INSPECTION REQUEST FORM FOR SITE CLEARANCE
(DEMOLITION OF BUILDINGS & STRUCTURES)
Unless otherwise approved,this inspection request shall be submitted during the daily mor
meeting among LTA,Contractor and QP(S)
Contractor: Project:
To: Date:
LTA Time:
The work described below has been inspected by our Site Engineer and is complete
and read for our ins ection. A checklist is attached overleaf.
Location
Checked and Requested By:
Chainage
Type of Structure
Activity
Other DescriptionContractor's PM Name & Signature
The meeting noted that the information provided by the Contractor is adequate/not adequate*
*delete where appropriate
INITIAL INSPECTION DECISION BY QP(S)
We have inspected the above referenced works and found them acceptable. You may proceed.
You cannot roceed. Please carr out corrective works as noted on the checklist andsubmit a fresh request for inspection.
Other comments:
LTA's RE/RTO Name & Signature/ Date
FINAL INSPECTION DECISION BY QP(S)
work approved to start:__________________ work completed on:______________________
________________________________
QP(S) Name & Signature/Date
LTA
The above process for request for inspection of work by Contractor and approval by QP(S) is noted.
LTA's representative/Date/Time
NO.
SAMWOH CORPORATION PTE LTD SK E&C
ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA
GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL
ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND
ASSOCIATED ROAD WIDENING WORKS INTERCHANGE
QP(S) may proceed Request Rejected
_____________________________
-
7/27/2019 IR Site Clearance,Demolition
2/2
CHECKLIST FOR SITE CLEARANCE NO.
Chainage:
S/No Description of Works Checked by Confirmed by
Contractor QP(S)
1 Confirm affected buildings, structures for demolition
are those indicated on site plan
2 Check contractor has notified services depts of his
intention to demolish structure
3 Check all meters and services removed /
disconnected
4 Check contractor has notified ENV (Sewerage)
5 Confirm with ENV that sewer mains and manholes
properly protected and sealed
6 Check contractor has obtained necessary approval /
license from Chief Inspector of Factories7 Check sufficient machinery, scaffolding
hoarding etc.
8 Check all warning signs for traffic and pedestrian
9 Check temporary provision of footpath
10 No burning of debris
11 Sweeping and clearing of roadway after each
demolition exercise is completed
12 Check sufficient temporary traffic devices if lane
closure is required13 Others
(DEMOLITION OF BUILDINGS & STRUCTURES)
Date/Time: Location: