iwlearn m&e format

20
Annual Monitoring of GEF IW Projects GEF IW Task Force M&E Framework as June 1, 2006 applied to Self-Assessment

Upload: iwl-pcu

Post on 27-Jun-2015

54 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IWLEARN M&E Format

AnnualMonitoring ofGEF IW Projects

GEF IW Task Force M&E Framework as

June 1, 2006

applied to Self-Assessment

Page 2: IWLEARN M&E Format

•In order to utilize the framework as a tracking tool for Replenishment results/targets, an Annual Scorecard for each project will submitted. Part A: annual results (last 12 months) and Part B: cumulative results (since beginning of project).

•For all projects, agencies would also annually report on implementation progress (% of scheduled disbursement; delivery of outputs in line with original schedule; co-financing on schedule) to contribute to a portfolio characterization.

•Two tracking tools will be maintained for results reporting for Replenishment purposes by the IW Task Force: a Coverage Indicator Tracking Tool, and a Results Indicator Tracking Tool (with annual and cumulative tables – see attached example).

Page 3: IWLEARN M&E Format

Cumulative Coverageas of May 2006*

• 0 (0) “waterbody” projects established Web sites w/IW:LEARN tools, 0 (0) Web sites connected with iwlearn.net via IW-IMS

• 10,668 (10,668) unique visits to iwlearn.net from over 120 (120) countries.

• 3 (3) helpdesk requests fielded from 3 (3) countries & 0 (0) projects.

• 216 (41) people from 70 (21) GEF-beneficiary countries across 40 GEF IW projects participated in Structured Learning activities, including 36% (41%) women and 64% (59%) men -- since 1998

• 291 (0) participants in 3rd IW Conference, of which 80% male,63% from GEF IW beneficiary nations, and 52% from the Americas

• 150 (150) people and 57 (57) GEF projects received GEF IW Bridges newsletters via direct mailing.…

* Numbers in parenthesis represent only data for year 2006, as of May 2006.

Page 4: IWLEARN M&E Format

GEF IW Scorecard Template--Annual Report of GEF IW Scorecard Template--Annual Report of Results to Contribute to the Tracking ToolsResults to Contribute to the Tracking Tools

Part A: Annual Results Report quantitative; or 0-1 / 0-3 rating

I. Process Indicators: ______: _____; ______;

II. Stress Reduction Indicators:

______; ______; ______;

III. Catalytic Impact Indicators:

______; _____: ______:

IV. Implementation progress:

outputs; % disbursement; co-fin.

Part B: Cumulative Results Report

Roll ups of progress toward the different types of indicators listed in Part A / logframe on a cumulative basis for the life of the project.

I. _____; ______; ______;

II. _____; ______; _____;

III. _____; ______; _____;

IV. _____; ______; _____;

Subcommittee formed to develop theTemplate for the Scorecard

Page 5: IWLEARN M&E Format

IW:LEARN Results

• Per GEF IW Scorecard, focus on..– Catalytic Impact Indicators (Annually, Section III)

(cf. “Outcomes” and more)– Implementation Progress (Quarterly, Section IV)

– Disbursement (quarterly)

– Co-finance (annually)

Page 6: IWLEARN M&E Format

III. IW:LEARN Outcomes (Catalytic Impacts)

Across 5 Project Components: A. Information Sharing: >75% projects use IW-IMS and >50% of users obtain needed info by 2008.   B. Structured Learning: 30+ projects apply lessons from IW:LEARN structured learning to improve TWM in the basins by 2008.   C. IW Conferences: Representatives from all GEF IW projects participate in 2 portfolio-wide review, replication and partnership events.  D. Testing Innovative Approaches: GEF IW projects and partners benefit from a set of demonstration activities integrating TWM information sharing and structured learning.  E. Partnerships to Sustain Benefits: TWM structured learning and information sharing institutionalized. 

IN PROGRESS

Page 7: IWLEARN M&E Format

III. Other “Catalytic Impacts”2005 Anecdotes

– 50 useful, measurable actions planned by St. Petersburg workshop participants– UNECE Water Convention contributes to Petersberg/Athens Process to improve

IWRM– IWC3 participants felt learning would improve their projects' design,

implementation, communications, inter-project linkages and integration. – Gender, Water and Climate exhibit deployed (via co-finance)– [email protected] helping to link projects with professional personnel

2006 Anecdotes– IW Communications Manual drafted by and for GEF IW projects– 21 Newport workshop participants provide recommendations to 10 LMEs to

improve governance and socioeconomics.– ELI obtained external finance to deliver P2 for water mgmt. training in LAC and

WWF4 session on P2 in IW mgmt.– LME governance workshop participants carry over XXXX recommendations back

to their home projects.– G&WA partners foster and sustain Gender & Water exhibit tour in LAC region

Page 8: IWLEARN M&E Format

IV(a) IW:LEARN Outputs (Progress by Component)

• Based on Project Timeline in IW:LEARN Project Document• Need for each PAL and partners to provide quarterly updates

regarding progress relative to these indicators.

• Accomplished (in full) by end of target year

• Partially accomplished by end of target year

• Not accomplished by end of target year

Page 9: IWLEARN M&E Format

Year 1 Year 2 Year 3 Year 4

 

A. Information Sharing: >75% projects use IW-IMS and >50% of users obtain needed info by 2008.  A1. IW Info. Mgmt. System (IW-IMS)

IW-IMS protocols established, prototype in place; 1 new module (Africa)

IW-IMS populated; Helpdesk operational, proactive & responsive;1 new module (aquifers)

Helpdesk responds to 24 requests/yr; 1 new module (TBD)

Helpdesk fielding 48+ requests/yr; 1 new module(TBD)

A2. ICT Technical Assistance

1 ICT Training Workshop; 25% of projects’ Websites linked to IW-IMS

50% of projects’ Websites linked to IW-IMS

1 ICT Workshop; 75% of projects’ Websites linked to IW-IMS

95% of projects’ Websites linked to IW-IMS

Page 10: IWLEARN M&E Format

Year 1 Year 2 Year 3 Year 4

 

B. Structured Learning: 30+ projects apply lessons from IW:LEARN structured learning to improve TWM in the basins by 2008.

 B1. Regional Multi-Project Exchanges

At least 1 regional exchange launched (Europe)

At least 2 regional exchanges launched (Caribbean)

At least 3 regional exchanges launched (Africa); Present regional exchange findings at IWC4

Learning products on IW-IMS

B2. Learning for Portfolio Subsets

Freshwater &/or LMEs exchanges launched

Freshwater & LME exchanges both launched (or continuing)

Coral reef exchange launched; other exchanges present findings at IWC4

Learning products on IW-IMS

B3. Inter-Project Exchange Missions

1-4 multi-week inter-project exchanges

1-4 multi-week inter-project exchanges

1-4 multi-week inter-project exchanges

1-4 multi-week inter-project exchanges

B4. Public Participation Training

Training materials developed 1st workshop; training materials revised

2nd workshop; training materials augmented

3rd workshop; training materials on IW-IMS

Page 11: IWLEARN M&E Format

Year 1 Year 2 Year 3 Year 4

 

C. IW Conferences: Representatives from all GEF IW projects participate in 2 portfolio-wide review, replication and partnership events.

C1. IWC3 (Rio de Janeiro, Brazil)

IWC3 held; IW portfolio recommendations to CSD

Proceedings disseminated via IW-IMS

   

C2. IWC4 (Cape Town, South Africa)

  IWC4 host, location and co-finance secured; agenda set

IWC4 held Proceedings disseminated via IW-IMS

Page 12: IWLEARN M&E Format

Year 1 Year 2 Year 3 Year 4

 

D. Testing Innovative Approaches: GEF IW projects and partners benefit from a set of demonstration activities integrating TWM information sharing and structured learning.

D1. S.E. Asia Regional Learning Center (SEA-RLC)

SEA-RLC established to address projects TWM needs; Web site launched and linked to IW-IMS

Regional GEF IW GIS on-line, connected to IW-IMS

Roster of >100 experts addresses projects’ needs; 3 GIS DSS modules featured

>1000 IW resources added to IW-IMS; SEA IW project applying GIS modules

D2. Southeastern Europe/Mediterranean

3 roundtables for senior officials and experts; regional TWM information exchange network launched via Internet

3 roundtables for senior officials and experts; network sustained via regional partners

Network and learning products accessible via IW-IMS

D3. CSD/GEF Roundtable with CSD

Global roundtable, in follow-up to CSD-12 (and leading up to CSD-13)

Learning products accessible via IW-IMS

Page 13: IWLEARN M&E Format

Year 1 Year 2 Year 3 Year 4

 

E. Partnerships to Sustain Benefits: TWM structured learning and information sharing institutionalized. E1. Partnerships and Strategic Plan

Initial sustainability plan finalized and approved by IW:LEARN SC; role for partners in sustainability plan finalized, approved

Partners recruited and aligned to sustain IW:LEARN benefits for all activities per plan.

Sustainability plan revised per mid-term review

Sustainability plan realized through partners strategic plans.

E2. IW Contributions to Global TWM

2-3 projects receive cost share to participate each of in 2 GEF IW side events; 1-2 outreach &/or learning products disseminated, including LME video (co-produced by IW:LEARN)

2-3 projects receive cost share to participate in each of 2 GEF IW side events; 1-2 outreach &/or learning products disseminated, including Gender and Water exhibit

2-3 projects receive cost share to participate in 1-2 GEF IW side events; 1-2 outreach &/or learning products disseminated

2-3 projects receive cost share to participate in each of 2 GEF IW side events; 1-2 outreach &/or learning products disseminated

Page 14: IWLEARN M&E Format

IV(b) IW:LEARN Disbursement

• Based on annual budgets, contracts and periodic invoicing • Need for each PAL to invoice according to contractual schedules or

else negotiate with PCU for contractual modifications to accommodate shifting delivery dates.

• Need for UNEP to provide disbursement data for its activities (currently D1 still MIA)

Page 15: IWLEARN M&E Format

% Disbursement, by IA

0200000

400000600000

80000010000001200000

14000001600000

18000002000000

2004 2005 2006est.

2007est.

2008est.

UNEP

UNDP

NOTE: Current UNEP values do not add to 100% and are not yet fully re-phased for 2008Q3 end date.

Page 16: IWLEARN M&E Format

IV(c) IW:LEARN Co-Finance• Based on co-finance commitments in IW:LEARN Project Document• Need for each PAL and partner with commitment to provide annual

co-finance estimates (distinguishing cash and in-kind)• Need to track unanticipated co-finance (cash &/or in-kind) as

provided

Page 17: IWLEARN M&E Format

Name of Co-financier (source)

Classification Type Amount (US$)

Status*

IBRD-WBI Multi-Laterals Cash 100,000  

IBRD-WBI Multi-Laterals In-Kind 410,000  

UNDP Cap-Net UN Agency In-Kind 1,400,000  

UNEP-DEWA** UN Agency In-Kind and/or Cash

1,207,400  

UNDP-EEG UN Agency In-Kind 230,000  

USA-NOAA Government In-Kind 200,000  

ELI NGO In-Kind 300,000  146,116

IUCN-WANI NGO In-Kind $350,000  

IUCN-GMP NGO In-Kind $300,000  

GWP NGO In-Kind $100,000  

GWP NGO In-Kind $90,000  

Co-

finan

ce 1

Page 18: IWLEARN M&E Format

Co-

finan

ce 2

Name of Co-financier (source)

Classification Type Amount (US$)

Status*

GETF NGO Cash & In-Kind

$355,000 137,000 

SEA-START RC Chulalongkorn U.**

NGO In-Kind 290,400  

UNECE UN Agency In-Kind 225,000  

38,600UNESCO-IHP ISARM/IGRAC

UN Agency In-Kind 30,000  

Germany-MoE

Government In-Kind 150,000

 131,537

Greece-MoFA Government In-Kind 150,000

 

GWP-Med NGO In-Kind 20,000 20,000 

LakeNET NGO In-Kind 48,000  

EcoAfrica NGO In-Kind 170,000  

Page 19: IWLEARN M&E Format

Unexpected Cofinance

• E2: IISD/IIED/Environment Canada: $3035 (cash) in 2006

• E2; Boston University: $2000 (in-kind) in 2006

• B1: CTC-St. Petersburg : $650 (in-kind) in 2005

• A1: Transnatura, LLP: $525 (in-kind) in 2005

• TOTAL unexpected: >$6,000

Page 20: IWLEARN M&E Format

Take Home Message

• IW:LEARN needs PALs and other partners to help collate data to support indicators tracking IW:LEARN’s:– Coverage

• By activity; across projects, geography, gender

– Results• Catalytic Impacts (annually)• Progress (quarterly)• Disbursement (quarterly)• Co-finance (annually)

Thank you for your ongoing help!