j-pocket pile · steel sheet pile sealing rubber filler sealing rubber type filler injection type...

12
J - POCKET PILE Leak-proof steel sheet pile for cut-off wall TM

Upload: others

Post on 11-Mar-2020

6 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

J-POCKET PILELeak-proof steel sheet pile for cut-off wall

TM

Page 2: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection
Page 3: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

What is J-Pocket Pile (JPP)?

Use of swelling type sealing rubber practically proven as segment seal joint filler at the groove type pocket portion allows a continuous high-quality cut-off wall to be formed with excellent sealing performance and durability.

Stable cut-off sealing work can be done by injecting a filler (such as silicone) after all working loads such as waves and soil pressure have been applied.

The pockets serve as observation holes for monitoring, which enables to check the sealing condition of the cut-off wall at any time and to conduct any necessary repair work.

Rolled steel manufactured by a JIS-certified plant has small quality deviation and provides high stable quality.

J-Pocket Pile has performances equal to conventional steel sheet piles, ensuring excellent execution efficiency and economical efficiency.

J-Pocket Pile (JPP) is a new steel wall specifically designed for vertical cut-off walls. It has a groove type pocket (diameter of around 10 mm), made by rolling, at the bottom portion of the joint hook of a conventional steel sheet pile. It makes it possible to install sealing material or filler injection mate-rial along the joint, and to install monitor-ing pipes for leak-proof observation.

FEATURES

Reliable cut-off sealing work

Monitoring and repair function

Stable quality

Excellent execution and economical efficiency

Page 4: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

(mm)

Remarks: 1.Equivalent carbon content is calculated according to the following equation: Equivalent carbon content (%)=C+Mn/6+Si/24+Ni/40+Cr/5+Mo/4+V/14 2.Charpy absorbed energy is the value obtained at a test temperature of 0°C. 3.The value of free nitrogen conforms to JIS A 5523. 4.Chemical composition is expressed in total volume of nitrogen in accordance with remark 2.  

JPP’s standard conforms to JIS A 5523 (weldable hot-rolled steel sheet piles) and JIS A 5528 (hot-rolled steel sheet piles).

600 630

660

111.0

126.0

234.8

267.5

57,000

66,600

2,720

3,170

184

210600

210

210

18.0

22.0

140.9

160.5

10,400

11,200

(Weldable Hot-rolled steel sheet piles)

(Hot-rolled steel sheet piles)

0.18 or less0.18 or less

0.55 or less

1.50 or less

0.04 or less0.04 or less0.04 or less0.04 or less

0.04 or less

0.44 or less0.45 or less

0.0060 or less0.0060 or less

0.04 or less0.04 or less0.04 or less

1.50 or less

0.55 or less

Free nitrogen

295 or more

295 or more

390or more

450or more490or more

18or more

43or more43or more

16or more18or more16or more

450or more490or more

390or more

Yield point or yield strength

(m2) (m4/m) (m3/m)(m2/m)(m4) (m3) (kg/m) (kg/m2)

(N/mm2) (N/mm2)

Tensilestrength Elongation Charpy absor-

bed energy(%) (J)

Type codeStandard

Chemical composition (%) Equivalent carbon content (%)

Mechanical properties

Chemical composition and mechanical properties

Standard

Sectional shape

STRUCTURE OF J-POCKET PILE

FLOW OF GENERAL EXECUTION

General view Joint hook portion

Model

Size

Effective width

Effective height

(mm)

Thickness Sectional area ×10-4

Section modulus ×10-6

Unit massGeometrical moment of inertia ×10-8

Sectional area ×10-4

Section modulus ×10-6

Unit massGeometrical moment of inertia ×10-8

(mm)

Per wall Per meter of wall width

Sealing rubber type

Preparatory work Piling work

Piling work Filling hole (pocket) protection workPreparatory work

Installation of swelling type sealing rubber into pockets, etc.

Piling by vibratory hammer Pulling out of pre-stressed concrete steel wires

Insertion of pre-stressed concrete steel wires into pockets for protection

Filler injection type

Section performance table

Page 5: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

JPP’s standard conforms to JIS A 5523 (hot-rolled steel sheet piles for welding) and JIS A 5528: 2000 (hot-rolled steel sheet piles).

TYPES OF CUT-OFF SEALING WORK 

Filler injection work

Ground conditions for application of JPP

Soft (N=less than 30)

Water level at cut-off wall

Below water level (under water)

Steel sheet pile Steel sheet pile

FillerSealing rubber

Sealing rubber type Filler injection type

Above water level (in air, etc.)

Hard (N=30 or greater)

Insertion of filler injection tube

Setting of high-pressure pump

Injection of filler material (silicone)

Checking of filling condition by divers

Swelling type sealing rubber is applied along the pocket prior to piling. The rubber swells by absorbing water and seals the joint by its swelling pressure.

The pocket of one pile is filled with sealing rubber prior to piling, and a filling injection tube is placed in the pocket of the other pile after piling. Through this tube, silicone is injected into the pocket.

Low HighCost

Page 6: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection
Page 7: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection
Page 8: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

EXAMPLE OF APPLICATION ON AN ON-LAND DISPOSAL SITE

Overview

Photos of execution

Installation of sealing rubber along pockets

Setting of high-pressure pump Injection of filler material (silicone)

Check of filling condition

Piling by vibratory hammer Pulling out of pre-stressed concrete steel wires

J-Pocket Pile was adopted for cut-off work of waste containment works at a non-industrial final disposal site (Yoshinogawa-city, Tokushima Prefecture).J-Pocket Piles (9 to 24 m) were installed in a fan shape by a vibratory hammer to contain waste dumped in a valley at the site.

cut-off wall

cut-off wall

cut-of

f w

all

Page 9: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

CUT-OFF PERFORMANCE AT ON-SITE WELDS

General description of test

Test results

Size of test sample

Record of accumulated leakage Photo of welding execution

Welding area (shown by red line)

Welding area (shown by red line)

Leak

age(

cm3 )

Elapsed time(min.)

Leakage speed(cm3/s)

Converted permeabilitycoefficientConverted to thickness of 50 cm

(cm/s)

J-pocket Pile 5WS

J-pocket Pile 5WS

Case Joint shape Cut-off sealing material Caulking method

Weld joint

Test sample and pressure vessel

Sealing rubber + Sealing rubber

Sealingrubber + silicone resin

Silicone resin + silicone resin

Sealing rubber + silicone resin

Silicone resin + silicone resin

Application of silicone

Not caulked

The cut-off sealing performance was tested for differnt cases (see the table on the right). Visible external area of joints were padded by manual welding. For area that could not be welded, applying of silicone caulking was evaluated. Each test sample was set on the pressure vessel as shown in the photo, and the leakage from the joint was measured.

For each of case-1 to 5, the test showed that the cut-off sealing performance of on-site welds satisfied the standard.

*

For steel sheet piles which need to be jointed by on-site welding due to transportation condition, laboratory test was conducted to check the cut-off sealing performance of the welds.

Page 10: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection
Page 11: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection
Page 12: J-POCKET PILE · Steel sheet pile Sealing rubber Filler Sealing rubber type Filler injection type Above water level (in air, etc.) Hard (N=30 or greater) Insertion of filler injection

1908R(1508)JSK