Context
1. Activity Plan2. Highlights of year 2011/12
3. Projects Related IT work
4. Non- scheduled additional works
5. Challenges faced during the year.6. Budget
7. Future Plans
-
7/31/2019 IT Review Annual 2011-2012
3/13
Activity Plan
http://localhost/var/www/apps/conversion/current/tmp/scratch13024/ABP%202011-12.dochttp://localhost/var/www/apps/conversion/current/tmp/scratch13024/ABP%202011-12.doc -
7/31/2019 IT Review Annual 2011-2012
4/13
Highlights of year 2011/12 Share point 2010 Upgrade Process completed during 1st & 2nd
quarters with the project sites. Conducted the Training sessions for SP 2010 with support of
Rekha and Prepared background work for training .
Office Package Upgraded from Office 2003 to office 2010
Hardware upgrade - upgrading the Memory / HDD on each
computers for installing above softwares
Installed and configured Hyper V server in order to install
SharePoint 2010 , SQL and Domain Controller Server
Minimize Spam Issues almost zero, Minimize Virus infections
Purchased and Replaced the new notebooks(12 Nos) with oldNBs and old desktops during the 4th Quarter.
Completed the IT fix assets verification and disposed the old
equipment's.
-
7/31/2019 IT Review Annual 2011-2012
5/13
Project work performed ENERGIA portal Web management and energia portal
updates are continuing.
African Bio Gas Web designed and Site administration and
assisting for e discussions
-
7/31/2019 IT Review Annual 2011-2012
6/13
Nanotech site Web development completed, customization is
continuing as per the request.
Janathakshan Janathakshan face lift completed . Provided
necessary technical input on request.
Duryog Nivaran Face lift is done, Layout and design
completed, Site Administration is continuing
-
7/31/2019 IT Review Annual 2011-2012
7/13
Sabah Site web development process partially
completed ,Support provided for content uploading with
necessary trainings. Site Administration is continuing .
Sa-energy.net Continued support for content uploading
and Provided necessary technical input on request.
-
7/31/2019 IT Review Annual 2011-2012
8/13
Non- scheduled additional works Rectified Backup Device failure, and start using the
alternative backup plan with external Hard disks
We had to re-conduct the super user training newly
identified super users.
Remote level support provided to staff who are located in
different geographical locations. Design and Created database for energy survey and
coordinating the translation & data entry work.
Conducted the IT awareness and Security workshop for
Vidhatha officers in Mahiyanganaya for supportjanathakshan team.
Two hard disks of Sun Sever failed and the recovered back
to normal.
Conducted IT Security workshop for local staff.
-
7/31/2019 IT Review Annual 2011-2012
9/13
IT awareness and Security workshop
for Vidhatha officers
-
7/31/2019 IT Review Annual 2011-2012
10/13
Budget
Annual Budget - 37,733.51
-
7/31/2019 IT Review Annual 2011-2012
11/13
Challenges
SharePoint data migration process result was very
painful for each staff member because we had to
convert folder structure into meta data values and less
knowledge of trainer about local data was effected to
end result.
Some of the trained super users resigned from practical
Action therefore we had to conduct more training
sessions.
Air-condition locate at server room ware trouble fewtimes and had to monitoring it frequently .
Hardware Faulty/repair frequency is high .
-
7/31/2019 IT Review Annual 2011-2012
12/13
Future Plans
To introduce Skype for business and CISCO Webex
To design and implement the pilot level open source
working environment for Janathakshan and provide
necessary support and training.
Planning IT concerns of office closure plan and how the
services and the equipment should transferred or
handover.