    Annual Review - 2011/12Information Technology Unit

    Kushantha Gunawardana

  • 7/31/2019 IT Review Annual 2011-2012

    2/13

    Context

    1. Activity Plan2. Highlights of year 2011/12

    3. Projects Related IT work

    4. Non- scheduled additional works

    5. Challenges faced during the year.6. Budget

    7. Future Plans

  • 7/31/2019 IT Review Annual 2011-2012

    3/13

    Activity Plan

    http://localhost/var/www/apps/conversion/current/tmp/scratch13024/ABP%202011-12.dochttp://localhost/var/www/apps/conversion/current/tmp/scratch13024/ABP%202011-12.doc
  • 7/31/2019 IT Review Annual 2011-2012

    4/13

    Highlights of year 2011/12 Share point 2010 Upgrade Process completed during 1st & 2nd

    quarters with the project sites. Conducted the Training sessions for SP 2010 with support of

    Rekha and Prepared background work for training .

    Office Package Upgraded from Office 2003 to office 2010

    Hardware upgrade - upgrading the Memory / HDD on each

    computers for installing above softwares

    Installed and configured Hyper V server in order to install

    SharePoint 2010 , SQL and Domain Controller Server

    Minimize Spam Issues almost zero, Minimize Virus infections

    Purchased and Replaced the new notebooks(12 Nos) with oldNBs and old desktops during the 4th Quarter.

    Completed the IT fix assets verification and disposed the old

    equipment's.

  • 7/31/2019 IT Review Annual 2011-2012

    5/13

    Project work performed ENERGIA portal Web management and energia portal

    updates are continuing.

    African Bio Gas Web designed and Site administration and

    assisting for e discussions

  • 7/31/2019 IT Review Annual 2011-2012

    6/13

    Nanotech site Web development completed, customization is

    continuing as per the request.

    Janathakshan Janathakshan face lift completed . Provided

    necessary technical input on request.

    Duryog Nivaran Face lift is done, Layout and design

    completed, Site Administration is continuing

  • 7/31/2019 IT Review Annual 2011-2012

    7/13

    Sabah Site web development process partially

    completed ,Support provided for content uploading with

    necessary trainings. Site Administration is continuing .

    Sa-energy.net Continued support for content uploading

    and Provided necessary technical input on request.

  • 7/31/2019 IT Review Annual 2011-2012

    8/13

    Non- scheduled additional works Rectified Backup Device failure, and start using the

    alternative backup plan with external Hard disks

    We had to re-conduct the super user training newly

    identified super users.

    Remote level support provided to staff who are located in

    different geographical locations. Design and Created database for energy survey and

    coordinating the translation & data entry work.

    Conducted the IT awareness and Security workshop for

    Vidhatha officers in Mahiyanganaya for supportjanathakshan team.

    Two hard disks of Sun Sever failed and the recovered back

    to normal.

    Conducted IT Security workshop for local staff.

  • 7/31/2019 IT Review Annual 2011-2012

    9/13

    IT awareness and Security workshop

    for Vidhatha officers

  • 7/31/2019 IT Review Annual 2011-2012

    10/13

    Budget

    Annual Budget - 37,733.51

  • 7/31/2019 IT Review Annual 2011-2012

    11/13

    Challenges

    SharePoint data migration process result was very

    painful for each staff member because we had to

    convert folder structure into meta data values and less

    knowledge of trainer about local data was effected to

    end result.

    Some of the trained super users resigned from practical

    Action therefore we had to conduct more training

    sessions.

    Air-condition locate at server room ware trouble fewtimes and had to monitoring it frequently .

    Hardware Faulty/repair frequency is high .

  • 7/31/2019 IT Review Annual 2011-2012

    12/13

    Future Plans

    To introduce Skype for business and CISCO Webex

    To design and implement the pilot level open source

    working environment for Janathakshan and provide

    necessary support and training.

    Planning IT concerns of office closure plan and how the

    services and the equipment should transferred or

    handover.

    How we should support Janathakshan

  • 7/31/2019 IT Review Annual 2011-2012

    13/13

    THANK YOU