MERCURIO 502CAF SR 24.29CAF KIT WITH ENCODER FOR SLIDING GATES (UP TO 500 kg -230V~)
FOR INSTALLATION WITH CHAIN
E R A ISGATE OPENER DEPARTMENT
DAL
1965 Pag. 1/16
INSTALLATION MANUAL
CAUTION:
- THE CONTROL UNIT MUST BE PROGRAMMED PRIOR
TO GATE OPERATION, OTHERWISE THE UNIT WILL
NOT OPERATE CORRECTLY - see Page 12-
- READ THIS MANUAL CAREFULLY BEFORE MAKING
ANY CONNECTIONS, AND KEEP FOR FUTURE
REFERENCE
ME
RC
UR
IO/5
02
CA
F I E
CT/87 SR 24.87 1/2 INCH CHAIN, 5 METERS LONG, COMPLETE WITH ACCESSORIES
DAL
1965
Pag. 2/16
!
Thank you for choosing a SERAI ELETTRONICA product, which we are confident will perform to your requirements.
Please be advised that you are about to fit a system classified as “a power-operated drive designed to move automatic gates and doors in commercial or residential buildings accessed by vehicles and persons”, and, as such, the system must be considered potentially hazardous. By law, you are responsible for rendering this equipment as “safe” as is reasonably possible.
Installation and maintenance of equipment of this kind must therefore be carried out by skilled, qualified and trained personnel, working in a professional manner, as provided for by DM 37/08 and subsequent amendments and supplements thereto. The law in question prohibits the construction of these types of systems by non-qualified personnel.
SERAI manufacturing complies with the following legislation:
Applicable directives for the CE marking:Machines: 2006/42/EECLow voltage: 73/23/EEC + 93/68/EECElectromagnetic compatibility: 2004/108/EECR&TTE (Radio and Telecommunications Terminal Equipment): 99/5/EEC
General applicable standards:Electrical safety: IEC EN60335-1 + IEC EN60335-2-103 Electromagnetic compatibility - emissions: IEC EN61000-6-3Electromagnetic compatibility - immunity: IEC EN61000-6-1
Apart from the legislation mentioned above, you are also reminded to comply with the following standards during the installation phase.
General applicable standards:Safety of electrical systems in non-specialised environments: CEI 64-8 V2
Specific product standards applicable:Safety in the use of power-operated doors requirements: UNI EN12453Safety in the use of power-operated doors testing methods: UNI EN12445
SERAI products enable users to build systems which comply with these standards. This is extremely important as THE INSTALLER IS LIABLE FOR THE SYSTEM AND FOR ENSURING ITS OPERATION COMPLIES WITH LEGAL PROVISIONS.
This handbook must be read in full, at least once, before proceeding with the installation of the various parts of the system.
The installation of the mechanical end stops for gate opening and closure is necessary for system safety purposes and therefore this operation must be performed before proceeding with the installation of the control unit.
ME
RC
UR
IO/5
02
CA
F I E
DAL
1965
Pag. 3/16
4
6
1 2
3 3
230 V~
5 5
7
8
ME
RC
UR
IO/5
02
CA
F I E
CHAPTER 1: GENERAL INFORMATION1.1 KIT CONTENTS
1.2 WIRING EXAMPLE FOR KIT CONTENTS
Advice for wiring up in non-specialised environments.1. Fit an omnipolar switch upstream of the system, choosing one with a gap of at least 3 mm between the contacts. Or,
alternatively, use a 10A magnetothermic switch.2. When making the connections (using any type of connector), ensure the system is disconnected from the power
supply, i.e. that the main switch is in the “open” position (“0” symbol). The control unit, in particular, must never be connected to the power supply either during the wiring up, or when fitting any expansion cards.
3. The following cables must be used for installation of the system:2 2- for the control unit and motor power supplies: 1.5 mm section for lengths of up to 19m, 2.5 mm section for
lengths of up to 31 m,2 2- for the flashing light: 0.75 mm section for lengths of up to 3 m, 1.5 mm section for lengths of up to 19 m.
- for the low voltage and current lines (e.g. For the photocells, control buttons, electromechanical key, sensitive 2 2edges and other safety devices): 0.5 mm section for lengths of up to 50 m, 0.75 mm section for lengths of up to
100 m.4. Wire up the earth connection in compliance with legal provisions.
CABLE FOR TX 2 x 0,5 mm²
KEY CABLE 3 x 0,5 mm²
POWER SUPPLY CABLE 3 x 1,5 mm²
CA
BL
E F
OR
LIG
HT
+ A
NT
EN
NA
2
x 0
,75
mm
² +
RG
58
CA
BL
E F
OR
RX
4 x
0,5
mm
²
MERCURIO 502CAF
1. Motor models: Encoder system CR/42A electronic control unitRelease keys, e- M8 grub screws for motor levelling
2. a- Base plate, b- Bolts, c- Nuts, d- Washers
3. M/10 electric key
4. Pair of P/10 photocells with plugs
5. OG/64 mini transmitter
6. Flashing light with built-in antenna RZ/20 F
7. RZ/99 L-shaped holder
a- MT/502CA, b- , c- , d-
CT/87
8. a- End stop sliding plates b- M6 grub screws for fastening sliding platesc- Fixing plate
9. Chain
10.a-b-c-
Fixing bracketsChain adjuster springChain fixing rods
a
c
d
1
d
ac
b
2
3 4 5
6
e
8
7
b
9
a
b c
10
ab c
35 mm
100÷110 mm
80 mm
DAL
1965
Pag. 4/16
MECHANICAL END STOP(CLOSURE)
MECHANICAL END STOP(OPENING)
GROUND-ANCHORED RAIL (REINFORCED CONCRETE GROUND)
SUPPORT RAILS
CHAPTER 2: MOTOR INSTALLATION
2.1 BEFORE STARTING
� Check that the gate is equipped with sturdy support rails
� Check that the rail is anchored securely to the ground
� Fit two sturdy mechanical stops at the two ends of the rail
� Check that the gate runs smoothly along the rail
The installation of the mechanical end stops for gate opening and closure is necessary for system safety purposes and therefore this operation must be performed before proceeding with the installation of the control unit.
2.2 INSTALLING THE BASE PLATE
2.2A
� Screw the two nuts onto the bolts, until they are positioned 35 mm from the end of the thread
� Fit the J bolts through the holes in the base plate
� Screw the other two nuts onto the J bolts without tightening
2.2B
� Dig a hole and place the base plate (fastened to the bolts) inside it, along with the cable carrier hose
� Position the base plate at the heights specified, fastening it so that it stays flat
2.2C
� Cast concrete to secure the unit to the ground, ensuring all the base plate parts are kept clean and the two nuts are out of the concrete completely.
� Wait for the concrete to harden, then remove the two nuts
CAUTION:If the motor is located in an area prone to flooding, the base plate must be positioned high enough to stop the water reaching the motor
ME
RC
UR
IO/5
02
CA
F I E
1/2
Pag. 5/16
2.6 INSTALLATION OF THE CHAIN
2.6 A Fix the L-shaped brackets at the far sides of the gate either screwing them or welding them.
DAL
1965
2.3 OPENING THE MOTOR UNIT
� Remove the fastening screws on the side of the unit
� Remove the motor cover
� Remove the plastic casing from the motor unit
2.4 MOTOR POSITIONING
2.4 A
� Screw the 4 grub screws into the relevant housing� Position the motor on the base plate, inserting the threaded part of the J bolts
through the slots in the base� Level the motor by adjusting the grub screws� Fit the washers onto the bolts and screw on the 2 nuts without tightening them
completely. These bolts must not be secured until the tooth rack is in its final position
GRUB SCREWS
NUTS
WASHER
2.4 B
� Cut small holes in the rubber seals, so that they grip each of the cables properly. If this operation is not carried out and insects get inside the unit, a short circuit may occur, causing irreparable damage to the ECU.
2.5 RELEASING THE MOTOR
� Fit the release key into the lock on the front panel of the motor unit and turn it anticlockwise by a half turn
� Push the release flap hard downwards until the release mechanism is triggered
ME
RC
UR
IO/5
02
CA
F I E
DAL
1965
Pag. 6/16
2.6 B Insert the chain in between the motor gears.
2.6 C Position the motor on the counterplate.
2.6 D - Insert the threaded pin at the end of the chain corresponding to the back part of the gate using one of the two split links provided.
- insert a washer into the threaded pin - insert the threaded pin in the corresponding hole of the L-shaped bracket;- insert a second washer in the threaded pin- insert the supplied control spring into the pin- insert a third washer and then screw the self-locking nut
2.6 E Insert the threaded pin into the hole of the L-shaped bracket in the front of the gate and screw the M10 self-locking nut by hand alone.
2.6 F Stretch the chain by hand and shorten it at the transversal hole of the threaded pin. In order to shorten it, file the rivet of the pin and then pull it off using an awl.
WHERE TO SHORTEN THE CHAIN
ME
RC
UR
IO/5
02
CA
F I E
2.6 G Join the threaded pin to the end of the chain using the second split link provided.
2.6 H - Screw an M10 nut onto the pin until the end of the threaded part.- insert a washer into the threaded pin - insert the pin into the hole of the L-shaped bracket;- insert a washer and screw the M10 self-locking nut to set the chain.The correct tension of the chain is
obtained by making sure that there is a height variation of approximately 3 cm at half the length of the chain.
CHECK 3cm BEND
DAL
1965
Pag. 7/16
2.7A Fix the correct position of the end stop sliding plate permanently.
CLICK!
5 cm
� Slide the gate and position the sliding plates so that they command the micro switch control spring. You must hear a click.
CAUTION:- To guarantee correct limit switch operation, ensure there is a distance of 30 mm (tolerance: ±
5 mm) between the side of the motor and the sliding plate. A gap of over 35 mm may cause the gate to jam open or closed. A gap of under 25 mm may cause breakage of the limit switch control spring.
- The end stop sliding plates must be set (taking into account inertia and changes in temperature) so that the gate never ends up resting on the mechanical end stops during opening and closure. If this occurs, the FLAP COULD GET BROKEN during the release operation. Because of seasonal temperature differences, we recommend you check this in both summer and winter.
MAX 35 mmMIN 25 mm
MECHANICAL END STOP (OPENING)
MECHANICAL END STOP(CLOSURE)
CAUTION:For safety reasons, an end stop must be fitted for both the closure and opening movements
MOTOR
2.8 DEFINITIVE MOTOR FASTENING
2.8 A
� Tighten the nuts on the J bolts fully
� Place the lower plastic casing and the motor cover back in position, fastening the latter with the two side screws
2.8 B
� Lock the motor manually by closing the release flap and removing the key from the lock cylinder
2.8 C
� Open or close the gate a few cm by hand until the stop pinion locks
TIGHTEN FULLY
ME
RC
UR
IO/5
02
CA
F I E
� When the correct position is found, fix the sliding plate to the chain with the supplied two M6 grub screws and the backside fixing plate
2.7C
� Repeat the operation during opening
CHAIN
END STOP SLIDING PLATES
M6 GRUB SCREWS
FIXING PLATE
2.7 INSTALLATION OF THE END STOP SLIDING PLATES
2.7B FASTENING
CHAPTER 3: CR/42A ELECTRONIC CONTROL UNIT
3.1 CR/42A WIRING DIAGRAM
Page 8/16
SOG/4AConnector for any SOG/4A receiver cards
nd2 C INDICATOR LIGHTConnector for wiring for MR/08 relay module for gate open indicator light
ndand 2 capacitor
ENCODERConnector for encoder wiring (If featured)Sw1Microswitches for control unit setting Sw2Microswitches for control unit settingPROGButton to enter programming mode
PAUSEButton for gate open pause Programming
WORKWork programming button
REGTrimmer for motor force adjustment
DESCRIPTION
Card power supply input 230V~ ±10% 50/60 Hz
Flashing light power supply output -max 50W- SERAI RZ/2
Courtesy light output -max 100W- active for 90 seconds from STOP
Motor power supply output (8 = Common 6 = Opening/Closure) 7 = Opening/Closure)
Power supply output 24Vdc (9=+, 10=-) max 500mA for photocells
CAUTION: always respect the polarity
Opening limit switch (NC contact when gate is in an intermediateposition)
Closure limit switch (NC contact when gate is in an intermediateposition)
Sensitive edge input (NC contact): inverts movement by 10cm.
Pedestrian control input (NO contact). When pressed, this control opens the gate by approx. 1 metreN.B. This function can be modified as described in "modify controls".
Stop control input (NC contact). When pressed, this control locks out motor operation; if pressed during the gate open pause time, it overrides the automatic reclosure
Input for antenna connection for built-in receiver (21=ANTENNA,22=GND/braid)
With dip1 SW2 OFF: input for photocell active during closure only (NC contact).
With dip1 SW2 ON: input for photocell active during both closure and opening (NC contact).
FUSES:F1 = 5A 250V~ power supply protection 230V
F2 = T1,6A 250V~ low voltage protection
+-
PHOTOCELL (FOR CLOSURE OR OPENING)
RECEIVERTRANSMITTER
NC
NOPEDESTRIANNCSTOP
NOOPEN/CLOSE -START-
NC
NC
NC
SENSITIVE EDGE
CLOSURE LIMIT SWITCH
OPENING LIMIT SWITCH
DISCONNECT THEPOWER SUPPLY
BEFORE WORKING ON THE WIRING
Input common terminals
10
9
11
13
12
14
15
16
17
18
19
20
21
22
TERMINALS
1 - 2
3 - 4
3 - 5
6 - 7 - 8
9 - 10
12
13
14
15
17
18
10-11-16-20
19
21 - 22
CONNECTIONS
POWER SUPPLY
FLASHING LIGHT
COURTESY LIGHT
MOTOR
POWER SUPPLYPHOTOCELLS
LIMIT SWITCH(OPENING)
LIMIT SWITCH (CLOSURE)
SENSITIVE EDGE
PHOTOCELL(FOR CLOSUREOR OPENING)
PEDESTRIANCONTROL
STOPCONTROL
OPEN/CLOSE CONTROL-START-
INPUTCOMMON
BUILT-IN RECEIVERANTENNA
Open/close control input (NO contact) - this controls gate opening and closure in the step-step modeN.B. This function can be modified as described in "modify controls".
START
PED
STOP
FOTO
FCA
FCC
COSTA
DL10
DL11
+-
EN
CO
DE
R DL12
nd
2 C
RE
G
SW
1S
W2
ANTENNA
GND
SPIA2° CO
ND
GATE OPENINDICATOR LIGHT
IND
ICA
TO
R L
IGH
T
PO
WE
R S
UP
PLY
F
N
OPEN
CLOSE
COMMON
FLA
SH
ING
LIG
HT
230
V~
CO
UR
TES
Y LI
GH
T 2
30V
~
230V~ ±10%50/60Hz 1
2
3
4
5
6
7
8
C1 C2
MR/08 MODULE
MODULE MR/08 SR 24.08
Optional for 300-500 kgStandard on 800 kg
C1Starting capacitor for models MT/302-502-501-802
C2nd2 starting capacitor for model MT/802
SO
G/4
A
2221
F1F1
F2F2
ON
ON
SINC
E 1
965
IND
ICA
TO
R
LIG
HT
S
PAUSE WORK PROG
ME
RC
UR
IO/5
02
CA
F I E
3.2 EARTH CONNECTION
Page 9/16
3.3 MOTOR CONNECTIONS
The connections differ depending on whether the motor (viewed from inside the gate) is positioned on the right (factory setup) or on the left.
MOTOR ON THE RIGHT (FACTORY SETUP) MOTOR ON THE LEFT
To connect the motor on the left-hand side of the gate, swap the following connections:6 with 713 with 14
CR/42A6 7 8 11 13 14
BLACK
BLUE
BROWN
COMMON
CLOSE
OPEN
3.4 LED SIGNALS
LED
FCC
FCA
FOTO
COSTA
STOP
PED
START
ON OFFFUNCTION
Opening limit switch
Closure limit switch
Photocell
Sensitive edge
STOP button
PEDESTRIAN button
Open/Close button
Photocell clear
Stop button in normal status
Sensitive edge in normal status
Pedestrian button pressed
Open/Close button pressed
Gate moving or in intermediate position (NC contact)
Gate completely closed(NO contact)
Gate completely open (NO contact)
Photocell obscured (obstacle present)
Sensitive edge pressed
Stop button pressed
Pedestrian button in normal status
Open/Close button in normal status
DL10 Programming/Test- Flashing light to show programming mode has been accessed- High frequency flashing light to indicate faults encountered during the motor control test
DL11 Motor control
DL12 Encoder
Brightness varies depending on the motor control voltage
During gate movement, indicates encoder pulse reception
POWER SUPPLY CABLE 230 V~
YELLOW/GREEN CABLE
MOTOR CONNECTION TERMINAL
Gate moving or in intermediate position (NC contact)
SINC
E 1
965
ME
RC
UR
IO/5
02
CA
F I E
3.5 SETTINGS OF EACH MICROSWITCH
OPERATION SETTING
Page 10/16
12
ON
SW
2ENABLE/DISABLE
IMMEDIATE CLOSURE FUNCTION
IN THE EVENT OF PASSAGE ACROSS THE PHOTOCELL
Immediate closure function enabled
12
34
ON
SW
1
12
34
ON
SW
1
Pre-flashing enabled: the flashing light switches on 3 seconds prior to the gate opening.
ENABLE/DISABLE FLASHING LIGHT PRE-FLASHING
Step-step function disabledDuring opening: if an OPEN/CLOSE command is sent, it is ignored and the gate goes on opening.During closure: if an OPEN/CLOSE command is sent, gate motion stops for a few seconds and then the gate starts opening again.During open gate pause: overrides the pause time, making the gate close immediately.
ENABLE/DISABLE STEP-STEP
OPERATION MODE
PHOTOCELL OPERATION
MODE
Input for photocell active during closure only: if obscured during closure, the gate stops and then opens again. If obscured during opening, the photocell does not respond.
12
34
ON
SW
1
IMPACT WITH OBSTACLE
Force limitation deactivated: impact with an obstacle is not detected and the motor goes on driving the gate.
CAUTION: If the microswitch programming is modified, the new settings are rendered Active by switching the control unit off then on again.
DESCRIPTION OF OPERATION
12
ON
SW
2
CAUTION: with the force limitation feature deactivated, other safety devices must be adopted (e.g. sensitive edge), which must be compliant with regulations in force.
DO NOT USE Leave on OFF position
12
ON
SW
2
12
ON
SW
2
12
34
ON
SW
1
12
34
ON
SW
1
12
34
ON
SW
1
12
34
ON
SW
1
Input for photocell active during both closure and opening: if the photocell is obscured during opening, the gate stops moving, but starts again as soon as the photocell is clear; if the photocell is obscured during closure, the gate will stop moving, and then start opening again.
Immediate closure function disabled
Force limitation activated: in the event of an impact with an obstacle, whether during opening or closure, an encoder system detects the impact, stops the gate and then reverses it by 10cm see Page 11.
Pre-flashing disabled: the flashing light switches on at the same time as the gate starts opening.
Step-step function enabledDuring opening: if an open/close command is sent, gate motion stops; if the command is sent again, gate closure is activated.During closure: if an open/close command is sent, gate motion stops; if the command is sent again, gate opening is activated.During open gate pause: an open/close command overrides the pause times, making the gate close immediately.
SINC
E 1
965
ME
RC
UR
IO/5
02
CA
F I E
Page 11/16
ND3.6 GATE OPEN INDICATOR LIGHT AND 2 STARTING RELAY (RELAY MODULE MR/08)
NDThe “INDICATOR LIGHT 2 C” connector located between the two terminal boards serves to connect relay module MR/08 SR 24.08 (optional for 300-500 kg motors, standard on 800 kg motors), which allows:1- an optical signalling device to be located inside the building. In more detail, the NO/C terminals (clean relay
contact 3A 250Vac) can be used to provide the following signals:
Light lit permanently: gate is open and stationaryLight flashing slowly: gate opening manoeuvreLight flashing fast: gate closure manoeuvre
2- a second starting capacitor to be connected, which remains active for approx. 2 s every time the motor starts. In the 800 kg version, this allows the starting force to be increased and reduces motor heating
3.7 OBSTACLE IMPACT CONTROL - MOTOR FORCE ADJUSTMENT - SENSITIVE EDGE
VOLTAGE FREE RELAY CONTACT -NO 3A 250Vac-FOR OPTICAL SIGNALLING
Power supply : 230Vac ±10% 50/60Hz
Motor power supply : 1 single-phase motor, 230Vac, 400W
Accessories power supply : 24Vdc, 500mA
Flashing light power supply : 230Vac, max 50W
Courtesy light power supply : 230Vac, max 100W
Courtesy light : 90 s permanently lit from when the gate stops
Starting time : 2 s permanently lit
Motor work time maximum safe level- : 300s
Pause time setting : from 0 to 120s
Operating temperature : -20 °C + 60 °C
Dimensions and weight : 112x151x50mm, 555g
F1F1
F2F2
+-
ON
ON
VOLTAGE FREE RELAY CONTACT -NO-NDFOR 2 STARTING CAPACITOR
3.8 CR/42A CONTROL UNIT TECHNICAL SPECIFICATIONS
SPIA2° CO
ND
MR/08 MODULE
SINC
E 1
965
With the SW1 microswitch 1 in the OFF status, obstacle impact is detected (during both the opening and closure manoeuvres) by the encoder system which stops the gate moving and then reverses it by approx. 10 cm. This control is switched off with the SW1 microswitch 1 in the ON status; in this case, other safety systems compliant with regulations in force (e.g. sensitive edges) must be adopted.
The impact force is adjusted using the REG potentiometer during the programming phase and adjustments must be performed in compliance with the regulations in force.
CAUTION: The considerable differences in temperature between summer and winter can cause differing rates of expansion in all materials, including those used for manufacturing our motors. That is why we recommend you check the impact force setting at the start of winter and summer.
THE INSTALLER IS LIABLE FOR THE SYSTEM AND FOR ENSURING ITS OPERATION COMPLIES WITH LEGAL PROVISIONS
The sensitive edge can be fitted both on the fixed parts as well as on the gate itself (in front and back of the gate) and can be connected to the input 12 or in series to the stop or in series to the photocells, according to the protection requirements deriving from the laws in force.
.
F1F1
F2F2
+-
ON
ON
ME
RC
UR
IO/5
02
CA
F I E
3.9 CR/42A CONTROL UNIT PROGRAMMING
With the control unit powered, release the gate, open it approx. 2 metres, then relock it. Press the PROG, button once; the DL10 LED will start flashing, indicating that the control unit has entered the programming phase.
The next section deals with the CR/42A control unit programming.It is important to follow the programming step by step; in the event of errors during this stage, a new programming session must be performed, in which case the new data will replace the previous data.To quit an incorrect programming session, switch the control unit off then on again.
Before proceeding with the programming, check that the system is equipped with all the electrical and safety devices (buttons, photocells, flashing lights, etc.) and that they are all connected. Ensure they all operate correctly, i.e.:
All the indicator LEDs for the NC inputs (stop, photocell, limit switch, sensitive edge) are lit; All the indicator LEDs for the NO inputs (open/close, pedestrian) are off.
In the event of faults, ascertain and remove the cause.
CAUTION: ANY UNUSED NORMALLY CLOSED (NC) INPUTS MUST BE JUMPERED.
3.9.1 PROGRAMMING THE WORK TIMES AND IMPACT FORCE SETTING MANUALLYThe deceleration point is set by the installer and can be cut out
Press the WORK button once to start the closure manoeuvre. The sliding gate will begin the closure manoeuvre with a starting thrust and will then decelerate and continue at a slow pace.During slowing down, adjust the REG trimmer to set the force that will be applied during deceleration (in the event of impact with an obstacle).
Once the closure manoeuvre is complete and the FCC (closure limit switch) LED is off, set the REG trimmer back at half stroke.
Press the LAVORO (Operation) button once: the gate will start opening.During the opening manoeuvre, adjust the REG trimmer again to set the force that will be applied during deceleration (in the event of impact with an obstacle).
Before the gate completes the opening manoeuvre, press the LAVORO (Operation) button (we recommend doing this when it is 50 cm away from the end stop). This sets the desired deceleration start point, and the gate will start the deceleration phase.N.B. If you wish to deactivate deceleration during normal operation cycles, skip this step.
As soon as the gate has completed the opening manoeuvre, the work cycle is acquired, as is the deceleration point, if set. After a few seconds, the closure manoeuvre starts, and the programmed deceleration is applied.
When the gate reaches the closure limit switches (FCC LED off), the control unit automatically quits the programming phase and switches to standard operation mode.
CAUTION: If one or more parameters are altered, programming must be repeated from the beginning.
Page 12/16
3.9.2 GATE OPEN PAUSE TIME PROGRAMMING
With the control unit powered and the gate closed (closure limit switch FCC - LED off), press the PROG, button once; the DL10 LED will start flashing, indicating that the card has entered the Programming phase.
Press the PAUSA (Pause) button once, keeping it pressed until the flashing light comes on; the control unit will start the gate open pause count, which is indicated by the light flashing intermittently.
Once the desired time has lapsed, press the PAUSA (Pause) button again; the control unit will automatically store the amount of time between the two times the PAUSA (Pause) button was pressed. It then quits the programming phase and switches to standard operation mode.If the PAUSA (Pause) button is not pressed a second time within 120 s, the control unit quits the programming, memorising the maximum time as 120 s.
ACTIVATING AUTOMATIC RECLOSURE (max time settable: 120 s)
With the control unit powered and the gate closed (closure limit switch FCC - LED off), press the PROG button once; the DL10 LED will start flashing, indicating that the card has entered the programming phase.
Press the PAUSA (Pause) button and keep it pressed until the DL10 LED switches off. The control unit quits the programming phase and switches to standard operation mode. This operation deactivates the automatic reclosure function.
DEACTIVATING AUTOMATIC RECLOSURE
SINC
E 1
965
CONTROLS MODIFICATIONIt is possible to modify the functioning of the 18 and 19 inputs in this way:- Input 19 functions as "START": with control unit off, press and hold keys "PROGR" and "WORK" simultaneously and apply power supply.
- Input 19 functions as "CLOSE only": with control unit off, press and hold keys "PROGR" and "PAUSE" simultaneously and apply power supply.
- Input 18 functions as "PEDESTRIAN": with control unit off, press and hold keys "WORK" and "PAUSE" simultaneously and apply power supply.
- Input 18 functions as "OPEN only": with control unit off, press and hold keys "PAUSE" and "WORK" and "PROGR" simultaneously and apply power supply.
ME
RC
UR
IO/5
02
CA
F I E
Page 13/16
CHAPTER 4: MINI TRANSMITTER CODE LEARNINGThe electronic card incorporates a 433.92 MHz 2-channel radio receiver which allows remote gate control via either the OG/02 and OG/04 series microswitch-operated mini transmitters or the self-learning mini transmitters from the following series: OG/62, OG/64, OG/28, OG/48, OG/52, OG/54, OG/82/1 and OG/84. Both channels are used solely for gate control; more specifically, channel 1 of the radio receiver serves for the open/close function, while channel 2 is used for the pedestrian function.
!CAUTION: - a mini transmitter must be programmed before it is used.
- the maximum number of codes that can be stored is 32 for the open/close control + 32 for the pedestrian control (no other combinations, e.g. 40 open/close + 24 pedestrian etc, are possible). Let's have a look at two examples of storable codes:
- example A: 32 self-learning mini transmitters from the following series: OG/62, OG/64, OG/28, OG/48, OG/52, OG/54, OG/82/1 and OG/84 as the open/close control (e.g. left-hand button) + 32 self-learning mini transmitters from the following series: OG/62, OG/64, OG/28, OG/48, OG/52, OG/54, OG/82/1 and OG/84 as the pedestrian control (e.g. right-hand button)
- example B: 31 self-learning mini transmitters from the following series: OG/62, OG/64, OG/28, OG/48, OG/52, OG/54, OG/82/1 and OG/84 as the open/close control (e.g. left-hand button) + 1 OG/02 or OG/04 series microswitch-operated mini transmitter as the open/close control (there is no need to store the other OG/02 and OG/04 transmitters, simply set the microswitches in the same sequence as the one already stored) + 31 self-learning mini transmitters from the following series: OG/62, OG/64, OG/28, OG/48, OG/52, OG/54, OG/82/1 and OG/84 as the pedestrian control (e.g. the right-hand button) + 1 OG/02 or OG/04 microswitch-operated mini transmitter as pedestrian control (there is no need to store the other OG/02 and OG/04 transmitters, simply set the microswitches in the same sequence as the one already stored)
!
12 3 4 5 6 7 8 9 10
12 3 4 5 6 7 8 9 10!
MODIFYING THE FACTORY-SET CONFIGURATION TO PREVENTUNWANTED COMMANDS
MICROSWITCH CONFIGURATION (FOR OG/02 AND OG/04 MINI TRANSMITTERS ONLY)These instructions only apply if the OG/02 and OG/04 series microswitchoperated mini transmitters are fitted. Before performing the code learning procedure on the receiver, the factory-set configuration of the microswitches must be modified to prevent unwanted commands
CAUTION: before proceeding with the mini transmitter programming or clearing phase, disconnect the antenna to prevent the receiver from acquiring other signals during these phases which could impair automation operation. Reconnect the antenna once the procedures are complete.
4.2 CLEARING OF STORED CODESAll the radio codes stored in the memory can be cleared by pressing the PROG and PAUSA keys AT THE SAME TIME, and keeping them pressed until the DL10 LED switches off (approx. 10 s) without sending any radio codes during this time. This operation clears all the codes associated to both the open/close and the pedestrian control.
OPEN/CLOSE CODE LEARNING - With the control unit powered and the gate closed, press the PROG key once to enter the programming phase.
The DL10 LED starts flashing to indicate that the control unit is in the programming mode.- Press the button on the mini transmitter (the left-hand one, for example) which you wish to serve as the
open/close control, and keep it pressed until the DL10 LED switches off. The control unit stores the radio code received and automatically quits the programming phase, switching to the standard operation mode.
- Repeat the procedure if several mini transmitters need to be stored.
PEDESTRIAN CODE LEARNING- With the control unit powered and the gate closed, press and hold down the PROG key to enter the programming
phase. The DL10 LED starts flashing to indicate that the control unit is in the programming mode.- Keeping PROG pressed, push the button on the mini transmitter (the right-hand one, for example) which you wish
to serve as the pedestrian control, and keep the two buttons pressed until the DL10 LED switches off. The control unit stores the radio code received and automatically quits the programming phase, switching to the standard operation mode.
- Repeat the procedure if several mini transmitters have to be stored.
4.1 MINI TRANSMITTER PROGRAMMING PROCEDURE
SINC
E 1
965
ME
RC
UR
IO/5
02
CA
F I E
4.3 EXPANDING THE NUMBER OF MINI TRANSMITTERSIf the 32 mini transmitters storable in the built-in receiver are not sufficient, they can be increased by fitting the SOG/4A receiver (which increases the number of mini transmitters up to 40), possibly with the addition of the SOG/2A expansion card (which increases the number of mini transmitters up to 834). After fitting the SOG/4A receiver, all the codes stored in the built-in receiver must be cleared and all the mini transmitters on the new SOG/4A receiver reprogrammed (see specific instructions). The antenna must be mo-ved from the terminals on the control unit to the terminals on the SOG/4A
ND2 CHANNEL OUTPUT:
AUXILIARY CONTROL
ANTENNA
FIT THE SOG/4A RECEIVER
ST1 CHANNEL
OUTPUT: CONTROL UNIT START CONTROL PEDESTRIAN CONTROL
ON TERMINALS 18-20
F1F1
F2F2
+-
ON
ON
NC
CNO
Channel 2 output (relay contact)
Max. applicable voltage = 24Vac/dcCorrente Max applicabile= 1A
ELECTRIC LOCKS
LIGHTS
OTHER AUTOMATIONS
OTHER
DISCONNECT THE POWER SUPPLY BEFORE WORKING ON THE WIRING
Page 14/16
90
mm
70 mm 40 mm
Power supply . . . . . . . . . . . 24 V~ ±10%Relay output . . . . . . . . . . . . 1A 24 V~ Range . . . . . . . . . . . . . . . . 10 m outdoors - 20 m indoors -TX absorption . . . . . . . . . . 55 mA a 24 V-; 67 mA a 24 V-; RX absorption. . . . . . . . . . . 15 mA a 24 V-; 25 mA a 24 V-;Temperature . . . . . . . . . . . . -10° +60°C Dimensions and weight . . . 70 x 40 x 90 mm 120 g
5.1 TECHNICALSPECIFICATIONS
CHAPTER 5: P/10 PHOTOCELLS
5.2 INSTALLATION POSITION
RECEIVER
NO
TX RX
h M
IN h = 40 cmMIN
l = 10 mMAX
l MAX
RX TXTX RX
RX RXTX TXNO OK
h M
IN
5.3 INSTALLATION
CABLE ROUTING HOLE
RECEIVERTRANSMITTER
RELAY OUTPUT: THE CONTACT POSITION REFERS TO WHEN THE RECEIVER IS ENERGIZED
POWER SUPPLY
+ -
5.2 A The receiver must not be exposed to direct sunlight; recommended height from ground = 50 cm5.2 C If two pairs of photocells are installed, position the transmitters on opposite sides
NO OK
LED
RECEIVER TRANSMITTER
5.3 A Open the photocell by unscrewing the front screw completely and pulling the tab underneath the appliance5.3 B Open up the cable routing hole on the base of the housing by either boring it or forcing it
CAUTION To prevent tiny insects getting inside, the cable routing hole must be exactly the right size for the cable, and no bigger.
5.3 C � Using the drilling template supplied, make the holes required in the fastening surface. Hole sizes:- Ø 6 mm for wall mounting, in which case use the masonry plugs supplied- Ø 3.5 mm for mounting on a metal support, in which case use the self-threading screws supplied� Fasten the base of the photocells to the surface
5.3 D Wire up and seal the photocell
CAUTION
always respect the polarity for the receiver power supply connection
5.4 E Check photocell alignment using the red LED on the receiver:
- LED on: photocell not aligned or obstructed - LED off: photocell aligned
SINC
E 1
965
NC NO
ME
RC
UR
IO/5
02
CA
F I E
216 mm
27
2 m
m
248 mm
82
mm
230 V~ ±10% 50/60 Hz
IP44
-20 °C ÷ +60 °C
216 X 272 X 248 mm - 9,6Kg
+ 150°C
1:28
MT/502
500 Kg
2,0 A
180 W
760 N
10 m/min
CHAPTER 7: GEARMOTOR SPECIFICATIONS
CHAPTER 6: RZ/20 F FLASHING LIGHT
!
NO
WHEN REPLACING LIGHT BULBS,
ALWAYS USE BULBS WITH
MIN. SPECIFICATIONS:
240 V~ MIN ,
25W, E14
2 x 0,75 mm²POWER SUPPLY
Rg58ANTENNA
CS/07 SR12.07 OPTIONAL CABLE
CONNECTIONS
230 Vac
OK
!CAUTION:WE RECOMMEND THAT THE POWER SUPPLY CABLE BE POSITIONED INSIDE A CONDUIT WHICH IS NOT ACCESSIBLE BY THE USER. IF, ON THE OTHER HAND, THERE ARE ANY ACCESSIBLE PARTS, THESE MUST BE DOUBLY INSULATED FOR THE USER'S PROTECTION; A CABLE CLAMP MUST ALSO BE USED TO PREVENT THE SAID CABLE FROM BEING TUGGED OR RIPPED.
RZ/99 SR 10.99
L-SHAPED
HOLDER
Motor type
Dimensions and weight
Max gate weight
Power supply
Absorbed current
Absorbed power
Traction and thrust force
Motor power adjustment
Gate speed
Motor thermal protection
Gear ratio
Protection class
Operating temperature
Irreversible
Adjusted via the power supply voltage
Page 15/16
CHAPTER 8POWER CUT - manual gate release -
8.1 A � Fit the release key into the lock on the front panel of the motor unit and turn it anticlockwise by a half turn.� Push the release flap hard downwards until the release
mechanism is triggered.� The gate can now be moved by hand
CAUTION: The gate must not be resting on the mechanical end stops, otherwise the force required to perform the release manoeuvre would break the flap
8.1 B � To relock the gate, lift the release flap and remove the key from the lock cylinder.� Open or close the gate a few cm by hand until the stop pinion
locks, ensuring the limit switch has been pressed.
1/2
In the event of a power cut, the gate can be moved manually by releasing the motor as shown above.CAUTION: if the gate is in an intermediate position (one of the limit switches has not been pressed) when power is restored, the next time the open command is sent, the manoeuvre will be performed in deceleration mode for a maximum time of 300 s. If, during that time, the limit switch is still not reached, the subsequent closure manoeuvre will be performed normally. To prevent this, the gate must be moved during the power cut to either the fully open or the fully closed position (so that one of the limit switches is pressed).
SINC
E 1
965
ME
RC
UR
IO/5
02
CA
F I E
ME
RC
UR
IO/5
02
CA
F I E
0
2 1
6 11
02
03
A4
Vf/
r -I
S M
ER
C5
02
CA
-E
Unsuitable limit switch setting
Check and adjust the position of the end stop sliding plates and that they activate the control spring.
PROBLEM CAUSE SOLUTION
The gearmotor is not working Fuse fault Replace the fuse.
No power
The gate does not move or the motor slips
Obstacle impact control cutting in
Motor force setting not optimal
Repeat the work times and impact force setting programming.
Capacitors worn out Measure the capacitances of the capacitors and if necessary, replace them.
Motor thermal protection cutting in
Leave the motor stationary for at least 5 minutes and then check operation again.
The gate does not complete its travel
The gate has difficulty starting
Unsuitable gearmotor position
Check that the distance between the end stop sliding plate and the front, outgoing trim of the spring is between 25 and 35 mm.
Unsuitable limit switch sliding plate setting
The gate is jammed against the mechanical end stop
Remove the lower casing from the motor.Unscrew the nuts fastening the base plate bolts.Remove the motor from its position by releasing the pinion from the tooth rack.By hand, move the gate right away from the mechanical end stop.Release the motor manually.Reposition the motor on the base plate.Set the end stop sliding plates properly.Replace the lower casing and secure the motor.If necessary, repeat the work times and impact force setting programming.
Check the motor power supply input terminals to see if they are live.Check that the power supply cable is not cut or broken (cable replacement must be carried out by an authorised technician).
Release the gate manually and check that there are no obstacles. If obstacles are found, remove them.Repeat the “work times and impact force setting programming” procedure, setting a greater force.N.B. The impact control can be switched off by positioning the
SW1 microswitch 1 to ON; in this case, other safety systems compliant with regulations in force (e.g. sensitive edges) must be adopted. This is extremely important as THE INSTALLER IS LIABLE FOR THE SYSTEM AND FOR ENSURING ITS OPERATION COMPLIES WITH LEGAL PROVISIONS.
The remote control range is reduced
Unsuitable antenna connection
Check that the antenna is connected correctly to terminals 21 and 22.
External antenna required
To permit maximum reception distance, replace the internal antenna on the flashing light with an external one (SERAI OG/50 -SR 25.50).
SOG/4A receiver in use
Replace the built-in receiver with the SOG/4A card.
The first opening manoeuvre takes place during deceleration (if the gate is in an intermediate position) and can take up to 300 s; if it does not occur within this time, the gate must be moved to the fully open or fully closed position by hand (see chapter 8).
Power cut during operation
E L E T T R O N I C A P A D O V A I
SIN
CE
19
65
M A D E I N I T A L YVIA ENRICO FERMI, 2235020 LEGNARO - PADOVAI T A L I A
PHONE +39 049 79 08 58FAX +39 049 88 30 529
E-MAIL [email protected] www.serai.com
TERMS OF GUARANTEEThe company reserves the right to make modifications to the equipment without prior notice thereof. SERAI products are covered by a standard guarantee with a term of 24 months. Coverage starts on the date on which the tax document constituting proof of purchase is issued and guarantee services shall be provided on the company's premises at Legnaro - PD - or at the Authorised Service Centres. Carriage costs shall be borne by the Customer.
CE CONFORMITY DECLARATIONSERAI spa declares that the product MERCURIO/502CAF has been desifned and manufactured according to the above mentioned directives and standards
WEEE DIRECTIVE 2002/96/ECThis appliance was manufactured after 13/08/2005. To protect the environment: when the equipment is no longer needed, take it to a special WEEE (Waste Electric and Electronic Equipment) collection centre. Do not dispose of it with normal household waste.
CHAPTER 9: TROUBLESHOOTING GUIDE