LIST OF HANDLED PROJECTS INDUSTRY: OIL & GAS PROJECTS
Year Project Client Description 1980 Alexandria Petroleum CO.
Lub Oil Complex Chiyoda Chemical Engineering & Construction CO.
Handling of 65,000 FRT including 22,000 FRT of Heavy Haul up to 185 tons
1982 Ras Badran Oil Field Development
Suez Oil CO. (SUCO) Handling of 60,000 FRT including Heavy Haul up to 150tons/piece
1982 Ras Fanar Project Suez Oil CO. (SUCO) Handling of 5,000 FRT of General Cargo 1982 Nasr Petroleum CO. Plant Technipetrol SPA Handling of 20,000 FRT of General Cargo 1984 Zeit Bey LPG Facilities Suez Oil CO. (SUCO) Handling of 45,000 FRT including Heavy & O.D
Cargoes 1984 Petrobel Water Treatment
Plant Fergal SPA Handling of 8,000 FRT of General Cargo
1986 Zeit Bay Gulf of Suez Project Suez Oil CO. (SUCO) Handling of 65,000 FRT of G.C plus Heavy Haul up to 120tons/piece
1987 El-Obayed Gas Development Badr El-Din Petroleum CO. (BAPETCO)
Handling of 250,000 FRT of G.C plus Heavy & OD Cargo
1989 North Abu Kir Gas Production Plant II
Enppi & WEPCO Handling of 2,700 FRT of General Cargo
1990 Nidoco, El-Qaraa Project Belayim Petroleum CO. (Petrobel)
Handling of 45,700 FRT of G.C plus Heavy & OD Cargo
1993 Ras Gara Field Development Belayim Petroleum CO. (Petrobel)
Handling of 5,500 FRT of General Cargo
1993 Marine Incremental Recovery
Belayim Petroleum CO. (Petrobel)
Handling of 1,500 FRT of General Cargo
1996 Western Desert Gas Development Project
Samsung Engineering CO. Ltd
Handling of 50,000 FRT including 17,000 FRT Heavy & OD Cargo
1998 El-Obayed Gas Development Petrojet Handling of 62,245 FRT of G.C plus Heavy & OD Cargo
1998 Egyptian Natural Gas CO. Gas Complex
Enppi Handling of 45,000 FRT of G.C
1998 Amereya Petroleum Refining CO. / Gas Oil Dewaxing
Enppi Handling of G.C
1999 MIDOR Refinery Technip, TTIL + Saga & Palumbo
Handling of 200,000 FRT of G.C including 50,000FRT (240pcs) Heavy & OD Cargo up to 850Tons
2000 Cairo Oil Refining CO./ Light Nafta Isomerization
Enppi Handling of General Cargo
2000 Amereya Petroleum Refining CO. Nafta Isomerization
Enppi Handling of General Cargo
2000 Alexandria Petroleum CO./ Naphta Reformer
Technip & Danzas Handling of 45,000 FRT of G.C including Heavy & OD Cargo
2001 Meleha Field Upgrading / Agiba Petroleum CO.
Enppi Handling of General Cargo
2001 Gulf of Suez Petroleum CO./ Ha’py Offshore Development Project
Agip, Amoco & Danzas Handling of 80,000 FRT of G.C plus Heavy & OD Cargo
2001 AMOC Project Foster Wheeler France, Shenker & BTL
Handling of 50,000 FRT of G.C including Heavy & OD Cargo (up to 427 tons)
2002 Scarab Saffron Development Project/ Burullus Petroleum CO.
Bechtel / K&N Handling of 35,000 FRT of G.C including Heavy & OD Cargo
2002 Esh El-Malaha Petroleum CO. (ESHPETCO)
ESHPETCO Jacking up/down & Inland Transportation of 1x80tons Oil Tank (Height: 14m; Diameter: 17m)
2003 Damietta LNG Project Transcar Inland Transportation of 1x350 tons Heat Exchanger plus Jacking Down & Reloading for Temporary Storage
2003 Egyptian Liquefaction Natural Gas Project (ELNG) Train I & II
Bechtel Overseas Corporation
Handling of 400,000 FRT of General Cargo plus 1x200 tons Absorber
2003 Egyptian Liquefaction Natural Gas Project (ELNG) Train I & II / LNG TANKS
Mitsubishi Heavy Industries / Tomen Corporation
Handling of 25,000 FRT of Nickel Steel Sheets plus G.C
2003 NGL Project UGDC / Mammoet Fostrans Egypt
Loading & Inland Transportation of 3 Columns (160tons, 320 tons & 350 tons)
2003 NGL Project UGDC / Petrojet Inland Transportation of 11 Heavy & OD Cargoes (up to 136 tons)
2004 Damietta LNG Project SEGAS / DLC Inland Transportation of Ethane Gas 2004 El-Qasr Petroluem Project Khalda Petroleum CO. Handling of 40,000tons of pipes 2005 El-Bakr Base Development Enppi Handling of 25,000 FRT of G.C & OD Cargo 2007 Saqqara Project Saving
Egypt/Panalpina Energy & Projects Solutions—KBR / BP
Handling of all general cargo & over dimensional/weight cargo including: - Amine Reboiler Skid (120tons;
12.0x5.1x9.5m) - Teg Regeneration Skid (80tons;
12.0x5.1x8.5m) 2008 Salam Gas Train III Saving Egypt/
Panalpina Energy & Projects Solutions --Petrofac
Handling of all general cargo & over dimensional/weight cargo
2008 Methanol Project Techint Cimi Montubi Customs Clearance & Inland Transportation of 120,000FRT of G.C including: 2x300tons Boilers (19.0m high); 1x350tons column (71.0m length
2009 Salam Gas Train III Khalda Petroleum CO. Transportation of 2x280 tons Slug Catchers
2012 Egyptian Polypropylene Panalpina Energy & Projects Solutions /UHDE
1x284 tons (70m long) absorber
2012 Sumed Sukhna Plant Development
Enppi Customs Clearance & Inland Transportation
2013 Assil & Karam Project
Enppi / BAPETCO / Shell
Customs Clearance & Inland Transportation of 16 Amine Packages max. height 10m with weight 170tons from Dekheila Port up to Western Desert Field
2014-2016
ERC Mustorod Refinery GS E&C / Pantos Logistics
Customs Clearance & Inland Transportation of 322,197.00 FRT of general cargo, ODC (101 units), heavy cargos (109 units) including 198tons drum 31.4x7.8x9.5m, 11Silos 21.0x11.0x9.5m
2016-2017
Zohr Gas Plant Phase I Petrobel / Eni / ISS Palumbo / Saga Italia
Customs Clearance & Inland Transportation of 200,000 FRT of general cargo, ODC, heavy cargo including - 3x220 tons Boilers (18x11x12m) - 3x280 tons Gas Sour Absorbers
(30x4.35x4.65m) - 1x250 tons Umbilical Reel (12.0m
diameter) 2016-2017
West Nile Delta Gas Plant Bechtel / BP Handling of 100,000FRT of general cargo, containers, ODC and heavy cargo including: - 4x395tons Absorption Towers
(21x5.4x6m) - 1x207 tons HP Separator (18x3.7x4.2m) - 1x138 tons HP Separator (16x3x3.5m)
2017 Zohr Gas Plant Phase I Saipem / ISS Palumbo Handling of 140,000 of coated pipes at Damietta Port (receiving at port storage area/stacking on racks/reloading on trucks/shifting inside port/loading on vessel/lashing)
2018 Zohr Gas Plant Phase II Petrobel / Eni / ISS Palumbo / Saga Italia
Customs Clearance & Inland Transportation of 200,000 FRT of general cargo, ODC, heavy cargo including - 3x280 tons Gas Sour Absorbers
(30x4.35x4.65m) 2019 Assiut Refinery
(Utilities/CCR) ASORC/ENPPI Customs Clearance & Inland Transportation of
100,000 FRT of general cargo, ODC, heavy cargo including - 1x Deisohexanizer Column 135 tons
65x5.4x6.15m
- 1x Splitter Column 76 tons 44.15x3.65x4.1 m
- 2x Boiler 110 tons - Plus other columns and heavy cargo
Industry: Power Station Projects
Year Project Client Description 1981 Shoubra El-Kheima
Power Station Mitsubishi Heavy Industries
Handling of 4,000 FRT of Piping Material
1985 Rehabilitation of Aswan II Power Plant
Agat Handling of 38,000FRT of G.C including Heavy & OD Cargo
1985 Petrobel Abu Redeis Power Station
Turbo Technica SPA Handling of 6,000 FRT of G.C
1995 Assyut Power Station Mitsubishi Heavy Industries
Handling of 38,000 FRT of G.C including Heavy & OD Cargo
1994 Al Arish Power Station (2x30MW)
Fuji Electric / Tomen Corporation
Handling of 2,700 FRT of G.C plus Heavy & OD Cargo up to 108 tons/piece
1996 El-Kureimat Power Station (2x600MW / Boiler Package)
Nouva Cimi Montubi / Babcock & Wilcox
Handling of 160,000 FRT of G.C plus Heavy & OD Cargo (max. 320 tons/pc & max. length 28m)
1996 El-Kureimat Power Station (2x600MW / Condensers & Heaters Package)
Korean Heavy Industries / Nouva Cimi Montubi
Handling of 20,000 FRT including Heavy & OD Cargo up to 81 tons / 24m length / 5.4m height
1996 El-Kureimat Power Station (2x600MW / Chimney Package)
Saving Italy / Nouva Cimi Montubi
Handling of 11,250 FRT of G.C
1994 Overhead Transmission Line Towers
Metra Handling of 7,500 FRT of General Cargo
1998 Sidi Krir Power Station (2x230MW) / Boiler Package
Babcock & Wilcox / Techint Cimi Montubi
Handling of 48,000 FRT of G.C including 189tons Steam Drum (17.4m length)
1998 Sidi Krir Power Station (2x230MW) / Critical Piping Package
Mecanica De La Pena Handling of 7,000 FRT of G.C
2000 Ayoun Mousa Power Station (2x230MW) / Boiler Package
Babcock & Wilcox / Techint Cimi Montubi
Handling of 48,000 FRT of G.C including 182tons Steam Drum (17.4m length)
2000 Ayoun Mousa Power Station (2x230MW) / Critical Piping
Mecanica De La Pena Handling of 7,000 FRT of G.C
1997 El-Ezz Sub-Station / Sadat City
ABB Transformatori / Saving
Handling of G.C plus Transformers 98 tons/pc
1998 Egyptian Petrochemical CO. Sub-Station II
ABB / Danzas Handling 6,000 FRT of G.C including Heavy & OD Cargo
2000 Sidi Krir Power Station 3&4
Bechtel Power Corp. / Intergen
Handling of 50,000 FRT of G.C including Heavy & OD Cargo (2 x 290 tons Trafos.)
2000 Sidi Krir Power Station 3&4 / Boiler Package
Bechtel Power Corp. / Intergen
Handling of 40,000 FRT of G.C including 250 tons Boiler
2000 Sidi Krir Power Station 3&4 / Turbine Package
ABB / Alstom U.K Handling of 30,000 FRT of G.C including Heavy & O.D Cargo
2001 East Port-Said Power Station
EDF / CFTI / Saving Egypt Handling of G.C, Heavy & O.D Cargo plus Inland Transportation & Skidding of 3x230 tons Trafos.
2001 Ain El-Sukhna Power Station
EDF / CFTI / Saving Egypt Handling of G.C, Heavy & O.D Cargo plus Inland Transportation & Skidding of 3x230 tons Trafos.
2003 Ein EL-Seira Power Station
Saving Egypt Customs clearance, Inland Transportation & Skidding of 3x120 tons Trafos. Plus G.C
2002 Cairo North Power Station I / Gas Turbine Package
Mitsubishi Heavy Industries / Tomen Corporation
Handling of 25,000 FRT of G.C, Heavy & O.D Cargo plus 2x205tons Turbine
2003 Cairo North Power Station I / Transformers Package
Conisys Customs clearance, Inalnd Transportation & Skidding of 3x180 tons Trafos. Plus G.C
2004 El-Kureimat Power Station
Saving Egypt / Tomen Corporation / MHI
Customs clearance, Inalnd Transportation & Skidding of 1x125 tons Trafos. Plus G.C
2004 Naga Hamadi Power Station
Transcar / Tomen Corporation / MHI
Customs clearance, Inalnd Transportation & Skidding of 3x110 tons Trafos. Plus G.C
2005 Cairo North Power Station II / Transformers Package
Techint Cimi Montubi Customs clearance, Inalnd Transportation & Skidding of 2x180 tons Trafos. Plus G.C, Heavy & O.D Cargo
2005 Nubaria Power Station / Steam Turbine Package
Mitsubishi Heavy Industries / Tomen Corporation
Handling of G.C, Heavy & O.D Cargo including 2x205tons STG
2005 Nubaria Power Station
Mammoet Fostrans Egypt / DSD Ferrometalco
Inland Transportation of 250 Harps (23tons/piece, 21.0x3.6x0.7m)
2005 GECOL/ LIBYA International Heavy Transport CO. / Libya
Inland transportation of G.C from Cairo/Egypt up to Derna & Tubruk / Libya
2006 Talkha Power Station CMI Inland transportation of 12 modules (126 tons up to 200 tons) plus 2HP Drums (90tons each)
2007 Kureimat Power Station
CMI Inland transportation of 9 modules (126 tons up to 200 tons)
2007 Kureimat Power Station
Fagioli / General Electric Customs Clearance & Inland Transportation of 2x280tons Gas Turbines, 2x205tons Generators, plus general cargo
2008 Nubaria Power Station
Fagioli / General Electric Customs Clearance & Inland Transportation of 2x280tons Gas Turbines, 2x205tons Generators, plus general cargo
2009 Sidi Krir Power Station
MHI/Toyota Tsusho Corporation
Customs Clearance & Inland Transportation of 2x391tons Gas Turbines, 2x280tons Generators, plus general cargo
2009 Cairo West Power Plant
MHI/Toyota Tsusho Corporation
Customs Clearance & Inland Transportation of 2x276tons Steam Turbines, plus general cargo
2009 6th of October Plant
Siemens/Baggio/Zanninoni Mobilization of 2x97tons mobile stations
2010 Abu Quir Plant Ansaldo/Fagioli Boiler Package including 2x290tons steam drums
2011 Damietta West Power Station
Kharafi National 4x215 tons Gas Turbines + 4x170 tons Generators + other ODC, general cargo, and containers
2011 Damietta East Power Station
Kharafi National 4x215 tons Gas Turbines + 4x170 tons Generators + other ODC, general cargo, and containers
2012 Sukhna Thermal Power Plant
Techint Cimi 90 tons Boiler + other ODC, general cargo, and containers
2012 Sukhna Thermal Power Plant
CFTI/VEOLIA Gas Oil Fired Units heavy cargo and general cargo
2012 Banha Power Station SEPCO III/RESOC 2x280tons Turbines + 2x218tons Generators + 50,000 FRT ODC/General Cargo. The Project involved the reinforcement of 10 bridges
2013 Banha Power Station Fagioli/Ansaldo Customs Clearance & Inland Transportation of 180 Harps 23m long each
2015 Mobile Stations El-Sewedy/G.E Delivery of 110tons mobile turbines to various locations
2015 West Damietta OC/G.E/Egyptian Armament Authority
Delivery of 4x200 tons G.T, 4x177 tons GTG, 4x125 tons Trafos plus general cargo
2015 Assiut Power Station OC/G.E/Egyptian Armament Authority
Delivery of 8x200 tons G.T, 8x177 tons GTG, 8x125 tons Trafos plus general cargo
2016 Burullus CCPP Siemens/DBS/Mammoet Refurbishing Burullus Fishing Port to receive heavy cargo. Extension of Western Break Water, Dredging navigational chanel and port basin from -2m to -5.5m, reinforcing quay wall, and preparing 6,000sqm storage area. Ship agent and stevedoring works for all heavy lift vessels calling the port
2016 Damietta P.S Ansaldo Energia/Pentagon/Aprile
Customs Clearance & Inland transportation of general cargo, containers, ODC, & 1x230tons Stator, 1x170 tons Trafo (plus skidding on foundation), 1 x 95tons HP IP plus other heavy cargo
2016 Shabab P.S Ansaldo Energia/Pentagon/Aprile
Customs Clearance & Inland transportation of general cargo, containers, ODC, & 2x230tons Stator, 2x170 tons Trafo (plus skidding on foundation), 2 x 95tons HP IP plus other heavy cargo
2016 West Damietta CCPP OC/G.E/Egyptian Armament Authority
Delivery of heavy cargo: - 12x230 tons HRSG Modules
(24x5.5x3.8m) - 1x230 tons Generator - 1x100 tons steam turbine - 1x150tons Transformer
plus, general cargo, ODC, and containers
2017 Assiut CCPP OC/G. E/Egyptian Armament Authority
Delivery of heavy cargo: - 40x150 tons HRSG Modules
(21x6x3.8m) - 2x230 tons Generator - 2x100 tons steam turbine
- 2x150tons Transformer plus, general cargo, ODC, and containers
2017 Beni Suef Substation G.E Grid / Geodis Delivery of containers, general cargo and 9x146 tons transformers including placing on foundation
2018 East Ismailia Substation
G.E Grid / Geodis Delivery of containers, general cargo and 10x146 tons transformers including placing on foundation
2018 Temay El-Amdeed Substation
G.E Grid / Geodis Delivery of containers, general cargo and 9x146 tons transformers including placing on foundation
2018 Talkha Substation DHL 1x122.5 tons Trafo- port handling, delivery to site and placing on foundation
2018 Sukhna Substation DHL 1x157 tons Trafo- port handling, & delivery to site
2018 South Helwan Substation
DHL 2x 170 tons Trafo- port handling, delivery to site and placing on foundation
2018 Ras Ghareb Substation
Orascom 3 x 100 tons Trafos- port handling & delivery to site
2019 Hurghada Substation DHL 1x127 tons Trafo- port handling, delivery to site and placing on foundation
2019 15th of May Substation
DHL 1x127 tons Trafo- port handling, delivery to site and placing on foundation
2019 El-Narges Substation DHL 1x157 tons Trafo- port handling, delivery to site and placing on foundation
Industry: Petrochemicals Projects
Year Project Client Description 1998 Egyptian Petrochemicals CO.
Ethylene Plant Technipetrol SPA Handling of 35,000
FRT of G.C 1998 Egyptian Petrochemicals CO. /
PVC Plant Technipetrol SPA Handling of 25,000
FRT of G.C 1999 Sidi Krir Petrochemicals CO. /
Ethylene & Polyethylene Utilities
Enppi Handling of 15,000 FRT of G.C, Heavy & O.D Cargo
1999 Ethylene Plant Heaters Techint Cimi Montubi / Toyo Engineering Corp.
Handling of G.C, Heavy & O.D Cargo
1999 Sidi Krir Petrochemicals CO. / Polyethylene Utilities
Samsung Handling of G.C, Heavy & O.D Cargo
2008 Egyptian Polyproplene Panalpina Energy & Projects Solutions /Uhde
Customs Clearance & Inland Transportation of 100,000FRT of G.C including: 1x200tons Boilers (10.0 high)
2013/2014 Ethylene Plant Enppi / Toyo/ Panalpina Energy & Projects Solutions
Handling of 100,000 FRT of G.C, Heavy & O.D Cargo including 1x400tons fractionators (101m long) + 2x180tons Boilers (9.5m high) + other pencil towers columns
2014/2015 Polyethylene Plant Enppi / Toyo / Deugro
Handling of 50,000 FRT of G.C, Heavy & O.D Cargo including 2x400tons Reactors (47m length x 9.5m diameter)
2019 Egyptina PolyProplene Plant Jas Projects/Thyssen krupp
Inland transportation of 1x200 tons Boiler plus accessories
Industry: Ammonia Urea Plants
Year Project Client Description 1998 Suez I / Ammonia Urea Plant Krupp Uhde / VTS Handling of 50,000 FRT of G.C plus 19,000 FRT of
Heavy & O.D Cargo including: - Convertor (248tons; 20.35x4.44x4.18m) - Reactor (254tons; 28.82x3.68x4.2)
2005 Suez II / Ammonia Urea Plant
Krupp Uhde / VTS Handling of 50,000 FRT of G.C plus 19,000 FRT of Heavy & O.D Cargo including: - Convertor (248tons; 20.35x4.44x4.18m)
Reactor (254tons; 28.82x3.68x4.2) 2007 Sukhna Ammonia Plant Orascom
Construction Industries
Handling of 100,000 FRT of G.C, Heavy & O.D Cargo including: - Reactor (450tons; 32.0x5.0x5.0m) - CO2 Stripper (257tons; 72.0x7.3x7.3m) - Ammonia Convertor (330tons; 26.7x5.5x6.3)
2007 Damietta Ammonia Urea Plant / MOPCO
Krupp Udhe / VTS Handling of 50,000 FRT of G.C plus 19,000 FRT of Heavy & O.D Cargo including: - Convertor (248tons; 20.35x4.44x4.18m) - Reactor (254tons; 28.82x3.68x4.2)
2010 E-Agrium Uhde / Panalpina Energy & Projects Solutions
Handling of 100,000 FRT of G.C/Containers/Heavy Cargo including 2x300tons Reactors plus 2x245tons Convertor
2017 Kima Fertilizer Tecnimont / Aprile Handling of 100,000 FRT of G.C/Containers/Heavy Cargo including - 1x494 tons Synthesis Convertor
(29.3x3.8x4.86m) - 1x347 tons Pool Reactor (30.5x3.8x5.4m) - 1x316 tons CO2 Absorber (48.8x6.02x6.6m) - 1x200 tons Boiler (14.5x9.1x7.5m)
Industry: Miscellaneous Projects
Year Project Client Description 1979 Gezira Sheraton Hotel Geosonda Handling of 20,000 FRT of G.C 1979 Agha Khan Housing
Units Attiki Handling of 10,000 FRT of G.C
1983 Cario Underground Project
SGE Handling of 50,000 FRT of G.C
1988 Novotel Luxor Hotel Feal SPA Handling of 10,000 FRT of G.C 1983 Abumadi Revamping
Project Ingelo SPA Handling of 10,000 FRT of G.C
2000 Arco Steel CO. / Special Steel Mills
Poesc Handling of 40,000 FRT of G.C, Heavy & O.D Cargo
2000 Citro Misr CO. / Citric Acid Plant
Danzas Handling of 5,500 FRT of G.C including 6x45tons Fermentors (30x5.5x5.6m)
1997 Toshka Pumping Station
Kaverner Construction / Transcar
Handling of G.C, Heavy & O.D Cargo
2000 Sheikh Zayed City / Water Supply Project
Balfour Kilpartric Handling of 20,000 FRT of G.C
2000 Kaft Pharmaceutical Factory
Saving Egypt Handling of G.C
2003 El-Merghany Bridge Arab Contractors Inland Transportation of 5x50 tons Beams (30.0x2.0x2.0m)
2003 Kafr El-Zayat Bridge Arab Contractors Inland Transportation of 4x94tons Beams (43m length)
2006 Relocation of Ramsis Statue
Arab Contractor Inland Transportation of King Ramsis II Statue from down town Cairo to the new Egyptian Grand Museum (Pyramids Area) 160 tons, 15.0m high
2010 Helwan Steel Plant EZACO Inland Transportation of 3 Cold Boxes: - 116.2tons; 12.62x9.4ox4.64m - 136.6tons; 39.90x4.30x4.70m - 122.5tons; 51.17x3.60x4.70m
2010 Cairo Airport Metro Marasem/Bin Laden Transportation of 60x80tons bridge (rail way) columns 35.0m each
2011 Cairo Under Ground Metro Line 3
VINCI Transportation of TBM from Abbassia up to Salah Salem Station
2012 Cairo Under Ground Metro Line 3
VINCI Transportation of TBM from Abbassia up to Attaba Station
2014-2015
El-Mosheer Bridge OC Transportation of 20x200tons 55m long bridge beams
2016-207
Manar Conference Hall
OC 25,000 FRT of general cargo and containers
International Projects
Year Country Project Client Description 2005 Libya Great Man-Made River CFTI / DSD
FERROMETALCO / VINCI Inland transportation of 3x90 tons (L:21m; Diam.:6m) from Cairo/Egypt up to Asdada/Libya