iran operatorship possble options (1)

1
Operatorship Possible Options Flow Chart Exploration IOC JECO (Joint Exploration Co) Development Joint Development Company (JODCO) or NIOC option Joint Operating (JOPCO) IOC in JECO shall be responsible for All Risks, costs, in cases of failure NIOC/NIOC affiliate shall be only Technical Partner under leadership of the IOC IOC shall be responsible for: All Risks and Costs, and shall Lead the Operation IOC (NIOC affiliate/subsidiary) shall be Technical Partner under IOC Production NIOC/NIOC affiliate, Supported by IOC, Technically & Financially or or or JODCO JODCO (only for running the field) +JODCO to support Technically & Financially IOR&EOR JODCO for technical & financial Report Grid JODCP (prod.operator) End of Contract

Upload: dr-arzu-javadova

Post on 09-Feb-2017

105 views

Category:

Business


2 download

TRANSCRIPT

Page 1: Iran operatorship possble options (1)

Operatorship Possible Options Flow Chart

Exploration

IOC

JECO (Joint Exploration Co)

Development

Joint DevelopmentCompany (JODCO)

or NIOC option

Joint Operating (JOPCO)

• IOC in JECO shall be responsible for All Risks, costs, in cases of failure

• NIOC/NIOC affiliate shall be only Technical Partner under leadership of the IOC

• IOC shall be responsible for: All Risks and Costs, and shall Lead the Operation

• IOC (NIOC affiliate/subsidiary) shall be Technical Partner under IOC

ProductionNIOC/NIOC affiliate, Supported by

IOC, Technically & Financially

or

or

or

JODCO

JODCO (only for running the field) +JODCO to support Technically &

Financially

IOR&EOR JODCO for technical & financial

Report Grid

JODCP (prod.operator)

End of Contract