Salzburg, 4 February 2013
Evolutions in air traffic management procedures
Towards 4D trajectory management: Ø Objective: sustain the air traffic growth with an increased level of automation and
progressive delegation of separation tasks to the pilot Ø Pre-requisite: new air-ground datalinks for safety communications, very reliable and
able to guarantee high performance while remaining affordable for airspace users
Procedural Control
Estimate the current & planned a/c positions
Past
Radar Control Know the current
Estimate the planned a/c positions
Today
Trajectory Management Know & Share the current &
planned a/c positions
Future
A320
Source: Airbus, ICAO GANIS
ESA UNCLASSIFIED – Releasable to the public
Airline Operation Centre
Airport network
Airport Terminal Manoeuvering Area / En-route (continental area: dual link )
Oceanic, Remote & Polar
Future terrestrial network
System Wide Information Management (SWIM) Satcom
European Air Traffic Control Centre
Login (no traffic)
New aviation safety communications systems
Iris Programme external interfaces: what has happened during 2012?
Aeronautical stakeholders
Concerns about costs remain but increased interest from aviation
incl. ANSPs, Airspace Users, Eurocontrol, EASA, ICAO,
EUROCAE…
ARTES 10 funding increased & creation of sub-element
13 Participating
States
Iris programme contractors
Aerospace Aerospace & Telecom R&D
institutes Telecom
European industry Non-commercial
ESA-SJU and ESA-EC relations
Consolidation of requirements
pending…
SESAR deployment scheme pending…
ESA UNCLASSIFIED – Releasable to the public
1. ICAO progress in introducing oceanic safety services via satcom for the north-Atlantic airspace (NAT) with better performance:
Ø RCP 240, based on ICAO GOLD document (initially developed by FAA)
Ø Services: satcom voice and ACARS
2. Creation of Aireon by Iridium: a service provider certified for the provision of ADS-B surveillance services, using ADS-B receiver payloads on IridiumNEXT by 2017
Competitive landscape for satcom aero safety: what has happened during 2012?
NB: In continental Europe, the datalink Implementing Rule leads to deployment of CPDLC services using VDL2 networks based on terrestrial networks.
ESA UNCLASSIFIED – Releasable to the public
• Evolution towards datalink services led to reconsider the level of performance for the THAUMAS concept based on Inmarsat’s SwiftBroadband => Precursor service to Iris, at horizon 2017
Ø Level of performance lower than COCR Ø Service based on Inmarsat SBB system (with additions) Ø Service provider to be certified
Iris Solution (Full 4D)
Oceanic airspace reqs
Requirements based on
CPDLC/VDL2 for 2017-2025 Iris precursor solution (i4D)
+ SESAR requirements (COCR)
for continental airspace in 2020+
- SBB Non-safety reqs
SBB -Oceanic
Iris adapted to include 2 requirements levels: Precursor for i4D and solution for Full 4D services
ESA UNCLASSIFIED – Releasable to the public
Iris Programme objectives - updated
Iris is implemented in close collaboration with the Single European Sky ATM Research programme (SESAR) and is driven by its schedule & requirements. Iris objective: supply a validated satellite-based communication solution for the European Air Traffic Management System Ø Develop a new communication system & validate end-to-end performance Ø Subject to agreement with SESAR/European Commission and a future
Operating Entity, develop the validation infrastructure
NEW additional objective: add the Iris Precursor service (= ARTES 10 Sub-element 1), to contribute to the longer-term objectives of SESAR
ESA UNCLASSIFIED – Releasable to the public
Iris Programme: outcome of CMIN-12
• Iris subscriptions were not re-opened (decision postponed to CMIN-14)
Ø On-going technical activities (esp. ANTARES Ph.B2) are funded and continue to 1Q2014
Ø Some additional funding is expected during 2013 from several Participating States
Ø Development of testbeds is postponed to 2014 IRELAND
2.6%
NORWAY13.3%
PORTUGAL1.7%
UNITED KINGDOM 82.4%
12/6/2012 CaC 447_Nov2012_part 1.xlsx
• Sub-element 1 created Ø It will start in 2013, for the Iris
Precursor development Ø Partnership with Inmarsat, as Prime
Contractor ESA UNCLASSIFIED – Releasable to the public
ANTARES System Design Phase B study
(Prime TAS-I + 23 sub-contractors)
Aircraft terminal Preliminary Design
Rx
Tx
Ctrl
PWR
Ant
Diplexer
LNA
HPA
Up/Dwn Cvtr
MODEM
Base-Band Unit
Outside
Inside
Avionic Bay
Develop Aircraft
terminals (with industry)
Satellite System
Preliminary Design
Specifications
Satellite system:
• validation infrastructure (Ph.C/D in Iris Phase 2.2)
• operational system
=> opportunity judged too risky for industry to invest in the validation infrastructure
Com. System
Preliminary Design
Specifications
...011010 1001010..
ICAO Standardisation
(by SJU/EC)
Satellite System Operations studies
Service provision + Business case model
3 studies with Sat. Operators during 2010/12
EATMS
Technical activities
Interactions
Long-term Iris solution: Purpose-built system and open service model
Develop the Iris Precursor, based on Inmarsat
Satellites and SwiftBroadband Safety
protocols (to be standardised)
Precursor: modified Inmarsat system
THAUMAS study
SwiftBroadband Safety system
Preliminary Design
Specifications
...011010 1001010.. +
SBS Com. System
Satellite System
ANTARES Phase B study: Ø Draft technical specifications of the communication system Ø Closure of the SRR and start of Phase B2 Ø Definition of the testbed to be developed during 2013
THAUMAS study: Study re-oriented towards the Iris Precursor service Ø Definition of the System Requirements
Operation studies Ø Completed 3 parallel studies which all concluded on the service viability
for ca. EUR 5/flight with the need of public funding for the validation
Increased awareness of what Iris will bring to aviation Ø Iris mentioned in the Global Air Navigation Plan of ICAO ANC 2012 Ø Use of the Iris demo tool during events
Main achievements in 2012
ESA UNCLASSIFIED – Releasable to the public
ESA Iris Programme [email protected]
ESA Iris System Design Studies
[email protected] (System Engineer) [email protected] (Requirements & standardisation management) [email protected] (Communication System) Documentation available via http://telecom.esa.int/iris
Iris - Contact Points