CONVERSATORIO : Junio 10 Sistemas HVDC SESIÓN 2 : Operación e impacto de Sistemas HVDC en redes existentes Un evento: Issues derived from the Multiplicity of new HVDC Links Embedded to AC Transmission Grids Experience in Brasil MARCIO SZECHTMAN President - Technical Council CIGRE Eletrobras Chief Transmisson Officer

Upload: others

Post on 21-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

CO

NV

ER

SA

TO

RIO

:

Junio 10Sistemas HVDC

SESIÓN 2 : Operación e impacto de Sistemas HVDC en redes existentes

Un evento:

Issues derived from the Multiplicity of new HVDC Links Embedded to AC Transmission Grids

Experience in Brasil

MARCIO SZECHTMANPresident - Technical Council CIGREEletrobras Chief Transmisson Officer

Page 2: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

2

Philosophy for Implementing new HVDC Schemes in Brazil

Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles

Two standards in the country:

± 600 kV 3,150 MW 2,625 A; Itaipu and Madeira Bipoles

± 800 kV 4,000 MW 2,500 A: Belo Monte Bipoles

In parallel, they can transmit, respectively:

6300 MW

8000 MW

Itaipu and Madeira links: were designed to allow bipolar parallel operation

Belo Monte links: the receiving end terminal selected differently for each Bipole: greater

concern of loosing the entire two Bipoles for an AC fault at the receiving end terminal

Page 3: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles

Two standards in the country:

± 600 kV 3,150 MW 2,625 A; Itaipu and Madeira Bipoles

± 800 kV 4,000 MW 2,500 A: Belo Monte Bipoles

In parallel, they can transmit, respectively:

6300 MW

8000 MW

Itaipu and Madeira links: were designed to allow bipolar parallel operation

Belo Monte links: the receiving end terminal selected differently for each Bipole: greater

concern of loosing the entire two Bipoles for an AC fault at the receiving end terminal

Philosophy for Implementing new HVDC Schemes in Brasil

Page 4: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

4

0.8 1 1.2 1.4 1.6 1.8 2-1000

-500

0

500

1000

IPC

C_L1

[A

]

IPC

C_L2

[A

]

IPC

C_L3

[A

]

0.8 1 1.2 1.4 1.6 1.8 2-400

-200

0

200

400

UP

CC

_L1_P

RIM

SID

E [kV

]

UP

CC

_L2_P

RIM

SID

E [kV

]

UP

CC

_L3_P

RIM

SID

E [kV

]

File: TFR CL_S2PCP1B1 1 20131113 02;49;30_368000.CFG

0.8 1 1.2 1.4 1.6 1.8 2158.7726

479.9612

UP

CC

_P

RIM

SID

E_R

MS

[kV

]

0.8 1 1.2 1.4 1.6 1.8 2-0.5

0

0.5

1

UD

_M

EA

N_F

[p

u]

HVDC response due to a mid-line pole DC fault: left VSC System; right typical LCC Scheme

Fault current cleared by AC breaker (3 cycles); full recovery time, from 700 to 1500 ms; with DC breakers or full bridge, time will be less

Fault current cleared by Thyristor control in 10 ms; typical straight forward recovery time in the range of 400 ms, including arc deionization

VSC x LCC: Recovery from a DC line fault

Page 5: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Madeira

ProjectBelo Monte

Project

Configurations of Madeira and Belo Monte HVDC Projects

Page 6: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Need for a further HVDc link to power flow control in avery meshed network

Page 7: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Therefore after completion of the Madeira and Belo Monte projects, we will have 4 PoC in the Southeastregion (SE) where major load is placed.

Page 8: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

The Brazilian Transmission Grid New Paradigms

Northeast

Region

Northern

Region

Southern

Region

Southeast

Region • Madeira and Itaipu: assinchronous• Belo Monte: system embedded

and bi-directional

Itaipu

Bipoles

Madeira

Bipoles

Belo Monte

Bipoles

System Effect of HVDC Links

Page 9: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Norteast

Region

Northern

Region

Southeast

Region

Southern

Region

The Effect upon diferente markets (or sub-markets in Brasil)

The Benefit of close integration of regions

Frequency Decoupler AC AC

DC line

Zero Hz

Zero Hz: no oscillation modes transfers

Zero “km”: approximation effect of sending and receiving end terminals

Page 10: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

3500 MW

3500 MW

Main AC Grid

X

For a pole outage, apply the overload in the

other 3 Poles, so as to keep the same Pdclevel.

Madeira

Project

Overload Cycles Specified

Page 11: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

11000 MW

For any AC or DC contingency, apply the

overload in all avaliable Poles or Bipoles.

Main AC Grid

Belo

Monte

Parallel AC Grid

Belo Monte

Project

Overload Cycles Specified

Page 12: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Main Configuration:Hydro Gen of

18000 MWHydro Gen of

18000 MW

Main Load AreaMain Load Area

BM Bipoles 1 and 2

3.000 MW

7.000 MW

4.000 MW

Fault at two 500 kV circuits

Fault at two 500 kV circuits

Stability Studies Results (Belo Monte)

Page 13: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Stability Studies Results

Reference Machines:

N = Northern System (H)

NE = Northeastern (H + WP + T)

SE = Southeastern (H + T)

Main Load AreaMain Load Area

~

~

~

N

SE

NE

Page 14: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

44

105

165

226

286

0, 0,5 1, 1,5 2, 2,5

DELT 6419 10 TUCURUI1-4GR 501 10 I.SOLTE-18GR

DELT 6419 10 TUCURUI1-4GR 5022 10 PAFO-4G1-3GR

Time (s)

Machin

eA

ngle

s

N - SE

N - NE

Results with no overload

Page 15: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Time (s)

AC

Voltages

500 k

V

lines

(pu)

0,737

0,888

1,04

1,191

1,343

0, 0,5 1, 1,5 2, 2,5

VOLT 5580 P.DUTR-PI500

VOLT 7100 GURUPI-TO500

VOLT 7200 MIRACE-TO500

Out-of-stepProtection

System islanding

Results with no overload

Page 16: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Time (s)

Machin

eA

ngle

s

Results with no overload - worst

Page 17: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Time (s)

Machin

eA

ngle

s

-12,3

5,8

23,9

42,

60,1

0, 3, 6, 9, 12, 15,

DELT 6419 10 TUCURUI1-4GR 501 10 I.SOLTE-18GR

DELT 6419 10 TUCURUI1-4GR 5022 10 PAFO-4G1-3GR

N - SE

N - NE

Results with 33% overload

Page 18: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Time (s)

AC

Voltages

500 k

V

lines

(pu)

0,737

0,83

0,923

1,016

1,109

0, 3, 6, 9, 12, 15,

VOLT 5580 P.DUTR-PI500

VOLT 7100 GURUPI-TO500

VOLT 7200 MIRACE-TO500

Results with 33% overload

Page 19: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

Conclusions

1. HVDC links cannot longer be considered as separate “entities” in the Grid.

2. Coordination studies to assess the external signals (from the AC system) that may require

run-up or run-down of the HVDC dispatch, are becoming of greater importance.

3. HVDC overload requirements have to be carefully analyzed.

4. HVDC embedded in the AC Grid may provide fundamental contributions to system stability

and security.

5. Current studies contemplate: key external signals to be considered by the Master Control;

flexibility in the overload level and ramp time to be set.

6. Objective is to minimize the number of Hydro machines to be dropped to maintain system

stability.

Page 20: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

20

Muchas Gracias!!

Page 21: Issues derived from the Multiplicity of new HVDC Links Embedded … · 2020-06-11 · Differently from China, Brazil has been planning the HVDC links in a pair of Bipoles Two standards

21

Gracias