    INSPECTION & TEST PLAN FOR PIPING SYSTEMS

    Doc. No. : Rev No. : 0

    SR. NO.CHARACTERISTICS TO BE

    CHECKED

    EXTEND OF CHECKREF.

    DOCUMENTS

    TESTING

    INSTRUMENTS

    INSPECTION BYINSPECTION FORMAT

    NO.SUB-CONTRACTOR

    Name

    Signature

    Date

  • 8/16/2019 ITP for Piping Systems

    2/6

    INSPECTION & TEST PLAN FOR PIPING SYSTEMS

    Doc. No. : Rev No. : 0

    SR. NO.CHARACTERISTICS TO BE

    CHECKED

    EXTEND OF CHECKREF.

    DOCUMENTS

    TESTING

    INSTRUMENTS

    INSPECTION BYINSPECTION FORMAT

    NO.SUB-

    CONTRACTOR

    1.0 P!e S!oo" F#$%c#o'

    1.1Check availability of latest Drawings /Spec.

    100% Verification  Approved Drawings Visal ! " s

    2.0 R#( M#e%#" )e%*c#o' +D,%' F-U!

    2.1Check the correctness of specified#aterials sed and $it&p of 'ipe spool

    100% Verification Approved Drawings ( )aterial *C

    Visal ! " s

    3.0 F ,! C"e#%#'ce

    3.1Selection of "'S. $it + &p Checked,bevel ends free fro# conta#inationprior to tack welding.

    100% Verification V*-/001/*'/001 Visal ! " "

    4.0 /e"'

    4.1 "'S ( "' alification eview ( ApprovalV*-/001/*'/001*C2 Specifications

    Visal ! ! !

    4.2Check proper backing of electrode asapplicable.

    ando# Verification   "'S *e#peratre 3n ! " "

    4.3Check availability of "'S and welder4s5d at site..

    ando# Verification V*-/001/*'/001 Visal ! " S

    4.4

    Check 'reheating and 5nter pass

    te#peratre as applicable ando# Verification   "'S Visal ! " S

    4.5 $it p 5nspection ( 'reheat 65f e7d.8 ando# verification   Approved "'Soot 3age,"eld gage

    ! " "

    4.6"elding 5n process 5nspection as Correct2lectrode, 5nterpass *e#p etc.,

    ando# verification   Approved "'S"eld gage

    *e#peratre 3n! " S

    Name

    Signature

    Date

  • 8/16/2019 ITP for Piping Systems

    3/6

    INSPECTION & TEST PLAN FOR PIPING SYSTEMS

    Doc. No. : Rev No. : 0

    SR. NO.CHARACTERISTICS TO BE

    CHECKED

    EXTEND OF CHECKREF.

    DOCUMENTS

    TESTING

    INSTRUMENTS

    INSPECTION BYINSPECTION FORMAT

    NO.SUB-

    CONTRACTOR

      1.0 /e"' #' NDT C"e#%#'ce

    9.1 "elder alification 100% Verification As 'er *C2 Spec. ( Applicable Code

      Visal ! " !

    9.: Visal 5nspection of "elds 100% "elds *C2 Specifications "eld gage ! " "

    9.;Dye 'enetrant 5nspection 6Asapplicable8

    "here ever e7d.   VTKN/9001/QM/014   Visal ! "   D

    9.<)agnetic 'article 5nspection 6As Applicable8

    10% $illet "elds V*-/001/)/01; Visal ! " D

    9.9 &ltrasonic 5nspection6As applicable8 "here ever e7d. V*-/001/)/01: Visal ! " "

    9.=adiography 5nspection 6Asapplicable8

     As per #aterial spec As 'er *C2 Spec. Applicable Code ( Approved 'rocedre

      $il# Viewer  ! " "

    9.>'ne#atic *est on reinforce#ent pad6As applicable8

     All $ 'ads V*-/001/)/019   'ressre 3age ! " "

    2.0 S!oo" P%e3e%v#o'

    =.12nsre Spools are correctly *aggedwith relevant details

    100% Verification  Approved Drawings Visal ! " S

    =.:2nsre Spools are correctly cleaned,stored ( protected dring te#porarystorage

    100% Verification  Approved Drawings Visal ! " S

    =.; elease for painting and 2rection ando# Verification V*-/001/*'/001 Visal ! " S

    =.< Spool !ydro *est 65f re7ired8 100% V*-/001/*'/001 'ressre 3age ! " !

    Name

    Signature

    Date

  • 8/16/2019 ITP for Piping Systems

    4/6

    INSPECTION & TEST PLAN FOR PIPING SYSTEMS

    Doc. No. : Rev No. : 0

    SR. NO.CHARACTERISTICS TO BE

    CHECKED

    EXTEND OF CHECKREF.

    DOCUMENTS

    TESTING

    INSTRUMENTS

    INSPECTION BYINSPECTION FORMAT

    NO.SUB-

    CONTRACTOR

    4.0 P!' E%eco'

    >.1 're $abricated Spools verification ando# Verification  Approved Drawings   Visal ! " S

    >.:Verification of erected 'iping Syste# for its Co#pleteness and )echanicalClearance

    100% Verification  Approved Drawings   Visal ! " S

    >.;Spool to Spool $it p 5nspection, ?ointo. "elder 5d

    100% Verification Approved Drawings

    "'S  oot gage ! " S

    >.< $inal "eld Visalando# Verification,("eld !istory Sheet

     Approved Drawings"'S   "eld 3age ! " S

    5.0 )#"ve3 E%eco'

    @.1 5nstallation of " valves ando# Verification  Approved Drawing Visal ! " S

    @.: $it p ( "elding 100% Verification  Approved "'S oot 3age ! " "

    @.;5nstalling 3asket 6original8

    100% Verification Approved Drawing Visal

    ! " S

    @.<$low direction all valves ( tag.no.5nclde inline ite#s.

    100% Verification  Approved Drawing Visal!

    " S

    Name

    Signature

    Date

  • 8/16/2019 ITP for Piping Systems

    5/6

    INSPECTION & TEST PLAN FOR PIPING SYSTEMS

    Doc. No. : Rev No. : 0

    SR. NO.CHARACTERISTICS TO BE

    CHECKED

    EXTEND OF CHECKREF.

    DOCUMENTS

    TESTING

    INSTRUMENTS

    INSPECTION BYINSPECTION FORMAT

    NO.SUB-

    CONTRACTOR

    @.= olting ( *or7eing 100% Verification Approved Drawing*C2 Specifications

    *or7e "rench ! " !

    6.0 S,!!o%3 F#$%c#o' ando# Verification  Approved Drawing )easring *ape ! " S

    .1 Spports 2rection 100% Verification  Approved Drawing  Visal)easring *ape

    ! " "

    10.0 H7%o Te3

    10.1 5so#etric Clearence 100% Verification  Approved Drawing Visal (Doc#ent eview ! ! S

    10.: elease for !ydrotest 100% Verification Approved Drawings'(5D and B!S

      il ! " "

    10.; Bine walk ( 'nch 'oints 100% Verification  Approved Drawings   Visal ! " "

    10.< $lshing of pipe syste# 100% Verification

     Approved Drawings*C2 Specification   Visal ! " S

    10.9 !ydrotest 100% Verification V*-/001/*'/00; 'ressre gages ! " "

    11.0 'ainting 100% VerificationV*-/001/*'/00

  • 8/16/2019 ITP for Piping Systems

    6/6

    INSPECTION & TEST PLAN FOR PIPING SYSTEMS

    Doc. No. : Rev No. : 0

    SR. NO.CHARACTERISTICS TO BE

    CHECKED

    EXTEND OF CHECKREF.

    DOCUMENTS

    TESTING

    INSTRUMENTS

    INSPECTION BYINSPECTION FORMAT

    NO.SUB-

    CONTRACTOR

    1:.0 5nslation 6As re7ired8 100% Verification

     Approved Drawings,( As per approved5nslation $'

    Visal ! " "

    1;.0 'iping *est 'ack Clearence 100% Verification  Approved Drawings   Visal ! " !

    Lee'3:

    ! !old 'oint is a #andatory inspection point and work shall not proceed withot the presence of a representative of the organiation.  Activity designated as !old #stbe signed off by the Ewner4s epresentative.

    " "itness 5nspection 'oint Designated "itness 'oints for the involved personnel, which are re7ired to be signed off by the personnel who witnessed. All activities, whichhave a " point, will re7ire a written notification to owner representative. 5n the event the owner representative does not attend within an agreed period the work #ayproceed. 5n sch cases, the owner representative will record in the appropriate signatre space on the for#s as Fot "itnessedG, and sign off.

    " "itness 5nspection point Designated % witness points assigned by the owner4s representative, which will re7ire written notification fro# the owner representative. 5n theevent owner representative does not attend within agreed the work, #ay proceed. 5n sch cases, the owner representative will record in the appropriate signatre spaceon the for#s as Fot "itnessedG, and sign off. *he percentage #eans a #ini## of 10% inspection over all. !owever this #ay be increased at the discretion of constrction #anager or his designee.

    S Srveillance Ever seeing or #onitoring of activities by visiting. Activities designated as srveillance will ot be signed off by the owner4s representative.

    D Doc#ent eview *his entails review of appropriate doc#entation and does not re7ire signatre of owner representative.

    Name

    Signature

    Date