IRP Presentation Modeling Energy System Investment Planning Infrastructure for the State of Iowa Advisor / Clients: Dr. James McCalley Venkat Krishnan Joseph Slegers Team Members: Michael Healy (EE), Deogratius Mpinge (CprE), Spenser Mussmann (EE), and Abdelmagid Yousif (EE) Team ID: Dec11_06

Upload: maleah

Post on 12-Jan-2016

34 views

Category:

Documents


2 download

DESCRIPTION

IRP Presentation. Advisor / Clients: Dr. James McCalley Venkat Krishnan Joseph Slegers Team Members: Michael Healy (EE), Deogratius Mpinge (CprE), Spenser Mussmann (EE), and Abdelmagid Yousif (EE) Team ID: Dec11_06. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IRP Presentation

IRP Presentation

Modeling Energy System Investment Planning Infrastructure for the State of Iowa

Advisor / Clients: Dr. James McCalley Venkat Krishnan Joseph Slegers

Team Members: Michael Healy (EE), Deogratius Mpinge (CprE), Spenser Mussmann (EE), and Abdelmagid Yousif (EE)

Team ID: Dec11_06

Page 2: IRP Presentation

Problem Statement

The energy and transportation demands continue to rise across the state of Iowa. An investment plan will need to be created for the next several decades to meet these demands and remain economical.

The goal of this project is to accurately describe, in a data set, the current energy and transportation sectors within the state of Iowa. This data set will be analyzed by NETPLAN, Iowa State University software, and the results will describe investment strategies as well as emission, un-served demands, capacities, arc flows, and system resiliency.

These results will be displayed on a public website. The current system as well as other scenarios will be available to the user to demonstrate different investment strategies available.

2

Page 3: IRP Presentation

Project PlanSoftware analysis:

o NEMS – Electric infrastructure

o MARKAL/TIMES – Electric infrastructure

o CARVER2 – Transportation infrastructure

o TRAGIS – Transportation infrastructure

o NETPLAN – Relationship between electric and transportation

3

Page 4: IRP Presentation

Project Plan1. Collect Required Data for NETPLANo Generation

- Type- Capacity- Specifications

o Transmission- Size- Capacity- Specifications

o Transportation- Passenger- Commodity

4

Page 5: IRP Presentation

Project Plan2. Develop Website

o Google Earth- Provide infrastructure information- Visual depiction of current infrastructure

o Results/Documentation - Dynamic- Easy to access- Easy to understand- Easy to navigate

5

Page 6: IRP Presentation

Project Plan3. Base Case and Scenario Creation

o Base Case- Describes current infrastructure- Benchmark for all other scenarios

o Alternative Cases- Accounts for potential technological improvements or government intervention

6

Page 7: IRP Presentation

Project Plan4. Create a guide and improve NETPLAN user manual

o Guide- Step-by-step description of our data set- Provides guidance for next research team

o User manual updates- Description of all files- Hints/tips we learned along the way

7

Page 8: IRP Presentation

Project PlanSchedule

o Task Breakdown

o Task Schedule

8

Page 9: IRP Presentation

Project Design1. Data Set

o Node system- Generation

At least 95% of total generation Cut off limit

- Demand Locations Compensation

9

Page 10: IRP Presentation

Project Design1. Data Set (cont.)

o Arc system- Transmission Lines

Size Routes

- Transportation Routes Type Emissions

- Fuel Routes Natural gas pipelines Fuel by rail Fuel by vehicle

10

Page 11: IRP Presentation

Project Design2. Developing the Websiteo Google Earth Map

- Contains node map

- Generation sites

- Transmission lines

- Transportation routes

- Wind maps

- Natural gas pipelines/storage sites

11

Page 12: IRP Presentation

Project Design2. Developing the Website (Cont.)o All project documentation

o Interactive NETPLAN results

- Tables

- Charts

- Downloadable content

o References/contact information

o Instructions on running NETPLAN from home

12

Page 13: IRP Presentation

Project Implementation1. Investment Strategies

Data Set

o Formulation of base case

o Formulation of alternative scenarios

NETPLAN

o Interface Results

o Result files

o Results displayed on website

13

Page 14: IRP Presentation

Project Implementation

Data Set to NETPLAN

NETPLAN results stored as tables and charts

Results to website

14

1. Investment Strategies (Cont.)

Page 15: IRP Presentation

Project Implementation2. Google Earth Map

I. Acquire all needed infrastructures data for electric and transportation sectors

II. Use the geographical coordination to build KML files ( Keyhole Markup

Language) in Google Earth

III. Add the basic information (owner, size, length,…etc) for each unit to KML files

IV. Implement the KML files on the website using HTML and Java script languages

HTML & Java Script

Coordinate

Owner, size, length…etc

Data KML file Website15

Page 16: IRP Presentation

Project Implementation2. Google Earth Map (Cont.)

16

Page 17: IRP Presentation

Project Implementation

Google Earth Interface Java script and HTML code Allows user to specify which

infrastructure component to view

User can view multiple components at a time (Wind speed maps and wind farm locations)

NETPLAN Results Interface Java script and HTML code 21 different scenarios available User can view the results on

the website or download them

3. User Interface

17

Page 18: IRP Presentation

Testing and Evaluation

18

• Test the functionality of the website to ensure all the

requirements are met

• Analyze and evaluate the base case result to ensure it is

reasonable and accurate

• Develop scenarios to compare with base case on the future

energy and transportation needs

• Evaluate each scenario for violations

Page 19: IRP Presentation

Base CaseAssumptions

o Generation Investment Costs

o Transportation Investment Costs

o Lifespan

o Current Fuel Price

o Average Annual Demand

o Annual Peak Demand

o Emission Rates

o Investment Limits

o Investment Locations 19

Page 20: IRP Presentation

Base CaseResults

o High wind and natural gas generation investmentso High wind potential led to feasibility of hybrid vehicleso Emissions per GW dropped significantlyo The total capacity of Iowa increased from approximately

12 GW to 30 GW

20

Page 21: IRP Presentation

Base Case

21

Results (Cont.)

Page 22: IRP Presentation

High Wind Investment ScenarioClarification: The total wind capacity we found was for use in Iowa only. If we consider the potential export of energy this number will be much higher.

This scenario represents a possible investment strategy Iowa could undertake. There have been many improvements to wind turbine technology, and this case accounts for increased capacity factor.

We found similar results to that of the base case, however wind investments now covered the capacity of the initial coal investments.

Hybrid vehicles became more feasible since more energy was being generated without an increase in generation sites. We assumed existing and new capacity factors would increase by approximately 15%.

22

Page 23: IRP Presentation

High Wind Investment Scenario

23

Page 24: IRP Presentation

Conclusion

24

• Wind is able to provide the most needed energy for the future

with the best economical and environmental solution

• Increase the wind turbine efficiency considered as the best

solution than other wind scenarios

• Investment in wind will also require investment in natural gas

• According to our analysis, hybrid vehicles should become

economically feasible sometime during the next 40 years

Page 25: IRP Presentation

Future Work

• Develop and Improve NETPLAN software

• Simulation time

• End of lifespan function

• Running NETPLAN from the website

• Simulation time

• Access to CPLEX

25

Page 26: IRP Presentation

Special Thanks

• Dr. James McCalley, advisor

• Venkat Krishnan, PhD graduate student

• Joseph Slegers, MS graduates student

• Eduardo Eibanez, ISU PhD graduate

• NETSCORE21 Team

26

Page 27: IRP Presentation

Questions ?

Senior Design Team Website:http://seniord.ece.iastate.edu/dec1106

27