INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. : Rev No. : 0
SR. NO.CHARACTERISTICS TO BE
CHECKED
EXTEND OF CHECKREF.
DOCUMENTS
TESTING
INSTRUMENTS
INSPECTION BYINSPECTION FORMAT
NO.SUB-CONTRACTOR
Name
Signature
Date
-
8/16/2019 ITP for Piping Systems
2/6
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. : Rev No. : 0
SR. NO.CHARACTERISTICS TO BE
CHECKED
EXTEND OF CHECKREF.
DOCUMENTS
TESTING
INSTRUMENTS
INSPECTION BYINSPECTION FORMAT
NO.SUB-
CONTRACTOR
1.0 P!e S!oo" F#$%c#o'
1.1Check availability of latest Drawings /Spec.
100% Verification Approved Drawings Visal ! " s
2.0 R#( M#e%#" )e%*c#o' +D,%' F-U!
2.1Check the correctness of specified#aterials sed and $it&p of 'ipe spool
100% Verification Approved Drawings ( )aterial *C
Visal ! " s
3.0 F ,! C"e#%#'ce
3.1Selection of "'S. $it + &p Checked,bevel ends free fro# conta#inationprior to tack welding.
100% Verification V*-/001/*'/001 Visal ! " "
4.0 /e"'
4.1 "'S ( "' alification eview ( ApprovalV*-/001/*'/001*C2 Specifications
Visal ! ! !
4.2Check proper backing of electrode asapplicable.
ando# Verification "'S *e#peratre 3n ! " "
4.3Check availability of "'S and welder4s5d at site..
ando# Verification V*-/001/*'/001 Visal ! " S
4.4
Check 'reheating and 5nter pass
te#peratre as applicable ando# Verification "'S Visal ! " S
4.5 $it p 5nspection ( 'reheat 65f e7d.8 ando# verification Approved "'Soot 3age,"eld gage
! " "
4.6"elding 5n process 5nspection as Correct2lectrode, 5nterpass *e#p etc.,
ando# verification Approved "'S"eld gage
*e#peratre 3n! " S
Name
Signature
Date
-
8/16/2019 ITP for Piping Systems
3/6
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. : Rev No. : 0
SR. NO.CHARACTERISTICS TO BE
CHECKED
EXTEND OF CHECKREF.
DOCUMENTS
TESTING
INSTRUMENTS
INSPECTION BYINSPECTION FORMAT
NO.SUB-
CONTRACTOR
1.0 /e"' #' NDT C"e#%#'ce
9.1 "elder alification 100% Verification As 'er *C2 Spec. ( Applicable Code
Visal ! " !
9.: Visal 5nspection of "elds 100% "elds *C2 Specifications "eld gage ! " "
9.;Dye 'enetrant 5nspection 6Asapplicable8
"here ever e7d. VTKN/9001/QM/014 Visal ! " D
9.<)agnetic 'article 5nspection 6As Applicable8
10% $illet "elds V*-/001/)/01; Visal ! " D
9.9 <rasonic 5nspection6As applicable8 "here ever e7d. V*-/001/)/01: Visal ! " "
9.=adiography 5nspection 6Asapplicable8
As per #aterial spec As 'er *C2 Spec. Applicable Code ( Approved 'rocedre
$il# Viewer ! " "
9.>'ne#atic *est on reinforce#ent pad6As applicable8
All $ 'ads V*-/001/)/019 'ressre 3age ! " "
2.0 S!oo" P%e3e%v#o'
=.12nsre Spools are correctly *aggedwith relevant details
100% Verification Approved Drawings Visal ! " S
=.:2nsre Spools are correctly cleaned,stored ( protected dring te#porarystorage
100% Verification Approved Drawings Visal ! " S
=.; elease for painting and 2rection ando# Verification V*-/001/*'/001 Visal ! " S
=.< Spool !ydro *est 65f re7ired8 100% V*-/001/*'/001 'ressre 3age ! " !
Name
Signature
Date
-
8/16/2019 ITP for Piping Systems
4/6
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. : Rev No. : 0
SR. NO.CHARACTERISTICS TO BE
CHECKED
EXTEND OF CHECKREF.
DOCUMENTS
TESTING
INSTRUMENTS
INSPECTION BYINSPECTION FORMAT
NO.SUB-
CONTRACTOR
4.0 P!' E%eco'
>.1 're $abricated Spools verification ando# Verification Approved Drawings Visal ! " S
>.:Verification of erected 'iping Syste# for its Co#pleteness and )echanicalClearance
100% Verification Approved Drawings Visal ! " S
>.;Spool to Spool $it p 5nspection, ?ointo. "elder 5d
100% Verification Approved Drawings
"'S oot gage ! " S
>.< $inal "eld Visalando# Verification,("eld !istory Sheet
Approved Drawings"'S "eld 3age ! " S
5.0 )#"ve3 E%eco'
@.1 5nstallation of " valves ando# Verification Approved Drawing Visal ! " S
@.: $it p ( "elding 100% Verification Approved "'S oot 3age ! " "
@.;5nstalling 3asket 6original8
100% Verification Approved Drawing Visal
! " S
@.<$low direction all valves ( tag.no.5nclde inline ite#s.
100% Verification Approved Drawing Visal!
" S
Name
Signature
Date
-
8/16/2019 ITP for Piping Systems
5/6
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. : Rev No. : 0
SR. NO.CHARACTERISTICS TO BE
CHECKED
EXTEND OF CHECKREF.
DOCUMENTS
TESTING
INSTRUMENTS
INSPECTION BYINSPECTION FORMAT
NO.SUB-
CONTRACTOR
@.= olting ( *or7eing 100% Verification Approved Drawing*C2 Specifications
*or7e "rench ! " !
6.0 S,!!o%3 F#$%c#o' ando# Verification Approved Drawing )easring *ape ! " S
.1 Spports 2rection 100% Verification Approved Drawing Visal)easring *ape
! " "
10.0 H7%o Te3
10.1 5so#etric Clearence 100% Verification Approved Drawing Visal (Doc#ent eview ! ! S
10.: elease for !ydrotest 100% Verification Approved Drawings'(5D and B!S
il ! " "
10.; Bine walk ( 'nch 'oints 100% Verification Approved Drawings Visal ! " "
10.< $lshing of pipe syste# 100% Verification
Approved Drawings*C2 Specification Visal ! " S
10.9 !ydrotest 100% Verification V*-/001/*'/00; 'ressre gages ! " "
11.0 'ainting 100% VerificationV*-/001/*'/00
-
8/16/2019 ITP for Piping Systems
6/6
INSPECTION & TEST PLAN FOR PIPING SYSTEMS
Doc. No. : Rev No. : 0
SR. NO.CHARACTERISTICS TO BE
CHECKED
EXTEND OF CHECKREF.
DOCUMENTS
TESTING
INSTRUMENTS
INSPECTION BYINSPECTION FORMAT
NO.SUB-
CONTRACTOR
1:.0 5nslation 6As re7ired8 100% Verification
Approved Drawings,( As per approved5nslation $'
Visal ! " "
1;.0 'iping *est 'ack Clearence 100% Verification Approved Drawings Visal ! " !
Lee'3:
! !old 'oint is a #andatory inspection point and work shall not proceed withot the presence of a representative of the organiation. Activity designated as !old #stbe signed off by the Ewner4s epresentative.
" "itness 5nspection 'oint Designated "itness 'oints for the involved personnel, which are re7ired to be signed off by the personnel who witnessed. All activities, whichhave a " point, will re7ire a written notification to owner representative. 5n the event the owner representative does not attend within an agreed period the work #ayproceed. 5n sch cases, the owner representative will record in the appropriate signatre space on the for#s as Fot "itnessedG, and sign off.
" "itness 5nspection point Designated % witness points assigned by the owner4s representative, which will re7ire written notification fro# the owner representative. 5n theevent owner representative does not attend within agreed the work, #ay proceed. 5n sch cases, the owner representative will record in the appropriate signatre spaceon the for#s as Fot "itnessedG, and sign off. *he percentage #eans a #ini## of 10% inspection over all. !owever this #ay be increased at the discretion of constrction #anager or his designee.
S Srveillance Ever seeing or #onitoring of activities by visiting. Activities designated as srveillance will ot be signed off by the owner4s representative.
D Doc#ent eview *his entails review of appropriate doc#entation and does not re7ire signatre of owner representative.
Name