issue 08-018: coordination and synchronization of jten services and lvc training enhancements for...

5
Issue 08-018 : Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant commands/Services. Discussion : JTEN currently has temporary connections to like networks in Australia and the United Kingdom, with a connection to Canada on the horizon. No formal procedure exists for scheduling the use of the JTEN by ABCA partners or combatant commands/Services for the scheduling and provisioning of distributed training assets (i.e. Virtual and Constructive training enablers). Endstate : Development of a formal coordination process, business rules and/or other documents as necessary for ABCA partners and combatant commands/Services that outlines the process for scheduling and coordinating JTEN utilization and LVC training enhancements for ABCA/combatant commands/Services pre-deployment training for OIF/OEF. POA&M: JWFC to be given the lead for: Development of a catalog of available ABCA virtual and constructive training capabilities Establishment of a scheduling process for the JTEN and V&C assets Develop business rules formalizing this process OPR: USJFCOM OCRs: PJHQ J7, HQJOC J7, and CFD/CFEC. MAR 10 Formal acceptance of Business Rules SEPT 08 SEPT 09 APR 09 FEB 09 Finalize Business Rules; begin vetting process Develop scheduling process; draft business rules. Brief JTCC Deliver V&C Capabilities Catalog Approve d POA&M MAR 09 Convene WJTSC WG Integration of ABCA Partners Into the Joint Training Enterprise (Updated) JUL 09 Brief JTCC

Upload: kelley-york

Post on 05-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Issue 08-018: Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant

Issue 08-018: Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant commands/Services.

Discussion:  JTEN currently has temporary connections to like networks in Australia and the United Kingdom, with a connection to Canada on the horizon. No formal procedure exists for scheduling the use of the JTEN by ABCA partners or combatant commands/Services for the scheduling and provisioning of distributed training assets (i.e. Virtual and Constructive training enablers).

Endstate: Development of a formal coordination process, business rules and/or other documents as necessary for ABCA partners and combatant commands/Services that outlines the process for scheduling and coordinating JTEN utilization and LVC training enhancements for ABCA/combatant commands/Services pre-deployment training for OIF/OEF.

POA&M: JWFC to be given the lead for:– Development of a catalog of available ABCA virtual and constructive training capabilities – Establishment of a scheduling process for the JTEN and V&C assets– Develop business rules formalizing this process

OPR: USJFCOM OCRs: PJHQ J7, HQJOC J7, and CFD/CFEC.

MAR 10

Formal acceptance of Business Rules

SEPT 08 SEPT 09APR 09FEB 09

Finalize Business Rules; begin

vetting process

Develop scheduling process; draft

business rules. Brief JTCC

Deliver V&C Capabilities

Catalog

ApprovedPOA&M

MAR 09

Convene WJTSC WG

Integration of ABCA PartnersInto the Joint Training Enterprise

(Updated)

JUL 09

Brief JTCC

Page 2: Issue 08-018: Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant

Dissection of the Issue• Issue:

– Coordination & synchronization of JTEN services & LVC training enhancements for

– ABCA/COCOM/Services exercises…pre-deployment training for OIF/OEF

– No formal procedures to schedule coalition use of JTEN– No formal process to integrate ABCA into scheduled events,

inserting new events, or schedule use of distributed training LVC assets/capabilities

• Desired End State:– Formal coordination process– Business rules– Documentation– Outlines process for scheduling & coordinating JTEN and LVC

asset use • JWFC Lead for:

– Development of catalog of available ABCA LVC training assets– Establishment of Scheduling Process for ABCA V&C assets– Development of formal Business Rules

Page 3: Issue 08-018: Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant

Deliverables• Formal coordination & scheduling process for JTEN & ABCA LVC

asset use– ACTION: JWFC TD-Programs provide JTCP process as one venue (CDR

Kesselring)– ACTION: ABCA provide process for event scheduling, use of training networks

and assets for Coalition Partners integration. (Lanny White)• Formal ABCA Training Business Rules

– ACTION: JWFC benchmark and provide JCTC Business Rules as starting point (Steve Kostoff)

• Ensure funding and capacity constraints are addressed• Catalog of available ABCA V&C training assets

– ACTION: ABCA each provide catalog of all available training assets & coordination POCs

• US ACTION: TD provide first draft of US catalog of JNTC Certified Sites (Dave Hill)• Documented Network Architecture and CONOPS

– ACTION: JWFC provide status of ABCA Training Network design concept (Steve Kostoff)

– ACTION: JWFC provide draft ABCA Training Network CONOPS (Steve Kostoff)

Page 4: Issue 08-018: Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant

WJTSC 09-1 Plan of Action• Ensure Issue dissection correct & complete• Discuss deliverables, action officers, and

suspenses– Brief working group on issue slide changes since

WJTSC 08-2 (e.g., timeline slip)– Discuss whether or not to include Live training

capabilities/facilities in the catalog– Discuss capturing essence of funding & capacity

constraints in the business rules– Do we introduce to the Plenary the concept of having

a “ABCA Desk Officer” at JWFC?• Provide update on technical enablers• Update Issue Slide and develop any required

briefing slides for the Plenary– Ensure slide changes are captured

Page 5: Issue 08-018: Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant

WJTSC 09-1 Engagements

• Tues, 24 Mar, 1500-1600, Joint Training Enterprise WG, Gold Camp Room– Business Rules, Catalog, Network

Architecture & CONOPS

• Tues/Wed, 24/25 Mar, TBD Time, USJFCOM Exercise Support WG, Centennial Room– Event Scheduling, Resource scheduling– Venues: JTCP/JTCC, WJTSC