is 11309 (1985): method of conducting pull-out test on ... · method for conducting pull-out test...

10
Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public. इंटरनेट मानक !ान $ एक न’ भारत का +नम-णSatyanarayan Gangaram Pitroda “Invent a New India Using Knowledge” प0रा1 को छोड न’ 5 तरफJawaharlal Nehru “Step Out From the Old to the New” जान1 का अ+धकार, जी1 का अ+धकारMazdoor Kisan Shakti Sangathan “The Right to Information, The Right to Live” !ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता ह Bharthari—Nītiśatakam “Knowledge is such a treasure which cannot be stolen” IS 11309 (1985): Method of conducting pull-out test on anchor bars and rock bolts [CED 48: Rock Mechanics]

Upload: others

Post on 11-Mar-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

Disclosure to Promote the Right To Information

Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.

इंटरनेट मानक

“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda

“Invent a New India Using Knowledge”

“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru

“Step Out From the Old to the New”

“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan

“The Right to Information, The Right to Live”

“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam

“Knowledge is such a treasure which cannot be stolen”

“Invent a New India Using Knowledge”

है”ह”ह

IS 11309 (1985): Method of conducting pull-out test onanchor bars and rock bolts [CED 48: Rock Mechanics]

Page 2: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand
Page 3: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand
Page 4: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand
Page 5: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

IS: 11309 - 1985

Indian Standard METHOD FOR

CONDUCTING PULL-OUT TEST ON ANCHOR BARS AND ROCK BOLTS

Rock Mechanics Sectional Committee, BDC 73

Chairman Representing

DR BRAWANI SINQH University of Roorkee, Roorkee

Members

ASSISTANT RESEARCH OFFICER Irrigation Department, Government of Uttar ( IRI ) Pradesh, Roorkee

DIRECTOR Central Water and Power Research Station, Pune SRRI S. L. MOEHASHI ( Alternate )

DIRECTOR Cent;L,E;il and Materials Research Station, New

DR A. K. DUBE Central Mining Research Station ( CSIR ), Dhanbad

SHRI P. S. GOSAL Irrigation and Power Department, Government of

DR G. S. ME:~ROTRA Punjab, Amritsar _

Central Building Research Institute ( CSIR ), Roorkee

SRRI A. GHOSH ( A~~ernafe ) SHRI M. D. NAIR Associated Instrument Manufacturers ( India )

Private Limited, New Delhi PROF T. S. NAQARAJ ( Alternote )

SRRI P. L. NARULA Geological Survey of India, Calcutta SHRI T. K. NATRAJAN CentrDalhiRoad Research Institute ( CSIR ), New

SHRI P. J. RAO ( Alternate ) PROF T. RAMAMURTHI

DR G. V. RAO ( Alternate ) Indian Institute of Technology, New Delhi

DR Y. V. RAMANA National Geophysical Research Institute ( GSIR ), Hyderabad

RESEARCH OFFICER ( MERI )

SHRI G. RAMAN, Director ( Civ Engg )

Irrigation Department, Government of Maharashira, Nasik

Director General, IS1 ( Ex-ojicio Member )

Secrdary

SH~I K. M. MATRUR Senior Deputy Director ( Civ Engg ), IS1

@ Copyright 1985

INDIAN STANDARDS INSTITUTION

This publication is protected under the fad& Copyright Act ( XIV of 1957 ) and reproduction in whole or in part by any means except with written permission of the oublisher shall be deemed to be an infring-nent of coovrilht under the said Art.

Page 6: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

IS : 11309 - 1985

Indian Standard METHOD FOR

CONDUCTING PULL-OUT TEST ON ANCHOR BARS AND ROCK BOLTS

0. FOREWORD

0.1 This Indian Standard was adopted by the Indian Standards Institution on 29 June 1985, after the draft finalized by the Rock Mechanics Sectional Committee had been approved by the Civil Engineering Division Council.

0.2 A number of Indian Standards covering methods of test to assess various properties of rocks are being formulated. This standard covers method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand grout or resin and rock bolt is ungrouted mechanically anchored bolt. The anchorage may be of any type that is lot wedge type, expansion shell type, etc.

0.3 In reporting the result of a test or analysis made in accordance with this standard, if the final value, observed or calculated, is to be rounded off, it shall be done in accordance with IS

1. SCOPE

1.1 This standard lays down the method for conducting anchor pull-out test in rock and the evaluation of bond strength between reinforcement and grout concrete or grout concrete and rock.

NOTE - This method assumes that diameter of the bore in rock throughout the length of reinforcement is uniform and cement mortar density around the reinforce- ment and throughout the length of reinforcement is alto uniform.

2. EQUXPMEWT

2.1 Central Hole Jack -- Tt is a special jack in which ram has a dentral hole throughout the height of the jack.

*Rules for rounding off numerical values ( reoised ).

2

Page 7: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

IS : 11309 - 1985

3. DESCRIPTION OF THE ANCHOR BAR PULL-OUT TEST

3.1 A hole is drilled in rock with the help of minicore drill machine keeping in view that the geology of the mass should not be disturbed around the desired diameter. The diameter of the bore-hole should be at least double the diameter of the anchor bar and the bore length should be equal to the length of anchor bar. Arrangement should be made to make base slab below the jack perpendicular to the bolt.

NOTE - It is necessary to test anchors under realistic field conditions. Therefore, care is necessary in selection of site for such test specially the rock mass shall be representative of the same at actual anchor location. The drill hole shall be inclined to the bedding planes at the same angle at which it will be placed during excavation.

3.2 The upper end of the bar under test should project up to the length of 50 cm, so that the double nuts may be fitted in it above the 40 cm high spring-return central-hold jack.

3.3 The rock surface around the reinforcement over a diameter of 60 cm should be made flat by hand chiselling and plastered by a rich cement- sand mortar. A mild steel plate of 25 mm thickness having a hole equal to the diameter of bore hole should be placed over it.

3.4 The cement-sand slurry should be filled in bore-hole all round the anchor bar with the help of grouting machine at suitable pressure.

3.5 Prior to starting the actual test it should be ensured that the curing period of grout mix filled in the bore-hole around the anchor is completed ( see IS : 6066-1985” ).

4. APPLICATION OF LOADING

4.1 Central-hole jack should be fitted~ in anchor bar. Two dial gauges, 0’01 mm least count and 50 mm travel, should be fitted on diagonally opposite sides of central-hole jack to record the movement of the anchor bar at the time of loading ( Fig. 1 ).

4.2 Pressure should be applied, with the help of hydraulic pump connected with the central-hole jack of 50 tonne capacity having a central ho!e of 60 mm with uniform but SLOW rate of 250 kg/min as the pulling h;ir shotlld not be subjected to any jerk till the bar starts coming out. During the application of pressure, the dial gauge observations should ;I~SO be recorded at every load interval of 1 tonne. The p!ot of pull versus bolt extension should also be made as shown in Fig. 2 for better under- standing of mode of failure.

*Recommendations for pressure grouting ofrock foundations in river valIey projects ( /irst reuision ).

3

Page 8: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

/

REINFORCE0 ANCHOR 8OLT

PAIR tIcSP;zRICAL ,-MS FLAT

DIAL GAUGE -\ \. fi CENTRAL HOLE JACK

t CAPACITY)

MAGNET1C LVU”I\L. “O-“. DDCCCIIDE r,Allr,c

I.. .

*- . ::. .+ j.‘1..‘100

: 1.9’ .JI y: a:. CEMENT MORTAI; ***:d*: . ..: . .: . _: ..I ;: BASE .-*:

. . r .’ . . ‘.. * ;._. .’

9.’ CEMENT MORTAR .i l . _.. ’

ROCK/CONCRETE ,T .I ‘: / ..: MASS . .

P . * z ::: r v’ . I’

. . . ; 1. & . . LA. 2’ , ,

b ‘* .$ . . : f .‘( .p :.I 3 :; ; I ., . . . . .: . -.o:.‘:-..-.. . , . l .‘. .v P .

\ .+.a: ;_.,‘.;.*‘;;.:‘:.*.:, . ..*_. ,*:.,i . . *:. ,., ’ . ; w,.:.“: :’ i - ‘” . 0 * l , p

FIG. 1 SET-UP FOR PULL-OUT TEST

Page 9: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

FULL COLUMtd GROUTED ANCHOR BARS

I-J BOLT EXTENSION

FIG. 2 VARIATION BETWEEN JACK

IS:11309 -1985

UNGROUTEO MECHANICALLY

I ANCHOR BOLT

I I

PULL AND BOLT EXTENSION

4.3 An initial arbitrary load not greater than 5 kN shall be applied to take up slack in the equipment.

4.4 The anchor/rock belt shall be tested by increasing the load in incre- ments until total extension greater than 40 mm reached or bolt yields or fractures whichever is early.

4.5 Readings for each increment shall be taken only after both load and extension are stabilized.

4.6 The ram of the jack must have low friction seals for reproducible calibration.

4.7 A pair of spherical washers shall be provided between nut and the jack to avoid eccentric loading on the jack.

4.8 At least 3 tests shall be conducted in one rock formation.

4.9 The boIts that form part of the actual rock support system shall nor be tested beyond 10 percent more than the design load.

5. DETERMINATION OF BOND STRENGTH BETWEEN GROUT AND ROCK ( ,rI )

5.1 Load versus movement of bar observations should be recorded and plotted on arithmetic scale.

5

Page 10: IS 11309 (1985): Method of conducting pull-out test on ... · method for conducting pull-out test on anchor bars and rock bolts is a full-column-grouted rock bolt or bar with cement-sand

IS : 11309 - 1985

5.2 The bond strength is worked out by the following formula in case bolt is below up to failure between grout and rock.

Bond strength 7r = w x 1000

2x R x L- kgf/cmz . . . . . . . . . (1)

where

w-

R =3

L =

Load taken by the bar in tonnes,

Radius of grouted hole in cm, and

Length of embedded bar in cm.

6. BOND STRENGTH BETWEEN STEEL AND GROUT ( rg )

6.1 If failure is between bar and grout, equation (1) will be used to determine bond strength considering ‘R’ equal to radius of bar.

7. DETERMINATION OF ANCHORAGE CAPACITY OF MECHANICAL ANCHORAGES OF ROCK BOLTS (P)

7.1 The actual anchorage capacity of a mechanical anchorage of a rock bolt is the maximum pull exerted by the ram in tonnes.

8. REPORTING OF TEST RESULTS

8.1 The report shall include the following informations:

4 b)

cl 4 4 f >

9)

Lithological description of rock;

Details of grout mix and curing period along with date of grout- ing and date of testing;

Type of bolt or anchor bar;

Dimensions of anchor bar or bolt - length and diameter;

Dimensions of hole - length and diameter;

Bond strength and mode of failure observed, if the bar fails in tension, it should also be mentioned; and

Number of tests.