Iris Public Event – status after ESA CMIN-12

Salzburg, 4 February 2013

Page 2: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

Evolutions in air traffic management procedures

Towards 4D trajectory management: Ø  Objective: sustain the air traffic growth with an increased level of automation and

progressive delegation of separation tasks to the pilot Ø  Pre-requisite: new air-ground datalinks for safety communications, very reliable and

able to guarantee high performance while remaining affordable for airspace users

Procedural Control

Estimate the current & planned a/c positions

Past

Radar Control Know the current

Estimate the planned a/c positions

Today

Trajectory Management Know & Share the current &

planned a/c positions

Future

A320

Source: Airbus, ICAO GANIS

ESA UNCLASSIFIED – Releasable to the public

Page 3: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

Airline Operation Centre

Airport network

Airport Terminal Manoeuvering Area / En-route (continental area: dual link )

Oceanic, Remote & Polar

Future terrestrial network

System Wide Information Management (SWIM) Satcom

European Air Traffic Control Centre

Login (no traffic)

New aviation safety communications systems

Page 4: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

Iris Programme external interfaces: what has happened during 2012?

Aeronautical stakeholders

Concerns about costs remain but increased interest from aviation

incl. ANSPs, Airspace Users, Eurocontrol, EASA, ICAO,

EUROCAE…

ARTES 10 funding increased & creation of sub-element

13 Participating

States

Iris programme contractors

Aerospace Aerospace & Telecom R&D

institutes Telecom

European industry Non-commercial

ESA-SJU and ESA-EC relations

Consolidation of requirements

pending…

SESAR deployment scheme pending…

ESA UNCLASSIFIED – Releasable to the public

Page 5: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

1.  ICAO progress in introducing oceanic safety services via satcom for the north-Atlantic airspace (NAT) with better performance:

Ø  RCP 240, based on ICAO GOLD document (initially developed by FAA)

Ø  Services: satcom voice and ACARS

2.  Creation of Aireon by Iridium: a service provider certified for the provision of ADS-B surveillance services, using ADS-B receiver payloads on IridiumNEXT by 2017

Competitive landscape for satcom aero safety: what has happened during 2012?

NB: In continental Europe, the datalink Implementing Rule leads to deployment of CPDLC services using VDL2 networks based on terrestrial networks.

ESA UNCLASSIFIED – Releasable to the public

Page 6: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

•  Evolution towards datalink services led to reconsider the level of performance for the THAUMAS concept based on Inmarsat’s SwiftBroadband => Precursor service to Iris, at horizon 2017

Ø  Level of performance lower than COCR Ø  Service based on Inmarsat SBB system (with additions) Ø  Service provider to be certified

Iris Solution (Full 4D)

Oceanic airspace reqs

Requirements based on

CPDLC/VDL2 for 2017-2025 Iris precursor solution (i4D)

+ SESAR requirements (COCR)

for continental airspace in 2020+

- SBB Non-safety reqs

SBB -Oceanic

Iris adapted to include 2 requirements levels: Precursor for i4D and solution for Full 4D services

ESA UNCLASSIFIED – Releasable to the public

Page 7: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

Iris Programme objectives - updated

Iris is implemented in close collaboration with the Single European Sky ATM Research programme (SESAR) and is driven by its schedule & requirements. Iris objective: supply a validated satellite-based communication solution for the European Air Traffic Management System Ø  Develop a new communication system & validate end-to-end performance Ø  Subject to agreement with SESAR/European Commission and a future

Operating Entity, develop the validation infrastructure

NEW additional objective: add the Iris Precursor service (= ARTES 10 Sub-element 1), to contribute to the longer-term objectives of SESAR

ESA UNCLASSIFIED – Releasable to the public

Page 8: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

Iris Programme: outcome of CMIN-12

•  Iris subscriptions were not re-opened (decision postponed to CMIN-14)

Ø  On-going technical activities (esp. ANTARES Ph.B2) are funded and continue to 1Q2014

Ø  Some additional funding is expected during 2013 from several Participating States

Ø  Development of testbeds is postponed to 2014 IRELAND

2.6%

NORWAY13.3%

PORTUGAL1.7%

UNITED KINGDOM 82.4%

12/6/2012 CaC 447_Nov2012_part 1.xlsx

•  Sub-element 1 created Ø  It will start in 2013, for the Iris

Precursor development Ø  Partnership with Inmarsat, as Prime

Contractor ESA UNCLASSIFIED – Releasable to the public

Page 9: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

ANTARES System Design Phase B study

(Prime TAS-I + 23 sub-contractors)

Aircraft terminal Preliminary Design

Rx

Tx

Ctrl

PWR

Ant

Diplexer

LNA

HPA

Up/Dwn Cvtr

MODEM

Base-Band Unit

Outside

Inside

Avionic Bay

Develop Aircraft

terminals (with industry)

Satellite System

Preliminary Design

Specifications

Satellite system:

•  validation infrastructure (Ph.C/D in Iris Phase 2.2)

•  operational system

=> opportunity judged too risky for industry to invest in the validation infrastructure

Com. System

Preliminary Design

Specifications

...011010 1001010..

ICAO Standardisation

(by SJU/EC)

Satellite System Operations studies

Service provision + Business case model

3 studies with Sat. Operators during 2010/12

EATMS

Technical activities

Interactions

Long-term Iris solution: Purpose-built system and open service model

Develop the Iris Precursor, based on Inmarsat

Satellites and SwiftBroadband Safety

protocols (to be standardised)

Precursor: modified Inmarsat system

THAUMAS study

SwiftBroadband Safety system

Preliminary Design

Specifications

...011010 1001010.. +

SBS Com. System

Satellite System

Page 10: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

ANTARES Phase B study: Ø  Draft technical specifications of the communication system Ø  Closure of the SRR and start of Phase B2 Ø  Definition of the testbed to be developed during 2013

THAUMAS study: Study re-oriented towards the Iris Precursor service Ø  Definition of the System Requirements

Operation studies Ø  Completed 3 parallel studies which all concluded on the service viability

for ca. EUR 5/flight with the need of public funding for the validation

Increased awareness of what Iris will bring to aviation Ø  Iris mentioned in the Global Air Navigation Plan of ICAO ANC 2012 Ø  Use of the Iris demo tool during events

Main achievements in 2012

ESA UNCLASSIFIED – Releasable to the public

Page 11: Iris Public Event intro ESA 040213artes.esa.int/sites/default/files/2_Iris Public Event N.Ricard1.pdfIris Public Event – status after ESA CMIN-12 Salzburg, 4 February 2013 . Evolutions

ESA Iris Programme [email protected]

ESA Iris System Design Studies

[email protected] (System Engineer) [email protected] (Requirements & standardisation management) [email protected] (Communication System) Documentation available via http://telecom.esa.int/iris

Iris - Contact Points