

460

550

550

710

730

720

730

570

720

530

690

700

50 0

710

710

720

4 70

690

460

720

730

740

730

660

560

460

1

5

6

3

2

JL1 LAKE

JL9 LAKE

Lake 56

Lake 27

PH1 OBSE

A29 Lake

JL9 Lake

JL8 Lake

JL1 Lake

Ohoo Lake

Dawes Lake

Sweetheart Lake

4

440000 460000 480000

6240

000

6260

000

Rge. 7Rge. 8Rge. 9Rge. 10Rge. 11Rge. 12Rge. 13Rge. 14

Twp.

82

Twp.

83

Twp.

84

Twp.

85

Twp.

86

Twp.

87

LOCAL DRAINAGE PATTERNS AND2009 FIELD MONITORING LOCATIONS

C69580000\C69582042

Horse River

Horse C

reek

Han

gi ngstone River

Athabasca River

Tributary 1

Tributary 2

Horse Creek

Sub-Watershed Boundary

Local Study Area

Regional Study Area

Flow Direction

Contours - 10m Interval

Highway

Field Monitoring Stations!!

PDA Footprint

Waterbody Location!!

Horse River

Edited By:LF

Page 12: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part
Page 13: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment Appendix 8A: Hydrology Baseline Assessment September 2011

8A-9

8A.3.3 Analysis Methods

There are no changes to Section 8A.3.3.

8A.3.3.1 Climatic Variables Analysis

There are no changes to Section 8A.3.3.1.

8A.3.3.2 Streamflow Analysis

There are no changes to Section 8A.3.3.2.

SEASONAL VARIATION IN FLOWS

There are no changes to this section.

SEDIMENT YIELD ANALYSIS

There are no changes to this section.

WATER USER ANALYSIS

There are no changes to this section.

8A.4 Characterization of Climatic and Hydrologic Variables

There are no changes to Section 8A.4.

8A.4.1 Regional and Local Climate

There are no changes to Section 8A.4.1.

8A.4.1.1 Air Temperature

There are no changes to Section 8A.4.1.1.

8A.4.1.2 Precipitation

There are no changes to Section 8A.4.1.2.

8A.4.1.3 Evaporation and Evapotranspiration

There are no changes to Section 8A.4.1.3.

Page 14: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and

Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment

Appendix 8A: Hydrology Baseline Assessment September 2011

8A-10

POTENTIAL AND LAKE EVAPORATION

There are no changes to this section.

POTENTIAL AND AREAL EVAPOTRANSPIRATION

There are no changes to this section.

CHARACTERIZATION OF EVAPORATION AND EVAPOTRANSPIRATION

There are no changes to this section.

8A.4.2 Surface Drainage Patterns

8A.4.2.1 Regional Surface Drainage

There are no changes to Section 8A.4.2.1.

8A.4.2.2 Local Surface Drainage

There are no changes to Section 8A.4.2.2.

8A.4.3 Field Monitoring Results

8A.4.3.1 Flows

There are no changes to Section 8A.4.3.1.

8A.4.3.2 Water Levels

There are no changes to Section 8A.4.3.2.

8A.4.4 Seasonal Variation of Flow

There are no changes to Section 8A.4.4.

8A.4.4.1 Regional Seasonal Variation of Flow

There are no changes to Section 8A.4.4.1.

8A.4.4.2 Local Seasonal Variation of Flow

There are no changes to Section 8A.4.4.2.

Page 15: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment Appendix 8A: Hydrology Baseline Assessment September 2011

8A-11

8A.4.5 Basin Yields

8A.4.5.1 Regional Basin Yields

There are no changes to Section 8A.4.5.1.

8A.4.5.2 Local Basin Yields

There are no changes to Section 8A.4.5.2.

8A.4.6 Extreme Peak Flows

8A.4.6.1 Regional Extreme Peak Flows

There are no changes to Section 8A.4.6.1.

8A.4.6.2 Extreme Peak Flows in the LSA

There are no changes to Section 8A.4.6.2

8A.4.7 Extreme Low Flows

There are no changes to Section 8A.4.7.

8A.4.7.1 Extreme Low Flows in the RSA

There are no changes to Section 8A.4.7.1.

8A.4.7.2 Extreme Low Flows in the LSA

There are no changes to Section 8A.4.7.2.

8A.4.8 Water levels in Waterbodies in LSA and RSA

There are no changes to Section 8A.4.8.

8A.4.9 Sediment Yield

8A.4.9.1 There are no changes to Section 8A.4.9.Regional Sediment Yield

There are no changes to Section 8A.4.9.1.

8A.4.9.2 Local Sediment Yield

There are no changes to Section 8A.4.9.2.

Page 16: JACOS Hangingstone Expansion Project Description Update ......JACOS Hangingstone Expansion Project Description Update and Responses to Second Supplemental Information Request Part

JACOS Hangingstone Expansion Project Description Update and

Responses to Second Supplemental Information Request Part 2B – Project Update – Environmental Impact Assessment

Appendix 8A: Hydrology Baseline Assessment September 2011

8A-12

8A.4.10 Water Balance for the LSA

There are no changes to Section 8A.4.10.

8A.4.11 Water Users

There are no changes to Section 8A.4.11.

8A.5 Conclusions

There are no changes to Section 8A.5.

8A.6 References

8A.6.1 Literature Cited

There are no changes to Section 8A.6.1.

8A.6.2 Internet Sites

There are no changes to Section 8A.6.2.