ises tgis pproach a recision p oan erl e n g i n e e r i n g · 2018-03-23 · limits. see...
TRANSCRIPT
INTERSTATE 5
RUNWAY 16-34
S
A
N
TIA
M
H
IG
H
W
A
Y
PRICE ROAD SE
TAXIWAY A
A
I
R
P
O
R
T
KN
OX
B
UT
TE
R
D
R
O
A
D
INTERSTATE 5
S
R
20
APRON IMPROVEMENTS - PHASE 2
VICINITY MAP
ALBANY MUNICIPAL AIRPORT
PROJECT AREA
AIP PROJECT NO. 3-41-0001-014-2016
INDEX TO DRAWINGS
CITY OF ALBANY
PROJECT MAP
0
SCALE IN FEET
300 600 1200
NO
RTH
PROJECT
SITE
NORTH
ALBANYOREGON
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
1p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-C
ove
r.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
COVER SHEET
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
1
21
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
Sheet List TableSheet Number Sheet Title
1 COVER SHEET
2 BID SCHEDULE AND LEGEND
3 SITE PLAN
4 CONSTRUCTION PLAN - PROJECT SPECIFIC CRITICAL AREAS
5 CONSTRUCTION PLAN - PHASE 1
6 CONSTRUCTION PLAN - PHASE 2
7 CONSTRUCTION PLAN - PHASE 3
8 CONSTRUCTION PLAN - PHASE 4
9 CONSTRUCTION PLAN - PHASE 5
10 CONSTRUCTION PLAN GENERAL NOTES AND DETAILS
11 EROSION AND SEDIMENT CONTROL PLAN NOTES
12 EROSION AND SEDIMENT CONTROL PLAN
13 EROSION AND SEDIMENT CONTROL PLAN DETAILS
14 DEMOLITION PLAN
15 LAYOUT PLAN
16 PAVING AND GRADING PLAN
17 PAVEMENT DETAILS AND TYPICAL SECTION
18 PAVING DETAILS
19 TIE-DOWN DETAILS
20 DRAINAGE DETAILS
21 MARKING PLAN
CONSTRUCTION
UNITDESCRIPTION
BID ITEM
ESTIMATED
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
NUMBER
QUANTITY QUANTITY
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
DEMOLITION
GEOTEXTILE FABRIC
AIRCRAFT TIE-DOWN ANCHOR
FULL DEPTH PAVEMENT REMOVAL
JOINT AND CRACK REPAIR
COLD MILLING
AIRCRAFT TIE-DOWN ANCHOR REMOVAL
UNCLASSIFIED EXCAVATION
UNSUITABLE EXCAVATION
SUBBASE COURSE
TEMPORARY EROSION CONTROL
INSTALLATION AND REMOVAL OF SILT FENCE
CRUSHED AGGREGATE BASE COURSE
BITUMINOUS SURFACE COURSE
BITUMINOUS PRIME COAT
BITUMINOUS TACK COAT
RUNWAY AND TAXIWAY MARKING
12-INCH REINFORCED CONCRETE PIPE
PIPE CONNECTION TO EXISTING STRUCTURE
STORM DRAIN CATCH BASIN
LEGEND
ELECTRICAL LEGEND
NEWEXISTING
POH
P
CIVIL SYMBOLS LEGEND
1
0
1
EXISTING NEW
T
G
W W
SS SS
SD SD
SDSD
EDGE OF PAVEMENT
EDGE OF GRAVEL
CONTOUR
DITCH FLOW LINE
FENCE
STORM DRAIN
UNDER DRAIN
CULVERT
SANITARY SEWER
WATER
GAS
TELEPHONE
IRRIGATION
SLOPE SYMBOL
CATCH BASIN
STORM DRAIN MANHOLE
CLEANOUT
CULVERT END STRUCTURE
SURFACE FLOW DIRECTION
SANITARY MANHOLE
FIRE HYDRANT
WATER METER
WATER VAULT
WATER VALVE
IRRIGATION VALVE
TIE DOWN
SIGN
SURVEY CONTROL POINT
SURVEY FOUND MONUMENT
BRASS CAP
BENCHMARK
AIRPORT BEACON
SHRUBS
TREES
ABANDONED FEATURE LINE
DEMO FEATURE LINES
SS
HANDHOLE
POWER VAULT
DUCT MARKER
JUNCTION CAN
ELECTRICAL RISER
RUNWAY EDGE LIGHT AND THRESHOLD LIGHT
C = CLEAR
R = RED
G = GREEN
Y = YELLOW
O = OPAQUE
RUNWAY LIGHT IN PAVEMENT (FLUSH MOUNT)
REIL (RUNWAY END IDENTIFIER LIGHT)
PAPI (PRECISION APPROACH PATH INDICATOR)
TAXIWAY LIGHT (BLUE LENS)
TAXIWAY LIGHT IN PAVEMENT (FLUSH MOUNT)
RETROREFLECTIVE MARKER
POWER CIRCUIT / OVERHEAD
POWER UNDERGROUND
POWER POLE
GUY WIRE
STREET LIGHT
GUIDANCE SIGN
SS
JJ
IRR
UD
BASE BID SCHEDULE
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
1p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-C
ove
r.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
BID SCHEDULE AND LEGEND
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
2
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
LS
LS
LS
SY
EA
SY
LF
SY
EA
CY
CY
CY
LS
LF
CY
TON
TON
TON
SF
LF
EA
EA
1
1
1
760
15
520
5,780
8,700
60
360
110
290
1
420
110
2,180
1
2
610
170
1
3
KN
OX
B
UT
TE
R
OA
D
W
A
Y
INTERSTATE 5
S
A
N
TIA
M
H
IG
H
W
A
Y
(20)
PRICE ROAD SE
FBO BUILDING
A
V
I
A
T
I
O
N
3 1 2
APRON REHABILITATION AND TIE-DOWN
RECONFIGURATION, PHASE 1. PROJECT WAS
AWARDED IN 2017, CONSTRUCTION IS
ANTICIPATED TO BEGIN IN THE SUMMER OF 2018.
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
WINDCONE
AIRCRAFT FUELING FACILITY
KN
O
X B
U
TT
E R
D
E
RUNWAY 16-34
TAXIWAY A
APRON REHABILITATION AND TIE-DOWN
RECONFIGURATION PHASE 2 NO
RTH
0 100 200 400
SCALE IN FEET
SITE PLAN
SURVEY REFERENCE CONTROL POINTS TABLE
HORIZONTAL DATUM: NAD 83 OREGON STATE PLANE NORTH ZONE
COORDINATES SHOWN ARE INTERNATIONAL FEET
VERTICAL DATUM: NAVD 88
SURVEY NOTES:
1. HORIZONTAL AND VERTICAL CONTROL SURVEY REFERENCE POINTS ARE PROVIDED
FOR CONTROL OF THE PROJECT. ALL LAYOUT AND CONSTRUCTION SURVEYING
SHALL BE CONDUCTED BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE
STATE OF OREGON.
2. PRIOR TO BEGINNING ANY LAYOUT, THE CONTRACTOR'S SURVEYOR SHALL OCCUPY
ALL REFERENCE CONTROL POINTS SHOWN IN THE TABLE ON THIS SHEET AND
VERIFY DATA GIVEN. ANY DISCREPANCY SHALL IMMEDIATELY BE BROUGHT TO THE
ENGINEER'S ATTENTION FOR CLARIFICATION OR CORRECTION. NOTES SHOWING
CONFIRMATION OF THE HORIZONTAL AND VERTICAL CONTROL IN ACCORDANCE
WITH GENERAL PROVISION SECTION 50-06 SHALL BE PROVIDED TO THE ENGINEER
PRIOR TO STARTING CONSTRUCTION.
PROJECT FUNDING:
1. EXECUTION OF ALL WORK IN THIS CONTRACT IS CONTINGENT UPON THE CITY OF
ALBANY'S RECEIPT OF FEDERAL FUNDS. THESE FUNDS WILL NOT BE ASSURED UNTIL A
GRANT IS EXECUTED BETWEEN THE FAA AND THE CITY OF ALBANY AFTER THE
CONTRACT BID OPENING. GRANT EXECUTION IS EXPECTED TO OCCUR IN THE SUMMER
OF 2018. OWNER SHALL HAVE THE FINAL AUTHORITY REGARDING START DATE OF
CONSTRUCTION.
CONTRACTOR’S SUPERINTENDENT AND SAFETY OFFICER:
1. THE CONTRACTOR SHALL HAVE A FULL TIME SUPERINTENDENT ON THE PROJECT SITE
ANY TIME WORK IS BEING ACCOMPLISHED ON THE AIRPORT. THIS INCLUDES WORK
BEING PERFORMED BY SUBCONTRACTORS OR SERVICE PROVIDERS UNLESS
OTHERWISE APPROVED BY THE OWNER.
2. THE CONTRACTOR SHALL ASSIGN ONE PERSON TO BE THE SAFETY OFFICER DURING
THE PROJECT. THE SAFETY OFFICER SHALL BE ONSITE AT ALL TIMES WHEN WORK IS
OCCURRING IN THE AIR OPERATIONS AREA (AOA) WHEN THE AIRPORT IS OPEN UNLESS
OTHERWISE APPROVED BY THE OWNER. THE SAFETY OFFICER SHALL BE RESPONSIBLE
FOR THE EDUCATION AND TRAINING OF ALL PERSONNEL WHO WILL ACCESS AIRPORT
PROPERTY. THE OFFICER SHALL MAINTAIN RECORDS INDICATING THAT PERSONNEL
HAVE BEEN TRAINED AND ARE FAMILIAR WITH SAFETY RULES AND REGULATIONS
RELATED TO OPERATIONS AT THE AIRPORT DURING CONSTRUCTION. PERSONNEL
WHO VIOLATE SAFETY REQUIREMENTS MAY BE REMOVED FROM THE PROJECT AT THE
DISCRETION OF THE OWNER. THE SAFETY OFFICER SHALL ALSO BE RESPONSIBLE FOR
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT. SEE CONSTRUCTION SAFETY AND
PHASING PLAN FOR ADDITIONAL REQUIREMENTS.
3. THE CONTRACTOR'S SUPERINTENDENT AND SAFETY OFFICER SHALL ATTEND THE
WEEKLY CONSTRUCTION MEETING.
CONSTRUCTION SCHEDULE:
1. THE CONTRACTOR SHALL PREPARE AND SUBMIT A "CONSTRUCTION SAFETY PLAN COMPLIANCE DOCUMENT" AND
"CONSTRUCTION SCHEDULE" TO THE ENGINEER AND OWNER FOR REVIEW A MINIMUM OF 10 DAYS PRIOR TO STARTING
CONSTRUCTION OR PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, WHICHEVER OCCURS EARLIER. THE PLAN MUST
BE ACCEPTABLE TO THE OWNER PRIOR TO BEGINNING WORK.
2. THE CONTRACTOR SHALL PREPARE AND SUBMIT A "QUALITY CONTROL PROGRAM" TO THE ENGINEER AND OWNER FOR
REVIEW A MINIMUM 10 DAYS PRIOR TO STARTING CONSTRUCTION OR PRIOR TO THE PRE-CONSTRUCTION CONFERENCE,
WHICHEVER OCCURS EARLIER. THE PLAN MUST BE ACCEPTABLE TO THE OWNER PRIOR TO BEGINNING WORK, SEE
GENERAL PROVISIONS SECTION 100 FOR REQUIREMENTS.
3. THE CONSTRUCTION SCHEDULE SHALL BE REVISED ANY TIME AN ELEMENT OF WORK DOES NOT COINCIDE WITH THE
INITIAL TIME LINE PRESENTED OR IF REQUESTED BY THE ENGINEER OR OWNER.
BEFORE YOU DIG
CALL 48 HOURS
1
-
8
0
0
-
3
3
2
-
2
3
4
4
I
G
!
D
U
O
Y
E
R
OFE
B
L
L
A
C
-
P
O
T
S
RE
T
N
E
C
N
O
I
T
A
C
I
FI
TO
N
Y
T
I
L
I
T
U
N
O
G
ER
O
GENERAL NOTES:
1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL PROVISIONS, GENERAL REQUIREMENTS AND
CONSTRUCTION SAFETY AND PHASING PLAN SECTIONS OF THE CONTRACT DOCUMENT FOR REQUIREMENTS RELATING
TO CONSTRUCTION SAFETY, LAYOUT WORK, QUALITY CONTROL TESTING AND OTHER CONTRACT PROVISIONS.
2. THE CONTRACTOR, ENGINEER, OWNER, AND OTHER INVITED REPRESENTATIVES OR GUESTS WILL CONDUCT A
PRE-CONSTRUCTION MEETING PRIOR TO BEGINNING CONSTRUCTION IN ORDER TO DISCUSS PROJECT SCHEDULE,
CONSTRUCTION REQUIREMENTS, AIRFIELD IMPACTS, AND OTHER AGENDA ITEMS RELATED TO THE PROJECT.
3. OWNER WILL OBTAIN COVERAGE UNDER THE OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY CONSTRUCTION
STORMWATER PERMIT. COVERAGE WILL BE TRANSFERRED TO CONTRACTOR PRIOR TO BEGINNING CONSTRUCTION.
CONTRACTOR WILL ASSUME ALL RESPONSIBILITY FOR PERMIT COMPLIANCE INCLUDING BUT NOT LIMITED TO THE
FOLLOWING: SUPPLY A CERTIFIED EROSION AND SEDIMENT CONTROL LEAD, SITE INSPECTION, RECORDS, REPORTING,
AND TERMINATION OF COVERAGE. THE CONTRACTOR SHALL OBTAIN AND THE OWNER WILL PAY FOR ANY ADDITIONAL
PERMITS NECESSARY TO COMPLETE THIS PROJECT.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT ALL UTILITIES DURING THIS PROJECT. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING THE UTILITY NOTIFICATION CENTER TO LOCATE PUBLIC UTILITIES
AND FOR ANY ADDITIONAL UTILITY LOCATES INCLUDING HIRING A PRIVATE LOCATE SERVICE IF REQUIRED. ANY UTILITIES
DAMAGED IN CONJUNCTION WITH THE CONSTRUCTION ACTIVITIES SHALL BE REPLACED AND/OR REPAIRED BY THE
CONTRACTOR AS APPROVED BY THE OWNER.
5. ALL HAUL ROUTES SHALL BE MAINTAINED DURING CONSTRUCTION AND SHALL BE RESTORED TO ORIGINAL CONDITION BY
THE CONTRACTOR UPON COMPLETION OF THE PROJECT. VERIFY CONDITION WITH OWNER PRIOR TO CONSTRUCTION.
RESTORATION AND GRADING OF GRAVEL ACCESS ROADS SHALL BE CONDUCTED UPON COMPLETION OF USE BY THE
CONTRACTOR.
6. LIMITS OF WORK SHOWN ON THIS SHEET ARE APPROXIMATE AND SHOW GENERAL AREAS OF WORK. SEE SPECIFIC
SHEETS FOR ACTUAL LIMITS OF WORK.
7. IF REQUIRED BY THE ENGINEER, CONTRACTOR SHALL COORDINATE WORK ACTIVITIES WITH OTHER CONTRACTORS
DURING THE COURSE OF THIS PROJECT. CONTRACTOR SHALL ALLOW AND COORDINATE ACCESS THROUGH PROJECT
WORK LIMITS BY OTHER CONTRACTORS. THE INTENT IS TO MINIMIZE WORK CONFLICTS WHICH MAY ARISE.
NORTHING
365191.39
362535.55
366601.34
EASTING
7535931.33
7535845.21
7535977.06
POINT NO
1
2
3
ELEV
223.07
224.20
221.90
DESCRIPTION
PACS
SACS
SACS
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-S
ite
Pla
n.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
SITE PLAN
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
3
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
FBO BUILDING
PHASE 1,2,3, 4 AND 5 APPROXIMATE WORK
LIMITS. SEE CONSTRUCTION PLAN
DRAWINGS AND CONSTRUCTION PLAN
GENERAL NOTE 8, SHEET 10 FOR
ADDITIONAL REQUIREMENTS.
AIRCRAFT FUELING
FACILITY
CONTRACTOR STAGING
AREA (ALL PHASES)
60'
125'
RUNWAY 16-34 CENTERLINE
49'
89'
TAXIWAY A2
RUNWAY 16-34
TAXIWAY A
AV
IAT
ION
WA
Y
NO
RTH
0 30 60 120
SCALE IN FEET
RUNWAY SAFETY AREA (RSA)
RUNWAY OBJECT FREE AREA (OFA)
TAXIWAY SAFETY AREA (TSA)
TAXIWAY OBJECT FREE AREA (TOFA)
AIRFIELD CRITICAL AREAS LEGEND
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN - PROJECT
SPECIFIC CRITICAL AREAS
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
4
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
CONTRACTOR'S ACCESS TO WORK LIMITS,
SEE NOTES 3 AND 4
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
PHASE 1 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· DEMOLITION
· PAVEMENT GRINDING
· DRAINAGE IMPROVEMENTS
· CRACK SEAL
· FULL-DEPTH PAVEMENT DIGOUT
RUNWAY 16-34
TAXIWAY A
AV
IAT
ION
WA
Y
CONTRACTOR
STAGING AREA
AUTOMATED VEHICLE GATE
AIRCRAFT
FUELING FACILITY,
SEE NOTE 2
NO
RTH
0 50 100 200
SCALE IN FEET
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN - PHASE 1
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
5
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT.
PHASE
1
2
3
4
5
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 3, SHEET 10
WEST APRON CLOSURE
EAST APRON CLOSURE
EAST AND WEST APRON CLOSURE
WEST APRON CLOSURE
EAST AND WEST APRON CLOSURE
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
21
14
7
7
1
ALLOWABLE DAILY WORK PERIOD,
(LOCAL TIME), SEE NOTE A
24 HOURS
24 HOURS
24 HOURS
24 HOURS
12 HOURS
WORK ELEMENTS TO COINCIDE WITH CLOSURE AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. TAXIWAYS, TAXILANES, AND AIR OPERATIONS AREA (AOA) IMPACTS WILL BE FOR THE NUMBER OF DAYS INDICATED.
C. IF THE CONTRACTOR FAILS TO COMPLETE ANY OF THE PHASES WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
PHASING NOTES
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 10, FOR ADDITIONAL
REQUIREMENTS.
2. CONTRACTOR SHALL MAINTAIN AIRCRAFT ACCESS TO THE AIRCRAFT
FUEL FACILITY AT ALL TIMES DURING CONSTRUCTION OF THIS PHASE.
3. VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS MUST HAVE A
WORKING TWO-WAY RADIO, BE UNDER THE SUPERVISION OF
CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A VEHICLE
WITH A RADIO. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT DEBRIS
(FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED ONTO ACTIVE
AREAS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR.
5. THE ENGINEER MAY REQUIRE SAFETY MEASURES IN ADDITION TO THOSE
SHOWN. CONTRACTOR SHALL COMPLY AS DIRECTED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
PORTABLE LOW PROFILE BARRICADES WITH RED LIGHTS TO BE PLACED BY THE
CONTRACTOR DURING TAXILANE, APRON AND/OR OTHER WORK AREA CLOSURES
THIS PHASE OR AS DIRECTED BY THE ENGINEER. BARRICADES TO BE PLACED
OUTSIDE OF TAXIWAY SAFETY AREAS FOR OPEN TAXIWAYS OR TAXILANES (SEE
PROJECT SPECIFIC AIRFIELD CRITICAL AREAS SHEET AND CONSTRUCTION
SAFETY AND PHASING PLAN TEXT). MAY REQUIRE ADJUSTMENT DURING
CONSTRUCTION ACTIVITIES, SEE CONSTRUCTION SAFETY AND PHASING PLAN
TEXT AND DETAIL .
1
10
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
RUNWAY 16-34
TAXIWAY A
AV
IAT
ION
WA
Y
CONTRACTOR
STAGING AREA
AUTOMATED VEHICLE GATE
PHASE 2 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· DEMOLITION
· PAVEMENT GRINDING
· CRACK SEAL
· FULL-DEPTH PAVEMENT DIGOUT
CONTRACTOR'S ACCESS TO WORK LIMITS,
SEE NOTES 3 AND 4
AIRCRAFT
FUELING FACILITY
NO
RTH
0 50 100 200
SCALE IN FEET
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT.
PHASE
1
2
3
4
5
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 3, SHEET 10
WEST APRON CLOSURE
EAST APRON CLOSURE
EAST AND WEST APRON CLOSURE
WEST APRON CLOSURE
EAST AND WEST APRON CLOSURE
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
21
14
7
7
1
ALLOWABLE DAILY WORK PERIOD,
(LOCAL TIME), SEE NOTE A
24 HOURS
24 HOURS
24 HOURS
24 HOURS
12 HOURS
WORK ELEMENTS TO COINCIDE WITH CLOSURE AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. TAXIWAYS, TAXILANES, AND AIR OPERATIONS AREA (AOA) IMPACTS WILL BE FOR THE NUMBER OF DAYS INDICATED.
C. IF THE CONTRACTOR FAILS TO COMPLETE ANY OF THE PHASES WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN - PHASE 2
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
6
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
PORTABLE LOW PROFILE BARRICADES WITH RED LIGHTS TO BE PLACED BY THE
CONTRACTOR DURING TAXILANE, APRON AND/OR OTHER WORK AREA CLOSURES
THIS PHASE OR AS DIRECTED BY THE ENGINEER. BARRICADES TO BE PLACED
OUTSIDE OF TAXIWAY SAFETY AREAS FOR OPEN TAXIWAYS OR TAXILANES (SEE
PROJECT SPECIFIC AIRFIELD CRITICAL AREAS SHEET AND CONSTRUCTION
SAFETY AND PHASING PLAN TEXT). MAY REQUIRE ADJUSTMENT DURING
CONSTRUCTION ACTIVITIES, SEE CONSTRUCTION SAFETY AND PHASING PLAN
TEXT AND DETAIL .
1
10
PHASING NOTES
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 10, FOR ADDITIONAL
REQUIREMENTS.
2. VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS MUST HAVE A
WORKING TWO-WAY RADIO, BE UNDER THE SUPERVISION OF
CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A VEHICLE
WITH A RADIO. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
3. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT DEBRIS
(FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED ONTO ACTIVE
AREAS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR.
4. THE ENGINEER MAY REQUIRE SAFETY MEASURES IN ADDITION TO THOSE
SHOWN. CONTRACTOR SHALL COMPLY AS DIRECTED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
RUNWAY 16-34
TAXIWAY A
AV
IAT
ION
WA
Y
CONTRACTOR
STAGING AREA
AUTOMATED VEHICLE GATE
AIRCRAFT
FUELING FACILITY
PHASE 3 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· APRON PAVING
CONTRACTOR'S ACCESS TO WORK LIMITS,
SEE NOTES 3 AND 4
NO
RTH
0 50 100 200
SCALE IN FEET
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT.
PHASE
1
2
3
4
5
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 3, SHEET 10
WEST APRON CLOSURE
EAST APRON CLOSURE
EAST AND WEST APRON CLOSURE
WEST APRON CLOSURE
EAST AND WEST APRON CLOSURE
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
21
14
7
7
1
ALLOWABLE DAILY WORK PERIOD,
(LOCAL TIME), SEE NOTE A
24 HOURS
24 HOURS
24 HOURS
24 HOURS
12 HOURS
WORK ELEMENTS TO COINCIDE WITH CLOSURE AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. TAXIWAYS, TAXILANES, AND AIR OPERATIONS AREA (AOA) IMPACTS WILL BE FOR THE NUMBER OF DAYS INDICATED.
C. IF THE CONTRACTOR FAILS TO COMPLETE ANY OF THE PHASES WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN - PHASE 3
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
7
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
PORTABLE LOW PROFILE BARRICADES WITH RED LIGHTS TO BE PLACED BY THE
CONTRACTOR DURING TAXILANE, APRON AND/OR OTHER WORK AREA CLOSURES
THIS PHASE OR AS DIRECTED BY THE ENGINEER. BARRICADES TO BE PLACED
OUTSIDE OF TAXIWAY SAFETY AREAS FOR OPEN TAXIWAYS OR TAXILANES (SEE
PROJECT SPECIFIC AIRFIELD CRITICAL AREAS SHEET AND CONSTRUCTION
SAFETY AND PHASING PLAN TEXT). MAY REQUIRE ADJUSTMENT DURING
CONSTRUCTION ACTIVITIES, SEE CONSTRUCTION SAFETY AND PHASING PLAN
TEXT AND DETAIL .
1
10
PHASING NOTES
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 10, FOR ADDITIONAL
REQUIREMENTS.
2. VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS MUST HAVE A
WORKING TWO-WAY RADIO, BE UNDER THE SUPERVISION OF
CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A VEHICLE
WITH A RADIO. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
3. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT DEBRIS
(FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED ONTO ACTIVE
AREAS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR.
4. THE ENGINEER MAY REQUIRE SAFETY MEASURES IN ADDITION TO THOSE
SHOWN. CONTRACTOR SHALL COMPLY AS DIRECTED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
RUNWAY 16-34
TAXIWAY A
AV
IAT
ION
WA
Y
CONTRACTOR
STAGING AREA
AUTOMATED VEHICLE GATE
PHASE 4 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· TIE-DOWN INSTALLATION
CONTRACTOR'S ACCESS TO WORK LIMITS,
SEE NOTES 3 AND 4
AIRCRAFT
FUELING FACILITY,
SEE NOTE 2
NO
RTH
0 50 100 200
SCALE IN FEET
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT.
PHASE
1
2
3
4
5
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 3, SHEET 10
WEST APRON CLOSURE
EAST APRON CLOSURE
EAST AND WEST APRON CLOSURE
WEST APRON CLOSURE
EAST AND WEST APRON CLOSURE
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
21
14
7
7
1
ALLOWABLE DAILY WORK PERIOD,
(LOCAL TIME), SEE NOTE A
24 HOURS
24 HOURS
24 HOURS
24 HOURS
12 HOURS
WORK ELEMENTS TO COINCIDE WITH CLOSURE AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. TAXIWAYS, TAXILANES, AND AIR OPERATIONS AREA (AOA) IMPACTS WILL BE FOR THE NUMBER OF DAYS INDICATED.
C. IF THE CONTRACTOR FAILS TO COMPLETE ANY OF THE PHASES WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
PHASING NOTES
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 10, FOR ADDITIONAL
REQUIREMENTS.
2. CONTRACTOR SHALL MAINTAIN AIRCRAFT ACCESS TO THE AIRCRAFT
FUEL FACILITY AT ALL TIMES DURING CONSTRUCTION OF THIS PHASE.
3. VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS MUST HAVE A
WORKING TWO-WAY RADIO, BE UNDER THE SUPERVISION OF
CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A VEHICLE
WITH A RADIO. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT DEBRIS
(FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED ONTO ACTIVE
AREAS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR.
5. THE ENGINEER MAY REQUIRE SAFETY MEASURES IN ADDITION TO THOSE
SHOWN. CONTRACTOR SHALL COMPLY AS DIRECTED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN - PHASE 4
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
8
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
PORTABLE LOW PROFILE BARRICADES WITH RED LIGHTS TO BE PLACED BY THE
CONTRACTOR DURING TAXILANE, APRON AND/OR OTHER WORK AREA CLOSURES
THIS PHASE OR AS DIRECTED BY THE ENGINEER. BARRICADES TO BE PLACED
OUTSIDE OF TAXIWAY SAFETY AREAS FOR OPEN TAXIWAYS OR TAXILANES (SEE
PROJECT SPECIFIC AIRFIELD CRITICAL AREAS SHEET AND CONSTRUCTION
SAFETY AND PHASING PLAN TEXT). MAY REQUIRE ADJUSTMENT DURING
CONSTRUCTION ACTIVITIES, SEE CONSTRUCTION SAFETY AND PHASING PLAN
TEXT AND DETAIL .
1
10
CONTRACTOR'S ACCESS TO WORK LIMITS,
SEE NOTES 3 AND 4
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
RUNWAY 16-34
TAXIWAY A
AV
IAT
ION
WA
Y
CONTRACTOR
STAGING AREA
AUTOMATED VEHICLE GATE
PHASE 5 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· PAVEMENT MARKING
AIRCRAFT
FUELING FACILITY,
SEE NOTE 2
NO
RTH
0 50 100 200
SCALE IN FEET
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT.
PHASE
1
2
3
4
5
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 3, SHEET 10
WEST APRON CLOSURE
EAST APRON CLOSURE
EAST AND WEST APRON CLOSURE
WEST APRON CLOSURE
EAST AND WEST APRON CLOSURE
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
21
14
7
7
1
ALLOWABLE DAILY WORK PERIOD,
(LOCAL TIME), SEE NOTE A
24 HOURS
24 HOURS
24 HOURS
24 HOURS
12 HOURS
WORK ELEMENTS TO COINCIDE WITH CLOSURE AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. TAXIWAYS, TAXILANES, AND AIR OPERATIONS AREA (AOA) IMPACTS WILL BE FOR THE NUMBER OF DAYS INDICATED.
C. IF THE CONTRACTOR FAILS TO COMPLETE ANY OF THE PHASES WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
PHASING NOTES
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 10, FOR ADDITIONAL
REQUIREMENTS.
2. CONTRACTOR SHALL MAINTAIN AIRCRAFT ACCESS TO THE AIRCRAFT
FUEL FACILITY AT ALL TIMES DURING CONSTRUCTION OF THIS PHASE.
3. VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS MUST HAVE A
WORKING TWO-WAY RADIO, BE UNDER THE SUPERVISION OF
CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A VEHICLE
WITH A RADIO. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT DEBRIS
(FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED ONTO ACTIVE
AREAS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR.
5. THE ENGINEER MAY REQUIRE SAFETY MEASURES IN ADDITION TO THOSE
SHOWN. CONTRACTOR SHALL COMPLY AS DIRECTED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN - PHASE 5
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
9
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
NOTE:
THIS DRAWING IS INTENDED TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND WHITE MAY REDUCE READABILITY
AND ALTER ENTITY DEFINITION OR REPRESENTATION.
LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN GENERAL NOTE 8, SHEET 10.
PORTABLE LOW PROFILE BARRICADES WITH RED LIGHTS TO BE PLACED BY THE
CONTRACTOR DURING TAXILANE, APRON AND/OR OTHER WORK AREA CLOSURES
THIS PHASE OR AS DIRECTED BY THE ENGINEER. BARRICADES TO BE PLACED
OUTSIDE OF TAXIWAY SAFETY AREAS FOR OPEN TAXIWAYS OR TAXILANES (SEE
PROJECT SPECIFIC AIRFIELD CRITICAL AREAS SHEET AND CONSTRUCTION
SAFETY AND PHASING PLAN TEXT). MAY REQUIRE ADJUSTMENT DURING
CONSTRUCTION ACTIVITIES, SEE CONSTRUCTION SAFETY AND PHASING PLAN
TEXT AND DETAIL .
1
10
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
ha
sin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
CONSTRUCTION PLAN GENERAL
NOTES AND DETAILS
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
10
21
CONSTRUCTION PLAN GENERAL NOTES
1. EXCEPT FOR CLOSURES NOTED, AIRPORT AND AIR OPERATIONS AREAS (AOAS) TO REMAIN OPEN
TO AIRCRAFT OPERATIONS DURING ENTIRE COURSE OF WORK. SEE SPECIFICATIONS AND
CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) TEXT FOR ADDITIONAL REQUIREMENTS.
CONTRACTOR SHALL COORDINATE WORK TO ASSURE MINIMUM INCONVENIENCE TO AIRPORT
OPERATIONS. IN ALL CIRCUMSTANCES SAFETY SHALL TAKE PRECEDENCE.
2. AIRCRAFT ACCESS TO THE APRON AREAS TO BE MAINTAINED AT ALL TIMES.
3. WORK WITHIN THE TAXIWAY/TAXILANE OBJECT FREE AREA (TOFA) OR TAXIWAY/TAXILANE SAFETY
AREA (TSA) WILL REQUIRE CLOSURE OR RESTRICTED USE OF IMPACTED TAXIWAY. SEE AIRFIELD
CRITICAL AREAS DRAWING FOR LIMITS. SEE CSPP TEXT FOR ADDITIONAL REQUIREMENTS.
4. THE CONTRACTOR SHALL PROVIDE SUFFICIENT LEAD TIME FOR REQUIRED NOTIFICATIONS WITH
PROJECT STAKEHOLDERS AND THE FEDERAL AVIATION ADMINISTRATION. THIS WILL REQUIRE
SUBMITTAL OF A PRELIMINARY SCHEDULE TO INCLUDE START DATES FOR INDIVIDUAL PHASES AND
DATES FOR AIRPORT FACILITIES IMPACTS WITHIN 10 CALENDAR DAYS AFTER NOTICE OF CONTRACT
AWARD. A REVISED "CONSTRUCTION SCHEDULE" WILL BE PREPARED IN CONJUNCTION WITH THE
PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL NOTIFY THE OWNER WITH REQUESTS
FOR NOTICES TO AIRMEN (NOTAMS) 48 HOURS PRIOR TO IMPLEMENTATION. CONTRACTOR SHALL
COORDINATE WITH ENGINEER FOR CONSTRUCTION RELATED AOA CLOSURES. CLOSURES ARE
SUBJECT TO APPROVAL BY THE OWNER. SEE CSPP TEXT FOR ADDITIONAL REQUIREMENTS.
5. CONTRACTOR SHALL DELINEATE LOCATION OF TOFA AT TRAFFIC ACCESS POINTS, AND PROVIDE
OTHER FIELD DELINEATION TO SEPARATE CONSTRUCTION ACTIVITIES FROM AIRPORT OPERATIONS
AS DIRECTED BY THE ENGINEER. DELINEATION WITHIN THE ROFA AND TOFA SHALL BE LOW
PROFILE AND SHALL NOT PRESENT A HAZARD TO AIRCRAFT. CONES, STAKES, OR OTHER METHODS
AS APPROVED BY THE ENGINEER MAY BE USED OUTSIDE THE ROFA AND TOFA.
6. BARRICADES, LIGHTS, AND OTHER CONSTRUCTION CONTROL DEVICES FURNISHED, PLACED, AND
MAINTAINED BY THE CONTRACTOR SHALL BE PROVIDED AT VARIOUS LOCATIONS, AS NECESSARY
TO ADEQUATELY SEPARATE CONSTRUCTION ACTIVITIES FROM THE AOA. BARRICADES SHOWN ON
THE DRAWINGS ARE FOR REFERENCE AND THE NUMBER AND LOCATION OF BARRICADES MAY
CHANGE TO MEET SAFETY REQUIREMENTS. SEE CSPP PARAGRAPH 220.B.1 FOR ADDITIONAL
REQUIREMENTS.
7. PRIOR TO REOPENING A CLOSED TAXIWAY, TAXILANE, OR APRON AREA FOR OPERATIONS THE
CONTRACTOR SHALL PROVIDE ADEQUATE TIME FOR THE ENGINEER OR OWNER TO INSPECT FOR
CLEANLINESS AND CONFORMANCE TO REGULATIONS INCLUDING GRADING REQUIREMENTS OF THE
TAXIWAY/TAXILANE SAFETY AREA (TSA). THE TIME NEEDED FOR INSPECTION AND POSSIBLE
NECESSARY CORRECTIVE ACTION SHALL BE INCLUDED WITHIN THE ALLOWED CLOSURE PERIOD.
8. WORK AREAS SHOWN IN PHASING PLANS ARE APPROXIMATE. SEE APPROPRIATE DRAWINGS FOR
SPECIFIC WORK LIMITS. CONTRACTOR SHALL COORDINATE ALL WORK ELEMENTS COMPATIBLE
WITH INTENDED PHASE UNLESS OTHERWISE APPROVED BY THE ENGINEER OR OWNER. AIRCRAFT
OPERATIONS ROUTES SHOWN ARE APPROXIMATE AND ARE NOT LIMITED TO LOCATIONS SHOWN.
CONTRACTOR SHALL REMAIN CLEAR OF AIRCRAFT OPERATIONS AT ALL TIMES.
9. CONTRACTOR SHALL NOT BLOCK VEHICLE ACCESS ROADS OR GATES AT ANY TIME.
10. LOCATION OF THE CONTRACTOR'S STAGING AREAS ARE APPROXIMATE. VERIFY LIMITS AND
LOCATIONS WITH ENGINEER PRIOR TO MOBILIZATION.
11. ALL VEHICLES NOT ESSENTIAL FOR CONSTRUCTION, INCLUDING CONTRACTOR-EMPLOYEE
VEHICLES SHALL REMAIN OUTSIDE OF AIR OPERATIONS AREA. PARKING SHALL BE CONFINED TO
THE CONTRACTOR'S STAGING AREA.
12. ALL PORTIONS OF WORK NOT COVERED BY PAYMENT UNDER A SPECIFIC BID ITEM OR LISTED AS
INCIDENTAL TO A BID ITEM SHALL BE CONSIDERED INCIDENTAL TO THE MOBILIZATION BID ITEM.
13. THE CONTRACTOR SHALL USE AND MONITOR THE AIRPORT'S COMMON TRAFFIC ADVISORY
FREQUENCY (CTAF), 122.800 MHZ. SEE CSPP TEXT FOR ADDITIONAL REQUIREMENTS.
14. CONTRACTOR SHALL SCREEN EXISTING GUIDANCE SIGNS LEADING TO CLOSED AREAS USING
METHODS APPROVED BY ENGINEER. CONTRACTOR SHALL SUBMIT GUIDANCE SIGN SCREENING
PLAN FOR ENGINEER REVIEW AND APPROVAL PRIOR TO IMPLEMENTATION.
15. ALL CONSTRUCTION EQUIPMENT MUST BE MARKED WITH A 3 FEET BY 3 FEET ORANGE AND WHITE
CHECKERED FLAG AND/OR AMBER BEACON. ALL CONSTRUCTION VEHICLES MUST BE CLEARLY
MARKED WITH THE COMPANY LOGO AT ALL TIMES.
SIDE VIEW
TOP VIEW
96"
NOTES:
1. PROVIDE BARRICADE CAPABLE OF BEING FILLED WITH WATER OR SAND. IF ALTERNATE
METHOD OF ANCHORING IS USED IT SHALL NOT CAUSE DAMAGE TO PAVEMENT.
2. BARRICADE TO BE CAPABLE OF BEING DEPLOYED BY ONE PERSON WHEN EMPTY.
3. CONTRACTOR SHALL MAINTAIN ALL LIGHTS IN WORKING ORDER FOR THE DURATION OF
THE PROJECT. CONTRACTOR SHALL REPLACE FLAGS AS NECESSARY OR AS DIRECTED
BY THE ENGINEER DUE TO DETERIORATION.
4. BARRICADES TO BE PROVIDED BY THE CONTRACTOR ARE INCIDENTAL TO THE
MOBILIZATION BID ITEM AND ARE PROPERTY OF THE CONTRACTOR UPON COMPLETION
OF THE PROJECT.
5. NO CONSTRUCTION SHALL BEGIN UNTIL BARRICADES HAVE BEEN PLACED AND
APPROVED BY THE ENGINEER.
RED
FLASHING
LIGHT, TYP
ORANGE
FLAG
10"
MAX
PORTABLE PLASTIC BARRICADE DETAIL 1
10
NTS
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-E
ro
sio
nC
on
tro
l.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
EROSION AND SEDIMENT
CONTROL PLAN NOTES
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
11
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
STANDARD NOTES (DEQ 1200-C PERMIT) INSPECTION FREQUENCY
1. Hold a pre-construction meeting of project construction personnel that includes the inspector to discuss
erosion and sediment control measures and construction limits. (Schedule A.8.c.i.(3))
2. All inspections must be made in accordance with DEQ 1200-C permit requirements. (Schedule A.12.b and
Schedule B.1)
3. Inspection logs must be kept in accordance with DEQ’s 1200-C permit requirements. (Schedule B.1.c and
B.2)
4. Retain a copy of the ESCP and all revisions on site and make it available on request to DEQ, Agent, or the
local municipality. During inactive periods of greater than seven (7) consecutive calendar days, the above
records must be retained by the permit registrant but do not need to be at the construction site. (Schedule
B.2.c)
5. All permit registrants must implement the ESCP. Failure to implement any of the control measures or
practices described in the ESCP is a violation of the permit. (Schedule A 8.a)
6. The ESCP must be accurate and reflect site conditions. (Schedule A.12.c.i)
7. Submission of all ESCP revisions is not required. Submittal of the ESCP revisions is only under specific
conditions. Submit all necessary revision to DEQ or Agent within 10 days. (Schedule A.12.c.iv. and v)
8. Phase clearing and grading to the maximum extent practical to prevent exposed inactive areas from
becoming a source of erosion. (Schedule A.7.a.iii)
9. Identify, mark, and protect (by construction fencing or other means) critical riparian areas and vegetation
including important trees and associated rooting zones, and vegetation areas to be preserved. Identify
vegetative buffer zones between the site and sensitive areas (e.g., wetlands), and other areas to be
preserved, especially in perimeter areas. (Schedule A.8.c.i.(1) and (2))
10. Preserve existing vegetation when practical and re-vegetate open areas. Re-vegetate open areas when
practicable before and after grading or construction. (Schedule A.7.a.v)
11. Maintain and delineate any existing natural buffer within the 50-feet of waters of the state. (Schedule
A.7.b.i.and (2(a)(b))
12. Install perimeter sediment control, including storm drain inlet protection as well as all sediment basins,
traps, and barriers prior to land disturbance. (Schedule A.8.c.i.(5))
13. Control both peak flow rates and total stormwater volume, to minimize erosion at outlets and downstream
channels and streambanks. (Schedule A.7.c)
14. Control sediment as needed along the site perimeter and at all operational internal storm drain inlets at all
times during construction, both internally and at the site boundary. (Schedule A.7.d.i)
15. Establish concrete truck and other concrete equipment washout areas before beginning concrete work.
(Schedule A.8.c.i.(6))
16. Apply temporary and/or permanent soil stabilization measures immediately on all disturbed areas as
grading progresses. Temporary or permanent stabilizations measures are not required for areas that are
intended to be left unvegetated, such as dirt access roads or utility pole pads.(Schedule A.8.c.ii.(3))
17. Establish material and waste storage areas, and other non-stormwater controls. (Schedule A.8.c.i.(7))
18. Prevent tracking of sediment onto public or private roads using BMPs such as: construction entrance,
graveled (or paved) exits and parking areas, gravel all unpaved roads located onsite, or use an exit tire
wash. These BMPs must be in place prior to land-disturbing activities. (Schedule A 7.d.ii and A.8.c.i(4))
19. When trucking saturated soils from the site, either use water-tight trucks or drain loads on site. (Schedule
A.7.d.ii.(5))
20. Control prohibited discharges from leaving the construction site, i.e., concrete wash-out, wastewater from
cleanout of stucco, paint and curing compounds. (Schedule A.6)
21. Use BMPs to prevent or minimize stormwater exposure to pollutants from spills; vehicle and equipment
fueling, maintenance, and storage; other cleaning and maintenance activities; and waste handling
activities. These pollutants include fuel, hydraulic fluid, and other oils from vehicles and machinery, as well
as debris, fertilizer, pesticides and herbicides, paints, solvents, curing compounds and adhesives from
construction operations. (Schedule A.7.e.i.(2))
22. Implement the following BMPs when applicable: written spill prevention and response procedures,
employee training on spill prevention and proper disposal procedures, spill kits in all vehicles, regular
maintenance schedule for vehicles and machinery, material delivery and storage controls, training and
signage, and covered storage areas for waste and supplies. (Schedule A. 7.e.iii.)
23. Use water, soil-binding agent or other dust control technique as needed to avoid wind-blown soil.
(Schedule A 7.a.iv)
24. The application rate of fertilizers used to reestablish vegetation must follow manufacturer’s
recommendations to minimize nutrient releases to surface waters. Exercise caution when using
time-release fertilizers within any waterway riparian zone. (Schedule A.9.b.iii)
25. If an active treatment system (for example, electro-coagulation, flocculation, filtration, etc.) for sediment or
other pollutant removal is employed, submit an operation and maintenance plan (including system
schematic, location of system, location of inlet, location of discharge, discharge dispersion device
design, and a sampling plan and frequency) before operating the treatment system. Obtain plan approval
before operating the treatment system. Operate and maintain the treatment system according to
manufacturer’s specifications. (Schedule A.9.d)
26. Temporarily stabilize soils at the end of the shift before holidays and weekends, if needed. The registrant is
responsible for ensuring that soils are stable during rain events at all times of the year. (Schedule A 7.b)
27. As needed based on weather conditions, at the end of each workday soil stockpiles must be stabilized or
covered, or other BMPs must be implemented to prevent discharges to surface waters or conveyance
systems leading to surface waters. (Schedule A 7.e.ii.(2))
28. Construction activities must avoid or minimize excavation and bare ground activities during wet weather.
(Schedule A.7.a.i)
29. Sediment fence: remove trapped sediment before it reaches one third of the above ground fence height
and before fence removal. (Schedule A.9.c.i)
30. Other sediment barriers (such as biobags): remove sediment before it reaches two inches depth above
ground height and before BMP removal. (Schedule A.9.c.i)
31. Catch basins: clean before retention capacity has been reduced by fifty percent. Sediment basins and
sediment traps: remove trapped sediments before design capacity has been reduced by fifty percent and
at completion of project. (Schedule A.9.c.iii& iv)
32. Within 24 hours, significant sediment that has left the construction site, must be remediated. Investigate
the cause of the sediment release and implement steps to prevent a recurrence of the discharge within the
same 24 hours. Any in-stream clean-up of sediment shall be performed according to the Oregon Division
of State Lands required timeframe. (Schedule A.9.b.i)
33. The intentional washing of sediment into storm sewers or drainage ways must not occur. Vacuuming or dry
sweeping and material pickup must be used to cleanup released sediments. (Schedule A.9.b.ii)
34. The entire site must be temporarily stabilized using vegetation or a heavy mulch layer, temporary seeding,
or other method should all construction activities cease for 30 days or more. (Schedule A.7.f.i)
35. Provide temporary stabilization for that portion of the site where construction activities cease for 14 days or
more with a covering of blown straw and a tackifier, loose straw, or an adequate covering of compost
mulch until work resumes on that portion of the site. (Schedule A.7.f.ii)
36. Do not remove temporary sediment control practices until permanent vegetation or other cover of exposed
areas is established. Once construction is complete and the site is stabilized, all temporary erosion
controls and retained soils must be removed and disposed of properly, unless doing so conflicts with local
requirements. (Schedule A.8.c.iii(1) and D.3.c.ii and iii)
STANDARD NOTES (cont.)
SITE CONDITION
1. ACTIVE PERIOD
2. PRIOR TO THE SITE BECOMING
INACTIVE OR IN ANTICIPATION OF
SITE INACCESSIBILITY.
3. INACTIVE PERIODS GREATER
THAN FOURTEEN (14)
CONSECUTIVE CALENDAR DAYS
4. PERIODS DURING WHICH THE SITE
IS INACCESSIBLE DUE TO
INCLEMENT WEATHER.
5. PERIODS DURING WHICH
DISCHARGE IS UNLIKELY DUE TO
FROZEN CONDITIONS.
MINIMUM FREQUENCY
DAILY WHEN STORMWATER RUNOFF, INCLUDING
RUNOFF FROM SNOWMELT, IS OCCURRING
AT LEAST ONCE EVERY TWO (2) WEEKS, REGARDLESS
OF WHETHER STORMWATER IS OCCURRING
ONCE TO ENSURE THAT EROSION AND SEDIMENT
CONTROL MEASURES ARE IN WORKING ORDER. ANY
NECESSARY MAINTENANCE AND REPAIR MUST BE
MADE PRIOR TO LEAVING THE SITE
ONCE EVERY MONTH
IF PRACTICAL, INSPECTIONS MUST OCCUR DAILY AT A
RELEVANT AND ACCESSIBLE DISCHARGE POINT OR
DOWNSTREAM LOCATION
MONTHLY. RESUME MONITORING IMMEDIATELY UPON
MELT, OR WHEN WEATHER CONDITIONS MAKE
DISCHARGES LIKELY.
SD
S
D
SD SD SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
APPROXIMATE PROJECT WORK LIMITS
EROSION AND SEDIMENT CONTROL PLAN
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
2p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-E
ro
sio
nC
on
tro
l.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
EROSION AND SEDIMENT
CONTROL PLAN
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
12
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
STANDARD PRACTICE CODING SYSTEM:
IP
BB BIOFILTER BAGS, SEE DETAIL
STORM DRAIN INLET PROTECTION, SEE DETAIL
SEDIMENT FENCE, SEE DETAIL
DUST CONTROL
CONSTRUCTION ENTRANCE, SEE DETAIL
DIRECTION OF FLOW
1. EROSION CONTROL ITEMS TO BE PLACED BASED ON PROJECT PHASING AND AS DIRECTED BY THE ENGINEER.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEASURES THAT MAY BE REQUIRED BY THE CONTRACTORS MEANS
AND METHODS OF CONSTRUCTION AS NEEDED TO CONTROL EROSION AND SEDIMENT AT THE CONSTRUCTION SITE
AND TO PREVENT VIOLATION OF SURFACE WATER QUALITY, GROUND WATER QUALITY, OR SEDIMENT MANAGEMENT
STANDARDS AND SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES AND
STANDARDS. CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR PERMIT COMPLIANCE AND APPLICABLE
REQUIREMENTS INDICATED ON SHEET 11.
3. EXISTING CATCH BASINS AND INLETS TO BE PROTECTED PRIOR TO DEMOLITION. NEWLY INSTALLED CATCH BASINS
AND INLETS TO BE PROTECTED UNTIL CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.
4. PUBLIC RIGHTS-OF-WAY AND AIRCRAFT OPERATIONS AREAS SHALL BE KEPT IN A CLEAN AND SERVICEABLE
CONDITION AT ALL TIMES. IN THE EVENT MATERIALS ARE INADVERTENTLY DEPOSITED ON ROADWAYS, TAXIWAYS OR
APRONS THE MATERIAL SHALL BE PROMPTLY REMOVED.
5. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO MINIMIZE DUST DURING CONSTRUCTION. IF THE ENGINEER
REQUESTS DUST CONTROL, THE CONTRACTOR SHALL COMPLY IMMEDIATELY.
6. THE CONTRACTOR SHALL HAVE SWEEPING OR VACUUMING CAPABILITIES ON-SITE AT ALL TIMES IN ORDER TO
REMOVE DEBRIS FROM ACTIVE OPERATIONAL AREAS. MATERIALS TRACKED ONTO THESE AREAS MUST BE
CONTINUOUSLY REMOVED DURING THE PROJECT.
NOTES
SF
CE
1
13
NO
RTH
0 30 60 120
SCALE IN FEET
DC
4
13
5
13
2
13
BB
IP
SF
TYP
DC
CE
TYP
BIO FILTER BAG,
FOR CROSS SECTION
SEE DETAIL3
13
5
0
'
F
L
O
W
A
SECTION A-A'
A'
ELEVATION
8' MAX.
POSTS, SAME SPACING
2"x2" WOOD POSTS
ALTERNATE: STEEL FENCE
FABRIC
EXPOSURE
2'-6" MIN.
BURY BOTTOM OF FILTER MATERIAL
IN MIN. 6" DEEP BY 6" WIDE TRENCH
NOTES:
1. INSTALLATION SHALL FOLLOW THE
MANUFACTURER'S RECOMMENDATIONS.
2. POSTS SHALL BE INSTALLED SO THAT A
MIN. OF 3'-0" EXTENDS ABOVE THE
GROUND WITH A MIN. OF 2'-0"
EMBEDMENT.
3. FILTER FABRIC SHALL BE PURCHASED IN
A CONTINUOUS ROLL TO AVOID JOINTS.
4. SPLICE JOINTS AT SUPPORT POSTS
ONLY, WITH A MIN. 6" OVERLAP.
5. SEDIMENT FENCE SHALL BE HIGH
VISIBILITY ORANGE FENCE.
GEOTEXTILE INSERT
GEOTEXTILE
INSERT SEWN FLAP
REBAR
FLOW
FLOW
FLOW
TYPE A
TYPE B
BURY IN NATIVE
GROUND
NOTES:
1. STAKING OF BAGS MAY BE REQUIRED USING (2) 1"X2"
WOOD STAKES OR APPROVED EQUAL PER BAG
BIO FILTER BAG DITCHES AND SWALES 2
13
NTS
INLET PROTECTION 5
13
NTS
BIO FILTER BAG SECTION 3
13
NTS
SEDIMENT FENCE DETAIL 4
13
NTS
BIO-FILTER BAG
SEDIMENT BARRIER,
TYP.
CATCH BASIN OR
INLET STRUCTURE
NOTES:
1. PT 'A' MUST BE 6" MIN HIGHER THAN PT 'B'
PT 'A'
6" OVERLAP TYP
RADIUS = 25' MIN.
A
P
P
R
O
V
E
D
A
C
C
E
S
S
P
O
I
N
T
P
R
O
V
I
D
E
F
U
L
L
W
I
D
T
H
O
F
I
N
G
R
E
S
S
/
E
G
R
E
S
S
A
R
E
A
6" MIN.
DEPTH
6
5
'
GRAVEL CONSTRUCTION ENTRANCE 1
13
NTS
CRUSHED AGGREGATE
BASE MATERIAL
SUBGRADE REINFORCEMENT
GEOTEXTILE FABRIC
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-E
ro
sio
nC
on
tro
l.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
EROSION AND SEDIMENT
CONTROL PLAN DETAILS
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
13
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
PT 'B'
2'-6" MIN.
FABRIC
EXPOSURE
6" MIN.
1'-0" MIN.
BURY FOR FABRIC
S
L
O
P
E
FABRIC
6" MIN
TRENCH
REINFORCING NETTING, IF
RECOMMENDED BY MFG
TRENCH BACKFILL
POST
FILTER FABRIC MATERIAL,
36" WIDE ROLLS MINIMUM.
ATTACH TO POSTS, SEE NOTE 5
FBO BUILDING
SD
SD
S
D
S
D
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
AIRPORT RD
TA
XIW
AY
A
2
LIMITS OF PARTIAL DEPTH
PAVEMENT REMOVAL, TYP
TIE-DOWN ANCHOR
TO BE REMOVED, TYP,
SEE DETAIL .3
19
10'
TYP
EXISTING STORM DRAIN
SYSTEM TO REMAIN,
PROTECT DURING
CONTRUCTION, TYP
EXISTING STORM DRAIN CATCH
BASIN TO BE REMOVED
EXISTING STORM DRAIN
SYSTEM TO REMAIN,
PROTECT DURING
CONTRUCTION, TYP
RETROREFLECTIVE
MARKER TO BE REMOVED
EXISTING STORM DRAIN CATCH BASIN,
PROTECT DURING CONSTRUCTION
EXISTING CONCRETE GUTTER AND CATCH
BASIN, PROTECT DURING CONSTRUCTION
NO
RTH
FULL DEPTH PAVEMENT REMOVAL
APPROXIMATE LIMITS OF 1/2" - 3"± PARTIAL DEPTH
PAVEMENT REMOVAL BY COLD MILLING
1/2" DEPTH PAVEMENT REMOVAL BY COLD MILLING
EXISTING STORM DRAIN TO BE REMOVED
STRUCTURE TO BE REMOVED
TIE-DOWN ANCHORS TO BE REMOVED,
SEE DETAIL
1. LIMITS OF PAVEMENT REMOVAL ARE APPROXIMATE. CONTRACTOR SHALL
LAYOUT LIMITS WITH SURVEY AND FIELD VERIFY WITH ENGINEER PRIOR TO
REMOVAL. SEE APRON LAYOUT PLAN FOR LIMITS AND GRADING SHEETS
FOR ADDITIONAL INFORMATION.
2. SEE DEMOLITION SPECIFICATIONS FOR REQUIREMENTS RELATED TO ITEMS
REMOVED AND/OR SALVAGED.
3. ALL PAVEMENT TO BE REMOVED BY COLD-MILLING UNLESS OTHERWISE
APPROVED. ALL GRINDINGS GENERATED DURING PAVEMENT REMOVAL
SHALL BE DISPOSED OF OFFSITE. SEE SPECIFICATIONS.
4. THE PAVEMENT MILLING OPERATION SHALL PRODUCE A PAVEMENT
SURFACE WHICH IS TRUE TO REQUIRED GRADE AND UNIFORM WHEN
MEASURED WITH 12-FOOT STRAIGHTEDGE. AREAS THAT DISPLAY ABRUPT
TRANSITIONS OR RIDGES IN EXCESS OF ½” SHALL BE RE-MILLED TO
PROVIDE A SMOOTH TRANSITION. PAVEMENT MILLING WILL BE MEASURED
BY THE SQUARE YARD OF THE FINAL MILLED SURFACE AREA REGARDLESS
OF THE NUMBER OF PASSES REQUIRED TO ACHIEVE ACCEPTABLE RESULTS.
5. GRADE CONTROL DURING COLD MILLING OPERATION IS REQUIRED. COLD
MILLING DEPTH WILL VARY, SEE SPECIFICATIONS.
6. ALL ELEMENTS OF DEMOLITION UNLESS OTHERWISE NOTED WILL BE
DISPOSED OF OFFSITE AND CONSIDERED INCIDENTAL TO THE DEMOLITION
BID ITEM.
7. DEMOLITION SHALL BE LIMITED TO APPROXIMATE WORK AREAS IDENTIFIED
IN THE CONSTRUCTION PLAN SHEETS FOR EACH PHASE UNLESS
OTHERWISE APPROVED BY THE ENGINEER.
8. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. SEE GENERAL NOTE 4,
SHEET 3 FOR CONTRACTOR REQUIREMENTS.
DEMOLITION NOTES LEGEND
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-D
em
o.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
DEMOLITION PLAN
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
14
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
0 20 40 80
SCALE IN FEET
3
19
FBO BUILDING
TAXIWAY A
AIRPORT RD
N 364628.75
E 7535695.74
N 364693.96
E 7535706.21
N 364382.86
E 7535688.30
N 364520.88
E 7535590.43
N 364385.95
E 7535586.35
N 365009.64
E 7535572.65
N 364523.76
E 7535495.20
N 364926.30
E 7535516.65
N 364926.60
E 7535506.65
N 364700.48
E 7535771.94
N 364705.35
E 7535610.96
118'2 EQUAL SPACES
TA
XIW
AY
A
2
TIE-DOWN TYPE B,
TYP, SEE DETAIL
2
19
N 364860.89
E 7535608.88
TAXILANE CENTERLINE BY OTHERS
N 364978.83
E 7535612.44
TAXILANE CENTERLINE BY OTHERS
N 365011.56
E 7535509.22
MATCH EXISTING, TYP,
SEE DETAIL1
18
APRON OVERLAY AND
PAVEMENT DIGOUT AREAS,
TYP, SEE DETAILS AND .2
17
3
18
N 364768.37
E 7535511.87
N 364767.83
E 7535529.87
N 364671.87
E 7535526.96
N 364672.57
E 7535503.97
N 364639.05
E 7535502.96
N 364639.17
E 7535498.69
N 364731.03
E 7535555.67
N 364672.05
E 7535553.89
TIE-DOWN TYPE B,
TYP, SEE DETAIL 2
19
MATCH EXISTING, TYP,
SEE DETAIL .
1
18
MATCH EXISTING CONCRETE
GUTTER, SEE DETAIL
AIRCRAFT FUELING
FACILITY
4
18
3
18
LIMITS OF NEW PAVEMENT
CONSTRUCTION, SIMILAR TO DETAIL
N 365013.04
E 7535593.29
N 365024.92
E 7535620.67
NO
RTH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-L
ayo
ut.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
LAYOUT PLAN
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
15
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
0 20 40 80
SCALE IN FEET
1. SEE MARKING PLAN FOR TAXILANE CENTERLINE LAYOUT.
2. SEE PAVING AND GRADING PLAN FOR STORM SYSTEM LAYOUT.
3. LOCATION AND LIMITS OF PAVEMENT CRACK SEALING AS DIRECTED
BY THE ENGINEER, SEE DETAIL .
LAYOUT NOTES
2
18
NO
RTH
0 20 40 80
SCALE IN FEET
FBO BUILDING
TAXIWAY A
SD
SD
SD
SD
SD
SD
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
AIRPORT RD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
TA
XIW
AY
A
2
MATCH EXISTING GRADE
MATCH EXISTING
GRADE, TYP
5%
M
A
X
10'
TYP
SLOPE VARIES, TYP
.6
.
4
.8
.
6
2
2
3
.2
.
6
5% MAX
5%
M
AX
5%
M
AX
AIRPORT RD
TAXIWAY A
10' TYP
SD
SD
SD
SD
S
D
NEW PIPE CONNECTION TO
EXISTING STRUCTURE, VERIFY
ELEVATION WITH ENGINEER
1
2
1
2
2
SD CB
N 364984.48
E 7535539.34
RIM 223.15'
12" RCP (OUT) IE 220.62' (NW)
12" RCP (IN) IE 220.75 (S)
SD CB
N 364842.13
E 7535544.67
RIM 223.04'
12" RCP (OUT) IE 221.00 (N)
EX PIPE (IN) IE 221.00± (W)
SD CB
N 364602.51
E 7535537.33
RIM 222.95'
EX PIPE IE 220.80± (S)
EX PIPE IE UNKNOWN (W)
EXTEND EXISTING PIPE INTO
NEW CATCH BASIN, VERIFY
WITH ENGINEER
FINISH GRADE DESIGNED TO
MATCH PAVEMENT FOLLOWING
COMPLETION OF PHASE 1 OF THE
APRON IMPROVEMENTS PROJECT
CRUSHED AGGREGATE BASE COURSE
MATERIAL AS NECESSARY, COMPACT
TO A FIRM AND UNYIELDING CONDITION
MATCH EXISTING
STORM DRAIN CATCH
BASIN ELEVATION
NO
RTH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-P
avin
g.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
PAVING AND GRADING PLAN
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
16
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
0 20 40 80
SCALE IN FEET
LEGEND
INSTALL NEW 12" RCP PIPE, SEE DETAIL
INSTALL NEW CATCH BASIN, SEE DETAIL
NEW PAVEMENT SECTION, SEE DETAIL
NEW APRON OVERLAY AND PAVEMENT
DIGOUT REPAIR, SEE DETAILS AND
1
2
1
20
2
20
1
17
2
17
3
18
1. CONTRACTOR SHALL VERIFY EXISTING STORM DRAIN PIPE LOCATION, SIZE,
MATERIAL, AND ELEVATION. NOTIFY ENGINEER OF ANY DISCREPANCIES
PRIOR TO CONSTRUCTION
NOTES
BITUMINOUS SURFACE COURSE, PAVEMENT
OVERLAY DEPTH VARIES, CONSTRUCT IN
LIFTS (0.17'MIN, 0.25 MAX, PRELEVEL 0.17 MAX)
AS REQUIRED, TACK BETWEEN LIFTS, SEE
SPECIFICATIONS
EXISTING ASPHALT,
DEPTH VARIES
EXISTING SUBBASE
NEW APRON OVERLAY ON ASPHALT
PAVEMENT SECTION 2
17
NTS
EXISTING PAVEMENT
SECTION, DEPTH
VARIES
FINISH GRADE
EXISTING PAVEMENT REMOVED
BY COLD MILLING, SEE NOTE 1
NOTES:
1. REMOVE EXISTING SURFACE PAVEMENT MARKING, CRACK SEALANT, AND
PAVEMENT FOR A NOMINAL DEPTH OF 0.5 INCHES OR AS REQUIRED TO
MEET FINISH GRADE AND ALLOW FOR A MINIMUM 2 INCH BITUMINOUS
SURFACE COURSE LIFT.
2. CONTRACTOR SHALL DEVELOP PAVING PLAN ILLUSTRATING PANEL SIZE
AND OVERLAY LIFT THICKNESS THAT WILL MINIMIZE NEED FOR PRE-LEVEL
COURSE. CONTRACTOR SHALL PROVIDE PLAN TO ENGINEER FOR
EVALUATION A MINIMUM 7 DAYS PRIOR TO PAVING.
NEW PAVEMENT SECTION DETAIL 1
17
NTS
3" BITUMINOUS SURFACE
COURSE, SEE SPECIFICATIONS
5" CRUSHED AGGREGATE
BASE COURSE
8" SUBBASE COURSE
COMPACT EXISTING SUBGRADE AS
REQUIRED, SEE SPECIFICATIONS
NEW
PAVE
MENT
SECT
ION
GEOTEXTILE FABRIC
APPLY PRIME COAT ON PREPARED
BASE COURSE, SEE SPECIFICATIONS
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-D
ET
AIL
S.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
PAVEMENT DETAILS AND TYPICAL
SECTION
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
17
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
CLEAN AND TACK COAT SURFACE
T + 1/4"
T = W + 3/8"
STEP 2
1/8" TYP
STEP 1
W
EXISTING CONDITION
NOTES:
1. CRACKS TO BE SEALED WILL BE DETERMINED BY ENGINEER.
2. AFTER THE PAVEMENT SURFACE IS REMOVED BY COLD MILLING, THE EXISTING
CRACKS SHALL BE THOROUGHLY CLEANED WITH COMPRESSED AIR OR BY OTHER
APPROVED METHODS. EXISTING SEALANT LOOSENED OR PARTIALLY REMOVED
SHALL BE ENTIRELY REMOVED AND THE CRACK EVALUATED FOR RESEALING.
3. FRESHLY LAID SEALANT ABOVE SURFACE LEVEL SHALL BE REMOVED PRIOR TO
OVERLAY. EXCESS SEALANT ADJACENT TO CRACK SHALL BE REMOVED BY GRINDING
OR BY METHOD DEMONSTRATED TO REMOVE SEALANT WITHOUT SIGNIFICANT
DISTRESS TO THE PAVEMENT.
SAWCUT OR ROUT
AND CLEAN CRACK
TOP OF EXISTING
PAVEMENT, TYP
REMOVE EXISTING AC PAVEMENT BETWEEN
2" AND ZERO POINT OVERLAY DEPTH BY
GRINDING OR OTHER APPROVED METHODS.
REPLACE WITH BITUMINOUS SURFACE
COURSE. SEE NOTE 2
2" M
IN
O
VE
RLA
Y
DE
PT
H O
R A
S
SH
OW
N O
N P
LA
NS
WHEN EXISTING PAVEMENT THICKNESS IS GREATER THAN 2"±
AND REMAINING PAVEMENT WILL SUPPORT CONSTRUCTION
EQUIPMENT AS DIRECTED BY THE ENGINEER
2" M
IN
O
VE
RLA
Y
DE
PT
H O
R A
S
SH
OW
N O
N P
LA
NS
SAWCUT AND REMOVE EXISTING AC PAVEMENT
BETWEEN 2" AND ZERO POINT OVERLAY DEPTH.
REPLACE WITH BITUMINOUS SURFACE COURSE
WHEN EXISTING PAVEMENT
THICKNESS IS APPROX 2"± OR LESS
SEAL JOINT
EXISTING ASPHALT
PAVEMENT
SEAL JOINT
EXISTING ASPHALT
PAVEMENT
NOTES:
1. MAINTAIN VERTICAL SAWCUT EDGE. RECUT IF NECESSARY AT
CONTRACTORS EXPENSE. CLEAN AND TACK COAT EDGE PRIOR
TO PAVING
2. CONTRACTOR SHALL SURVEY 2" OVERLAY LINE AND LAYOUT ON
PAVEMENT. VERIFY LIMITS WITH ENGINEER AFTER LAYOUT,
PRIOR TO SAWCUTTING OR GRINDING.
TRANSITION ZONE NOTCH DETAIL 1
18
NTS
REGRADE AND RECOMPACT EXISTING BASE COURSE IF
DISTURBED. IF BASE MATERIAL IS REMOVED DURING PAVEMENT
REMOVAL, THE CONTRACTOR SHALL REPLACE WITH BITUMINOUS
SURFACE COURSE AT NO ADDITIONAL COST TO THE OWNER
PAVEMENT CRACK SEALING DETAIL 2
18
NTS
TRANSITION NOTCH WITH
PARTIAL DEPTH ASPHALT PAVEMENT REMOVAL
TRANSITION NOTCH WITH
FULL DEPTH PAVEMENT REMOVAL
APPLY BACKER ROD
IF REQUIRED FOR
DEEP CRACKS
PAVEMENT DIGOUT DETAIL 3
18
NTS
NOTES:
1. DIGOUT SIZE AND LOCATIONS WILL VARY THROUGHOUT THE PROJECT AREA DEPENDING
ON EVALUATION DURING CONSTRUCTION. LIMITS OF PAVEMENT REMOVAL SHALL BE
DETERMINED BY THE ENGINEER. PRIOR TO SAWCUTTING VERIFY LIMITS IN THE FIELD
WITH THE ENGINEER.
2. ADDITIONAL EXCAVATION BELOW THE DEPTH SHOWN MAY BE REQUIRED AS DIRECTED
BY ENGINEER. PAID UNDER UNSUITABLE EXCAVATION BID ITEM. SEE SPECIFICATIONS.
3. SEE SPECIFICATIONS FOR MATERIAL TESTING REQUIREMENTS.
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-D
ET
AIL
S.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
PAVING DETAILS
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
18
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
APPLY JOINT SEALANT
SEE NOTE 1
SEE NOTE 1
NTS
NOTE:
CONTRACTOR TO SAWCUT NEW P-401 BITUMINOUS PAVEMENT
TO PROVIDE RESERVOIR FOR SEALANT MEETING ASTM D-6690.
CLEAN AND DRY ALL SURFACES PRIOR TO FILLING, TYPICAL.
SEE SPECIFICATIONS. JOINT SEALING SHALL BE CONSIDERED
INCIDENTAL TO BITUMINOUS SURFACE COURSE BID ITEM.
1 1
/2
" ±1
/4
"
PCC
AC
3/4"±1/8"
18
4
NTS
ASPHALTIC JOINT SEAL DETAIL
SEALANT RESERVOIR,
SEE NOTE
BITUMINOUS
SURFACE COURSE
NEW OR EXISTING PCC
SEALANT
EXISTING ASPHALT
PAVEMENT
DEPTH VARIES,
MATCH EXISTING
EXISTING BASE COURSE (DEPTH VARIES)
EXISTING AC (DEPTH VARIES)
BITUMINOUS SURFACE COURSE
EXISTING GRADE
5" CRUSHED
AGGREGATE
BASE COURSE
GEOTEXTILE FABRIC
COMPACTED SUBGRADE, SEE SPECIFICATIONS
NEW BITUMINOUS SURFACE
COURSE OVERLAY
FINISH GRADE AS
SHOWN ON PLANS
12" OR AS DIRECTED. TO BE
PERFORMED ON COMPLETION
OF CRUSHED AGGREGATE
BASE COURSE PLACEMENT
SAWCUT AND REMOVE EXISTING PAVEMENT,
CLEAN AND TACK PRIOR TO PAVING. IF
UNDERMINING OR EDGE DAMAGE TO THE
EXISTING PAVEMENT OCCURS, EXISTING
PAVEMENT SHALL BE RESAWCUT AND
REMOVED AT CONTRACTORS EXPENSE
8" SUBBASE
COURSE
49'-0"
13'-8
"
PLAN
SECTION
36"
24"
1/2"
6"
3" C
LR
8"
24"
NOTES:
1. ANCHOR MUST WITHSTAND
TENSION OF 11,000 LBS MINIMUM,
CONTRACTOR TO PROVIDE
DOCUMENTATION.
24'-6"
18'-0
"
AIRCRAFT TIE-DOWN ANCHOR DETAIL 1
19
NTS
AIRCRAFT TIE-DOWN TYPE B DETAIL 2
19
NTS
REMOVE EXISTING PAVEMENT BY
APPROVED METHODS, VERIFY WITH
ENGINEER, REMOVAL SHALL NOT
DAMAGE ADJACENT PAVEMENT
EXISTING
PAVEMENT
SECTION
SEAL EDGE, TYP,
SEE DETAIL .
TROWELED DEPRESSION
5/8" MIN DIAMETER
STAINLESS STEEL ROD
1 1/2" DIAMETER EYE TO BE
WELDED CLOSED
P-610 CONCRETE
UNDISTURBED EARTH, TYP
AIRCRAFT TIE-DOWN
ANCHOR, TYP, SEE
DETAIL
YELLOW STRIPE,
6" WIDE, TYP
NEAT VERTICAL CUT,
CLEAN CUT FACE, TYP
EXISTING PAVEMENT,
DEPTH VARIES, PROTECT
DURING CONSTRUCTION
NEW BITUMINOUS SURFACE
COURSE PAVEMENT
OVERLAY, DEPTH VARIES
REFERENCE POINT AS
SHOWN ON PLANS
1
19
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
3p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-D
ET
AIL
S.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
TIE-DOWN DETAILS
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
19
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
4
18
TIE DOWN
C
L
NOTES:
1. CONTRACTOR SHALL IMPLEMENT MEASURES DURING CONSTRUCTION TO PREVENT UNDERMINING OR
EDGE DAMAGE TO THE EXISTING PAVEMENT TO REMAIN. IF UNDERMINING OR EDGE DAMAGE OCCURS,
THE CONTRACTOR SHALL USE AN ENGINEER APPROVED METHOD TO PLACE AND COMPACT MATERIAL
OR REPAIR EDGE DAMAGE AT THE CONTRACTOR'S EXPENSE. MAY REQUIRE MULTIPLE SAW CUTS.
EXISTING TIE-DOWN REMOVAL DETAIL 3
19
NTS
EXISTING POST CONSTRUCTION
REMOVE ENTIRE TIE-DOWN AND PCC USING
METHOD APPROVED BY ENGINEER, CORE OR
CUT EXISTING PAVEMENT (SAW KERFS SHALL
NOT OVERLAP) AS REQUIRED TO PREVENT
DAMAGE TO ADJACENT PAVEMENT
EXISTING PAVEMENT,
DEPTH VARIES, PROTECT
DURING CONSTRUCTION
EXISTING AIRCRAFT TIE-DOWN
ANCHOR, DIMENSIONS VARY
RECOMPACT EXISTING SUBGRADE TO FIRM
UNYIELDING CONDITION IF DISTURBED
NEW BITUMINOUS SURFACE COURSE
PAVEMENT OVERLAY, DEPTH VARIES
REMOVE EXISTING CONCRETE
ENTIRELY, DEPTH VARIES
PLACE CRUSHED AGGREGATE BASE COURSE,
SEE SPECIFICATIONS
MATCH EXISTING ASPHALT DEPTH, 3" MIN DEPTH
CATCH BASIN DETAIL 2
20
NTS
NOTES:
1. DIMENSIONS OF CATCH BASIN MAY CHANGE, WITH ENGINEER'S APPROVAL, IF
REQUIRED FOR COMPATIBILITY WITH FRAME AND GRATE OR DUE TO PIPE SIZE.
2. GRATE SHALL BE BOLTED TO FRAME PER MANUFACTURER'S RECOMMENDATION.
3. CONSTRUCT LONGITUDINAL JOINT SEAL ALL SIDES, SEE DETAIL .
SECTION
PLAN
FINISH GRADE
ANGLE FRAME TO FIT GRATE OR
APPROVED EQUAL
12"
MIN
DEPT
H VA
RIES
8"
8"8" 3'-0"
WELD 1/2" DIA X 4" HEADED ANCHOR
STUD FRAME AT EACH CORNER
4'-4"
REINFORCING STEEL PER
MANUFACTURERS RECOMMENDATIONS
AS R
EQUI
RED
BY P
IPE
SIZE
24"
MIN
COORDINATES AS SHOWN
ON PLANS, IF APPLICABLE
8"
6" MIN
PIPE AS SHOWN ON PLANS
ALL PIPE CONNECTIONS
TO BE WATER TIGHT
PIPE TO BE FLUSH WITH INSIDE
FACE OF STRUCTURE
LIMIT OF CRUSHED
AGGREGATE BASE COURSE
6"
PLACE 6" MIN CRUSHED AGGREGATE
BASE COURSE, COMPACTED, INCIDENTAL
TO STORM DRAIN CATCH BASIN BID ITEM
6"
ALL COMPONENTS SHALL BE
CAPABLE OF SUPPORTING 40-KIP
LOAD MINIMUM
PIPE AS SHOWN ON
PLANS
1 1/2"
CLR
12"12"
PIPE AS SHOWN ON
PLANS
6"
BITUMINOUS SURFACE
COURSE TRENCH PATCH
BITUMINOUS SURFACE COURSE
MATCH EXISTING
PAVEMENT DEPTH
ADDITIONAL
SAWCUT, SEE
NOTE 2 AND 3
INITIAL SAWCUT, SEE NOTE 1
NOTES:
1. INITIAL SAWCUT TO PROVIDE AREA OF PAVEMENT
REMOVAL FOR TRENCHING AND BACKFILL.
2. ADDITIONAL SAWCUT INTENDED TO COMPENSATE
FOR PAVEMENT UNDERMINING,
VERIFY WITH ENGINEER PRIOR TO SAW CUTTING.
3. BACKFILL TO WITHIN 10" OF EXISTING SURFACE
PRIOR TO MAKING ADDITIONAL SAWCUT.
4. ALL NATIVE MATERIAL SHALL BE REMOVED WITH A
SMOOTH EDGE BUCKET TO MINIMIZE SUBGRADE
DISTURBANCE.
5. STRIP AND STOCKPILE NATIVE TOP SOIL PRIOR TO
TRENCHING, PLACE AND COMPACT TO A DENSE
AND UNYIELDING CONDITION AS APPROVED BY THE
ENGINEER PRIOR TO HYDROSEEDING.
ELEM
ENTS
OF
WOR
K PA
ID U
NDER
RESP
ECTI
VE P
IPE
BID
ITEM
ELEM
ENTS
OF
WOR
K PA
IDUN
DER
BITU
MINO
USSU
RFAC
E CO
URSE
BID
ITEM
CLEAN AND
TACK ALL
SURFACES
6"
NON-PAVEDEXISTING PAVEMENT
NATIVE
MATERIAL, SEE
NOTE 4 AND 5
4"
MIN
PIPE
BACKFILL
(SEE SPECS)
PIPE BEDDING
(SEE SPECS)
PIPE OD + 12" MINPIPE ID + 24" MAX
SPRINGLINE
STORM DRAIN PIPE INSTALLATION DETAIL 1
20
NTS
PIPE BEDDING
(SEE SPECS)
CRUSHED
AGGREGATE
BASE COURSE
PIPE AS SHOWN
ON PLANS
HYDROSEED ALL AREAS OF
DISTURBANCE, INCIDENTAL TO
RESPECTIVE BID ITEM
PIPE AS SHOWN ON PLANS
PIPE OD + 12" MINPIPE ID + 24" MAX
6"
NEW PAVEMENT
SECTION, SEE
DETAIL
ELEM
ENTS
OF
WOR
KPA
ID U
NDER
RESP
ECTI
VE P
IPE
BID
ITEM
ELEM
ENTS
OF
WOR
KPA
ID U
NDER
RESP
ECTI
VE B
ID IT
EM
NEW PAVEMENT
PIPE BEDDING
(SEE SPECS)
CRUSHED
AGGREGATE
BASE COURSE
1
17
GEOTEXTILE FABRIC
COMPACT TO
100% OF ASTM
D-698
COMPACT TO 100% OF ASTM D-698
GEOTEXTILE FABRIC
AS REQUIRED
SEE DRAINAGE PLAN
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
4p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-D
ET
AIL
S.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
DRAINAGE DETAILS
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
20
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
PIPE OD + 12" MINPIPE ID + 24" MAX
4
18
FBO BUILDING
TAXIWAY A
AIRPORT RD
TA
XIW
AY
A
2
2
19
MATCH EXISTING
N 364715.89±
E 7535675.86±
MATCH EXISTING
N 364395.36±
E 7535688.68±
R25'
R25'
R25'
R25'N 364978.85
E 7535612.40
N 364919.87
E 7535610.61
N 364731.04
E 7535555.63
N 364672.07
E 7535553.84
N 365005.24
E 7535550.15
N 364823.82
E 7535544.67
N 364823.07
E 7535569.65
N 364798.08
E 7535568.90
N 364820.48
E 7535653.97
AIRPORT RD
N 364692.94
E 7535608.09
N 364717.17
E 7535633.83
N 364741.76
E 7535626.57
N 364692.19
E 7535633.08
N 364423.06
E 7535599.93
N 364422.31
E 7535624.91
N 364397.32
E 7535624.16
N 364860.90
E 7535608.83
N 364770.55
E 7535652.46
N 364771.31
E 7535627.47
N 364821.29
E 7535628.98
R25' R25'
MARKING DESIGNED TO MATCH
TAXILANE CENTERLINE FOLLOWING
COMPLETION OF PHASE 1 OF
APRON IMPROVEMENTS PROJECT
CENTERLINE STRIPE, 6" WIDE,
YELLOW, TYP
TIE-DOWN TYPE B,
TYP, SEE DETAIL
NO
RTH
MARKING PLAN
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0
3/2
1/ 1
8 - 4
:0
4p
m - S
Ho
rn
- P
:\A
\A
LB
00
5-A
pro
n Im
p-P
h 2
\0
40
0C
AD
\D
WG
\S
he
ets\A
LB
00
5-M
arkin
gP
la
n.d
wg
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street
Corvallis, OR 97333
541 754 0043
ALBANY MUNICIPAL AIRPORT
APRON IMPROVEMENTS - PHASE 2
MARKING PLAN
PRECISION APPROACH ENGINEERING, INC.
AIP PROJECT NO. 3-41-0001-014-2016
MAR 2018
DRR
JAW
GWV
0
AS SHOWN
ALB005
21
21
REENIG
N
E
OREGON
72693PEREGISTERED PROFESSIONAL
GOFF
EW VAUGHN
EXPIRES 6/30/2018
.
0 20 40 80
SCALE IN FEET