OJSC "Volgomost" – is the Russian road and bridge construction holding
Company with the 77th -year history includes unites: 8 Mostootryad, mechanization management, project department "Volgoproektstroymost", as well as representative offices in Moscow, Saratov and Krasnodar Territory, road profile enterprise LLC "AWT-Dorstroi" and leading design institute "Giprotransmost".
Today OJSC "Volgomost" – is one of the five leaders of the bridge
construction industry in Russia. Over the years our company has completed more
than 3 000 different objects of transport infrastructure - roads, bridges, viaducts,
tunnels and interchanges.
OJSC “Volgmost” has broad activity specialization, provides a full range
of services to transport construction – from the projection and construction of the
largest unique bridges, highways, interchanges in different geological conditions
to guarantee service of the constructed objects. Our company expands its
construction geography instantly.
COMPANY
The territory of OJSC “VOLGOMOST”
• Moscow
• Leningrad
• Saratov
• Volgograd
• Astrakhan
• Orenburg
• Penza
• Ulyanovsk
• Samara
• Kirov and Ryazan region
• Krasnodar region
• Republic of Mordovia
• Tatarstan
• Chuvashia
• Bashkortostan
• Udmurtia
• Kabardino-Balkaria,
• North Ossetia-Alania
• Karachay-Cherkessia and other subjects of the Russian Federation.
Moscow
- Office of Administration;
Saratov
- Executive Office;
Mechanization;
Volgoproektstroymost;
Representation of construction "Airport"
Krasnodar
- Representation
THE STRUCTURE
Kazan Mostootryad # 3 Engels Mostootryad # 8 Penza Mostootryad # 20 Samara Mostootryad # 21
Orenburg Mostoodryad #56
Volgograd Mostootryad # 57
Astrakhan Mostootryad # 83
Sochi Mostootryad # 131
Construction of rail, road and pedestrian bridges,
tunnels and interchanges.
Production of concrete and reinforced concrete structures.
Production and installation of metal constructions.
Engineering survey
Architectural activities
Construction, reconstruction, major repairs and maintenance of roads.
ACTIVITIES
Intellectual property and research and development of "Volgomost“
are one of the main production assets of the Company.
Company specialists are doing unique and innovative design solutions, which have no
analogues for both Russia and the global practice.
Introduction of scientific developments, development work helps create a commercially viable
for the economy, high-tech, competitive products, can significantly reduce the time and cost of
construction. The company has 19 patented inventions
PATENTS
OJSC “Volgomost" pays great attention to the development and introduction of new efficient building
technologies are constantly being improved and technological solutions for the construction of extra-curricular elements of bridge structures.
By innovative solutions and technologies used of “Volgomost" include:
1. Device bases, the bases themselves and supports using jackup platforms PMK; 2.New design of bridge piers with ldozaschitnymi shells ( LZO ); 3.Eholokatsionny monitoring the cavity formed in the device foundations of bridge piers ; 4.Montazh superstructures span more than 100 feet ( 126 m , 155 m, 157 m ) by longitudinal sliding device without using temporary supports special truss system; 5.Monitoring sliding process superstructures with automatic process control sliding ; 6.Razrabotka and implementation strendovoy mounting technology ( lift ) bridge spans a large weight to a height of 40-60 meters; 7.Primenenie contemporary designs joints and bearings , a special interface unit bridges with approaches; 8.Primenenie new corrosion protection systems of bridges and modern methods of their application; 9.Provedenie monitoring the application of pavement structures , joints , bearings , corrosion protection with an analysis of their effectiveness; 10.Primenenie new designs noise screens; 11.Primenenie new types of lighting poles on the bridge structures; 12.Tehnologiya mounting dampers dampers from the wind by the example of a bridge across the Volga in Volgograd; 13.Monitoring and analysis of deflections , oscillation amplitudes aerodynamic bridge span on the wind load; 14.Razrabotka and application of a new type of road pavement on the bridge structures using polymer modified binders (cast asphalt);
INNOVATIVE TECHNOLOGYS
unit 2006
2007
2008
2009 2010 2011 2012 2013
revenue 4 242 951 7 456 039 10 313 019 9 410 887 6 944 017 10 500 799 14 863 296 27 649 474
Construction and
installation work rbl 2 974 000 5 054 042 6 399 789 4 908 611 4 651 214 6 231 707 8 174 787 8 271 920
Construction and
installation work
(subcontract)
rbl 726 686 1 807 206 3 068 542 3 942 538 1 903 816 3 941 048 6 180 054 17 728 134
Profit on sales rbl 245 107 697 828 1 272 973 941 114 769 164 949 668 1 536 827 1 864 804
EBITDA rbl 313 486 744 143 1 152 751 1 121 784 997 130 1 109 601 1 622 604 1 925 811
Net profit rbl 100 704 308 353 585 104 318 962 127 120 293 077 640 234 838 943
HIGHLIGHTS 2006-2013
HIGHLIGHTS 2006 2013
DYNAMICS OF REVENUE
0
5000
10000
15000
20000
25000
30000
2006 2007 2008 2009 2010 2011 2012 2013
4243
7456
10313 9411
6944
10501
14863
27650
SPECIALISTS\STAFF
- OJSC " Volgomost " is an experienced team of managers and professionals with extensive
experience in the field of bridge construction .
- Almost all the leaders of MOSTOOTRYAD have more than thirty years of experience in the
industry and received awards for his contribution to the development of bridge construction. Under
their leadership, and their participation built dozens of rail and road bridges , overpasses and bridges .
Among managers and professionals share personnel with higher education is 71 %.
- Among the workers share with higher and secondary professional education - 43 %. Average
discharge workers - 4.5 . More than 50 % of workers rank 5 and above.
More than 80% of the staff working in OJSC "Volgomost" more than five years.
.
Indicators of personnel stability
TECHNOLOGY PARK
OJSC "Volgomost" has a modern fleet of mobile equipment from leading
manufacturers and Russian, which allows you to perform a variety of jobs at the
facilities. The composition of the park includes a variety of models and equipment
modifications total of more than 1,500 units.
Our Company also has its own river fleet to perform work on the water
Object
construction time The total contract
value, rbl
All in all 90 143 331
Construction and reconstruction of highway M-7 "Volga". Reconstruction of the bridge
over the river Vyatka at km 976 of the road M-7 "Volga" (second stage)
2011 - 2013 2 486 851
Construction and reconstruction of highway M-7 "Volga" in the section km 941 +000 -
km 957 +400, Republic of Tatarstan
2012 - 2015 6 496 213
Reconstruction of the highway A-155-Cherkessk Dombay between km 83 +000 - km 88
+700 to the construction of the bridge-overpass over the river. Kuban in the Karachay-
Cherkess Republic (2, 3 launch complexes)
2012 - 2015 3 147 580
Construction of a road bridge over the river. Sochi, Central District of Sochi 2010 - 2013 1 115 105
Construction of bypass Krasnoslobodsk road between km 95 +150 - km 106 +350 in the
Republic of Mordovia (starting complex 2)
2011 – 2014 2 859 603
Construction of a bridge across the river Sura at km 111 + 630 road 1E-178 Saransk -
Surskoe - Ulyanovsk
2011 - 2013 1 038 033
Entrance to the city of Orenburg highway M-5 "Ural" between km 96 - km 147, Samara
region
2011 - 2015 5 910 160
Reconstruction of the road M-5 "Ural" section km 634 - km 645 to the bridge over the
river Sura, Penza region
2012 - 2015 4 133 310
Construction of the M - 29 "Caucasus" on the site bypass Beslan (I place), in the Republic
of North Ossetia - Alania
2010 - 2013 4 799 750
Reconstruction of the road M-5 "Ural" in 1466 on a plot of 030 km - 000 km in 1480, the
Republic of Bashkortostan (r. White)
2012 - 2014 1 560 572
CONTRACT PORTFOLIO
Object
construction time The total contract
value, rbl
Construction of the airport complex "Central" (Saratov) I stage of construction (federal
property)
2012 - 2015 3 829 926
Construction of an automobile transport interchanges "Airport" in two levels (km 2) on
the road Adler (highway Dzhubga - Sochi) - Krasnaya Polyana
2010 - 2013 1 369 585
Perform additional work on the project: "Construction of automotive transport
interchanges" Airport "in two levels (km 2) on the road Adler (design and survey works,
construction)."
2012 - 2013 91 682
Execution of works on the reconstruction, maintenance and repair of the M-4 "Don" 2012-2014 18 999 028
Big Kazan ring (26.9 km) Section 5 - Road interchange at the intersection of Prospect
Street and Victory. Sakharov
2010 - 2013 1 717 442
Construction of the highway in the area st. Tank to the street. Pushkin (4.8 km). Section
6 - Transport interchange at the intersection of Esperanto Tihomirnova
2011 - 2013 1 613 758
The bridge across the river Kama in with. Sorochyi Mountains on the road Tchistopol
Kazan-Orenburg-Bugul'ma (starting complex 2 I-th stage of construction)
2002 - 2013 1 559 925
Construction of a bridge across the river on the road Talovaya Volodarskij - Colour in
Volodarsky near Astrakhan region "
2012 - 2013 867 686
Construction of the second, third and fourth stage of the bridge over the river Volga in
Volgograd. Second launch complex
2009 - (2014) 14 273 788
Construction of a bridge across a navigable canal in Balakovo, Saratov region (second
stage)
2010 - 2014 4 926 000
CONTRACT PORTFOLIO
Object
construction time The total contract
value, rbl
Reconstruction of the road bridge over the river. Volga in the alignment of the streets of
A. Barbuse Astrakhan (first stage. Correction)
2008 - 2010 1 223 667
Construction of the overpass on the road "Entrance of the road M-6" Caspian "to
Volgograd" 13 400 km in the Volgograd region
2012 - 2013 1 008 304
Disposal costs of ground ruptures. Construction of the road A-153 on a plot of Lyman -
border of the Republic of Kalmykia, Astrakhan region
2013 - 2013 221 702
Reconstruction and construction of 15 kilometers of road Sizran - Saratov - Volgograd
bypassing village Yelshanka Saratov region
2013-2015 2 600 000
Reconstruction of the bridge over the river B.Tsivil (left) on 677 174 km of highway M-7
"Volga" Moscow - Vladimir - Nizhny Novgorod - Kazan - Ufa.
2013 - 2014 678 546
Reconstruction of the bridge over the river. Sakmara to 3 300 km road Entrance to
Orenburg from highway Kazan - Orenburg region.
2013 - 2015 534 472
Repair road bridge Saratov Engels 2013 108 852
Repair support road bridge Saratov Engels 2013 12 692
Device piers metal dowel in a recreation "Breeze" 2013 19 085
Reconstruction of the road segments Muscovy large ring through Dmitrov, Sergiev
Posad, Orekhovo-Voskresensk, Mihnevo Balabanovo, Ruza, Klin. Construction of the
overpass on the highway Moscow outer ring
2013 - 2015 940 014
CONTRACT PORTFOLIO
In 2012, have been commissioned the follow objects :
The first start-up complex bridge - overpass across the Kuban River in the Karachay-Cherkess
Republic on the road A- 155 - Cherkessk Dombay to the border with the Republic of Georgia in
the area 83 km + 000 - km 88 + 700;
Overpass over the railway at km 403 of the road M -5 "Ural" - from Moscow through Ryazan,
Penza , Samara, Ufa and Chelyabinsk , Ryazan region ;
Bypass Krasnoslobodsk Entrance road to Saransk from road M -5 "Ural" section km 95 +150 -
km 106 + 350 in the Republic of Mordovia . I PK0 launch complex 00 - 50 pc + 16 (Bridge h / p
Zhabko 2 overpass );
Entrance road to the city of Orenburg and / d M-5 "Ural" km 96 - km 147 , Samara Oblast.
Starting complex 2 ( Bridge on the River Tavolzhanka on PK370 +09.81 );
Combined Adler - mountain climatic resort " Alpika Service " ( Bridge on the River Mzimta PC
446 + 00);
Second solid track on the Sochi-Adler North Caucasus Railway ( Bridge on the River Macesta
1972 km . )
Footbridge in street alignment . Kostin in the Kirov district of Astrakhan ;
Transport interchange at the intersection of Prospect Street and Victory . Sakharov , the
Republic of Tatarstan;
Transport interchange at the intersection and pr.Yamasheva ul.Gavrilova , Republic of Tatarstan
.
DONE OBJECTS
In 2013 there were commissioned
Transport interchange "Airport" in two levels on the road Adler - Krasnaya Polyana
Highway bridge across the river Sochi Central District of
Sochi
The bridge across the
river Vyatka, Republic
of Tatarstan
Highway M-29 "Caucasus"
on the site bypass Beslan
(Phase 1)
Bridge crossing h / p Talovaya,
Astrakhan region
DONE OBJECTS
3 launch complex highway "Entrance to Orenburg from the road M-5" Ural ", Samara region
OJSC "Volgomost"
Legal address:
410028, Russia Saratov, Michurina str. 112
Tel.: +7 (8452) 57-06-66, +7 (8452) 23-07-12 Fax: +7 (8452) 57-06-60
E-mail: [email protected]
Moscow – Representative office
119435, Russia, Moscow, Large Savvinsky lane, 17
Tel.: +7 (495) 744-29-65, + 7 (495) 787-71-60 Fax: +7 (499) 995-10-38
E-mail.: [email protected]
www.volgomost.ru
CONTACT INFORMATION