iso9001.pptx

Upload: rahul-verman

Post on 02-Jun-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 ISO9001.pptx

    1/24

    Prepared

    Rahul

  • 8/10/2019 ISO9001.pptx

    2/24

    Established in 2010

    Our head office is in Mumbai .

    Mainly deals in spare parts of two wheelers

    and four wheelers vehicles The companys product is already being

    marketed in several countries in Africa, the

    Middle East, South East Asia.

    Major clients are TATA Motors, Bajaj ,HeroMotors and Honda Motors.

  • 8/10/2019 ISO9001.pptx

    3/24

    Show A Commitment To The Customer

    Make Quality Important

    Establish A Quality Policy

    Establish, Monitor And Update Qualityobjectives

    Assign Responsibility And Authority

    Designate A Management Representative

  • 8/10/2019 ISO9001.pptx

    4/24

    Management - Planning, goals & objectives,

    reviewing progress

    Resources - People, tools, equipment etc

    Services or Products Realization' - whatever

    is involved in creating or delivering them.

    Monitor, Measurement & Checking All-

    important feedback loop.

  • 8/10/2019 ISO9001.pptx

    5/24

    We strive for excellence by providing

    customized solutions, products & services

    that best satisfies the requirements of our

    Customers.Continuously improve quality, reliability &

    service with the help of an effective Quality

    Management System.

    Encompassing all statutory, regulatory,health, safety & environment requirements

    at our work place.

  • 8/10/2019 ISO9001.pptx

    6/24

    Requirements of the contract are well

    defined.

    Review the Agreement of Sale.

    More formal contract clients.

    Installation and maintenance and delivery of

    the products and services which clients

    expects to receive.

  • 8/10/2019 ISO9001.pptx

    7/24

    Perform design review to confirm that the

    product will meet the specification.

    Use revision control on the specification.

    Perform validation and approval of the

    product to ensure that it meets the

    requirements.

    Document the design process

  • 8/10/2019 ISO9001.pptx

    8/24

    DEFINITIONS

    RESPONSIBILITIES

    CONTROL OF THE ISSUE OF (& AMENDMENTS TO) THE POLICY MANUAL

    CONTROL OF THE ISSUE OF (& AMENDMENTS TO) THE POLICY MANUAL

    DETAILS OF PROCESSES COVERED:

    CONTROL THE ISSUE OF WORK INSTRUCTIONS

    CONTROL AND ISSUE OF NEW OR REDESIGNED QUALITY SYSTEM

    DOCUMENTS AND FORMS

    PROPOSED CHANGES

    EXTERNAL DOCUMENTS AND OTHER DATA MANUFACTURER SUPPLIED INFORMATION

    SAFETY/HAZARD WARNINGS

    STANDARDS

  • 8/10/2019 ISO9001.pptx

    9/24

    Company organization chart to assign tasks

    and responsibilities

    Documentation that ensures the purchased

    material corresponds to the technicalspecification and budgeted cost

    Suppliers for each product they purchase

    regularly.

  • 8/10/2019 ISO9001.pptx

    10/24

    Customer supplied products are subjected to

    same inspection procedure

    All such items are stored in a separately de-

    marked area in the Central stores and areclearly identified as such

    Non-conformities detected are immediately

    communicated to the concerned department.

    Defected product/wrong package is sendback to quality check department.

  • 8/10/2019 ISO9001.pptx

    11/24

    knowing the identity of products

    knowing the quality status (good or bad) of

    materials and products

    involves keeping detailed records of productmanufacturer

  • 8/10/2019 ISO9001.pptx

    12/24

    Effective process control will result in

    reduced costs by helping eliminate wasted

    effort and material due to making the

    product incorrectly or inconsistently. Plan production and installation processes

    that directly affect the quality of the goods

    we produce.

  • 8/10/2019 ISO9001.pptx

    13/24

    Applies to incoming material, intermediate

    assemblies and finished products.

    Indicated by a variety of methods including

    the physical location of the product, noteson a routing sheet or a computer entry.

  • 8/10/2019 ISO9001.pptx

    14/24

    Identify the measurements to be taken, theirrequired accuracy, and the equipment to be usedto make the measurements.

    Establish, document and maintain calibrationprocedures, including details of equipment type,identification number, location, frequency ofchecks, check method, acceptance criteria andthe actions to be taken when the calibrationresults are unsatisfactory.

    Ensure that measuring equipment is of sufficientaccuracy.

    Identify inspection equipment with a calibration

    sticker.

  • 8/10/2019 ISO9001.pptx

    15/24

    Segregation of non performing product

    Notification to the customer

    Notification to the relevant parties,

    organizational, internal, external. Short term corrective actions

  • 8/10/2019 ISO9001.pptx

    16/24

    How do you address problems and how do you prevent

    them from occurring in the future?

    A documented procedure is required by the standard.

    This process is needed to establish a system for assuringthat conditions which are actually or potentially

    adverse to quality are:

    promptly identified

    documented, and reported to management.

    Corrective action

    Preventive measure

  • 8/10/2019 ISO9001.pptx

    17/24

    Material is handled to preserve the quality of the job duringproduction.

    One-sided racks

    Two sided racks.

    Drying racks

    Construction of new racks as required.

    Pre-masked material is unmasked as required during the job.

    Protective sheeting is placed between articles when required.

    Raw material is stored and labeled using a Material Control Label

    Material is allocated for production on a first in-first out basis (FIFO)

    Hazardous materials are:

    Handled by trained employees,

    Kept in a specified, controlled / limited access area, and

    Labeled with product information and/or special handling

    instructions.

  • 8/10/2019 ISO9001.pptx

    18/24

    Age sensitive material with adhesive is labeled

    stock audits of all storage areas biannually.

    Packaging should provide an appropriate level of protection to

    parts throughout delivery. Special customer packaging

    requirements are documented on the customer blueprint, shop

    order, or production inspection form.

    Product should be identified Special customer marking and labeling requirements are agreed

    on by contract and can be found on the applicable customer

    blueprint, specification.

    In order to ensure delivery of product, QNP packages according

    to carrier requirements: UPS

    Federal Express

    Common Carrier

    Delivery requirements specified by a customer are by contract

    and documented on the applicable Shop Order.

  • 8/10/2019 ISO9001.pptx

    19/24

    A recordis a special type of document thatprovides written evidence of results achieved or activityperformed

    Readily identifiable

    Easily determining the purpose and scope of the record

    It must be written legibly to be useful. Also make surethat they are not exposed to unauthorized change oralteration.

    Develop appropriate performance indicators todemonstrate effective implementation of your record

    control process.

    Track trends in these indicators and use this information totighten the controls and continually improve the recordcontrol process.

  • 8/10/2019 ISO9001.pptx

    20/24

    Audits are required to monitor and report on the

    effectiveness of the implementation of the

    quality management system.

    Planning of audit programs.

    Quarterly

    Half yearly

    Annually

    Document audit findingsAudit Report

    Audit Findings

    Audit Checklists

    Audit Schedule

  • 8/10/2019 ISO9001.pptx

    21/24

    Work what is the requirement

    What is available

    Fill the gapCheck to see it worked

    Record

    Repeat

  • 8/10/2019 ISO9001.pptx

    22/24

    Plan for work

    Plan verification activity

    Control of non-nonconforming products

    Plan maintenance activities.

    Asset number Asset description

    Serial number

    Date acquired

    Date put into service

    Date retired Asset location

    Digital image of asset

    Plan calibration activities.

  • 8/10/2019 ISO9001.pptx

    23/24

    It gives the idea of past performance of the

    company

    Preparation of MIS

  • 8/10/2019 ISO9001.pptx

    24/24

    Thank You